The Application of PH and Orp Process Control AEROBIC DENITRIFICATION
The Application of PH and Orp Process Control AEROBIC DENITRIFICATION
The Application of PH and Orp Process Control AEROBIC DENITRIFICATION
OFTHE
AUGUST 2004
ACKNOWLEDGEMENTS
I would like to give sincere thanks to my Supervisor Dr David Wareham for his
guidance and encouragement throughout my study. The advice and knowledge
imparted by David is much appreciated.
Special thanks also to Dave MacPherson and Richard Newton (technical staff at
the University of Canterbury) who provided so much input to the project from
2000-2004.
Thanks is given to the Foundation for Research Science and Technology whose
support through a Bright Future Scholarship made this research possible.
2 MAY 2005
TABLE OF CONTENTS
ACKNOWLEDGEMENTS
TABLE OF CONTENTS
LIST OF FIGURES AND TABLES
ABSTRACT
(Objective 3) Comment on the requirements for air relative to conventional separate stage nitrification
5,3 98
denitrification processes,
(Objective 4) Identify the dissolved oxygen conditions necessary for aerobic denitrification and for its
5.4 101
optimisation,
(Objective 5) Comment on the need for soluble organic carbon for the removal of nitrogen in the aerobic
5,5 107
denitrification process,
(Objective 6) Confirm if the online profiles have unique features with respect to the aerobic denitrification
process, in particular the ammonia elbow on the ORP prOfile and the ammonia valley on the pH profile,
5,6 113
Correlate these online features with measured biochemical events such as the depletion of organic carbon
or ammonia nitrogen,
5,6.2 pH 118
5,6,3 Dissolved oxygen [DO] 119
(Objective 7) Develop and demonstrate control algorithms that use online features to control the aerobic
5,7 denitrification process, (Le, indirectly detect the biochemical events), In doing so demonstrate the reliability 121
of pH and ORP control algorithms based upon relative rather than absolute values,
APPENDIXA1
A1 TRACK STUDY ONE TO TRACK STUDY SEVEN DOSP 4,0 mg/L 130-136
A2 TRACK STUDY ONE TO TRACK STUDY SEVEN DOSP 2,5 mg/L 137-143
A3 TRACK STUDY ONE TO TRACK STUDY SEVEN DOSP 1,0 mg/L 144-150
A4 TRACK STUDY ONE TO TRACK STUDY SEVEN DOSP 0,5 mg/L 151-157
APPENDIX 81
B1 PHOTOS OF EXPERIMENTAL HARDWARE 158-161
B2 SEQUENCING BATCH REACTOR OPERATIONAL PARAMETERS 162
B3 DETERMINATION OF AERATION SYSTEM EFFICIENCY 163
B4 PROCESS CONTROL SOFTWARE AND CONTROL ALGORITHMS 164-168
REFERENCES
REFERENCES 169-181
LIST OF FIGU
Schematic of possible dissolved oxygen profile within microbial floc (Adapted from Pochana
Figure 1.4-1 15
and Keller 1999).
Representative view of sludge floc under a microscope with suggested zones for nitrification
Figure 1.4-2 16
and denitrification. (Adapted from Demoulin et al (2001)).
Figure 1.5-1 Diagram of an ORP electrode and operation 19
Figure 1.6-1 Generalized schematic of ORP, pH, and DO profiles, main bending points illustrated. 23
Figure 1.6-2 Typical ORP vs time profile showing nitrate breakpoint (adapted from Wareham et al (1993)) 26
Figure 1.7-1 Typical ORP profile for AIO BNR plant (adapted from NZWWA, 1997) 31
Figure 2.2-1 Aeration system for set pOints down to 1.0 mg/L (Duplicated for second reactor). 39
Figure 2.2-2 Aeration system for set points below 1.0 mg/L (Duplicated for second reactor) 40
Schematic of Bromley wastewater treatment plant with the location of experimental feed
Figure 2.7-1 48
collection indicated, (Adapted from Christchurch City Council public information brochure).
Figure 4.3-1 Mixed liquor suspended solids concentration OOSP 2.5 mg/L 70
Figure 4.4-1 Mixed liquor suspended solids concentration DOSP 1.0 mg/L 77
LIST OF FI URES
Figure 4.5-1 Mixed liquor suspended solids concentration OOSP 0.5 mg/L 83
Figure 5.2-2 Extension in aeration time required to oxidise ammonia nitrogen (relative to OOSP 4.0 mg/L) 92
Figure 5.5-1 Cycle illustrating nitrogen removal rate versus soluble organic carbon availability 107
Figure 5.6.1-1 Illustration of ORP elbow in an AlO process. (Figure Adapted from Yu et al (1998) 114
Figure 5.6.1-2 Illustration of ORP elbow in an AlO process. (Figure Adapted from Ra et al (2000) 115
Table 4.2-1 Summary of track study data [operational dissolved oxygen] 4.0 mg/L 66
Table 4.3-1 Summary of track study data [operational dissolved oxygen] 2.5 mg/L 72
Table 4.4-1 Summary of track study data [operational dissolved oxygen] 1.0 mg/L 79
Table 4.5-1 Summary of track study data [operational dissolved oxygen] 0.5 mg/L 85
Table 5.4-1 Effect of dissolved oxygen concentration on aerobic nitrogen losses 101
ABSTRACT
Aerobic denitrification is a biological nitrogen removal process in which
nitrification and denitrification occur simultaneously (in the same reactor) under
identical environmental conditions. This contrasts to traditional separate stage
nitrification denitrification in which the nitrification and denitrification processes
occur sequentially in different reactors under opposing environmental conditions.
While aerobic denitrification has long been identified in other ecosystems (such
as the nitrogen cycle within soil) it was not thought possible within wastewater
treatment processes. The existence of aerobic denitrification within wastewater
treatment systems was first identified in the early 1980's following nitrogen mass
balances that suggested unexplained nitrogen losses were occurring in the
aeration tanks of many full-scale biological nutrient removal facilities (total
nitrogen losses of up to 30% were frequently occurring U.S.EPA (1987)). Since
then researchers and engineers have attempted to elucidate the mechanics
behind the aerobic denitrification phenomenon and the conditions required for its
optimization. It is thought that aerobic denitrification may offer advantages and
possible savings when compared to alternative traditional separate stage
nitrification denitrification processes.
The use of real time parameters such as ORP, pH, DO and airflow rate (oxygen
demand) can provide immediate insight into a biological treatment process. This
knowledge can be used to ensure optimum performance in terms of real time
pollutant concentrations and hydraulic loads. This research aimed to elucidate
some operational aspects of the aerobic denitrification phenomenon, to
investigate opportunities for several types of real time control (ORP, pH, DO, and
airflow), and to develop a process control system using the online parameters.
The biochemical event of interest was the depletion of ammonia nitrogen. The
key online profiles of interest were the ORP-time profile and the pH-time profile.
The research sought to demonstrate the credibility of ORP and pH as real time
control parameters for the depletion of ammonia nitrogen in the aerobic
denitrification process. To achieve this a microprocessor-software based process
control system was developed by using the relationship between online
measurements and biochemical events.
The results indicated the ORP-time profile does not provide any feature for the
depletion of ammonia nitrogen when the dissolved oxygen is maintained at a
fixed concentration. That is the previously identified "ammonia elbow" is probably
the result of dissolved oxygen concentration breakthrough rather than nutrient
depletion. The lack of an ammonia depletion elbow meant that ORP could not be
used for process control within the aerobic denitrification process. The pH-time
profile showed an "ammonia valley" feature at the point of ammonia depletion.
This feature was consistently present in both the nitrification and aerobic
denitrification processes. The research incorporated the feature into the process
control system and successfully used it to control the length of the aerobic
denitrification treatment sequence. With respect to elucidating some operational
aspects of the aerobic denitrification phenomenon the main variable of interest
was the dissolved oxygen concentration. The results indicated the aerobic
denitrification process has an optimum dissolved oxygen concentration around
but probably below 0.5 mg/L. The process probably does not have an optimum
concentration but an optimum range. It is likely this range is influenced by
variables such as the biomass concentration and the release of reducing power
in terms of the ability to hydrolyze stored carbon polymers.
The results suggested the low dissolved oxygen concentrations required for the
aerobic denitrification process significantly inhibit the nitrification process. This
causes a considerable extension in the required aeration times for the oxidation
of ammonia nitrogen (-300% increase in aeration time relative to a traditional
nitrification process). The longer aeration times suggest the process may not
offer savings in terms of aeration requirements (aerobic denitrification required
-200% more air per unit of wastewater treated relative to a traditional nitrification
process) or treatment tank sizes (relative to traditional separate stage
processes).
Due to the potential environmental and public health impacts the removal of
nitrogen from wastewater is becoming a requirement in many developed
countries. For example, countries within the European Union (EU) are
increasingly specifying nitrogen removal as a treatment objective (Fuerhacker et
a/ (2000)). Typical nitrogen removal rates (such as those required in Austria)
include 60-70% nitrogen removal (BGBI 210/1996) with a decrease in NH4-N and
1
N03-N to below 10 mg/L. The removal of nitrogen is also an economic necessity
for some European wastewater plants. New environmental protection legislation
has seen penalty taxes applied to nitrogen in wastewater effluents. For example
in Denmark the discharge of nitrogen from treatment plants is now taxed at a rate
of $US2.40/kg (Cecil (2003». Cecil (2003) investigated the Ejby Molle plant in
Denmark and reported possible penalty tax savings of $US 48,000 per year for
every 1mg/L of N that could be removed. The removal of nitrogen is typically
achieved in two separate stages, these are called nitrification and denitrification.
1 NITRIFICATION
Nitrification involves two steps the first being the biological oxidation of the
ammonium ion, (NH/) to nitrite nitrogen (N02 -) as shown in equation (1.2-1).
Within this simplified step the oxidation state of the nitrogen goes from in the
ammonium to +3 in the nitrite. This has involved the donation of electrons from
the nitrogen atom (or oxidation) where oxygen has acted as the electron acceptor
(has been reduced). ((Metcalf and Eddy (1991».
2
(1980». The bacteria act as catalysts in the reaction by reducing the activation
energy required for the ammonium ion to be oxidized (Thain and Hickman
(1996».
The second nitrification step involves the oxidation of nitrite (N02-) to nitrate
(N0 3-) as shown in equation (1.2-2).
Within this simplified step the oxidation state of the nitrogen goes from +3 in the
nitrite to +5 in the nitrate. This has involved the donation of electrons from the
nitrogen atom (or oxidation). Again oxygen acts as the electron acceptor.
Note that the term nitritation is often used to refer to the nitrification step from
!\IH3-N to N02-N while the term nitratation refers to the nitrification step from N02-
N to N03-N. It should also be noted that the nitrification process consumes
approximately 7.14 grams of alkalinity per 1 gram of ammonia oxidized, thus a
pH drop can occur if the wastewater lacks sufficient alkalinity for the nitrification
of ammonia to nitrate. From equations 1.2-1 and 1.2-2 it can be seen that
3
approximately 4.3 mg of O2 is required for the oxidation of each mg of ammonia
nitrogen to nitrate nitrogen. In a biological treatment process additional oxygen
would be supplied (by aeration) to the wastewater for these reactions. The
research of Painter (1977) found the DO concentration for nitrification should be
higher than 2.0 mg/L for nitrification to occur without the availability of oxygen
being rate limiting to the process. Bliss and Barnes (1986) found that nitrification
ceased to occur at residual DO concentrations below 0.2 mg/L..
It should be noted that the nitrification steps described in equations 1.2-1 and
1.2-2 do not facilitate nitrogen removal from the wastewater but they do eliminate
its oxygen demand. However the nitrogen is now in the form of nitrate nitrogen
(N03-N). To remove nitrogen another step called denitrification is required.
1.3 DENITRIFICATION
Denitrification involves the conversion of nitrate nitrogen (N03-N) to nitrogen
gases (which are released to the atmosphere). This is accomplished biologically
under anoxic conditions by a group of chemoheterotrophic bacteria.
Chemoheterotrophic means the bacteria obtain their energy and/or generate their
cell tissue from chemical reactions involving organic carbon material (Thain and
Hickman (1996)). The denitrifying microorganisms are part of the heterotrophic
group of microorganisms that may use oxygen as the electron acceptor in the
(biologically catalysed) oxidation of organic substrates. These organisms are
facultative in that they can live under altered conditions using either oxygen or
nitrate nitrogen as an electron acceptor (Henze (1991 )). In an aerobic
environment they tend to use oxygen as the preferred acceptor, however when
DO concentrations are very low or when only chemically bound oxygen is
available (Le. an anoxic environment) they have the ability to use nitrate nitrogen
as an electron acceptor. When anoxic conditions are provided along with an
organic substrate (requiring oxidation) this results in the reduction of the N0 3-N
to nitrogen gas as electrons are transferred from the substrate to the N03-N. It is
4
thought that the electron transfer pathway for the transfer of electrons from
organic material to the electron acceptor is similar regardless of whether oxygen
or nitrate acts as the final electron acceptor (Christensen and Harremoes (1977)
and Haandel et al (1981 )).
The last three compounds are gaseous products (nitrogen monoxide or nitric
oxide, di-nitrogen oxide or nitrous oxide, and nitrogen gas) that are released to
the atmosphere.
~
/
Oxidation stale of nitrogen = +5
'5 +"61:'1
1 \ ""dot'" ..... of Mm,... 0
5
Equation 1.3-3 Biosynthesis reaction
Note in equation 1.3-2 that the oxidation state of nitrogen goes from +5 to O.
Therefore the nitrogen atom has accepted electrons or has been reduced. The
electrons have come from the organic carbon source. Note also the oxidation
state of the carbon has gone from -2 to +4 i.e. it has donated electrons or has
been oxidized.
6
3. Potential advantages in terms of energy savings by reducing the aeration
requirements required for the oxidation of ammonia nitrogen
4. Potential advantages in terms of reducing the need for variable
anoxic/aerobic zones and the associated energy requirements
5. Potential "biological" as well as conventional energy savings. For example,
research by Helmer and Kunst (1998) and Stross (2000) suggests that
under certain conditions the micro-organisms responsible for aerobic
denitrification may be autotrophic. Other research Third (2004) suggests
that under certain conditions aerobic denitrification may be undertaken
using stored intracellular carbon. If either of these claims are true the need
to supply a readily degradable organic carbon source (as a source of
electrons/energy) for denitrification may be reduced or overcome. This
may allow a reduction in the quantity of flow recycled or the need for an
additional external carbon source.
7
Pontiac Michigan in which full-scale aeration tanks reported total nitrogen
reductions of 30%.
There have been various explanations for the mechanisms by which nitrogen is
reduced within aerobic treatment systems to nitrogen gas. These explanations
sL1ggest aerobic denitrification is the result of either a biological or a physical
phenomenon. It is possible that a number of different processes all contribute in
some way to the reduction of oxidized ammonia.
An early theory proposed by KL1gleman and Spector (1988) was that some of the
microorganisms responsible for denitrification during an anoxic phase might be
able to continue reducing nitrogen for an undefined period once oxygen
concentrations had increased Le. in the aerobic zone/tank following an anoxic
period. They found the aerobic denitrification phenomenon seemed to be
restricted to the biomass which developed in Ala or anoxic/aerobic style
systems. The theory was also indirectly supported by Payne (1981) who found
8
the denitrifying enzymes of some bacteria were inactivated by oxygen, while in
others, synthesis was suppressed, but the existing enzymes disappeared only
gradually meaning it might be possible for some denitrifiers to continue
denitrifying after an increase in DO concentration. Munch et al (1996) suggested
that heterotrophic bacteria coming from the anaerobic/anoxic phase might for a
limited period still produce enzymes that use NOx-N as a final electron acceptor
even though readily available dissolved oxygen is present. Patureau et al (2000)
also identified improved aerobic denitrification activity just after an anoxic period
and suggested it was due to the "expression of" enzymes synthesized during the
anoxic period.
9
(1991) have suggested a possible inhibition of oxygen respiration by nitrite,
resulting in the use of NOx-N as an electron acceptor.
A number of researchers have proposed that nitrogen removal may take place
via a shortened nitrite pathway. In some instances this is accompanied by
elevated nitrite concentrations. For example Pochana and Keller (1999)
conjectured that elevated N02-N levels experienced in the aerobic denitrification
process may be linked to reduction of nitrogen directly from the N0 2-N form.
They found that when nitrification activity in the aerobic denitrification process
was inhibited nitrite was not further oxidized to nitrate even after ammonia
oxidation was complete. They proposed this situation accompanied a shortened
nitrogen removal pathway with the reduction of N02-N directly to nitrogen gas.
Kim et al (2003) demonstrated aerobic denitrification within a biofilm airlift reactor
operated specifically under conditions in which low dissolved oxygen created
Nitrobacter inhibition. Biological nitrogen removal via the nitrite pathway was
also demonstrated by Strous et al (1997). He identified a bacterium belonging to
the Planctomycetes group called ANAMMOX (acronym for Anaerobic Ammonium
Oxidation) that could oxidise ammonium anaerobically using nitrite as its electron
10
acceptor (converting it to dinitrogen gas and trace amounts of nitrate). The
ammonium was converted to dinitrogen gas and small amounts of nitrate. Stross
(2000) found that ANAMMOX bacteria can be active in the aerobic denitrification
process and that under conditions of low dissolved oxygen can reduce nitrite
directly to dinitrogen gas. He found that under conditions of low dissolved oxygen
concentration traditional nitrifiers such as Nitrosomonas and Nitrosospira could
work cooperatively with ANAMMOX bacteria. That is nitrification was limited to
the production of nitrite by Nitrosomonas and Nitrosospira which was then
simultaneously reduced. This is a completely autotrophic process which Dijkman
and Strous (1999) named CANON (an acronym for Completely Autotrophic
Nitrogen-removal Over Nitrite). The CANON process can be considered in two
stages which occur simultaneously, first the oxidation of ammonium to nitrite
(equation 1.4-1) and the reduction of nitrite to nitrogen gas (equation 1.4-2). The
combined reaction is illustrated in equation 1.4-3.
