100% found this document useful (3 votes)
9K views15 pages

Manpower Histogram

The document provides a manpower loading chart for the EPCC of the Kamunting City Gate Upgrading Project. It shows the number of personnel required each month for different groups of work including indirect manpower, direct manpower, procurement, installation/construction, and pre-commissioning/commissioning. A total of 21,200 manhours are required over the course of the project with the highest number of personnel (4,400) needed in February for installation/construction works.

Uploaded by

Zaem Afifi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
9K views15 pages

Manpower Histogram

The document provides a manpower loading chart for the EPCC of the Kamunting City Gate Upgrading Project. It shows the number of personnel required each month for different groups of work including indirect manpower, direct manpower, procurement, installation/construction, and pre-commissioning/commissioning. A total of 21,200 manhours are required over the course of the project with the highest number of personnel (4,400) needed in February for installation/construction works.

Uploaded by

Zaem Afifi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 15

EPCC OF THE KAMUNTING CITY GATE UPGRADING PROJECT

MANPOWER LOADING CHART


MONTH
ITEM GROUP OF WORK
July Aug Sep Oct Nov Dec Jan Feb
A INDIRECT MANPOWER
1 Project Manager 1 1 1 1 1 1 1 1
2 Construction Manager 0 0 0 1 1 1 1 1
3 HSE Manager 1 1 1 1 1 1 1 1
4 Procurement Manager 1 1 1 1 1 0 0 0
5 QA/QC Manager 0 0 0 1 1 1 1 1
6 Commissioning Manager 0 0 0 0 0 0 1 1
Sub Total 3 3 3 5 5 4 5 5 -
240 240 240 400 400 320 400 400 2640
B DIRECT MANPOWER
1 Survey Work
1.1 Project Engineer 1
1.2 Surveyor 1
1.3 General Worker 2
Sub Total 4 0 0 0 0 0 0 0 -
640 0 0 0 0 0 0 0 640
2 Detailed Engineering Works
2.1 Engineering Manager 1 1 1 1 1 0 0 0
2.2 Mechanical Lead Engineer 1 1 0 0 0 0 0 0
2.3 Electrical Lead Engineer 1 1 0 0 0 0 0 0
2.4 Instrument Lead Engineer 1 1 0 0 0 0 0 0
2.5 Mechanical Engineer 1 1 1 1 1 0 0 0
2.6 Electrical Engineer 1 1 1 1 1 0 0 0
2.7 Instrument Engineer 1 1 1 1 1 0 0 0
2.8 Drafters 1 1 1 1 1 0 0 0
Sub Total 8 8 5 5 5 0 0 0 -
1280 1280 800 800 800 0 0 0 4,960
3 Procurement
3.1 Procurement Officer 1 1 1 1 1 0 0 0
3.2 Expeditor 1 1 1 1 1 0 0 0
Sub Total 2 2 2 2 2 0 0 0 -
320 320 320 320 320 0 0 0 1,600
EPCC OF THE KAMUNTING CITY GATE UPGRADING PROJECT
MANPOWER LOADING CHART
MONTH
ITEM GROUP OF WORK
July Aug Sep Oct Nov Dec Jan Feb

4 Installation / Construction
Civil and Pipespools fabrication
4.1 Project Engineer 1 1 1 1 1
4.2 Supervisor 1 1 1 1 1
4.3 Foreman 1 1 2 2 2
4.4 Fitter 1 1 2 2 2
4.5 Semi-skill 1 1 2 2 2
4.6 General Worker 1 1 2 2 2
Electrical & Instrumentation Work
4.7 Electrical & Instrumentation Engineer 0 1 1
4.8 Supervisor 0 1 1
4.9 Foreman 0 1 1
4.10 Instrument Technician 0 1 1
4.11 Electrician 0 1 1
4.12 General Worker 0 1 1
Communication Control
4.13 Project Engineer 0 0 0 1 1 1 1 1
4.14 Supervisor 0 0 0 1 1 1 1 1
Sub Total 0 0 0 8 8 12 18 18 -
0 0 0 1280 1280 1920 2880 2880 10,240
5 Precom & Commissioning
5.1 Commissioning Engineer 0 0 0 0 0 0 0 1
5.2 Supervisor 0 0 0 0 0 0 0 1
5.3 Safety Officer 0 0 0 0 0 0 0 1
5.4 Helper - Mech 0 0 0 0 0 0 0 2
5.5 Subcon System 0 0 0 0 0 0 0 2
Sub Total 0 0 0 0 0 0 0 7 -
0 0 0 0 0 0 0 1120 1,120
EPCC OF THE KAMUNTING CITY GATE UPGRADING PROJECT
MANPOWER LOADING CHART
MONTH
ITEM GROUP OF WORK
July Aug Sep Oct Nov Dec Jan Feb

