0% found this document useful (0 votes)
289 views6 pages

Unique Worksheet Test Estimation 2

This document provides a template for estimating manual testing work. It includes a worksheet to estimate effort for various testing activities based on size, complexity, and tester experience. Test activities like requirements analysis, test planning, execution and maintenance are listed with suggested effort metrics. Assumptions for the estimates are also to be documented. Another section allows capturing test scenarios with attributes to estimate individual test case efforts.

Uploaded by

vizag_vinod
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
289 views6 pages

Unique Worksheet Test Estimation 2

This document provides a template for estimating manual testing work. It includes a worksheet to estimate effort for various testing activities based on size, complexity, and tester experience. Test activities like requirements analysis, test planning, execution and maintenance are listed with suggested effort metrics. Assumptions for the estimates are also to be documented. Another section allows capturing test scenarios with attributes to estimate individual test case efforts.

Uploaded by

vizag_vinod
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

SHEET NAME: ESTIMATION - Manual Testing Worksheet

SHEET TYPE: Worsheet


SHEET WORKINGS: This sheet is template for calculating estimation. It lists all the TDLC activities that you would normally perform while doing a manual testing project. Document estimates
only on the acitivities that apply for the project.

ESTIMATION - Manual Testing Worksheet


PROJECT/SPRF# and NAME:
ESTIMATOR:
Estimates Based upon:
DATE of estimate mm/dd/yyyy
1. Do estimates EFFORT = (((total size * time per unit size) * complexity) * staff skill level) * rework.

Rework
Time per Complexity Staff Skill Level
High = 1.5 TOTAL
TDLC Activity Unit Size Total # of High = 1.75 Little Experience = 2
ID* Unit of Size Medium = 1.25 Effort in Comments
(General Activities - estimate only which apply to the project ) in person Size Units Medium = 1.25 Some Experience = 1.5
Low = 1.1 Hours (PH)
hours Low = 1 Extensive Experience= 1
No Rework = 1.0

Project Initiation:Assessment
Understand Business Requirements 5 1 1 1.5 1.25 9.38
Analyze/Review Business Requirements 0.00
Prepare OOM Estimates 0.00
Plan
Analyze/Review Functional/ Non Functional requirements 2.23 2 1.5 1.5 1 10.04
Define Test Management Tool or Set up of any vendor tool 0.00
Prepare High Level/Master Test Plan 0.5 15 1.25 1.5 1.25 17.58
Test Plan Review, Rework and Sign off 0.00
Prepare Requirement Estimates 0.00

Not sharing the full template


Execute Test (Refer Test Effort Counter and BenchMark) Test Cases 18.50 1 1 1 1 18.50
Execute Regression Test Suite 0.00
Execute Oneshot/Data conversion/Data Validation Test 0.00
Update Test Plan 0.5 15 1 1 1 7.50
Update Test Scenarios Scenarios 0.2 22 1 1 1 4.40
Update Test scripts/Cases Test Cases 0.2 22 1 1 1 4.40
Coordinate UAT and Retest UAT defects 0.00
Execute any Weekend Checkout Acitivity 0.00
Post-Implementation Support 0.00
Others
Meetings - Status Meetings, Change control meetings, Planning
meetings, Touchpoint etc 0.00
Onshore Coordination efforts with offshore resources 0.00
Issue Resolution (Do not include defect resolution here) 0.00
Total Effort (in hours) 71.79
*Optional. Could tie to requirement ID being fulfilled or other meaningful tag.

2. LIST ALL ESTIMATING ASSUMPTIONS


ID*
Test Effort Counter
Worksheet
Input in col A all the unique scenarios, cases, steps, function that you are going to test and select the category, Typ

Requirement Name Testing Category Type of Change

A= Online CICS Screen N= New


Testing H= High Change
B=COBOL /JCL Testing M=Moderate Change
Cycle # 1 and so on L= Low Change
F N
A L

Not sharing the full te


Total Cycle 1 Effort
Total Cycle 2 Effort
Total Test Execution Effort

Derived Combo Key Value


"ALC" 2
"FNS" 1
and select the category, Type of Change and Complexity.

Test Complexity Derived Combo Key Units Effort in Hours


Number of
Scenarios,
S=Simple Key Combo resulting from Cases, Steps,
M=Medium Category,Type and Function like
C=Complex Complexity this Effort (Person Hour)
S "FNS" 2 2
C "ALC" 4 8

aring the full template


10
8.5
18.5
Remarks
BenchMark Figures
Static Sheet

This sheet provides the base values for different testing components. Followi

Hours

A Online Screen testing New 2.0 4.0 8.0

High Change 1.5 3.0 6.0


Moderate Change 1.0 2.0 4.0
Low Change 0.5 1.0 2.0
Simple Medium Complex

Not sharing the full bench


different testing components. Following are hours based on benchmarking across project.

Change and Complexity Definition

ring the full benchmarked data

You might also like