+ +H 2 0
Others to demonstrate denitrification from systems via the nitrite pathway include
Yu (1998) who showed denitrification from a continuous flow SBR system in
which full pathway nitrification had become fully inhibited, (minimal nitrate was
11
formed) and Abeling and Seyfried (1992), Yang and Alleman (1992), Akunna et
al (1993), Ho (1994), Helmer and Kunst (1998), Gejlsbjerg et al (1998), and Yoo
et al (1999) who identified coupled NH/-N oxidation and N02-N reduction as an
important source of N20 production under nitrifying conditions in activated
sludge.
From the mid 1980's it was also found that nitrate may be reduced under certain
aerobic conditions in place of oxygen. Poth (1986), Abeliovich and Vonshak
(1992), and Bock et al (1995) found that under oxygen limiting conditions some
autotrophic nitrifiers were able to reduce nitrate or nitrite into nitric and nitrous
oxide and nitrogen gas. More recently Patureau et al (1996a) demonstrated co-
respiration of oxygen and nitrates through kinetic experiments.
The use of nitrate nitrogen as an electron acceptor (in place of oxygen) may also
be considered from a thermodynamic perspective. The potential energy available
to microorganisms from the transfer of electrons depends upon several variables
including the final electron acceptor. The free energy change (pe o) between the
-2
use of 02' N03-N, and S04 shows the free energy change available through the
use of oxygen is only slightly higher than when N03 -1\J is used. This might
suggest the 02 electron acceptance pathway is only slightly preferred over the
N0 3-N pathway (i.e. the additional energy available to microorganisms through
the use of 02 as opposed to N03 -N may not be that significant). The pe o values
-2
for 02' N0 3 -N, and S04 respectively are +21.5 , +21, +5.75 (Snoeyink and
David (1980)).
Other likely explanations for the occurrence of aerobic denitrification are that the
range of microorganisms involved in biological nutrient removal may be of
greater physiological variety than previously thought, traditional nitrification
12
denitrification theory is too simplistic, and some previously identified organisms
have a more complex respiratory system than was initially recognized.
Traditional theory also believed that (for the purposes of wastewater treatment
ecosystems) nitrification was undertaken by autotrophic microorganisms under
aerobic conditions, and denitrification was undertaken by heterotrophic
microorganisms under anoxic conditions. For practical purposes it was believed
that dissolved oxygen was the only electron acceptor in aerobic processes, that
is other elements such as nitrates could not be reduced in aerobic systems as
oxygen was thought to be preferentially reduced. However recent research has
shown the traditional theories to be too simplistic, for instance the presence of
heterotrophic nitrifiers in wastewater treatment processes has been
demonstrated (Verstraete (1975), Castlgnetti and Hollocher (1984), Kuenen and
Robertson (1987), Robertson (1988), Robertson et al (1988), Robertson et al
(1989), Van Niel (1991), Robertson and Kuenen (1992), Van Niel et al (1992),
and Zhao et al (1999». For example Robertson (1988) and Van Niel (1991)
13
identified heterotrophic microorganisms able to both nitrify in aerobic
environments and denitrify in both aerobic and anoxic environments and Zhao et
al (1999) found that heterotrophic nitrification could contribute a significant
fraction of ammonia oxidation under favorable conditions, such as low dissolved
oxygen concentration and relatively high organic loading. It was suggested that
autotrophic nitrifiers became inhibited under these conditions. The presence of
autotrophic denitrifiers has also been demonstrated Poth (1986), Abeliovich and
Vonshak (1992), and Bock et al (1995). They identified autotrophic denitrifiers
able to reduce nitrate or nitrite into nitric and nitrous oxide and nitrogen gas
under conditions of low dissolved oxygen concentration.
Since the mid 1980's it has also become evident that some of the previously
identified BNR species have a more complex respiratory system than was initially
recog nized. For example Robertson and Kuenen (1984) and Lloyd et al (1987)
demonstrated how traditional nitrifier species such as Nitrosomonas eutropha
and Nitrosomonas europea were able to denitrify in the presence of small
amounts of oxygen.
14
DISSOLVED OXYGEN
PROFILE INSIDE FLOC
Y-:;:,
--~- \ANOXIC
Figure 1.4-1 Schematic of possible dissolved oxygen profile within rnicrobial floc
(Adapted from Pochana and Keller 1999),
Typical floc sizes within the activated sludge process were found to range from 5-
200 IJm in diameter by Andreadakis (1993), 10-70 IJm by Pochana and Keller
(1999), and 50-110 IJm Third (2004). The floc diffusion theory was tested by
Pochana and Keller (1999) who illustrated that a reduction in median floc size
from 80 to 40 IJm by high speed blending of the biomass before a cycle resulted
in a reduction in aerobic denitrification nitrogen losses from 52 to 21 %. This
occurred while nitrification rates remained constant suggesting that the drop in
aerobic denitrification was not due to blending operations affecting the viability of
the biomass. The studies suggested that floc size may play an important part in
aerobic denitrification activity. Pochana et al (1999) also developed a
mathematical model to simUlate internal floc diffusion mechanisms and found
that while the outer part of flocs had a DO level above 0.2 mg/L (thereby
reducing denitrification activity) the central sections of flocs had considerable
time with virtually no DO providing an environment suitable for anoxic reduction
to occur. This finding supported the theory that aerobic denitrification may be
partly attributed to traditional denitrification within sludge flocs.
From a full-scale perspective it has been reported that the Potsdam wastewater
treatment plant in Germany (90,000 p.e,) achieves aerobic denitrification via
15
internal floc denitrification. Demoulin et al (2001) illustrated how the plant used
online measuring of the specific oxygen uptake rate to control the aerobic
denitrification process. Typical floc profiles were as illustrated in Figure 1.4-2.
They found the rate of nitrate diffusion into the floc was on the order of ten times
that of oxygen, thus under aerated conditions there was no nitrate limitation
within the floc. They also reported that sufficient carbon provision for
denitrification was achieved through carbon storage (biosorption) and the control
of dissolved oxygen which minimized the use of substrate carbon by oxic
metabolism.
NITRIFICATION
DENITiRIIFICATION
Heinen and Norgaard (1998) reported on the application of floc diffusion theory to
the full-scale "Symbio process". The Symbio process is a nitrogen removal
technology which has been developed on the basis of using dissolved oxygen
concentration gradients within microbial flocs, The process attempts to maintain
aerobic and anoxic zones within flocs through the control of a number of
biological parameters (mainly low dissolved oxygen concentration).
16
The floc oxygen diffusion theory may be indirectly supported by a number of
researchers (refer discussion 5.4) who have suggested the optimum dissolved
oxygen concentration for aerobic denitrification would be around 0.5 mg/L. The
general consensus is that the process has an upper limit of around 1.0 mg/L and
an optimum just under 0.5 mg/L. It should be noted these are theoretical values,
a review of the literature found no research that has experimentally determined
the optimum dissolved oxygen concentration range for the aerobic denitri'fication
process.
However the floc diffusion explanation has also been questioned by a number of
researchers including Helmer and Kunst (1998) who achieved significant aerobic
denitrification nitrogen losses in a reactor (with dilute mechanically homogenized
biomass) in which large cell clusters were eliminated ensuring all cells were
supplied equally with DO during batch tests. The earlier research of Kugleman et
al (1991) also creates some doubt as to the degree of nitrogen loss that can be
attributed to anoxic micro zones within flocs. In a lab scale (AlO) type process
with significant aerobic nitrogen losses they increased the DO concentration to a
constant 10 mg/L in order to reduce the volume of any possible anoxic/anaerobic
micro zones within the interior of floc particles. After 14 days of operation the
aerobic nitrogen losses were identical to the losses they experienced while
operating at 5 mg/L (around 30%). Kugleman et al (1991) supported their
findings with research undertaken by Robertson and Kuenen (1984) and
Kawakami et al (1985) who both established aerobic denitrification within pure
cultures maintained under highly aerobic conditions. Patureau et al (1996b) also
demonstrated simultaneous nitrate and oxygen reduction within a chemostat
culture maintained under conditions of high dissolved oxygen. The floc diffusion
theory may also be questioned by the work of Bang et al (1995) who studied
aerobic denitrification activity in the biofilms attached to a partially submerged
RBC, they found the numbers of denitrifiers in the surface layer of the biofilm
17
were of 1 to 2 orders of magnitude higher than those in the middle and bottom
layers. From this they suggested the surface layers had a higher denitrifying
activity. They also found aerobic denitrification was active at dissolved oxygen
concentrations up to 6 mg/L.
It is clear that to date, no definitive explanation for the loss of nitrogen under
aerobic conditions has been agreed upon. It is likely that aerobic nitrogen losses
may be the result of a number of mechanisms such as biological conversion by a
broad range of microorganisms under a range of conditions, as well as traditional
biological conversion resulting from a physical phenomenon such as anoxic
micro zones contained within flocs. As to the debate over the conditions required
for aerobic denitrification the generally accepted consensus is that aerobic
denitrification is principally a low dissolved oxygen concentration process (:::; 1.0
mg/L), the optimum dissolved oxygen concentration range for aerobic
denitrification has not been determined experimentally. The requirements for
organic carbon remain unclear.
1 OPERATION OF PROBES
The commonly used insitu control parameters for activated sludge are ORP
(Oxidation Reduction Potential), DO (Dissolved Oxygen) and pH as the probes
are inexpensive and easy to use (Peng et al (2002)). In this research all
measurements for ORP, pH, and DO have been undertaken using probes as
follows:
18
1.5.1 OXIDATION REDUCTION POTENTIAL (ORP)
ORP cannot be determined experimentally, rather it is always measured using an
ORP probe. The measurement of ORP allows the ratio of oxidants to reductants
prevailing within a solution to be established. The actual redox potential of a
solution may be considered as the tendency to give up or take up electrons (Le.
to be oxidized or reduced).
AglI'(JCI
REFERENCE
ELECTRODE-
CATHODE
Reducing environment
/\ Highly oxidising environment (Flow
(illustrated) Le. reduction of of electrons not illustrated) i.e.
hydroxylamine to nitrite ... during the aeration phase ...
NH,OH + H,O .... NO,- +5H+ +4.- 0, ~ 4,- +4H' -> 2H,0
19
To illustrate, within a denitrification process, there is a lack of freely available
dissolved oxygen. Organic material within this environment is continuously
subjected to degradation by redox reactions catalyzed by enzymes. The organic
material is oxidized in that it donates electrons and these electrons are accepted
by nitrate nitrogen which is itself reduced to nitrogen gas. When an ORP probe
is in this solution some of the electrons from the oxidized organics will gravitate
along the platinum wire to the electrode (cathode) since the Ag/AgCI reference
electrode has a large positive electrode potential. The flow of electrons will
cause the Ag/AgCI to be reduced forming solid silver and free chloride irons. In
this environment when the flow of electrons is from the solution to the reference
electrode the recorded ORP value will be negative. Thus a reducing environment
(I.e. during an anoxic phase) will cause the ORP mV reading to fall or have a
negative slope over time (BIOLAB Scientific (2003)).
When oxygen is present in solution the oxygen has a larger positive potential
than the reference Ag/AgCI electrode. That is the electrons from the oxidation of
materials such as organic carbon and ammonia which would have traveled to the
reference electrode wi" instead travel to the oxygen (and reduce the oxygen to
water). Thus material such as organic carbon and ammonia nitrogen are oxidized
and donate electrons while oxygen is reduced or accepts electrons. In addition
the oxygen has a greater attraction for electrons than the probe's Ag/AgCI
electrode and this results in a flow of electrons from the electrode to the oxygen
in solution. When the flow of electrons is from the reference electrode to the
solution the recorded ORP value will be positive. Thus an aerobic environment
(I.e. during an aeration phase) wi" cause the ORP mV reading to increase or
have a positive slope over time (BIOlAB Scientific (2003)).
20
composed of material such as Ag/AgCI. The probes have a thin glass (bulb
shaped) membrane located at the tip. The glass membrane separates the
internal HCI solution from the material being measured but allows an H+ ion
exchange to take place. The electrode works by allowing hydrogen ions to
exchange at the glass surface. The flow of H+ between the internal solution and
the solution being measured changes the cr concentration in the HCI solution.
This is in turn balanced by the Ag/AgCI electrode. Equation 1.5-1 illustrates the
action of the Ag/AgCI reference electrode depending upon the cr concentration
in the probe HCI solution.
The Ag+ ion either forms an ionic bond with the cr ion or alternatively can accept
one electron to balance its valence charge. Thus there is a flow of electrons
similar to the situation described for the ORP probe (Snoeyink and David (1980),
Tchobanoglous and Schroder (1987), Oxford dictionary of chemistry (1996)).
Readings of the electron flow can be made on a high resistance voltmeter or pH
meter (which is essentially a high resistance voltmeter with a scale to read in
pH). This reading can be used to determine the difference between the constant
internal [H+] and the external variable [H+]. An illustration of a pH probe is
provided in Figure 1.5-2.
21
COAXIAL CABLE TO METER
AII/AgCI
COATONA
PLATINUM WIRE
REFERENCE
ELECTRODE
INTERNAL
SOLUTION
0.1 mol HCI ~ H+ SENSITIVE GLASS
The output from probes such as dissolved oxygen, oxidation reduction potential,
and pH may be logged. When plotted over time the data produces curves known
as profiles. If plotted in real time the data produces online real time profiles.
22
1.6 ONLINE REAL TIME PROFILES (ORT PROFILES)
The present research used four online parameters, these were oxidation
reduction potential (ORP), pH, dissolved oxygen concentration [DO], and air
demand. Figure 1.6-1 illustrates a generalized schematic of the online profiles
that could be expected from an AIO process treating domestic wastewater (note
the air demand profile is not illustrated).
pH
1
ORP
Time
Figure 1.6 1 Generalized schematic of ORP, pH, and DO profiles, main bending
m
points illustrated.
23
With respect to the ORP profile in Figure 1.6-1, the ORP profile has four main
bending points; these are labeled A, B, C and 0 respectively, (note that bending
points Band C also appear on the DO profile).
At point A the air is switched on which causes the ORP to change from a
negative (downward facing) slope to a positive slope, (Le. as discussed in section
1.5.1 electrons start flowing from the ORP electrode to the oxygen in solution).
The strong attraction of oxygen for electrons results in an interrelationship
between the ORP and DO profiles. ORP is linked to dissolved oxygen
concentration (or any electron acceptor/donor for that matter) by a logarithmic
relationship (Paul et al (1998». Thus the change in ORP is not proportional to
electron acceptor concentration but the log of its concentration. This means that
large changes in concentration result in small changes in redox potential (Mosey
(1985».
24
The logarithmic relationship between the dissolved oxygen concentration and
ORP allows the bending point B on the ORP profile to be used to indicate
whether the aeration rate is appropriate for the oxygen demand. That is the
appearance of the ORP bending point typically indicates the oxygen supply rate
is suited to the oxygen requirements at that time. Under aeration will result in the
dissolved oxygen not breaking through in the aeration time of the process (which
means point B does not appear) while over aeration will also result in Point B not
appearing on the ORP profile. The absence of point B can also indicate problems
with the nitrification process, such as nitrification inhibition (Paul et 81 (1998)).
In the anoxic environment, nitrate nitrogen is reduced to nitrogen gas. The nitrate
acts as the electron acceptor (is reduced) while organic carbon is oxidized
(donates electrons). Once the NOx-N is depleted there is a transition from anoxic
to anaerobic conditions. At this point the bacteria pass from highly efficient
respiration (Le. using nitrate as a terminal electron acceptor in the electron
transport chain) to less efficient (e.g. anaerobic fermentative) processes
(Wareham et 81 (1993), Plisson-Saune et 81 (1996)). This transition from anoxic to
25
anaerobic conditions results in a nitrate breakpoint feature (Peng et al (2002),
Cecil (2003)). This is Illustrated as point 0 on Figure 1.6-1 and also in more detail
in Figure 1.6-2. The nitrate breakpoint feature is often called the "nitrate knee"
and it signals the point where the denitrification reaction is complete (i.e. all
nitrates have been eliminated).
5
:::::J' 4
c::n :3 Point of Zero
~ 2 Nitrate Concentration
<:
~
h 1
/
.-
<3"
0
-1
("'j
"S;:- -2
~ -3
--ORP
A NOs-N (mg/L)
&:
0
-4
-5
-6
Reducing Conditions
-7
0 2 4 6
(hours)
Figure 1.6-2 Typical ORP vs time profile showing nitrate breakpoint (adapted
from Wareham et al (1993))
Points Band D (Figure 1.6-1) are of particular interest to those working with
online real time systems as they represent the points at which nitrification and
denitrification (respectively) are complete. Identification of these points can
potentially allow treatment sequences to be terminated resulting in benefits such
as savings in aeration, greater treatment capacity, and improved process
stability.
With respect to the pH profile on Figure 1.6-1, the profile has 6 main bending
points or features that are correlated to changing biochemical conditions. At the
start of aeration there is typically a sudden sharp rise in the pH (points 1-2). This
26
is thought to be due to CO2 stripping from the system caused by the initiation of
aeration (Hao and Huang (1996)). After the initial increase the pH decreases
again (points 2-3), as nitrification consumes alkalinity as part of the nitrification
process (7.14 mg HC03 consumed per mg of ammonia). At point 3, the pH curve
shows the feature termed "ammonia valley" (Andreottola et al (2001)) Point 3
occurs when ammonia is essentially depleted (and nitrification is complete), note
that point 3 corresponds to point B on the ORP profile.