2480 1840 1360 2800 2800 2240 3280 4400 21,200


EPCC OF MERU CITY GATE STATION UPGRADING PROJECT (MERGAS)
MANPOWER LOADING CHART
MONTH
ITEM GROUP OF WORK
July Aug Sep Oct Nov
A COMPANY MANPOWER
1 PGB 13
Sub Total 13 0 0 0 0
1040 0 0 0 0

Total Manhours COMPANY

MONTH
ITEM GROUP OF WORK
July Aug Sep Oct Nov
B INDIRECT MANPOWER
1 Project Manager 1
2 Project Engineer 1
3 Construction Manager 0
4 HSE Executive 1
5 QA/QC Exec 0
6 Project Planner 1
7 Document Controller 1
8 Environment Officer 1
Sub Total 6 0 0 0 0
480 0 0 0 0
C DIRECT MANPOWER
1 Survey Work
1.1 Surveyor & UUD 0
1.2 General Worker 0
Sub Total 0 0 0 0 0
0 0 0 0 0
2 Detailed Engineering Works
2.1 Engineering Manager 1
2.2 Process Engineer 1
2.3 Mechanical Engineer 1
2.4 Instrument Engineer 1
2.5 Electrical & Instrument Engineer 1
2.6 Civil Engineer 1
2.7 Drafters 0
Sub Total 6 0 0 0 0
480 0 0 0 0
3 Procurement
3.1 Procurement Executive 1
3.2 Expeditor 0
Sub Total 1 0 0 0 0
80 0 0 0 0

Total Manhours OFFICE


MONTH
ITEM GROUP OF WORK
July Aug Sep Oct Nov
D INSTALLATION / CONSTRUCTION
4 Civil and Structural Work
4.1 Civil Engineer 0
4.2 SSS 0
4.3 Supervisor/Inspector 0
4.4 Foreman 0
4.5 Fitter 0
4.6 Semi-skill 0
4.7 General Worker 0
5 Electrical & Instrumentation Work
5.1 Electrical & Instrumentation Engineer 0
5.2 Supervisor 0
5.3 Foreman 0
5.4 Instrument Technician 0
5.5 Electrician 0
5.6 General Worker 0
6 Communication Control
6.1 Project Engineer 0
6.2 Supervisor 0
Sub Total 0 0 0 0 0
0 0 0 0 0
E FABRICATION WORK
1 Welder 0
2 Supervisor 0
3 QA /QC 0
4 Fitter 0
5 Skill Waker 0
6 Subcon System 0
Sub Total 0 0 0 0 0
0 0 0 0 0

Total Manhours YARD/SITE

TOTAL MANHOURS
RGAS)

TOTAL
Dec

0
0 1040

nhours COMPANY 1040

TOTAL
Dec

0
0 480

0
0 -

0
0 480

0
0 80

Manhours OFFICE 1040


TOTAL
Dec

0 -
0 -

0 -
0 -

hours YARD/SITE 0

OTAL MANHOURS 2080


EPCC OF MERU CITY GATE STATION UPGRADING PROJECT (MERGAS)
MANPOWER LOADING CHART
MONTH
ITEM GROUP OF WORK
July Aug Sep Oct Nov
A COMPANY MANPOWER
1 PGB 13 13
Sub Total 13 13 0 0 0
1040 2184 0 0 0

Total Manhours COMPANY

MONTH
ITEM GROUP OF WORK
July Aug Sep Oct Nov
B INDIRECT MANPOWER
1 Project Manager 1 1
2 Project Engineer 1 1
3 Construction Manager 0 0
4 HSE Executive 1 1
5 QA/QC Exec 0 0
6 Project Planner 1 1
7 Document Controller 1 1
8 Environment Officer 1 1
Sub Total 6 6 0 0 0
480 1008 0 0 0
C DIRECT MANPOWER
1 Survey Work
1.1 Surveyor & UUD 0 0
1.2 General Worker 0 0
Sub Total 0 0 0 0 0
0 0 0 0 0
2 Detailed Engineering Works
2.1 Engineering Manager 1 1
2.2 Process Engineer 1 1
2.3 Mechanical Engineer 1 1
2.4 Instrument Engineer 1 1
2.5 Electrical & Instrument Engineer 1 1
2.6 Civil Engineer 1 1
2.7 Drafters 0 1
Sub Total 6 7 0 0 0
480 1176 0 0 0
3 Procurement
3.1 Procurement Executive 1 1
3.2 Expeditor 0 0
Sub Total 1 1 0 0 0
80 168 0 0 0
Monthly Total 1040 2352 0 0 0
Total Manhours OFFICE

