Time Sheet

This time sheet documents the work of a 10-person team from August 29th to September 15th. The team, led by Agung Setiawan, was tasked with creating tender documents for an integrated engineering, procurement, construction and commissioning project for the development and modernization of two power plants. The time sheet tracks the work of team members with various roles including engineers, administrators, drafters and the team leader over the period. It is dated September 16th and signed by Agung Setiawan.

Uploaded by

andrieysyah2525
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views13 pages

Time Sheet

This time sheet documents the work of a 10-person team from August 29th to September 15th. The team, led by Agung Setiawan, was tasked with creating tender documents for an integrated engineering, procurement, construction and commissioning project for the development and modernization of two power plants. The time sheet tracks the work of team members with various roles including engineers, administrators, drafters and the team leader over the period. It is dated September 16th and signed by Agung Setiawan.

Uploaded by

andrieysyah2525
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

TIME SHEET

Pekerjaan : Pembuatan Dokumen Tender Pekerjaan Konstruksi Terintegrasi Engineering, Procurement Construction and Commisioning (EPCC
Pengembangan dan Moderinisasi PG. ASSEMBAGOES

AGUSTUS SEPTEMBER
NO PERSONIL POSISI
29 30 31 1 2 3 4 5 6 7 8 9 10 11

1 AGUNG SETIAWAN, ST Tim Leader

2 AMINUDDIN, ST Electrical Eng.

3 Ir. EKO ASIJANTO Mechanical Eng.

4 EDY SUROSO, ST Piping Eng.

5 AHMAD MASUD, Amd Admin Leader

6 INDRA HERWANDOKO Admin

7 ARIS NUROCHIM Admin

8 JUNED CAHYANU, ST Drafter Leader

9 ALFI Drafter

10 IQBAL Drafter

Surabaya, 16 Sep
AGUNG SE
Team
Commisioning (EPCC)

12 13 14 15

Surabaya, 16 September 2016


AGUNG SETIAWAN, ST
Team Leader
TIME SHEET
Pekerjaan : Pembuatan Dokumen Tender Pekerjaan Konstruksi Terintegrasi Engineering, Procurement Construction and Commisioning (EPCC)
Pengembangan dan Moderinisasi PG. DJATIROTO

AGUSTUS SEPTEMBER
NO PERSONIL POSISI
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13

1 AGUNG SETIAWAN, ST Tim Leader

2 AMINUDDIN, ST Electrical Eng.

3 Ir. EKO ASIJANTO Mechanical Eng.

4 EDY SUROSO, ST Piping Eng.

5 AHMAD MASUD, Amd Admin Leader

6 INDRA HERWANDOKO Admin

7 ARIS NUROCHIM Admin

8 JUNED CAHYANU, ST Drafter Leader

9 ALFI Drafter

10 IQBAL Drafter

Surabaya, 16 September 2016


AGUNG SETIAWAN, ST
Team Leader
IME SHEET

SEPTEMBER
14 15

Surabaya, 16 September 2016


AGUNG SETIAWAN, ST
Team Leader
TIME SHEET
Pekerjaan : Pembuatan Dokumen Tender Pekerjaan Konstruksi Terintegrasi Engineering, Procurement Construction and Commisioning (EPCC)
Pengembangan dan Moderinisasi PG. ASSEMBAGOES

AGUSTUS SEPTEMBER
NO PERSONIL POSISI
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13

1 AGUNG SETIAWAN, ST Tim Leader

2 AMINUDDIN, ST Electrical Eng.

3 Ir. EKO ASIJANTO Mechanical Eng.

4 EDY SUROSO, ST Piping Eng.

5 AHMAD MASUD, Amd Admin Leader

6 INDRA HERWANDOKO Admin

7 ARIS NUROCHIM Admin

8 JUNED CAHYANU, ST Drafter Leader

9 ALFI Drafter

10 IQBAL Drafter

Surabaya, 16 September 2016


AGUNG SETIAWAN, ST
Team Leader
IME SHEET

SEPTEMBER
14 15

Surabaya, 16 September 2016


AGUNG SETIAWAN, ST
Team Leader
listrik 1,000,000
drafter 1,500,000
atk 500,000
ass 2,000,000
bp 500,000
bj 500,000
printer 1,500,000

7,500,000
1,500,000 2,500,000