For a short period following the termination of aeration the pH can fall. This
occurs as the stripping of CO 2 from the system (caused by aeration) ends and
there is an increase in the CO 2 concentration (points 4-5) which may occur until
anoxic conditions develop. Once the conditions are anoxic the pH increases
again as alkalinity (consumed during nitrification) is partially released back into
the environment (points 5-6). The increase in pH occurs until denitrification is
complete, i.e. all nitrates have been reduced to nitrogen gas. At this point there is
a pH breakpoint commonly referred to as the "nitrate apex", (point 6) (Peng et al
(2002)). The nitrate apex is related to the ORP "nitrate knee" in that it signifies
the pOint at which all nitrates have been depleted and the system makes the
transition from anoxic to anaerobic conditions.
Following the nitrate apex the pH profile tends to plateau and then decrease
again as anaerobic conditions develop (Points 6-1). Anaerobic conditions occur
in three main stages, hydrolysis, acidogenesis, and methanogenesis.
Acidogenesis results in the breakdown of products into simple organic acids, the
27
most common of which is acetic acid. The breakdown of products into organic
acids results in the fall in pH observed between points 6-1.
Points 3 and 6 are of particular interest to those working with online real time
systems as they represent the points at which nitrification and denitrification
(respectively) are complete. As with the ORP features the identification of these
points can potentially allow treatment sequences to be terminated resulting in
benefits such as savings in aeration, greater treatment capacity, and improved
process stability.
28
There is also a growing need within the EU for improved online real time control
systems to monitor and control pollution in rivers and water bodies into which
treated wastewater is discharged, that is to monitor and take into account
pollutant emissions when determining control strategies for minimizing the impact
of compounds such as ammonia nitrogen on urban water bodies (Meirlaen ef al
(2002), Frehmann ef al (2002». Online real time control strategies are a way of
achieving the new treatment objectives and facilities such as new BNR plants
offer the opportunity to incorporate real time control as part of the plants ICA
system (Cecil (2003».
29
ORP measurement was first used in wastewater treatment from the early 1940's
following the development of practical ORP electrodes for this application
(Rohlich (1948)). However with the subsequent development of the dissolved
oxygen electrode engineers and plant operators lost interest in redox (Cecil
(2003)). Interest in ORP was revived when nutrient removal became an objective
in the 1980's (Koch (1985)). Nutrient removal required the inclusion of treatment
phases in which no dissolved oxygen was present. The profiles from pH, and
ORP can operate in anoxic and anaerobic conditions and have the capacity to
provide useful information under these conditions with respect to nitrogen
transformation and removal. This is primarily because in low dissolved oxygen
and/or anoxic-anaerobic environments significant changes in pH and redox
potential can occur while conventional control parameters such as the dissolved
oxygen probe may show little or no change.
Aeration On
Off
r::==::::J.__...r:==L.._J:====L___.L
1'""
Relative
Oxygen
Concentration ¥-----I-_......L.~_.L-_.........~_..L_ _ _~
ORP
Time (hours)
Figure 1.7-1 Typical ORP profile for A/O BNR plant (adapted from NZJJVWA,
1997)
30
The use of pH and or ORP profiles for control purposes requires the online data
to be analyzed so that process control decisions can be made. Specific profile
features are correlated to known biochemical events, when these profile features
appear their detection by a control system provides an indirect way of identifying
when the biochemical event has occurred. Control decisions can be based upon
either the use of set point (absolute) values (that is using set points at which the
event is thought to occur) or relative values. Relative values involve
measurement of the profile slope so that changes in slope can be used to identify
the feature.
Profile features may be considered relative in the sense that different probes may
show the breakpoints (features) occurring at different absolute values due to
irregularities in the mixing regime, individual probe characteristics, and localized
oxidation-reduction reactions occurring in the vicinity of the tip of the probe
(ORP). However most probes will tend to show the breakpoints occurring at the
same moment in time.
The use of relative ORP variations to monitor nutrient depletion has been
demonstrated by numerous researchers including Charpentier et al (1989),
Peddie et al (1990), Wareham et aJ (1994). Paul et aJ (1998), and Ra et al
(2000). For example Ra et al (2000) operated a two stage sequencing batch
reactor treating piggery wastewater and used relative ORP to detect the point of
nitrate depletion via identification of the nitrate knee feature. The change in slope
31
or derivative of the ORP profile has also been employed in some modern
process control systems and aspects such as the nitrate knee are now being
regularly detected by on-line systems which use the information in real time to
make changes to the process control (Le. initiation or termination of aeration).
For example, the recent adoption of the nitrate knee in the Zullig ORP control
system is reported to provide savings in energy of up to 30% over a strictly timer-
based system (Water and wastes in NZ (1997)).
Aspects such as the application of online parameters for monitoring and possibly
control of the aerobic denitrification process, the optimum dissolved oxygen
concentration, and the requirements for organic carbon are some areas that
require further research and clarification.
32
how ORP measurement and its rate of change throughout a cycle could
successfully control dissolved oxygen set points as well as optimize nitrogen and
phosphorus removal in a full-scale aerobic denitrification sequencing batch
reactor facility, Holman (2000) who investigated online ORP and DO profile
features within the aerobic denitrification process and highlighted possible
features for process control, and Third (2004) who used online OUR
measurements as a process control parameter for the aerobic denitrification
process.
The requirements for organic carbon in the aerobic denitrification process needs
to be clarified. For example the removal of nitrogen via autotrophic denitrification
(including aerobic denitrification) was identified in 2002 as an area that requires
further research by WG 4 biological processes (working group 4) a division of
COST (European cooperation in the field of scientific and technical research)
(Cost (2003)).
33
investigate opportunities for several types of real time control (ORP, pH, DO, and
airflow).
To achieve this the experimental work had the following specific objectives:
34
An intensive chemical parameter testing program (series of track studies) was
undertaken along with on-line monitoring of ORP, pH, DO, and air demand to
provide real-time analysis of process conditions. Specific cycles were singled out
for intensive testing of parameters such as COD, TN, NH3-N, N0 2-N and N03-N.
Samples for each of the parameters were taken periodically throughout a cycle.
The track studies provided an indication of the presence of aerobic denitrification
activity (in the event that a loss of NH3-N occurred without a corresponding
increase in N0 2-N or N03-N, once nitrogen assimilation had been considered).
35
Chapter 2 EXPERIMENTAL HARDWARE AND OPERATION
2.1 REACTORS
Biological treatment of the wastewater was undertaken in two sequencing batch
reactors (SBRs). Figure 2.1-1 illustrates a schematic of a reactor.
TORQUE INDEPENDENT
CONSTANT SPEED MIXER _ _ _ (FILLING) EMERGENCY
, CUTOFF FLOAT swrrCH
o
o
o
o
SAMPLING PORTS - - -
HEIGHT ADJUSTABLE
DECANT PIPE MOUNTED
IN BASE OF REACTOR
SHAPEDAQUARIUM
STONE POROUS ----1=~~ii:
AIR DIFFUSER
The reactors were built with the intention of using one reactor as a control,
however the consistency of the treatment process (from the perspective of online
readings and biochemical parameter testing) led to the decision to run the
reactors independently.
After reviewing various reactor materials (e.g. glass) the decision was made to
construct the reactors from 6mm thick perspex. This material was chosen for its
high impact resistance and because it was transparent. Transparency was
important to allow visual monitoring of the biological process and the assessment
of aspects such as flocculation and sedimentation. Other components within the
reactors were made from stainless steel, brass, or polyethylene. This eliminated
36
the use of materials which may have degraded in the potentially corrosive reactor
environment.
The decision was made to construct the reactors following similar designs used
by other researchers (Munch et al (1996), Yu et al (1998), Andreottola et al
(2001), Peng et al (2002)). The size of the reactors was based upon the likely
cycle lengths and the quantity of feed that could be stored in a modified freezer.
As the Christchurch City wastewater treatment plant was 20 km away it was
decided the design should not require the collection of feed more than once per
week. The usable freezer storage volume was about 450 L, with two reactors this
limited the design to a maximum through flow of about 225 L per week per
reactor (refer Appendix B2 for design details).
Mixing was undertaken by mixing blades. The motors that turned the mixing
blades were required to operate up to 20 hours per day, 7 days per week.
Stepper motors were used as they did not contain armature brushes which could
have worn out with continuous use. In order to overcome any overheating
problems the stepper motors were mounted in aluminum cases with thermally
conductive paste, (allowing the motor case to act as a heat sink). In addition a
secondary cooling fan was also incorporated within the motor case to provide
forced cooling. The use of stepper motors also provided the added benefit of
being torque independent, i.e. the RPM was constant regardless of the torque
experienced allowing for constant mixing.
Simple, open-shut, solenoid valves (230 volt) were used for control of clarified
effluent decanting. The solenoids were normally shut but would open upon
supply of 230 volts from the process control system.
37
Aeration of the activated sludge within the reactors was provided by compressed
air sourced from the laboratory reticulated air supply. A single air diffuser was
mounted in the base of each reactor.
The upstream side of the aeration system started with a regulator to reduce the
mains air pressure from 80 PSI to 40 PSI allowing for pressures within the range
specified by manufactures of the downstream equipment (such as variable rate
solenoids and air flow meters. The regulator was followed by a Burket 0-10 Bar
230 Volt on/off solenoid and then a Burket variable rate solenoid, (Burket 0-9
L/min, 0-20mA, 0-2.8 Bar Model 6021). The purpose of the first on/off solenoid
was to remove air pressure from the variable rate solenoid when the air supply
was off.
38
PROCESS CONTROL
COMPUTER
MANUAL AIR FLOW
_ INTERNET AND RATE METER
INTRANET LINK
. ..
SEQUENCING
BATCH REACTOR
.. . ELECTRONIC AIR
FLOW RATE METER
WITH AERATION PROPORTIONAL
AIR VALVE
CONTROLLER
VARIABLE AIR FLOW
RATE SOLENOID
(ORT) [DO]
REGULATOR
RETICULATED
AIR SUPPLY
(80 PSI)
Figure 2.2~1 Aeration system for set points down to 1.0 mg/L (Duplicated for
second reactor).
The variable rate solenoid was opened and closed by the proportional air valve
controller which determined the difference between the actual dissolved oxygen
concentration within the reactor and the desired concentration (specified in the
process control software). This difference corresponded to the degree to which
the air valve would open. As the difference became smaller the valve would
slowly close. Readings were updated every six seconds thereby allowing
responsive accurate control of the reactors dissolved oxygen concentration.
Downstream from the variable air flow rate solenoid there was an electronic
Honeywell mass air flow sensor. The flow rate sensor was a Model AWM5000
micro switch series/micro bridge able to detect flow accurately between 0-20
Llmin. The electronic flow rate sensor was linked to the process control system
and the computer to provide online real-time readings of air flow rate.
39
The variable rate solenoids used for the dissolved oxygen set points 4.0 mg/L to
1.0 mg/L were unable to accurately control the low air flow rates required for the
set points below 1.0 mg/L. To obtain accurate control of the low air flow rates it
was necessary to use a micrometer based needle valve.
A needle valve was selected that provided a linear response (that is a linear
increase in flow rate as the needle valve was opened). As the system had to be
automated the needle valve was opened and closed by a stepper motor
connected to the process control system. The 8 Bit control system allowed the
motor to control the valve by 256 graduations from the closed to the fully open
position.
The flow rate from the valve was dependent upon the input pressure but an input
pressure of 25 PSI provided for a flow rate from 0 Llmin to 9 Llmin. The 256
graduations allowed this flow rate to be controlled theoretically in steps of 36
mLimin. The aeration system for the set points below 1.0 mg/L is illustrated in
Figure 2.2-2.
RETICULATED
AIR SUPPLY
(SO PSI)
Figure 2.2~2 Aeration system for set points below 1.0 mg/L (Duplicated for
second reactor)
40
Diffusion of oxygen into the reactor was achieved with a single 25 mm diameter
sphere-shaped aquarium diffuser. Experimental work (Appendix 83) determined
there was little increase in oxygen transfer efficiency when multiple stones or
other diffuser types (such as sock diffusers or porous aeration discs) were used.
The oxygen transfer efficiency was found to be 3 % (in fresh water at 20°C). This
compares to values ranging from 27-39 % commonly experienced in full-scale
facilities (Metcalf and Eddy (1991)). The main impediment to increasing the
transfer efficiency was the depth of the reactor relative to full-scale facilities. Full-
scale aeration facilities frequently have depths in excess of 4.5 m while the depth
of the lab scale reactor was only 0.38 m. The depth of the aeration tank
translates directly into contact time between the diffused air and mixed liquor. As
the contact time could not be modified it was necessary to have high air flow
rates in order to compensate for the low dissolved oxygen transfer efficiency.
The duration of the aeration phase was determined either by online real time
readings or alternatively upon default timer values loaded into the process control
system.
Note that low dissolved oxygen concentrations can be maintained by either direct
control (as used in this research) or indirect control of the air flow rate. Direct
control relies upon readings from online real time dissolved oxygen sensors while
indirect control relies upon other process parameters such as ORP or NADH
fluorescence. Researchers to use direct control include Osada et al (1991) and
Suwa et al (1992); and use of ORP has been undertaken by Moriyama et al
(1993) and Collivignarelli and 8ertanza (1999); while NADH fluorescence has
been used by Helmo (1993).
41
based control system as illustrated in Figure 2.3-1 was developed in house at the
University of Canterbury. The process control system was composed of two key
elements, a central control box and a personal computer.
The central control box was microprocessor based and contained 16 analogue
inputs, 16 digital inputs, and 16 digital outputs. This allowed complete and
independent control of all the required reactor operations. Included within the
system was an independent "watch dog" microprocessor whose purpose was to
maintain control of the reactor on a limited basis in the event of a computer
malfunction. The central control box checked the status of the personal computer
every six seconds. In the event of identifying a computer problem the watchdog
microprocessor was programmed to act as a stand-alone unit operating on a
predetermined timer basis until being manually overridden by an operator. This
provided additional operational security by reducing the possibility of a
"biological" upset, if the computer had problems during an unattended period.
The personal computer ran a software program developed with the Lab View
package from National Instruments. The software allowed the computer to
control and monitor the process using either an onboard NO card or via one of
the computer communication ports. Other researchers to have used Lab View for
this type of application include Yu et al (1998) and Andreottola et al (2001).
42
EMERGENCY
OVERFLOW
_ _ _ SWITCHES
AIR
(4)
TREATED
EFFLUENT
WASTE
SLUDGE
MUNICIPAL
SEWAGE
KEY
(1 ) Process controller, microprocessor control, controlled and monitored on AMD 1 GHz Athlon PC running
Windows XP. Box incorporates 16 analogue inputs, 16 digital inputs, and 16 digital outputs.
(2) Online real-time data reports for the analysis of treatment process
(3) Network link allowing for remote access to process control system, for example via Intranet and intemet.
(4) Regulated compressed air supply
(5) 500Lcapacity cold wastewater storage with submersible feed pumps
(6) Immersion heated water bath
(7) (PAC) Proportional air valve controller
(8) Waste solenoids
(9) Air solenoid
(10) Variable rate air solenoids
(11 ) (FRS) Electronic flow rate sensors
(12) 8L capacity sequencing batch reactors
(13) Mixers
(14) DO meters
(15) pH meters
(16) ORP cables
(17) Fill control pressure transducers
and airflow (oxygen demand). It was possible to input algorithms to allow the
software to interpret the data for process control decisions. For example if the
profiles displayed certain features that were correlated to known biochemical
events the algorithms could identify these features and then initiate some form of
action.
As the process control system was developed on the fly, it was periodically
necessary to put the reactors under the control of a PLC (programmable logic
controller) while maintenance or changes were made to the main system.
44
Tile freezer contained two submersible feed pumps and one submersible mixer
pump. The wastewater mixer was connected to a timer which switched the mixer
on for 3 minutes of each 15 minute period. This ensured the wastewater
composition was as consistent as possible. The mixer pump was located so that
mixing could be undertaken without the pump acting as an aerator (thus reducing
biological degradation). To prevent the growth and acclimatization of bacteria in
the freezer it was emptied and washed thoroughly before each fresh batch of
wastewater was added.
By trial and error, it was found that the lowest temperature the wastewater could
be safely stored at without risk of forming ice on the sides of the freezer (and
possibly damaging the pumps) was 3.8 DC. Since the wastewater temperature at
Bromley was typically between 15-20 DC, the large thermal mass of the
wastewater (-450 L at 15 DC) meant the freezer typically took 15-20 hours to
lower the temperature to the desired 3.8 DC.
45
EfFLUENT
WASTEWATER
fEEDTD
REACTORS
-21 DEGREES
CENTIGRADE
INFLUENT
WASTEWATER
REMOVABLE LID FEED LINES TO
TO REDUCE EVAPORATION GLASS HEAT TRANSFER
COILS, If/PUT TEMP - 3,8
\ DEGREE CENTIGRADE
WATER BATH
FmEO WITH BULL CocK
DICITALOlsPLAY MAINS PRESSURE WATER
THERMOSTAT AND
SYSTEM To REpLACE WATER
TEMPERATURE CONTROL
LOST TO EVAPORATION
LINKED TO I1EA'TING COIL
ANOMIXER
EXPERIME NTAL
The SBR operation had four sequential steps to each cycle namely (1) fill & mix,
(2) react (aeration), (3) settle (sedimentation/clarification) and (4) draw (decant).
Figure 2.5-1 illustrates the four main steps to each cycle.
46
-- -
FILL MIX SElTLE DECANT
AEROBIC
INFLUENT EFFLUENT
47
Point of wastewater collection at the
Christchurch city wastewater treatment
plant (Bromley WWTP).
