API STD 650 Storage Tank Data Sheet: GENERAL Special Documentation Package Requirements

This document provides specifications for an oil storage tank to be built by PT. Bina Rasano Engineering. The tank will be located in Cilegon, Indonesia and purchased by Sembawang Project Engineering Company for owner Sembawang PO. Box 28 Singapore. Key details include a diameter of 30.48m, shell height of 13,729m, maximum capacity of 10017m3 of oil, and design according to API 650 12th edition standards. The tank will be designed for a maximum temperature of 65°C and wind speed of 39m/s.

Uploaded by

KevinSatria
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
476 views

API STD 650 Storage Tank Data Sheet: GENERAL Special Documentation Package Requirements

This document provides specifications for an oil storage tank to be built by PT. Bina Rasano Engineering. The tank will be located in Cilegon, Indonesia and purchased by Sembawang Project Engineering Company for owner Sembawang PO. Box 28 Singapore. Key details include a diameter of 30.48m, shell height of 13,729m, maximum capacity of 10017m3 of oil, and design according to API 650 12th edition standards. The tank will be designed for a maximum temperature of 65°C and wind speed of 39m/s.

Uploaded by

KevinSatria
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

API Std 650 Storage Tank

KDDB Data Sheet PAGE 1


* For boxes marked with *, if blank, Mfr. Shall determine and submit as per Appendix L. For all lines, see Appendix L for line-by-line instructions.
GENERAL Special Documentation Package Requirements:

Measurement Units to be used in API Std 650: SI US Customary

1. Manufacturer* PT. BINA RASANO ENGINEERING Contract No.*

Address* Jl. Raya Hankam No.85, Jatimurni, Pondokmelati, Kota Bekasi, Jawa barat

Mfg. Serial No.* Year Built* Edition & Addendum to API 650* 12th Edition-Latest

2. Purchaser SEMBAWANG PROJECT ENGINEERING COMPANY ( PTE ) LTD Contract No.

Address Sembawang PO. BOX, 28 Singapore

Tank Designation SIDIN

3. Owner/Operator Location Cilegon

4. Size Limitations* Tank Diameter* 30,48 m Shell Height*

Capacity: Maximum* 10017 m³ Net Working* 10017 m³ Criteria*

5. Products Stored:

Liquid Oil Max. S.G.: at ° C

Blanketing Gas Vapor Pressure PSIA at Max. Operating Temp.

% Aromatic Suppl. Spec. H2S Service? Yes No Suppl. Spec.

Other Special Service Conditions? Yes No Suppl. Spec.

DESIGN AND TESTING Purchaser to Review Design Prior to Ordering Material? Yes No

6. Applicable API Standard 650 Appendices:* A B C F G H I J L M O P S U V

7. Max. Design. Temp. 65 °C ° Design Metal Temp.* 20 °C ° Design Liquid Level* 13,729 m

Design Pressure kPa External Pressure kPa Maximum Fill Rate m /Hr
3
Maximum Emptying Rate

Floatation Considerations? Yes No Flot. Suppl. Spec:* Applied Supplemental Load Spec.

8. Seismic Design? Yes No Appendix E Alternate Seismic Criteria Seismic Use Group

MBE Site Class D Vertical Seismic Design? Yes No Vertical Ground Motion Accelerator AV:

Basis of Lateral Acceleration (Select one): Mapped Seismic Parameters? Ss S1 S0 ; Site-Specific Procedures: MCE

Design Required? Yes No ; Other (Non-ASCE) Methods

Freeboard Required for SUG I Design Roof Tie Rods @ Outer Ring?* Yes No

9. Wind Velocity for non-U.S. sites, 50-yr. wind speed (3-sec. Gust)* 39 m/s

Top Wind Girder Style* Dimensions* Use Top Wind Girder as Walkway? Yes

Intermediate Wind Girders?* Yes No Intermediate Wind Girder Style* Dimensions*

Check Buckling in Corroded Cond.? Yes No

10. Shell Design: 1-Ft Mthd?* Yes No ; Variable-Des-Pt Mthd?* Yes No Alternate ; Elastic Anal. Mthd?* Yes No

Plate Stacking Criteria* Centerline-Stacked? Yes No Flush-Stacked? Yes No Inside Outside

Plate Widths (Shell course heights) and Thicknesses * Numbers below Indicate Course Number.
1. 2441 2. 2441 3. 2441 4. 2441 5. 2441
6. 2441 7. 8. 9. 10.
11. 12. 13. 14. 15.

Joint Efficiency* % Shell-to-Bottom Weld Type* Shell-to-Bottom Weld Insp. Mthd*

Approvals: Revisions: Title:


By: Ck'd:
Drawing No.: Sheet
OF 7

wa barat

12th Edition-Latest

Cilegon

13,729 m

Maximum Emptying Rate m3/Hr

Seismic Use Group 2

Site-Specific Procedures: MCE

No

Alternate

2441

Date:
Sheet of