MONTH
ITEM GROUP OF WORK
July Aug Sep Oct Nov
D INSTALLATION / CONSTRUCTION
4 Civil and Structural Work
4.1 Civil Engineer 0 0
4.2 SSS 0 0
4.3 Supervisor/Inspector 0 0
4.4 Foreman 0 0
4.5 Fitter 0 0
4.6 Semi-skill 0 0
4.7 General Worker 0 0
5 Electrical & Instrumentation Work
5.1 Electrical & Instrumentation Engineer 0 0
5.2 Supervisor 0 0
5.3 Foreman 0 0
5.4 Instrument Technician 0 0
5.5 Electrician 0 0
5.6 General Worker 0 0
6 Communication Control
6.1 Project Engineer 0 0
6.2 Supervisor 0 0
Sub Total 0 0 0 0 0
0 0 0 0 0
E FABRICATION WORK
1 Welder 0 0
2 Supervisor 0 0
3 QA /QC 0 0
4 Fitter 0 0
5 Skill Waker 0 0
6 Subcon System 0 0
Sub Total 0 0 0 0 0
0 0 0 0 0

Total Manhours YARD/SITE

TOTAL MANHOURS
RGAS)

TOTAL
Dec

0
0 3224

nhours COMPANY 3224

TOTAL
Dec

0
0 1488

0
0 -

0
0 1656

0
0 248
0
Manhours OFFICE 3392

TOTAL
Dec

0 -
0 -

0 -
0 -

hours YARD/SITE 0

OTAL MANHOURS 6616


EPCC OF MERU CITY GATE STATION UPGRADING PROJECT (MERGAS)
MANPOWER LOADING CHART
MONTH
ITEM GROUP OF WORK
July Aug Sep Oct Nov
A COMPANY MANPOWER
1 PGB 13 13 13
Sub Total 13 13 13 0 0
1040 2184 1248 0 0

Total Manhours COMPANY

MONTH
ITEM GROUP OF WORK
July Aug Sep Oct Nov
B INDIRECT MANPOWER
1 Project Manager 1 1 1
2 Project Engineer 1 1 1
3 Construction Manager 0 0 0
4 HSE Executive 1 1 1
5 QA/QC Exec 0 0 0
6 Project Planner 1 1 1
7 Document Controller 1 1 1
8 Environment Officer 1 1 1
Sub Total 6 6 6 0 0
480 1008 576 0 0
C DIRECT MANPOWER
1 Survey Work
1.1 Surveyor & UUD 0 0 3
1.2 General Worker 0 0 0
Sub Total 0 0 3 0 0
0 0 72 0 0
2 Detailed Engineering Works
2.1 Engineering Manager 1 1 1
2.2 Process Engineer 1 1 1
2.3 Mechanical Engineer 1 1 1
2.4 Instrument Engineer 1 1 1
2.5 Electrical & Instrument Engineer 1 1 1
2.6 Civil Engineer 1 1 1
2.7 Drafters 0 1 1
Sub Total 6 7 7 0 0
480 1176 672 0 0
3 Procurement
3.1 Procurement Executive 1 1 1
3.2 Expeditor 0 0 0
Sub Total 1 1 1 0 0
80 168 96 0 0
Monthly Total 1040 2352 1416 0 0
Total Manhours OFFICE

MONTH
ITEM GROUP OF WORK
July Aug Sep Oct Nov
D INSTALLATION / CONSTRUCTION
4 Civil and Structural Work
4.1 Civil Engineer 0 0
4.2 SSS 0 0
4.3 Supervisor/Inspector 0 0
4.4 Foreman 0 0
4.5 Fitter 0 0
4.6 Semi-skill 0 0
4.7 General Worker 0 0
5 Electrical & Instrumentation Work
5.1 Electrical & Instrumentation Engineer 0 0
5.2 Supervisor 0 0
5.3 Foreman 0 0
5.4 Instrument Technician 0 0
5.5 Electrician 0 0
5.6 General Worker 0 0
6 Communication Control
6.1 Project Engineer 0 0
6.2 Supervisor 0 0
Sub Total 0 0 0 0 0
0 0 0 0 0
E FABRICATION WORK
1 Welder 0 0
2 Supervisor 0 0
3 QA /QC 0 0
4 Fitter 0 0
5 Skill Waker 0 0
6 Subcon System 0 0
Sub Total 0 0 0 0 0
0 0 0 0 0

Total Manhours YARD/SITE

TOTAL MANHOURS
RGAS)

TOTAL
Dec

0
0 4472

nhours COMPANY 4472

TOTAL
Dec

0
0 2064

0
0 72

0
0 2328

0
0 344
0
Manhours OFFICE 4808

TOTAL
Dec

0 -
0 -

0 -
0 -

hours YARD/SITE 0

OTAL MANHOURS 9280