Wastewater collected
from the h,)ad of the primary CLARIFIER
sedimentation tanks, (just following
the aerated grit chambers),
Figure 2.7-1 Schematic of Bromley wastewater treatment plant with the location
of experimental feed collection indicated, (Adapted from Christchurch City
Council public information brochure).
The wastewater at this point had been through coarse bar screens to remove
large objects such as rags and sticks and had been through an aerated grit
chamber sequence to remove most of the inert coarse grit. The composition of
the wastewater is illustrated in Table 2.7-1 which shows the average values from
tests taken over the duration of the work.
48
Table 2.7-1 Influent wastewater characteristics
Table 2.7-2 shows the COD declining at an almost linear rate and the ammonia
nitrogen increasing slightly as organic nitrogen is converted to the ammonium
cation NH/ (wastewater pH was typically between 6.8-7.4). Note the decline in
unfiltered COD appears to be largely caused by the fall in soluble COD. The
BODslTN ratio for the wastewater was 11 based upon a BOD 5 concentration of
domestic wastewater generally around 50% of the unfiltered COD concentration
(0.4-0.8 BODs/COD Metcalf and Eddy (1991), -0.5 BODs/COD WRC (1984».
49
800
700
600
'§, 626
593
TOTAL COD
E
z 500 544
0 525 524
;:: 496
IiI- 400
Z
W
u
z 300 330 326 SOLUBLE COD
0
u 280
0
0 200 242
u 225
191
100
0
1 2 3 4 5 7
DAYS IN STORAGE
50
The duration of the aeration phase was determined by the process control
system detecting an online profile feature which had been correlated to the
depletion of ammonia nitrogen. There was also a default aeration time which
terminated the aeration phase in the event that the online real time control
system failed. The default aeration time depended upon the dissolved oxygen set
point and the likely time required to oxidize the ammonia nitrogen.
The settle and decant steps were 15 and 5 minutes respectively and were
controlled by a timer within the process control system. The fill step was
dependent upon a fill level sensor; however this phase typically lasted 2-3
minutes.
The quantity of the clarified effluent that was decanted at the end of each cycle
was set at 50 % of the reactor volume or approximately 4.0 L (Total used reactor
volume 8.0 L). Sludge wasting was undertaken manually during the fully mixed
aeration cycle. It was not included as one of the main process steps as there was
no set time period within each cycle dedicated to wasting. No wasting was
undertaken during a track study.
The amount and frequency of sludge wasting was determined by taking regular
[MLSS] readings with the objective being to maintain the reactor within +/- 10% of
the desired operational [MLSS] of 3000 mg/L, (i.e. 2700-3300 mg/L). The desired
operational [MLSS] of 3000 mg/L was chosen following classification of the
wastewater as medium-high strength. With reference to Table 2.7-2 the
wastewater total COD while in cold storage was typically between 500-650 mg/L,
this corresponds to a medium-high strength wastewater. Typical design
parameters for sequencing batch reactors detailed in MetCalf and Eddy (2001)
give an operational MLSS range of 2000-5000 rng/L dependent upon factors
such as the COD concentration. The SRT was an independent parameter that
changed depending upon the relative growth rates of the bacteria.
51
2.9 REACTOR COIVIISSIONING
The reactors were run for nearly 18 months. The first 7 months were used for
development of the hardware. Following the developmental phase the reactors
were seeded and operated for six months before the official runs were
undertaken, during this time the reactors were operated at a range of dissolved
oxygen concentrations between 0.5 - 5.0 mg/L. The first run was initiated
subsequent to this six-month period using the acclimatized reactor biomass. The
reactors were operated continuously from the point of initial seeding to the point
of decommissioning.
52
Chapter 3 EXPERIIVIENTAL TESTING
All samples were taken while the reactor contents were fully mixed and were
vacuum filtered through Whatman glass fiber filters (GF/C) (grade C particle
retention 1.2 um) followed by Millipore griddled membrane filters made from
mixed esters of cellulose optimized for microbiological analysis of water (type HA
0.45 um). Retained activated sludge from the filtering process was returned to
the reactor. Certificates of quality for the filters used confirm Standard Methods
compliance. With the exception of MLSS and the on-line parameters, samples
were analyzed using HACH Test 'N Tube products. Readings were taken on a
HACH DR/2000 spectrophotometer as it provided consistently accurate results.
Table 3.1-2 provides a description of the analysis methods used.
53
Table 3.1 Chemical parameters analyzed using colorimetric methods
Water - wastewater -
i
Orthophosphate (reactive) 8048 Ascorbic acid method 0-2.5 mg/L sea water
Water - wastewater -
Oxygen demand COD 8000 Colormetric measurement 0-1500 mg/L COD sea water
Total nitrogen TPN 10071 Persulfate digestion method 0-25 mg/L N Water· wastewater
Water - wastewater-
Ammonia 10031 HR Salicylate method 0-50 mg/L NH,-N sea water
0-150 mg/L NO,
Nitrite 8153 HR Ferrous sulfate method (0-45 mg/L N0 2-N l Water wastewater
The filtered sample sizes required for analysis on the DR/2000 varied between
0.2 25 mL. For a complete analysis of COD, TN, NH3-N, N0 2 -N, and N0 3-N an
initial sample size of approximately 70 mL would be withdrawn from the reactor
which would then be filtered before sub-samples for the various chemical
parameters were taken. Experimental work was usually limited to specific testing
runs where a single cycle would be intensively analyzed during a track study, i.e.
samples would usually be taken every 10 15 minutes with the main emphasis
upon COD and the various forms of nitrogen.
The test for TN involved the use of a HACH alkaline persulfate digestion method
known as TPN. The Total Persulfate Nitrogen (TPN) measurement is a test
offered by HACH that provides a measure of nitrogen similar to the traditional
Total Kjeldahl Nitrogen (TKN) test except the procedure is faster and eliminates
hazardous Kjeldahl-method materials. The HACH method is based upon the
procedure in Standard Methods for the Examination of Water and Wastewater
20 th Edition Method 4500-P ,p. 4-146. An evaluation of the TPN method was
undertaken by Langner and Hendrix (1982),
54
The TPN test is finding application in the monitoring of total nitrogen within
wastewater treatment facilities. The TPN test uses an alkaline persulfate
digestion to convert all nitrogen forms to nitrate nitrogen. The nitrate reacts with
chromotropic acid under strongly acidic conditions to form a yellow complex with
an absorbance maximum at 410 nm, measurement of the yellow complex is
undertaken on a spectrophotometer. The test measures all forms of nitrogen
such as soluble forms of ammonia, nitrate and nitrite as well as soluble and
insoluble forms of organic nitrogen (BIOlAB Scientific (2003) Product technical
information). Table 3.1-3 provides an illustration of the types of nitrogen
measured in both the TPN and other nitrogen tests used in this research.
While the TPN test measured insoluble forms of nitrogen all samples in this
research were filtered to the 0.45 um level making it unlikely that insoluble
particulate matter was present in significant quantities.
Sampling for [MlSS] was undertaken on a daily basis. Sample sizes were
between 90 -100 ml; these were vacuum filtered through a Whatman glass fiber
filter (GF/C) (grade C particle retention 1.2 um) that had been oven dried at 110
°c for 24 hours prior to the test. The filtered samples were then dried at 110°C
for 24 hours and the MlSS was determined by calculating the retained/filtered
solids following standard methods 208 D.
55
3.2 SAMPLE PRESERVATION AND STORAGE
Samples were collected in clean plastic or glass bottles. The bottles for
phosphorus samples were acid cleaned with 1: 1 hydrochloric acid solution and
rinsed with demineralised water. Detergents containing phosphate were avoided
when cleaning sample bottles used in the tests.
All samples taken from the reactor were tested immediately. Some samples of
wastewater from Bromley wastewater treatment plant and from the feed cooler
were unable to be tested shortly after sampling and were preserved prior to
storage. The preservation was necessary to prevent degradation of the sampled
material and loss of test accuracy. Samples preserved by adding liquids had to
have adjustments made to their final test results to allow for the dilution
effects/volume changes of the original sample. It should be noted that
preservation was rarely undertaken due to the possible detrimental effects on
result accuracy and complications involved in preserving small sample sizes.
3.2.1 COD
For sample storage periods up to 28 days, sulfuric acid was added to the filtered
sample until the pH was less than 2.0. The sample was then placed in cold
storage at 4 °C or below. Immediately prior to analysis the preserved sample was
warmed to room temperature.
3.2.2 TPN
Preservation involved reducing the pH to 2 or less with concentrated sulfuric
acid. The samples were then stored at 4 °C or less for up to 28 days.
Immediately prior to analysis the samples were warmed to room temperature and
the pH was neutralized with 5 N sodium hydroxide.
56
3.2.3 NH3-N
The sample was preserved for up to 28 days by reducing the pH to 2 or less and
refrigerating at 4 DC or less. Immediately prior to analysis the sample was
warmed to room temperature and the pH was neutralized with 5 N sodium
hydroxide.
3.2.4 N03 -N
Samples could be preserved at 4 DC or lower, providing they were analyzed
within 48 hours. Prior to testing, the samples were warmed to room temperature.
For longer storage periods, the pH was adjusted to 2 or less with sulfuric acid
and the sample was refrigerated. Before testing the preserved sample was
warmed to room temperature and the pH was neutralized with 5.0 N sodium
hydroxide standard solution.
3.3.10RP
Platinum band electrodes were used as described in the literature review. The
ORP electrodes were connected directly to the process control system. The ORP
probes were cleaned frequently (which involved wiping with a damp sponge),
Failure to regularly clean ORP probes can result in the variation rate and the
variation range of the ORP reading being affected (Paul et al (1998),
Collivignarelli and Bertanza (1999». The probes were also periodically checked
in quinhydrone buffer solution following the method specified by BIOlAB
Scientific (2003) Product technical information.
3.3.2 pH
The pH was measured on EDT (RH357Tx) microprocessor controlled meters
fitted with "field grade" glass body electrodes; both meters provided a mV output
which was fed to the data logging PC.
Both the pH and the dissolved oxygen meters had the ability to measure the
temperature within the reactors. This was checked periodically to ensure the
water bath was working correctly.
3.3.3 DO
The presence and concentration of dissolved oxygen within the reactors was
measured using YSI Model 57 dissolved oxygen meters (one for each reactor).
The probes used membrane-covered clark-type polaragraphic sensors which
were covered with a thin permeab!e membrane. High sensitivity membranes (half
the thickness) were used to allow accurate readings at low DO concentration
leve!s. The meters provided a mV output which was fed to the process contro!
system.
58
Chapter 4 EXPERIMENTAL RESULTS SUMMARY
30
25
'" 20
f-""
Iii 15
10
0
0 0.5 1.5 2.5 3
00 Concentration, mgll
4) The settleability of the sludge was excellent throughout the entire period of
operation with the sludge volume index between 50 -100 mUg resulting in
a low effluent suspended solids content, (typically less than 5 mg/L
following a 15 minute settle period).
60
The track studies included samples for TN, I\IH3-N, N0 2-N, N03-N, and
COD, which were taken periodically through out a cycle. The chemical
results were then plotted against the online profiles for each run in which
the operational dissolved oxygen concentration was the variable. All the
track study results are primarily limited to the aeration phase of a
treatment cycle.
6) The nitrogen loss calculations in this study were based upon the change in
[NH3-N], the possible nitrogen assimilated, the change in [N0 2-N] and the
change in [N03-N]. Organic nitrogen was not included. Measurements for
TPN (which includes organic nitrogen) were undertaken but only to
provide a check/confirmation of the nitrogen mass balance calculations.
An example calculation for the estimated assimilation is provided in
appendix A 1.1.
61
8) Inaccuracies in measurement of the MLSS concentration have contributed
to inaccuracies in the assimilation estimates. A series of MLSS
concentration measurements revealed the test was only accurate to -
200mg/L.
9) This research did not take into account the ammonium nitrogen produced
from organically bound nitrogen.
11 )With reference to the analysis of the pH profiles the pH scale had a 0.8
unit difference for the 4.0 mg/L and 2.5 mg/L DO set points. However the
1.0 mg/L and 0.5 mg/L set pOints have a 0.4 unit difference. This should
be noted before comparing plots from different runs. Prior to the
discussion of results examples of one track study from each operational
dissolved oxygen set point follow. For a full set of results refer to the
appendices.
12)While the ORP, pH, and airflow profiles were all evaluated for their
potential use as process control tools only the pH profile was eventually
used, that is an algorithm was developed and demonstrated to detect the
point of ammonia depletion on the pH profile (ammonia valley).
62
Chapters 4.2 - 4.5 provide a summary of the specific dissolved oxygen set
points. The "finer nuances" of the results are presented in Table 4.1-1.
* The SRT for the aerobic denitrification process in this research ranged
between 15-29 days, this corresponds to values of 15-25 days reported by
Munch et al (1996) .
63
4.2 SUMMARY AND EXAMPLE OF OPERATIONAL DISSOLVED OXYGEN
CONCENTRATION 4.0 mg/L
The reactor was operated at a dissolved oxygen set point of 4.0 rng/L and
allowed to run for an acclimatization period of 14 days. Since the SRT for this run
was approximately 9 days this period was slightly less than two sludge ages.
Seven track studies were undertaken at dissolved oxygen set point 4.0 mg/L, the
track studies were undertaken over a one-month period following the 14-day
acclimatization period. The online profiles were consistent within 2-3 days (their
stability suggesting acclimatization of the system). This section provides a
summary and example of the results while Appendix A 1 contains a full set of
results. Figure 4.2-1 shows the [MLSS] over the duration of the run.
[MLSS]
o 5 10 15 20 25 30 35 40 45
OPERATIONAL DAYS FOR THE RUN
Figure 4.2~1 Mixed liquor suspended solids concentration DOSP 4.0 mg/L
64
The wasting rate required to keep the [MLSS] close to 3000 mg/L is illustrated in
Figure 4.2-2, while Figure 4.2-3 shows the SRT of the system.
M M ..,
Wastag e (L)
.., ..,
N N N N N • N NN N
t
N N
t
........... .... ...
o 5 10 15 20 25 30 35 40 45
SRT (days)
o 5 10 15 20 25 30 35 40 45
OPERATIONAL DAYS FOR THE RUN
65
Table 4.2-1 provides a summary of the seven track studies undertaken at DOSP
4.0 mg/L while Table 4.2-2 shows the average values corresponding to the
hydraulic residence time.
Table 4.2-1 Summary of track study data [operational dissolved oxygen] 4.0
mg/L
Parameter Units TS1 TS2 TS3 TS4 TS5 TSa 157 7Wii
[MLSS} mg/L 3300 3586 3115 3074 I 2972 3639 3179 3266
Initial NH,·N mg/L 20 22 20 19 21 20 19 20
Final NH,.N mglL 0 0 0 0 0 0 0 0
Del NH,·N (A) mglL 20 22 20 19 21 20 19 20
(D) (A-
Nitrogen loss (B+C» mg/LN 7 5 7 5 4 7 5 6
Nitrification rate mglL.min N 0.17 0.21 0.14 0.18 0.16 0.14 0.19 0.17
mg/L.min.mg MLSS 5,E-{lS 6,1:...Q5 4,E",S 6.E-05 6.E..{)5 -'i.E-OS fLE-05 S.E"'S
Rate unaccounted N loss mg/L.mln N 2£..02 O.E+OO 2.E"'2 :.lE-02 2.E·02 6.E---03 O.E-03 1.E.oZ
% Initial TN removal % 29 17 25 19 15 27 17 21
% TN assimilated % 21 17 15 7 4 24 14 14
% Inilial TN loss unaccounted % 9 0 10 12 11 3 3 7
COD Initial (J) mglL N 125 175 161 145 159 152 161 154
COD Final (K) mglL N 19 24 23 22 21 22 20 22
COD loss (L)=(J-K) mg/LN 106 151 138 123 138 130 141 132
HRT days 0.2 0.2 0.3 0.2 0.2 0.2 0.2 0.2
66
With reference to Table 4.2-1 the average influent soluble nitrogen (TN) was 27
mg/L (not including soluble organic N, this figure composed of 20 mg/L NH3-N, 1
mg/L N0 2-N, and 6 mg/L N03-N, refer * Table 4.2-1). Fourteen percent of the
influent soluble nitrogen was assimilated into new cell tissue; the remainder was
mostly transformed to NOx-N (refer ** Table 4.2-1).
Seven percent (refer *** Table 4.2-1) of the initial total nitrogen could not be
accounted for in the nitrogen mass balance procedure.
The main cause of error came from the calculations regarding assimilation; these
required the measurement of [MLSS] at the start and end of the cycle. The
difference in the two readings was then taken to calculate the nitrogen
assimilation. A series of tests on mixed liquor (MLSS concentration 3000 mg/L)
showed that two tests on the same material had a difference of up to 200 mg/L.
The actual change in [MLSS] over the length of a cycle was usually 20-40 mg/L,
thus an accurate determination of assimilation was not possible. See discussion
5.1, it is possible the assimilation calculations also over estimated the amount of
nitrogen assimilated into new cell material.
The online real time plots for pH and air flow provided some useful features that
could be correlated to biochemical events. Figure 4.2-4 shows a typical pH
profile with the ammonia valley (point 1) indicating the point of ammonia
depletion, (all profiles taken from TS1 DOSP 4.0 mg/L).
67
7.7
1.S
7.5
TPN
7.4
:z:
7.3 '"
7.2
The pH curves provided profiles with consistently clear features. The ammonia
valley, (as described in section 1.6), was so distinguishable and consistent that
an algorithm was developed so that the process control system could use the
feature to determine the point of ammonia depletion. The process control system
detected the point of ammonia depletion using the pH algorithm in 419/420
cycles giving a successful detection rate equal to 99.8% reliability. Figure 4.2-5
shows the air flow profile with ammonia and COD data.
T9
-'-B
:r ·7
C,
£ 20 6 '2
'j§
!if
a 5 ~
0 15 !:
~
Z
4 c
'"
:£ 10 3 ~
e. COD/5
2
5
o 0
o 10 20 30 40 50 60 70 80 90 100 110 120 130
SBR cycle time (minutes)
68
appeared as a drop in the air demand at the end of the cycle (point 2 Figure 4.2-
5). A visual inspection of the 420 profiles resulted in an estimate that the air flow
profile could have been used for determination of the point of COD and ammonia
depletion in 80% and 40% of the cycles respectively. The ammonia depletion
feature was inconsistent in that the feature was often not distinct and the shape
of the feature did not lend itself to be reliably detected by an algorithm. The 40%
detection rate would suggest the ammonia depletion feature is unlikely to provide
a reliable process control tool however it could be used for manual interpretation
by an experienced operator. No algorithms were developed in this research to
provide automated process control from the air flow profile. Figure 4.2-6 shows
the ORP and dissolved oxygen profiles.
9 200
8
ORP
7 -------------- 100
6
...J
a, ;;-
E
6'
5
4
~~~
DO
0 -
E
ll.
e. oc
0
3
2 -100
o 400
o 10 20 30 40 50 60 70 80 90 100 110 120 130
SBR cycle time (minutes)
The ORP profile did not show any distinguishing features that would enable it to
be used as a process control tool. The operation at a fixed dissolved oxygen
concentration meant that changes to ORP could only result from changes in
oxidation reduction potential resulting from nutrient depletion rather than by
changes in dissolved oxygen concentration (i.e. the ORP profile did not change
due to factors such as DO breakthrough).
69
4.3 SUMMARY AND EXAMPLE OF OPERATIONAL DISSOLVED OXYGEN
CONCENTRATION 2.5 mg/L
The reactor was set to a dissolved oxygen set point of 2.5 mg/L and allowed to
run for an acclimatization period of 19 days. Since the SRT for this run was
approximately 8 days this period was slightly greater than two sludge ages. As
with the previous DOSP consistent behavior (in terms of online profiles) was
established well before the end of the acclimatization period. Seven track studies
were undertaken at dissolved oxygen set pOint 2.5 mg/L. The track studies were
obtained over a one-month period following the 19-day acclimatization period.
This section provides a summary and example of the results while Appendix A2
contains a full set of results. Figure 4.3-1 shows the [MLSS] over the duration of
the run.
[MLSS] mg/L
~~
'IDID
, MM
;~
i<:t'<t
m~
C')i
,'<I'
, It)
'10
N
o 5 10 15 20 25 30 35 40 45
OPERATIONAL DAYS FOR THE RUN
Figure 4.3-1 Mixed liquor suspended solids concentration DOSP 2.5 mg/L
70
The wasting rate required to keep the [MLSS] close to 3000 mg/L is illustrated in
Figure 4.3-2 while Figure 4.3-3 shows the SRT of the system.
Wastage (L)
0 0
...; ...;
NN N
""
N
0 0
N N
IX!
..-
It!
..... It!
.....
...."! "!
.... '<I;
....
<"!
.,...
q q q q
.... .,... .... ....
o 5 10 15 20 25 30 35 40 45
OPERATIONAL DAYS FOR THE RUN
SRT (days)
o 5 10 15 20 25 30 35 40 45
OPERATIONAL DAYS FOR THE RUN
Table 4.3-1 Summary of track study data [operational dissolved oxygen] 2.5
mg/L
Units T51 T52 T53 -T54 T55 T56 T57 Ave
[MLSS] mglL 2504 2901 3620 3944 2834 3194 3594 3227
(D)=(A.
Nitrogen loss (B+C» mglL N 5 8 3 4 6 7 8 6
Nitrification rate mglLmin N 0.12 0.12 0.13 0,16 0.14 0,14 0,11 0.13
mg/L,min,mg
MLSS 5.f.,OS 4.E-05 4.E-05 4.E-OS 5,E-05 4,E-05 3.E,05 4,E,05
Rate unaccounted N loss mglL.min N 2.E-02 3,E..[)2 1,E-02 3.E-03 2.E-D2 3£"[)2 2.E-02 2,E-02
% Initial TN removal % 18 27 13 22 24 34 34 25
% TN assimilated % 5 10 8 15 11 16 20 12
% Initial TN loss unaccounted % 13 17 5 7 12 18 14 12
COD Initial (J) mg/LN 149 180 147 121 128 115 170 144
COD Final (K) mg/LN 19 19 28 12 19 22 19 20
COD loss (L)=(J·K) mglLN 130 161 119 109 109 93 151 125
72
Table 4.3-2 Summary of HRT values DOSP 2.5 mg/L
HRT days 0.2 0.3 0.3 0.2 0.2 0.2 0.3 0.2
8.4
With reference to Table 4.3-1 the average influent soluble nitrogen (TN) was 24
mg/L (not including soluble organic N, this figure composed of 19 mg/L NH 3-N, 1
mg/L N0 2 -N, and 4 mg/L N0 3 -N, refer * Table 4.3-1). Twelve percent of the
influent soluble nitrogen was assimilated into new cell tissue; the remainder was
mostly transformed to NOx-N (refer ** Table 4.3-1).
Twelve percent (refer *** Table 4.3-1) of the initial total nitrogen could not be
accounted for in the nitrogen mass balance procedure, the unaccounted for
nitrogen was within the accuracy limits of the mass balance calculations. It is
unlikely the unaccounted for nitrogen can be attributed to aerobic denitrification
as the dissolved oxygen concentration was maintained at 2.5 mg/L at all times
and the pH was between 6.8-7.8 which was too low for air stripping of the
ammonia to have occurred. In comparison to the previous run the average time
taken for the complete oxidation of the ammonia increased from 153 minutes to
175 minutes. Thus a 1.5 mg/L drop in the operational dissolved oxygen
concentration increased the aeration time by nearly 15% or 22 minutes.
The online real time plots for pH and air flow continued to display some useful
features that were correlated to biochemical events. Figure 4.3-4 shows a typical
pH profile with the ammonia depletion feature (point 1). All the profiles were
taken from track study six (TS6) DOSP 2.5 mg/L.
73
30 7.7
pH
7.6
::J 25
l
Z
7.5
~ 20
7.4
~ TPN
~ 15 7.3 X
Q.
~
o 7.2
~ 10
7.1
7.0
6.9
20 40 60 80 100 120 140
SBR cycle time (minutes)
The pH profiles were consistent and the ammonia valley feature (point 1 Figure
4.3-4) was always clear and well defined. During the run the SBR completed
approximately 370 cycles. The process control system using the ammonia valley
detection algorithm correctly identified the valley (and terminated the aeration) in
360/370 cycles giving a successful detection rate equal to 97% reliability. The 10
cycles where the algorithm failed to detect correctly the point of ammonia
depletion were due to either a flat slope following the valley or an earlier pH spike
(with false trigger) caused by noise in the signal. Figure 4.3-5 shows the air flow
profile with ammonia and COD data.
30 -
~ 20
.§. c:
!i?
a
0 15
5!
;:
!d.
4,ll
~
I10 3
coo
~--~--~--~----~--~--~-L~o
20 40 60 80 100 120 140
SBR eyet.lime (minutes)
7
ORP 100
6
J
.s""5 ~
o
5'4
e.
3 DO
2
0 +----,-----r--.----.---,---,--~_+ -200
0 20 40 60 80 100 120 140
SBR cycle time (minutes)
The ORP profile did not show any distinguishing features that could be correlated
to the depletion of nutrients. The response of the ORP does not appear to
correspond directly with features on the dissolved oxygen profile (as one would
expect). For example the change of the ORP from a negative to a positive slope
(point 1 Figure 4.3-6) occurred 18 minutes after the initiation of aeration, also the
75
ORP apex (point 2 Figure 4.3-6) appeared to occur slightly before the dissolved
oxygen concentration actually reached zero or before anoxic conditions had
developed. Reasons for this may include the dissolved oxygen probe not
accurately reflecting the true dissolved oxygen concentration (out of calibration),
and/or the ORP probe itself may have been fouled slightly leading to a slow
response.
76
4.4 SUMMARY AND EXAMPLE OF OPERATIONAL DISSOLVED OXYGEN
CONCENTRATION 1.0 mg/L
The reactor was operated at a dissolved oxygen set point of 1.0 mg/L and
allowed to run for an acclimatisation period of 15 days. Since the SRT for this run
was approximately 15 days this period was equivalent to one sludge age. Seven
track studies were undertaken at dissolved oxygen set point 1.0 mg/L, the track
studies were undertaken over a one-month period following the 15-day
acclimatisation period. Following the switch to DOSP 1.0 mg/L the reactor
displayed consistent conditions in terms of the online parameters within 3 days.
The acclimatization period of 15 days was considered adequate before sampling
analysis was undertaken. This section provides a summary and example of the
results while Appendix A3 contains a full set of results. Figure 4.4-1 shows the
[MLSS] over the duration of the run.
;
,':
[MLSS] mg/L " ;
o 5 10 15 20 25 30 35 40 45
OPERATIONAL DAYS FOR THE RUN
Figure 4.4-1 Mixed liquor suspended solids concentration DOSP 1.0 mg/L
77
The wasting rate required to keep the [MLSS] close to 3000 mg/L is illustrated in
Figure 4.4-2, while Figure 4.4-3 shows the SRT of the system.
o
,..;
1
wastage (l) 0 0 <.:>
N N N
'Xl
If!
..... If!
....
--
q q
..... ..-
I I
o 5 10 15 20 25 30 35 40 45
SRT (days)
o 5 10 15 20 25 30 35 40 45
OPERATIONAL DAYS FOR THE RUN
78
Table 4.4-1 provides a summary of the seven track studies undertaken at DOSP
1.0 mg/L while Table 4.4-2 shows the average values corresponding to the
hydraulic residence time.
Table 4.4-1 Summary of track study data [operational dissolved oxygen] 1.0
mg/L
~q,q",o.o,
Units TS1 TS2 TS3 TS4 TS5 TS6 TS7 Ave
[MLSS] mg/L ""~ i 3008 3105 3469 3012 3507 3793 3258
(D) = (A-
Nitrogen loss (B+C)) mg/L N 10 11 11 11 11 8 B 10
NitrifIcation rate mg/LmlnN 0.08 0.09 0.07 0.08 0.08 0.08 0.07 0.08
mg/Lmln.mg MLSS 3.E-05 3£-05 2,E·05 H·05 3.E..oS Z.E-OS 2.E-05 2.E-05
Rate unaccounted N loss mg/L.min N 3,E'()2 5,E-02 4 E-02 3£·02 3,E-02 1.E-02 2.E-02 3.E·02
% Initial TN removal % 38 41 47 38 44 33 32 39
% TN assimilated % 8 6 8 8 19 18 7 11
% Initial TN loss unaccounted % 31 34 39 31 24 15 25 28
COD Initial (J) mg/L N 130 182 144 169 180 161 155 160
COD Final (I<) mg/LN 18 26 24 26 23 23 20 23
COD loss (L)=(J-K) mg/L N 112 156 120 143 157 138 135 137
HRT days 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4
79
With reference to Table 4.4-1 the average influent soluble nitrogen was
approximately 26 mg/L (not including soluble organic N, this figure composed of
20 mg/L NH 3-N, 2 mg/L N0 2-N, and 4 mg/L N0 3-N, refer * Table 4.4-1). There
was significant nitrogen lost from the system which could not be accounted for
via the nitrogen mass balance and there was a build up of N0 2-N suggesting a
possible inhibition of the nitrification process (elevated nitrite levels often
accompany aerobic denitrification activity (Ho (1994), Yoo et al (1999)).
Eleven percent of the influent soluble nitrogen was assimilated into new cell
tissue; the remainder was mostly transformed to NOx-N. Twenty eight percent
(refer *** Table 4.4-1) of the initial total nitrogen could not be accounted for in the
nitrogen mass balance procedure. The build up of N0 2-N, and the unaccounted
for nitrogen loss suggests that aerobic denitrification activity was present in the
system.
The time taken to complete the oxidation of the ammonia increased from 175 to
283 minutes. Thus a further 1.5 mg/L drop in the operational dissolved oxygen
concentration increased the aeration time by nearly 62% or 108 minutes.
The online profiles for pH and air flow continued to provide some features that
were correlated to the depletion of ammonia and COD. Figure 4.4-4 shows a
typical pH profile with the ammonia valley (point 1) indicating the point of
ammonia depletion, (all profiles taken from TS6 DOSP 1.0 mg/L).
80
30 7.60
::r 7.55
'i3> 25
.s
za. 7.50
t:. 20
7.45
5?
0
~ 15
NH,-N pH
7.40 t
0
Z
. 7.35
--
10
~
7.30
5? NO,·N
-£ 5
~ 7.25
a 20 40 60 60 100 120 140 160 160 200 220 240 260 260 300
SBR cycle time (minutes)
The online pH profiles consistently illustrated the ammonia valley feature, (point 1
Figure 4.4-4). The process control system correctly identified the ammonia valley
in 214/228 cycles giving a successful detection rate equal to 94% reliability.
Figure 4.4-5 shows a typical air flow profile with ammonia and COD data.
30
25
~
OJ
.s 20 6
~
0
5
"
'E
=l
g 15
'"~"
0
4
5?
-£ 10
t:.
2
5
+~~~~~,---~~~~~~J····T~-+O
o 20 40 60 80 100 120 140 160 160 200 220 240 260 260 300
SBR cycle time (minutes)
81
operational dissolved oxygen set point resulted in the ammonia depletion feature
being less distinct. Figure 4.4-6 shows the ORP and dissolved oxygen profiles.
9 200
7 OR? 100
6
2'OJ >'
g 5
6' 4
0 -a.E
e. 0::
0
3
2 ·100
o 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
SBR cycle time (minutes)
As with the previous operational dissolved oxygen set points the ORP profile was
devoid of features (correlated to either the transformation or the depletion of
nitrogen or organic carbon) that would enable it to be used as a process control
tool.
82
4.5 SUMMARY AND EXAMPLE OF OPERATIONAL DISSOLVED OXYGEN
CONCENTRATION 0.5 mg/L
The reactor was set to a dissolved oxygen set point of 0.5 mg/L and allowed to
run for an acclimatization period of 15 days. The SRT for this run was
approximately 29 days thus the acclimatization period was equivalent to half a
sludge age (the SRT was double the previous SRT value experienced at DOSP
1.0 mg/L). Consistent behavior (in terms of online profiles) was established within
3 days following the decrease in the DOSP from 1.0 mg/L to 0.5 mg/L. Seven
track studies were undertaken at dissolved oxygen set point 0.5 mg/L. The track
studies were obtained over a one-month period following the 29-day
acclimatization period. This section provides a summary and example of the
results while Appendix A4 contains a full set of results. Figure 4.5-1 illustrates the
[MLSS] over the duration of the run.
~~
""" .\
!;i!<'),/'
~i
en
....
I()
M ,
,
,.;.
~
~/
~
en
~m
il()
."""
\C'I/
,/
"
o 5 10 15 20 25 30 35 40 45
OPERATIONAL DAYS FOR THE RUN
Figure 4.5-1 Mixed liquor suspended solids concentration DOSP 0.5 mg/L
83
The wasting rate required to keep the [MLSS] close to 3000 mg/L is illustrated in
Figure 4.5-2, while Figure 4.5-3 illustrates the SRT of the system.
Wastage (L)
o 5 10 15 20 25 30 35 40 45
SRT (days)
o 5 10 15 20 25 30 35 40 45
OPERATIONAL DAYS FOR THE RUN
84
Table 4.5-1 provides a summary of the seven track studies undertaken at DOSP
0.5 mg/L while Table 4.5-2 illustrates the average values corresponding to the
hydraulic residence time.
Table 4.5-1 Summary of track study data [operational dissolved oxygen] 0.5
mg/L
Q.a",a,a. Units TS1 TS2 TS3 TS4 TS5 TS6 TS7 Ave
[MLSS] mg/L 3160 80 2953 3343 3344 3256 3195
(D)=(A.
Nitrogen loss (B+C» mg/LN 12 14 15 14 13 12 17 14
Nitrification rate mg/L.min N 0.05 0.06 0.05 0.05 0.05 0.04 0.06 0.05
mg/L.min.mg
MLSS 2.E·Q5 2.E·05 2.E·05 2.E·05 2.E·05 1.E·OS 2.E·05 2.E·05
i
Rate unaccounted N loss mg/L.min N 3.E·02 3.E·02 3.E'{)2 2,E·02 3.E·Q2 1.E.02 i 3.E·02 3.E-02
% Initial TN removal % 43 52 54 52 49 46 57 50
% TN assimilated % 6 11 11 15 9 19 12 11
% Initial TN loss unaccounted % 38 41 43 37 41 28 46 40
COD Inilial (J) mg/LN 159 171 136 152 161 106 170 151
COD Final (K) mg/LN 25 23 26 28 23 20 23 24
COD loss (L)=(J·K) mg/LN 134 148 110 124 138 86 147 127
85
With reference to table 4.5-1 the average influent soluble nitrogen was
approximately 28 mg/L (not including soluble organic N, this figure composed of
21 mg/L NH3-N, 5 mg/L N0 2-N, and 2 mg/L N03-N, refer * Table 4.5-1). Eleven
percent (refer ** Table 4.5-1) of the influent soluble nitrogen was assimilated into
new cell tissue; the remainder was mostly transformed to NOx-N in particular
there was a significant increase in the N0 2-N concentration. Forty percent (refer
*** Table 4.5-1) of the initial total nitrogen could not be accounted for in the
nitrogen mass balance procedure.
The significant increase in the amount of unaccounted for nitrogen and the
increase in nitrite nitrogen would suggest an increase (relative to DOSP 1.0
mg/L) in aerobic denitrification activity at the 0.5 mg/L dissolved oxygen level.
There was a significant increase in the time required for the oxidation of the
ammonia. In comparison to the previous run the time taken for the complete
oxidation of the ammonia increased from 283 minutes to 445 minutes. Thus a 0.5
mg/L drop in the operational dissolved oxygen concentration increased the
aeration time by nearly 57% or 162 minutes.
The online real time plots for pH and air flow displayed some useful features that
were correlated to biochemical events. Figure 4.5-4 shows a typical pH profile, all
the profiles were taken from TS1 DOSP 0.5 mg/L.
7.70
7.65
7.S0
7.55
7.45
7.40
------"
7.35
7.30
o 100 200 300 400
SBR cycle time (minutes)
86
The pH profiles were consistent and the ammonia valley feature, (Point 1 Figure
4.5-4) was well defined. During the run the SBR completed 145 cycles. The
process control system using the ammonia valley detection algorithm correctly
identified the valley in 133/145 cycles giving a successful detection rate equal to
92% reliability. Figure 4.5-5 shows the air j:low profile along with the profiles for
ammonia and COD.
30 9
8
25
7
:J' 20 6
OJ .::
.§.
5 ~
5' 15 ;J:
o 4,g·
2. NH,·N ...
~ 10 3 :.{
£
~
2
5
, 1
87
9 200
8
ORP
7 100
6
:;;:-
~ E
§. 5 0
Q.
o 4 0::
0
8.
3
·100
2
DO
0 I ·200
0 50 100 150 200 250 300 350 400 450
SBR cycle time (minutes)
ORP failed to show any distinguishing features that would enable it to be used as
a process control tool.
88
Chapter 5.0 DISCUSSION
Operation of the reactors at the 4.0 mg/L and 2.5 mg/L dissolved oxygen level
resulted in a 95-100% transformation of ammonia nitrogen to nitrate nitrogen. At
these dissolved oxygen concentrations the presence of nitrite nitrogen was < 1
mg/L and the nitrogen mass balance procedure was able to account for
approximately 90% of the influent nitrogen. That is 90% of the influent nitrogen
went to known forms and could be accounted for with the mass balance
procedure. However once the dissolved oxygen concentration was lowered to 1.0
mg/L and 0.5 mg/L the nitrogen mass balance identified significant losses from
the system. At these dissolved oxygen levels 30% - 40% of the influent nitrogen
could not be accounted for with the nitrogen mass balance procedure. That is the
loss of ammonia nitrogen could not be balanced by an increase in nitrite, nitrate,
or assimilated nitrogen.
The nitrogen mass balance typically assumed ~10% of the influent nitrogen was
assimilated during each cycle. This estimate is higher than that reported by
Patureau et al (1998) who found the amount of nitrogen lost to assimilation in a
nitrifying sequencing batch reactor was around 1%. The removal of nitrogen from
the system under aerobic conditions suggests aerobic denitrification activity was
present, (volatilization of ammonia was not possible as the pH was too low at
around 7.0).
While there was minimal nitrite nitrogen present when the dissolved oxygen
concentration was maintained at 4.0 mg/L and 2.5 mg/L the nitrite nitrogen levels
were as high as 6 mg/L and 11 mg/L when the dissolved oxygen concentration
was lowered to 1.0 mg/L and 0.5 mg/L respectively. The presence of elevated
nitrite levels is another indicator that aerobic denitrification was occurring. Ho
89
(1994) suggested that aerobic denitrification may be accompanied by the
inhibition of the second step of nitrification involving the oxidation of nitrite to
nitrate. Elevated levels of nitrite nitrogen are common in aerobic denitrification
processes and have been reported by other researchers such as Randal and
Buth (1984), Hanaki and Wantawin (1990), Ho (1994), Munch et at (1996), Yoo
et al (1999), and Delgenes and Patureau (2004b)).
A likely explanation for the nitrite build up is that Nitrobacter can be inhibited by
low dissolved oxygen concentrations. With reference to double Monod kinetics
the half saturation coefficient for dissolved oxygen is 0.25-0.5 mg/L for
Nitrosomonas, this is lower than that of 0.72-2.84 for Nitrob a cter. «Randal et at
(1992), Munch et al (1996), Helmer and Kunst (1998)).
90
5.2 (Objective 2) Elucidate some operational aspects of aerobic denitrification, in
particular comment on the nitrification, denitrification, and sludge production
rates.
5.0 0.18
0.16
:i:f 4.0 0.14 2'2
.sI!II
"'!II ~ .-e;
~:J 0.12 c:
,g::s 3.0
0.10
0...1
+:i_
::lz
" ""
'u_
~:z
::: til 2.0
0.08 E~
z~
z§. 0.06
1.0 0.04
0.02
0.0 +----,.-----,---.----.----1- 0.00
o 2 3 4 5
DOSP(mgIL)
The decrease in the nitrification rate translates directly into increased aeration
time for aerobic denitrification processes. Table 5.2-1 and Figure 5.2-2 illustrate
the increase in aeration time required as the operational dissolved oxygen
concentration was lowered.
91
Table 5.2-1 Aeration time relative to dissolved oxygen concentration
4.0 153
2.5 175 1.5 14
1.0 283 1.5 60
0.5 445 0.5 60
The rate of nitrification experienced at the 0.5 mg/L aerobic denitrification level in
this experimental work corresponds well with that reported by Demoulin et al
(2001) who investigated the 90,000 p.e. aerobic denitrification plant in Potsdam
Germany. They reported a nitrification rate of 1.1 mg N/g MLSS.h. This
experimental work had a slightly higher value at 1.2 mg N/g MLSS.h. (1.4 mg N/g
MLVSS.h, tests showed the biomass was approximately 84% volatile).
3.5
~----
0.0 0.5 1.0 1.5 2.0 2.5 3,0 3.5 4,0 4.5
DOSPmg/L
92
Metcalf and Eddy (2001) reported the rates of both nitrification and denitrification
in aerobic denitrification processes are likely to be a function of the reaction
kinetics, floc size, floc density, floc structure, rbCOD loading and bulk DO
concentration. Because of the complex physical factors the process is still to be
modeled accurately. However Metcalf and Eddy (2001) reported nitrification rates
for the aerobic denitrification process to be lower than conventional processes.
This is thought to be due to the lower dissolved oxygen concentrations and
because only a portion of the nitrifying bacteria contained within the flocs are
active.
Metcalf and Eddy (2001) reported typical nitrification rates for conventional plants
being in the order of 0.78 - 21 mg N/g MLVSS.h. It would appear that the
nitrification rates for aerobic denitrification facilities are at the extreme lower end
of the values reported for conventional processes.
5.2.2 Denitrification
Full denitrification was not achieved in this work. The aerobic denitrification
process only managed -50% nitrogen removal (including any assimilation). If the
50% nitrogen removal value is converted into a rate it would equate to
approximately 0.71 mg N/g MLVSS.h
It is possible the incomplete nitrogen removal was a result of a low COD/N ratio
and/or the complexity of the wastewater organic carbon compounds. Research
by Third (2004) investigated aerobic denitrification within sequencing batch
reactors and suggested it was a heterotrophic process which relied on the
storage of carbon polymers (for use as intra-cellular carbon) for the reduction of
oxidized nitrogen. Third (2004) found that the quantity and types of storage
polymers depended upon the quantity and type of organic carbon present in the
feed. That is simple organic carbon compounds such as glucose or acetate (not
typically present in wastewater but present in synthetic experimental feed) are
93
more easily stored as polymers and produce simple polymers such as PHB.
Barker and Dold (1996), Wentzel and Ekama (1997) suggested a COD/N ratio
>12 is required to adequately support the denitrification process while Third
(2004) suggested a COD/N ratio (in influent feed) of >10 to achieve complete
aerobic denitrification. This research used a domestic wastewater that typically
had a COD/N ratio of around 5. It is possible the low COD/N ratio combined with
aspects such as raw wastewater producing storage polymers that did not easily
hydrolyze and release "reducing power" may be contributing factors to the
incomplete nitrogen removal achieved in this research.
lVIetcalf and Eddy (2001) reported values for conventional denitrification range
from 2.5 3.8 mg Nlg MLVSS.h for a single sludge anoxic reactor under non
limiting conditions (at 20°C) and 0.56-1.6 mg N/g MLSS.h for systems using
endogenous carbon sources. Values for aerobic denitrification processes have
yet to be established however Metcalf and Eddy (2001) reported aerobic
denitrification process would have lower denitrification rates than conventional
processes because of substrate consumption in the aerobic portion of flocs.
It would appear that the rate of denitrification for the aerobic denitrification
process is less, probably around half of that experienced in traditional separate
stage anoxic denitrification facilities. From an experimental perspective there are
conflicting reports with respect to aerobic denitrification rates. Patureau et a/
94
(1998) suggested the rate of aerobic denitrification will largely be limited by the
rate of nitrification at the low dissolved oxygen concentration. Neef et al (1996)
indicated that micro-organisms capable of aerobic denitrification may have
slower denitrification rates than anoxic denitrifying bacteria. However Delgenes
and Patureau (2004a) identified numerous strains of microorganisms able to
aerobically denitrify. Upon further examination they found the aerobic denitrifying
performances of the consortium were comparable to traditional anoxic
denitrifying performances.
A summary of the nitrification and denitrification rates for both traditional and
aerobic denitrification facilities is shown in Table 5.2-2. These values are
approximates sourced from this experimental work and calculated from Munch et
al (1996), Metcalf and Eddy (1991), and Demoulin et al (2001).
With reference to Table 5.2-2 the lower rates of biochemical transformation for
the aerobic denitrification process suggest the overall treatment reactor volume
will need to be larger. This finding is supported by Metcalf and Eddy (2001) who
reported aerobic denitrification was only suitable for processes with sufficient
volume to accommodate the lower nitrification and denitrification rates. That is
aerobic denitrification will require a longer detention time and larger treatment
reactors than a conventional process.
95
This conflicts with some reports from full scale aerobic denitrification facilities
which suggest an overall saving in treatment capacity. For example Collivignarelli
and Bertanza (1999) partitioned off the equivalent of 2,500 p.e. of a full-scale
440,000 p.e. facility and converted it into an aerobic denitrification process. A two
year trial showed the aerobic denitrification process offered a possible 20%
saving in treatment tank volume compared to the conventional process (when
results are translated on a flow weighted basis). This conclusion is also
supported by the research of Demoulin et al (1997) who compared the efficiency
of the aerobic denitri'fication process to a conventional nitrification denitrification
process. Parallel operations lasting one year were undertaken at the Austrian
GroBarl WWTP in 1995. It was found that the aerobic denitrification process
demonstrated superior treatment efficiency when operated at the same loading
conditions as the conventional process. Both nitrogen and phosphorus removals
were consistently around 30% higher in the aerobic denitrification batch process.
It was estimated that the aerobic denitrification process offered a volumetric
saving of about 30% when compared to the conventional treatment technology.
96
In summary this experimental work suggests the nitrification and denitrification
rates for aerobic denitrification are significantly lower than those of conventional
separate stage processes. It appears that savings in terms of achieving opposing
reactions in the same time/space are likely to be offset somewhat by the reduced
rate of biochemical transformation. While it is possible aerobic denitrification may
offer opportunities for simplification of the treatment process (I.e. less recycled
flow) the experimental results obtained in this research suggest it is unlikely
aerobic denitrification will offer a reduction in the size or number of reactors
required. These results appear to contradict reports from some full scale plants
which suggest aerobic denitrification may offer the potential for treatment tank
volumetric savings.
It should be noted that the higher dissolved oxygen set points only nitrified the
wastewater while the aerobic denitrification process also denitrified. Therefore
the true savings in sludge production arising from the aerobic denitrification
process will be greater than suggested by Table 5.2-3. That is the nitrification
97
only systems would also have a sludge contribution from subsequent anoxic
facilities (required for denitrification). Further research is required to determine
the sludge production rates in an optimized aerobic denitrification process (one
that achieves full denitrification).
There is little reference in the literature as to the sludge production rates for the
aerobic denitrification process. However assuming the aerobic denitrification
process uses a shortened denitrification (nitritation type) pathway Turk and
Mavinic (1986) and Turk and Mavinic (1987) found this nitrogen removal pathway
can result in lower biomass yields. Oelgenes and Patureau (2004b) also
suggested a shortened denitrification pathway achieved through the control of
dissolved oxygen should result in less biomass production. Stouthamer et al
(1997) investigated some of the microorganisms responsible for aerobic
denitrification and found that some like Thiosphaera pantotropha produced a
lower growth yield.
Table 1 shows the total amount of air required to oxidise the influent
ammonia nitrogen.
98
With reference to Table 5.3-1 the 4.0 mg/L DOSP required more air per unit of
ammonia oxidized than the 2.5 mg/L DOSP because of excessive aeration and
inefficiencies at the 4.0 mg/L level. The increase in the amount of air required at
DOSP 1.0 mg/L and 0.5 mg/L is due to inhibition of the nitrification process
caused by the low dissolved oxygen concentrations.
The data suggests a traditional nitrification process run at - 2.5 mg/L would
require - half as much air per unit of ammonia oxidized compared to an aerobic
denitrification process run at 0.5 mg/L.
With respect to the average flow rates required to reach the dissolved oxygen set
points it can be seen the 0.5 mg/L aerobic denitrification process required
approximately half the air flow rate of the traditional 2.5 mg/L nitrification process.
99
THE LIBRARY
UNIVERSITY OF CANTERBURY
CHRISTCHURCH, N.Z.
aeration savings were a result of the new control system also providing increased
efficiency.
Heinen and Norgaard (1998) reported results from full-scale facilities modified to
incorporate nitrogen removal through aerobic denitrification. Specifically they
noted the low dissolved oxygen concentration required for the process ensured
that existing aeration facilities were usually sufficient in upgraded plants, while
they expected proposed new facilities would require less oxygenation equipment.
Pedersen et a/ (2003) reported on the conversion of the industrial wastewater
treatment plant at the CPKeico ApS pectin plant in Denmark. The industrial
WWTP is one of the largest in Denmark and was converted from a conventional
nitrification/denitrification process to a nitritation-denitritation process. That is the
process was converted to one of ammonium oxidation to nitrite followed by
controlled reduction of nitrite to N2 . They reported the shortened pathway
process decreased the oxygen required for oxidation by 25%.
The development of a 2,500 p.e. aerobic denitrification trial facility within a larger
440,000 p.e. plant by Collivignarelli and Bertanza (1999) allowed operating data
to be obtained over a two year period. They undertook a cost evaluation of both
conventional and aerobic denitrification facilities. Based on costs calculated in
Italian lire it was found the construction of conventional facilities required an
additional 10% capital investment along with an ongoing 30% higher operational
cost per year. Specifically it was found that a 50% saving in the electrical energy
expenditure could be attained with an aerobic denitrification process.
100
75% of the oxygen resources compared to full pathway nitrification. This was
supported by Oelgenes and Patureau (2004b) who reported a possible 25%
reduction in theoretical air requirements for nitritation followed by nitrite type
denitrification. Stross (2000) reported on the CANON process (refer literature
review) in which nitrification is limited to nitrite type nitrification. He reported a
63% decrease in the total air requirements.
5.4 (Objective 4) Identify the dissolved oxygen conditions necessary for aerobic
denitrification and for its optimisation.
2.5 10% •
1.0 26%
0,5 40%
101
There was a drop in aerobic denitrification from 40% at a dissolved oxygen
concentration of 0.5 mg/L to 0-7% at a dissolved oxygen concentration of 4.0
mg/L. The nitrogen losses at the 1.0 and 0.5 mg/L dissolved oxygen
concentrations are classified as "aerobic denitrification losses".
It is important to note that the losses can probably be ascribed to both traditional
anoxic denitrification and aerobic denitrification. That is a combined effect of
aerobic denitrification and classic anoxic denitrification, refer literature review 1.2-
1.4).
The research attempted to operate at a set point of 0.3 mg/L however the
hardware was unable to reliably measure and control the dissolved oxygen
concentration at this level. The experimental hardware was limited to the use of
traditional dissolved oxygen probes which were not suited to this application. As
the aeration system relied upon a reading from the probe to adjust the amount of
air supplied a small drift in the probe reading at the low set point could result in a
(proportionately) significant reduction in aeration. That is the probe could read
-0.3 mg/L when the actual conditions were anoxic, in this situation the aeration
system would assume the set point of 0.3 mg/L had been reached and the air
flow rate was reduced to -zero. There was also a degree of instability as a result
of operating a nitrification system at such a low dissolved oxygen concentration.
That is the nitrification process became significantly inhibited most probably by
the lack of dissolved oxygen. Dissolved oxygen concentrations below 0.5 mg/L
are reported to result in considerable inhibition of the nitrification process (Metcalf
and Eddy (2001)).
102
While this research suggested the optimum dissolved oxygen concentration
appeared to be around 0.5 mg/L research by Third (2004) suggests the optimum
dissolved oxygen concentration for aerobic denitrification is unlikely to be a fixed
value, rather it will depend upon variables such as the biomass concentration
and the release of reducing power in terms of the ability to hydrolyze stored
carbon polymers.
The elevated nitrite and nitrate levels and absence of effluent ammonia nitrogen
at the 0.5 mg/L dissolved oxygen set point in this work may suggest the optimum
(in this instance) was lower than 0.5 mg/L. Researchers such as Munch et al
(1996), Demoulin et al (1997), Yoo et al (1999), and Collivignarelli and Bertanza
(1999) found that dissolved oxygen concentrations above the aerobic
denitrification optimum resulted in the effluent containing higher concentrations of
N02-N and N03-N while dissolved oxygen levels too low resulted in higher NH3-N
concentrations in the effluent.
Munch et al (1996) suggested a dissolved oxygen value of 0.5 mg/L was suitable
to achieve a nitrification rate equal to the denitrification rate ensuring complete
aerobic denitrification. However they only reported the 0.5 mg/L dissolved
oxygen level as a theoretical value and did not operate at that level. Instead they
established nitrification and denitrification rates at higher dissolved oxygen
concentrations and then determined a theoretical dissolved oxygen concentration
that could produce the same rate of nitrification and denitrification. This was done
by combining a Monod type kinetic expression for the rate of nitrification and an
IAWQ model for the rate of denitrification.
103
that a dissolved oxygen concentration of 0.2 mg/L may result in incomplete
nitrification with elevated effluent ammonia concentrations along with complete
denitrification of any oxidized ammonia. At a dissolved oxygen concentration of
0.5 mg/L the model found that nitrification would improve but a build up of nitrite
and nitrate could be expected. Thus the model essentially predicted the optimum
dissolved oxygen concentration would be somewhere between 0.2-0.5 mg/L. The
model also predicted that aerobic denitrification could achieve over 90% nitrogen
removal at very low dissolved oxygen concentrations (0.2 mg/L) where as at
higher dissolved oxygen concentrations (> 1mg/L) the aerobic denitrification
reaction would be strongly inhibited.
104
studies the optimum dissolved oxygen concentration (range) was not determined.
They worked with dissolved oxygen concentrations down to O.S mg/L and found
that aerobic denitrification rates continued to increase down to and possibly
beyond those concentrations (lab-scale SBR activated sludge process).
With respect to studies involving cultures attempts have been made to identify
the specific optimum conditions for aerobic denitrifiers within culture studies with
the aim of transferring this knowledge to experiments with activated sludge
processes. For example Heijnen and Van Loosdrecht (2004) are currently
undertaking research at the Delft university clean technology institute to
determine the process conditions which lead to optimal aerobic nitrogen
elimination rates in wastewater treatment processes. This research is based
upon earlier experiments with the model organism Thiosphaera pantotropha
which have indicated the specific optimum conditions for which aerobic
denitrification is likely to occur.
Patureau et al (2000) extended earlier work with culture studies and trialed an
aerobic denitrifier organism mixture within an alternating aerobic/anoxic process
(in the presence of nitrate). They evaluated the aerobic denitrifying performance
at various dissolved oxygen concentrations and found that aerobic denitrification
activity was present up to oxygen saturation conditions (7 mg/L dissolved
105
oxygen), however the denitrifying enzymes became increasingly active below a
0.35 mg/L threshold.
Thus while the aerobic denitrification process requires a low dissolved oxygen
concentration it would appear that "short" periods of high DO to oxidise remaining
ammonia may be acceptable. Demoulin et al (1997) demonstrated that once
established an aerobic denitrification process could continue for a limited period
in the presence of high dissolved oxygen concentrations however they also found
that continued operation at high dissolved oxygen concentrations required a
significant re-acclimatization period (~10 days) before removal efficiencies were
"fully restored". Munch et al (1996) found that "extended" operation at high
106
dissolved oxygen concentrations resulted in long term damage to the aerobic
denitrifying microorganisms, that is the removal efficiencies were not fully
restored following a period of extended operation at high dissolved oxygen
concentrations.
5.5 (Objective 5) Comment on the need for soluble organic carbon for the
removal of nitrogen in the aerobic denitrification process.
TPN
~ 15
o
!:!.
Z' 10
~
Figure 5.5-1 Cycle illustrating nitrogen removal rate versus soluble organic
carbon availability
107
Two explanations for the nitrogen loss include autotrophic denitrification, and
heterotrophic denitrification possibly using stored intracellular carbon.
108
acetate addition. For example Bilanovic et al (1999) found the addition of acetate
as a carbon source helped eliminate accumulated nitrite in an anoxic/aerobic
reactor. Gerber et al (1986) and Tam et al (1992) also found that acetate gave
higher anoxic denitrification rates than either methanol or glucose. Henze (1989)
found that the denitrification rate using wastewater as the carbon source in a
traditional separate stage denitrification process was only one third of the value
obtained when acetate or methanol was available.
Another explanation for nitrogen loss in the apparent absence of soluble carbon
may be heterotrophic denitrification using stored intracellular carbon. The
sequencing batch reactor is characterized by fluctuations in substrate
concentrations over time (feast famine conditions). Research by Third (2004) at
the University of Murdoch Western Australia has found that some bacteria can
adapt strategies to cope with the large fluctuations in electron donor/acceptor
concentrations. For example some microorganisms have been found to be able
to store soluble organic substrate as polymers. Aerobic denitrification research
by Third (2004) suggests that the SBR can select microorganisms which have
metabolic strategies such as storage capabilities. When these microorganisms
are cyclically exposed to high concentrations of substrate but limited electron
acceptor they are able to take in substrate far in excess of the amount required
for growth and respiration. This excess uptake of substrate can be converted into
a storage polymer such as PHB (poly-B-hydroxybutyrate) as illustrated in Figure
5.5-2. The PHB is essentially an energy reserve that is subsequently used when
an electron acceptor such as oxygen or nitrate nitrogen becomes available.
-O-CH-CH -C -
I I 2
CH 3 0
n
109
Third (2004) correlated PHS concentrations and aerobic denitrification rates and
found denitrification ceased when stored carbon in terms of PHS was diminislled
suggesting aerobic denitrification may be a heterotrophic process using stored
intracellular carbon. Data presented at the SSR3 conference Noosa Queensland
Australia March 2004 suggests that under suitable conditions up to 70% of the
soluble acetate can be converted to PHS. At this stage the trials have been
limited to a lab scale SSR run on synthetic wastewater, (with acetate as the
carbon source). The type of storage polymer formed depends upon the carbon
source. For example acetate is known to form PHS, the use of propionate and
acetate will yield PHV, glucose tends to yield glycogen. There is little data on
polymer storage with respect to aerobic denitrification systems operated with raw
domestic wastewater. To complement the lab scale experiments the University
of Murdoch is currently developing a 26 cubic meter pilot plant as well as a full-
scale experiment.
110
The carbon storage-heterotrophic explanation is also supported by some full-
scale aerobic denitrification facilities. For example Demoulin et al (2001)
reported on the Potsdam wastewater treatment plant in Germany (90,000 p.e.) in
which aerobic denitrification is achieved via internal floc denitrification using
carbon stored through biosorption. They reported the low dissolved oxygen
concentration of the process minimizes the use of substrate carbon by oxic
metabolism.
With respect to the data obtained with this experimental work Figure 5.5-1 shows
a constant rate of nitrogen removal (~ 0.95 mg N/g MLVSS.h). It is possible the
nitrogen reduction rate would decrease during a cycle as the stored organic
carbon was depleted or the rate of nitrogen removal would have been higher at
the start of a treatment cycle when soluble organic carbon was present. Third
(2004) found that one variable governing the rate of aerobic denitrification was
the release of reducing power from storage polymers. It is possible the use of
(complex relative to synthetic feed) domestic wastewater results in complex
storage polymers that provide a slow sustained release via polymer hydrolysis.
That is it is possible the polymers were not depleted within the cycle lengths of
this research. Third (2004) also found that the aerobic denitrification process had
a higher nitrogen removal rate after the carbon had been taken up as a storage
polymer. This would explain why nitrogen removal rates were not greater at the
start of the cycles in this work when soluble organic carbon was present.
While the mechanism behind the nitrogen removal remains somewhat unclear,
the ability to remove nitrogen in the apparent absence of soluble organic carbon
may offer economic advantages in terms of organic and operational savings.
Semi-treated wastewater may not need to be exposed to raw incoming
wastewater, (carbon source), or supplied with an expensive external carbon
source such as methanol. Traditional ("relatively" high dissolved oxygen
concentration) processes can require the addition of an external carbon source
when the insitu organic carbon supply is insufficient. Bilanovic et al (1999)
111
undertook a comparison of different external carbon sources for denitrification
and found the cheapest source by far was methanol. However some US$0.011
of methanol was still required for the denitrification of each m3 of wastewater
containing 30 mg/L of N03-N. This means that the use of an external carbon
source for denitrification is still an expensive operation in the wastewater
industry.
112
a role due to the low dissolved oxygen concentrations minimizing the use of
substrate carbon by oxic metabolism and/or microorganism metabolic storage
strategies resulting from batch type processes. The experimental work
demonstrated the ability of aerobic denitrification to remove nitrogen from
wastewater without the need for supplementary carbon, thus there exists a
possibility for savings in operational costs in terms of the opportunity to remove
nitrogen with less dependence on organic carbon. The mechanism behind the
nitrogen removal (in the absence of soluble carbon) and "quantification" of the
requirements for organic carbon remain to be "conclusively" determined.
5.6 (Objective 6) Confirm if the online profiles have unique features with respect
to the aerobic denitrification process, in particular the ammonia elbow on the
ORP profile and the ammonia valley on the pH profile. Correlate these online
features with measured biochemical events such as the depletion of organic
carbon or ammonia nitrogen.
5.6.10RP
In an aerobic nitrifying environment electrons are transferred from the ammonia
nitrogen to oxygen which acts as the electron acceptor. At the same time the
ORP profile shows a positive slope as electrons are also transferred from the
ORP reference cathode to the oxygen (which has a greater positive potential). As
the ammonia is depleted and the flow of electrons from the ammonia nitrogen to
the oxygen diminishes this would also be expected to affect the rate of electron
flow from the ORP probe. Effectively more oxygen should be available to act as
electron acceptors for the ORP reference cathode and this could theoretically be
expected to cause an elbow or increase in the positive ORP gradient.
Some researchers have in fact made a correlation between the ORP ammonia
elbow and the point of ammonia depletion with the implication being the increase
in ORP and the depletion of the ammonia are directly related (i.e. the change in
113
ORP is due to changes in oxidative reductive potential resulting from the
depletion of ammonia nitrogen). For example Yu et al (1998) suggested the
elbow resulted from ammonia depletion in an AlO process as shown in (Figure
5.6.1-1).
ORP
100 ORPE.JbllNal
pelnt of 21M'Cn1•
depl.~nn 7.0
100
\
30 0."
'§,
E INH:J-NI
z 0
10
:r: :r:
6.6 a.
Z
~
!l. 0 6.4
'"0
-100
-200
Asrohk:· ;1iron "
Time (hours)
Figure 5.6.1 ~1 illustration of ORP elbow in an AlO process. (Figure Adapted from
Yu et al (1998)
Another example of a correlation between the ORP elbow and the point of
ammonia depletion was evident in the work of Ra et al (2000). They operated an
aerobic-anoxic SBR process treating piggery wastewater and identified the ORP
elbow at the point of ammonia depletion. They then used ORP to terminate
aeration. In this instance they detected the ORP plateau that follows the elbow
feature (Figure 5.6.1-2).
114
Ra CIt <fI2000 deluded the ORP
plateau and loon ferminated i3e:aUon 10.0
{ drop In ORP her~ .caused by Mf~iOn
;rminallonl
50
9,5
·50
0.0
.'00
1
"- ·150 8.5 :a
a:
a
·200
80
.2£0
·300
.350
·400
0 12 15 21
Time (hours)
Figure 5.6.1-2 illustration of ORP elbow in an AlO process. (Figure Adapted from
Ra et al (2000)
\ 200
100 ~
:i!o
[DOJ
o
·100
+-~i---.----r-----'---"--::::::;===----+ ·200
20 40 60 60 100 120
Time (minutes)
The existence of an ORP ammonia elbow during the aerobic sludge digestion
process was also proposed by Wareham et al (1993) and Wareham et al (1994)
as illustrated in Figure 5.6.1-4.
115
NI-j"N
f--.l,l~r~-<>-----<>--~-~----.;~= [DO[
OR?
Elbuw at JWint of DO
break through fallowing
II
ammonIa depletioll .
•
I N{!rlilu, knee /
3 ho<Jts air on atpo!ntofnlttat~
depfallon
Tin'll! (HCUfS)
However in all the cases cited the dissolved oxygen concentration was allowed to
vary and find its own level. Figure 5.6.1-5 however shows a typical ORP profile
within an aerobic denitrification environment held at a fixed dissolved oxygen
concentration (0.5 mg/L). As can be seen dissolved oxygen breakthrough was
suppressed (as a result of the dissolved oxygen set point control system) and the
ORP showed no elbow at the point of ammonia depletion.
30 200
25 ORP
ioO
>E
o ;:
IS
NH,-N
·100
00
-I-d::::==;===;:=::;=:::::;:==~:::;===;:~~=i- ·200
50 100 150 200 250 3no 350 400 450
SBR cycle tIme (minutes)
In this work the ammonia elbow failed to appear for both the traditional
nitrification process when the dissolved oxygen concentration was maintained at
4.0 mg/L and 2.5 mg/L and the aerobic denitrification process when the dissolved
oxygen concentration was maintained at 1.0 mg/L and 0.5 mg/L.
The ORP dependence on the dissolved oxygen concentration may be due to the
logarithmic interrelationship between DO and ORP (section 1.6) and the strong
electron acceptance potential of the dissolved oxygen. Collivignarelli and
Bertanza (1999) reported the ORP value in the aerobic denitrification process
was determined by the 02/0H- equilibrium, as well as N03-INH/ N0 2-/NH/ etc.
However these experimental results suggest the 02/0H- equilibrium is probably
the dominant parameter such that in the presence of dissolved oxygen changes
in the other parameters do not result in detectable changes in the value of ORP.
In practical terms this means the ORP ammonia elbow probably results
exclusively from the DO breakpoint and it is misleading to imply the elbow is a
direct response to ORP changes resulting from ammonia depletion.
117
Odense City wastewater treatment plant in Denmark. Redox was clearly shown
to indicate the point of nitrate depletion during an anoxic phase. However redox
provided no useful information during the aerobic phases and an ammonium
sensor was necessary to determine the point of ammonia depletion during
aeration.
Thus while it would be possible to use the ORP elbow feature to identify the point
of ammonia depletion in a variable dissolved oxygen concentration system it
appears that a more direct pathway would be to use the dissolved oxygen
breakpoint feature itself.
5.6.2 pH
The nitrification process was known to produce a pH profile with an ammonia
depletion feature (ammonia valley Hao and Huang (1996». One objective of the
experimental work was to determine if the pH profile was also applicable to the
aerobic denitrification process; that is, did the ammonia valley identify the point of
ammonia depletion in a low dissolved oxygen aerobic denitri'fication process.
The results of this research found the pH profile provided a consistent and
reliable indication of the point of ammonia depletion for both the traditional
nitrification and the aerobic denitrification processes. The main pH feature
termed the ammonia valley was present at all dissolved oxygen levels. With
reference to Figure 5.6.2-1 the beginning of aeration caused a rise in pH
(between points 1 and 2); probably due to CO 2 stripping from the system caused
by the initiation of aeration. After the initial increase the pH decreased again
between points 2 and 3, caused by nitrification and the consumption of alkalinity
as part of the nitrification process (7.14 mg HC0 3 consumed per mg of
ammonia). At pOint 3, the pH curve shows the feature termed "ammonia valley"
signifying the point at which ammonia is essentially depleted and nitrification has
118
finished. An illustration of a pH profile from TS7 DOSP 0.5 mg/L is provided in
Figure 5.6.2-1
30
~ I''
7.65
r:
25
20
::J
'"
E
~ 15 NH 3·N pH 7.50 :a
J:
2!:. 7.45
10
5
~ 7.40
7.35
0 7.30
0 50 100 150 200 250 300 350 400 450
SBR cycle time (minutes)
The essential shape and features of the pH profile were the same for both the
traditional nitrification and aerobic denitrification processes; however aerobic
denitrification produced a pH profile of half the magnitude, that is the pH scale
had a maximum 0.8 unit and maximum 0.4 unit difference for the nitrification and
aerobic denitrification processes respectively. This is quite possibly linked to a
shortened pathway nitrification-denitrification process consuming less alkalinity in
the aerobic denitrification process (section 1.2). Full pathway denitrification also
returns 3.5 mg/L of alkalinity per mg of nitrogen reduced. It is possible some
alkalinity was returned to the process via the aerobic denitrification process and
this may have acted as a buffer.
119
5.6.4 Air flow rate
As the control system adjusted the air flow to maintain a fixed dissolved oxygen
concentration the air flow rate profile essentially equated to the air demand
profile. An illustration of an air flow profile taken from TS7 DOSP 0.5 mg/L is
provided in Figure 5.6.4-1.
NH,·N
Airflow
The air demand profile was expected to indicate events such as the depletion of
organic carbon or ammonia nitrogen as theoretically these events would result in
a fall in the oxygen demand. The research found the air demand profile provided
an indication of the point of (readily available) organic carbon depletion (point 1)
in 80% of the cycles. The pOint of ammonia .exhaustion was also evident in 15-
40% of the cycles (not evident in figure 5.6.4-1). The lower detection rates
occurred in the runs in which the DOSP was decreased (the aerobic
denitrification range). The profile was applicable to both the traditional nitrification
process and the aerobic denitrification process, that is the essential elements of
the profile were there in both cases. The features appeared as sudden drops in
the air flow.
120
In summary the research findings suggest ORP does not provide any features
that can be correlated to biochemical events within either the nitrification or the
aerobic denitrification processes. The previously identified ammonia depletion
elbow is probably a response to dissolved oxygen concentration changes (and is
reliant upon a breakpoint in the dissolved oxygen concentration). There is
therefore no ORP ammonia elbow when a system is operated at a fixed
dissolved oxygen concentration. The implication made by some researchers that
the change in ORP is related to changes in oxidative reductive potential resulting
from the depletion of ammonia nitrogen is probably misleading-incorrect.
The pH profile provided a useful ammonia depletion feature that was consistently
present over a range of operating conditions including those required for aerobic
denitrification, (The magnitude of the feature was approximately half for the
aerobic denitrification process).
The air demand profile did provide an indication of the point of organic carbon
depletion; there was also periodically a feature indicating the point of ammonia
depletion however this feature did not appear reliably under all operational
conditions.
5.7 (Objective 7) Develop and demonstrate control algorithms that use online
features to control the aerobic denitrification process, (I.e. indirectly detect the
biochemical events). In doing so demonstrate the reliability of pH and ORP
control algorithms based upon relative rather than absolute values.
5.7.10RP
ORP failed to provide any features that could be correlated to biochemical events
under fixed dissolved oxygen conditions. As such the ORP profiles were of no
121
further use for control of either the nitrification or aerobic denitrification
processes.
5.7.2 pH
The pH profile provided a feature at the depletion of the ammonia nitrogen
(ammonia valley) as illustrated in Figure 5.6.2-1. In order to detect the ammonia
valley an algorithm was developed in which the second derivative of pH was
calculated (algorithm based upon relative rather than absolute values). This
essentially equated to calculating the slope of the pH curve (dpH/dt) and then
calculating the change in slope over defined time periods (d 2 pH/de). For
example, the average slope of the pH profile over a 3D-minute period would be
determined (every six seconds) and when the second derivative changed beyond
some specific set point (typically set at 0.001) the control system identified the
event as the occurrence of the feature termed the ammonia valley and
terminated the aeration cycle, that is the air was switched off and the reactor put
into a settle phase. It was demonstrated that 92-99% of all cycles were able to be
controlled by the algorithm. This detection rate corresponds well with a similar
software system known as the Evolving Fuzzy Neural Network (EfuNN) system
developed by the University of Otago and Waste Solutions Ltd (both located in
Dunedin New Zealand). The EfuNN system obtained a 96% successful detection
rate for DO breakpoint determination with a laboratory SBR treating synthetic
wastewater (Cohen et al (2003». In this research the lower detection rates
occurred when the DOSP was decreased. Thus pH was demonstrated as a
monitoring and control tool for both the traditional nitrification and aerobic
denitrification processes. A description of the algorithms is given in Appendix B4.
122
features that correlated to the depletion of biochemical parameters and the
profile was of no use for process control purposes.
123
Chapter 6.0 CONCLUSIONS AND RECOMMENDATIONS
6.1 CONCLUSIONS
The conclusions have been incorporated into the summary sections associated
with each fulfilled objective; however to reiterate, the following conclusions can
be drawn from this research .
(I; This experimental work suggests the nitrification and denitrification rates
for aerobic denitrification are significantly lower than those of conventional
separate stage processes. Nitrifying bacteria are known to be inhibited by
the low dissolved oxygen concentrations. It is also thought that only a
portion of the nitrifying bacteria contained within flocs are active in low DO
systems. The rate of denitrification is lower as denitrification is limited to
the anoxic zones of floc particles. Factors such as reduced anoxic floc
area and substrate consumption in the aerobic portion of the floc act to
red uce the denitrification rate (Met Calf and Eddy (2001)).
124
• Calculated on the basis of a unit of sludge created per unit of wastewater
treated the results suggest the aerobic denitrification process offers a
lower sludge production rate. Further research is required to determine the
sludge production rates for an "optimized" aerobic denitrification
processes (that is an aerobic denitrification process that is achieving full
denitrification). There is little reference in the literature as to the sludge
production rates for the aerobic denitrification process.
125
organic carbon. It is also generally agreed that the process has a lower
stoichiometric requirement for organic carbon due to the low dissolved
oxygen concentration resulting in nitrification inhibition and shortened
pathway nitrification-denitrification. It is also felt that intra-cellular carbon
storage can play a role due to the low dissolved oxygen concentrations
minimizing the use of substrate carbon by oxic metabolism and/or
microorganism metabolic storage strategies resulting from batch type
processes. The experimental work demonstrated the ability of aerobic
denitrification to remove nitrogen from wastewater without the need for
supplementary carbon, thus there exists a possibility for savings in
operational costs in terms of the opportunity to remove nitrogen with less
dependence on organic carbon. The mechanism behind the nitrogen
removal (in the absence of soluble carbon) and "quantification" of the
requirements for organic carbon remain to be "conclusively" determined.
@II The research findings suggest ORP does not provide any features that
can be correlated to biochemical events within either the nitrification or the
aerobic denitrification processes. The previously identified ammonia
depletion elbow is probably a response to dissolved oxygen concentration
changes (and is reliant upon a breakpoint in the dissolved oxygen
concentration). There is therefore no ORP ammonia elbow when a system
is operated at a fixed dissolved oxygen concentration. The implication
made by some researchers that the change in ORP is related to changes
in oxidative reductive potential resulting from the depletion of ammonia
nitrogen is probably misleading-incorrect. As ORP failed to provide any
features that could be correlated to biochemical events under fixed
dissolved oxygen conditions the profiles were of no further use for control
of either the nitrification or aerobic denitrification processes.
126
• The shape and features of the pH profile were the same for both the
traditional nitrification and aerobic denitrification processes. The profile
provided a useful ammonia depletion feature (ammonia valley) that was
consistently present over a range of operating conditions including those
required for aerobic denitrification.
• The air demand profile contained up to two features that were correlated
to the depletion of (readily biodegradable soluble) COD and the depletion
of ammonia nitrogen. The experimental work showed SO% of cycles
provided profiles that would have enabled an algorithm to detect the point
of COD depletion while as little as 15 % of cycles showed a clear
ammonia depletion feature making the point of ammonia depletion
unsuited for detection by an algorithm. No air flow algorithms were
developed in this experimental work.
127
• As the control system maIntained a fixed dissolved oxygen concentration
the profile provided no information apart from the concentration itself.
There were no features that correlated to the depletion of biochemical
parameters and the profile was of no use for process control purposes.
6.2 RECOMMENDATIONS
The following recommendations can be drawn from this research.
III The sludge production rates for the aerobic denitrification process need to
be clarified. The results suggest the aerobic denitrification process may
offer a lower sludge production rate (relative to a separate stage
nitrification-denitrification process). There is little reference in the literature
as to the sludge production rates for the aerobic denitrification process.
128
release of "reducing power" in terms of the ability to hydrolyze stored
carbon polymers.
129
APPENDIX A1.1 - TRACK STUDY ONE (TS1) DOSP 4.0
The biochemical data, nitrogen mass balance calculations, and online data for track study 1 follow
Table A1.1-1 Track study data and nitrogen mass balance calculations The pH profile had an ammonia valley feature at the point of ammonia
30
25
:::J
III
g 20 6 "2
In' '6
t)liROGEN MASS /iA'.A\lCE Ci 5 2
0 15
0.17 m!VL,fl\i" ~ ~
Sf.05 mgfl3;-,ln mg MLSB
~ "'~
£ 10
1~·jLSSJ ]J:){j ~I\.
(.,d,,-sld'dY 10
0"" MlSS I ;;)'c!~ IiO mwLcyt~
VS3lTSS
Dol Ml5S VC/d!i" o+.--~~--'--.--~--r--r--.-~--~~~~~L+
RIII:tlNir.~H,t.O, OJ2
Df!NH"N ~) m!}<t..t'.j'tleN l (~l "'k!SsCfUN" GalnofN:)
o 10 20 30 40 50 60 70 60 90 100 110 120
1'II(jiL.r.,'d1'! N {Iii" (J.a!nofU (.) =11)4$ c,j»; SBR cycle time (minutes)
tJ ..:t>;O),N \2 ~tl t:}'Ch~N !{+jvGahOr4(-}"IGMofNJ
Nloss' A'iS ..q rntI,L;;:ydeN
E,l'rn"lwanim'Ia!.ed!J mall N lct C,H;N01
UnJqQlm!td H j:x." mqfLN !(tj"!o360IN(")"GirnofN)
Figure A1.1-2 Air flow rate [ammonia nitrogen], and [COD]
The air flow rate profile provided an indication of the points of COD and
ammonia depletion, points 1 and 2.
The transformation and removal of ammonia appears to be balanced
by the production of nitrate and the likely assimilation. The nitrogen
mass balance procedure accounted for all but 9% of the systems
nitrogen.
200
30
ORP
7.6
100
7.5
TPN ;;-
7.4
.g, 5 DO E
E 0
'"
Q. 5' 4 tl.
7.3 e. II:
0
7.2
·100
o +-_,____;c--__.__~-.,..__,____,,____._____r-.,..__,____;r_.J ·200
o 10 20 30 40 50 SO 70 80 90 100 110 120 130
10 20 30 40 50 GO 70 80 90 100 110 120 130 SBR cycle time (minutes)
SBR cycle time (minutes)
Figure A1.1-1 pH profile and [soluble nitrogen] Figure A1.1-3 [DO] and ORP
The ORP profile failed to show any features that could be correlated to
the biochemical events.
130
APPENDIX A1.2 - TRACK STUDY TWO (TS2) DOSP 4.0
The biochemical data, nitrogen mass balance calculations, and online data for track study 2 follow
Table A1.2-1 Track study data and nitrogen mass balance calculations 30
TS2
TRACKSTUPY
0.21 pjIJ'Lmin
fE·OS ~''Lm!rLmoMlSS
3586 moll
ML!>!> r,hange t 24 hours 526 mgll,.tj,jyMLSS
20 30 40 50 60 70 80 90 100 110
10
C,e!~\ime 134 m~'~ (Aeroble·se!lJ&+lDfIll1utUr.~and<ltC3fll)
SBR eyel" time (minutes)
CFI&siday 11
DEl M;"SS I l;¥tIe 4!l 8gjlsycle
VSSfTSS
Dei MLSS Vc!3Ma 39 mQlLc)"de
012
!)'" 'JHrN ZZ my/LeydeN (("l "'Iou (lIN (.)<cGa!71 of N)
Figure A1.2-2 Air flow rate [ammonia nitrogen], and [COO]
Dei No;·~J mg,1..cycIaN \\+),"Gair,dNH"losSQrl~)
p.;< ~jO,.~ IB m9IL'}~N I (.. )= Gain 01 N H ",j05!< 01 tl)
The air flow rate profile provided an indication of the points of COD and
Eo;llfI\!I£das!'frila{ed t; 109/lHln c,H 1r,o)
Jr91;'Cfhl,"!!itd N~" rr,glLN «+1 "lussoftlH=Ga!nciN}
ammonia depletion, points 1 and 2.
The nitrogen mass balance accounted for all the systems nitrogen.
TPN
r 7,6
7,5
7.4
9· 200
100
J:
7.3
'"
0.
0:
7.2 o
7.1
NH,.N 7.0
:=::::;::===;:::==;~::::;==:;:=~=::;=~==::;:::=~w 6.9
10 20 30 40 50 GO 70 80 90 100 110 +---r--~-~-~-~---'~-_-~-~-~--+ ·200
SBR cycJe- time (minutes)
10 20 30 40 50 60 70 80 90 100 110
SBR cycle Ume (mlnut••)
131
APPENDIX A 1.3 - TRACK STUDY THREE (TS3) DOSP 4.0
The biochemical data, nitrogen mass balance calculations, and online data for track study 3 follow
Table A1.3-1 Track study data and nitrogen mass balance calculations
TS3 30
\
TfI!\CXSTUDY
7
NH,-N
COOlS
+--r-r-~-'-,-~-~-r·-r--r-'-.-~~~-'~~'+O
mg{~Jnln
mg/L'flln.mgMlSS
o 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160
3115 mc/l SBR cycle time (minutes)
305 mgfLda'l MLSS
'"
C"lMLSS.' cycle mgIU:ytl<1
VS5,TSS
Figure A1.3-2 Air flow rate [ammonia nitrogen), and [COD)
Del MLSS Vol~li1e
R;liol~jnC~HINo. 0,12
OeltJH,-N A mgl\.-oycle 11 ((+) "" "'$.1 of ~j H'" Gam of N ) The air flow rate profile provided an indication of the points of COD and
Ddt/Orr! mwLcyt:!eN ti+)"'Ga;n4ftJH"'\os50fN)
1(+)""Ga:~¢IN(-i"'lossofN)
15 mgfL,itJL1eN
mp/LqclcN
ammonia depletion, points 1 and 2. Point 2 was present but somewhat
Nb"" A-(8+C}
B(imilled assl1fi1!!1ki N mgillHo c!H,NO t
Uracc/;;!.IderlNIru$ mgllN j(t) .. !fJn(l/N(-)"" Gl.!incfN}
unclear.
The nitrogen mass balance accounted for all but 10% of the systems
nitrogen.
30 200
ORP
·100
;g; 5
;;-
§, E
00
5' 4
0-
e. '"0
·100
7.1
7.0
o -200
+--+~~~-~~~--~-~~-~~-,...::::::o,....--.--+6.9
W W • • • _ 00 _ n ill _ _ m m ~ ~
o 10 20 30 40 60 60 70 80 90 100 110 120 130 140 150 160
Figure A1.3-1 pH profile and [soluble nitrogen) Figure A1.3-3 [DO) and ORP
The pH profile had an ammonia valley feature at the point of ammonia The ORP profile failed to show any features that could be correlated to
depletion, point 1. The detection algorithm successfully identified the the biochemical events.
valley and terminated the aeration phase.
132
APPENDIX A1.4 - TRACK STUDY FOUR (TS4) DOSP 4.0
The biochemical data, nitrogen mass balance calculations, and online data for track study 4 follow
Table A1.4-1 Track study data and nitrogen mass balance calculations
TS4
1R:ACKSTUDY
6 C
J
m
NH,-N
Airflow
:j !
tn~IU!11n
+---r--.---r--'---.---r--.---r--~--~~,L __--. 1
£E"()S tng:lLmln.rr'J MLSS 10 20 30 40 50 60 70 60 00 100 110 120 130
['~lSSl JO/4 I'TI\lIL SBR cycle time (minutes)
115 tn;ILday I,.'l5S
Cyd"limJ
Ci'd,,~jd!¥ 10
~'I,\lSSIC;y<;le
vssrrss 0,80
Dfl "1LSSV<lI~~i'- Figure A1.4-2 Air flow rate [ammonia nitrogen], and [COD]
Rd"l> N 'r, C~H>N{)) 0,1'2.
Dt.NH,..il m~jLt"rt:a N { (+) '" lau or tl H '" Gain mIi}
DdfiOrN M;)'Ltyc.Je-ti «(+)",GahclN(·l"!wcQO'.q The aeration system struggled in the initial stages of the cycle to reach
~INOyN 13 M~ILcycla 11 «t) '" Gill/l (If N (o} '" t~G6 or N )
11'I\l!Lt'f"laN the target DOSP and it is thought the DO transfer efficiency may have
E'lirraie31lt;l;jrri31tdfl tn9-ILNI¢ C,H,No"
[;~accv.,1dlla N bn fallen due to problems with the aeration stones. Following this track
study the aeration stones were replaced and this appeared to rectify
the problem. The air flow rate profile provided an indication of the point
With reference to table A 1.4-1 the nitrogen mass balance accounted
of COD depletion point 1. The point of ammonia depletion was not
for all but 12% of the systems nitrogen.
clearly visible.
30 7.7
r
7.6
25 o
Z 7.5
"-
t. ORP
20
~
z-
7.4
100
- -'
Z "'15 pH 7.3 i
a.§.
t:. :l
7.2
'"
.§. 5 ~
~
10
5' a.
e NH~-N 7.1 e. "'0
NO,·N 7.0
·100
<--~~~-"---··T--,--'--~~-..,..,.,=r=::::;:::'::5;""--.--+· 6.9
10 23 30 40 50 60 70 80 90 100 110 120 130
SBR cycte time (minutes)
o +---,--~.-~-,---,~~--~--~ --.----,---,----.---+ .~oo
10 20 30 40 50 60 70 80 90 100 110 120 130
Figure A1.4-1 pH profile and [soluble nitrogen]
SBR cycle tIme (minutes]
133
APPENDIX A1.S - TRACK STUDY FIVE (TSS) DOSP 4.0
The biochemical data, nitrogen mass balance calculations, and online data for track study 5 follow
Table A1.5-1 Track study data and nitrogen mass balance calculations
TS5
TRAG'{STUbY
The nitrogen mass balance accounted for all but 11 % of the systems
nitrogen.
30 7.7
200
TPN
;g: 25
7.6
g
7.5
Z
!l.
pH 100
t:, 20
7.4
Z :::r ;;;;
2; :r: OJ e
2::. 15 7.3 c. !. 00 0
~
!l.
Z 5' i>::
B- 0
2; 10
7.2
2::.
Z 7.1 ·100
:£ 5
2::. 7.0
0 6.9
o .200
10 20 30 40 50 60 70 80 90 100 110 120 130
0" W • 40 W • ro • • ~lH lWl.
SBR cycle time (minutes) SBR cycle lime (minutes)
134
APPENDIX A1.S - TRACK STUDY SIX (TSS) DOSP 4.0
The biochemical data, nitrogen mass balance calculations, and online data for track study 6 follow
Table A1.6·1 Track study data and nitrogen mass balance calculations
TS6
TRACK STUDY 25
7
~
20 6 ::r
.§. en
5 .§.
!l!
Cl
15
~
lrn:$ Galn Gain
0
!2. '"
«
~
10
~
20 13
mglt ""It mj)il. m,,,- moJl mg/Lmln mg/l..mn mQlLmln
:r
~
Il14 rug/Lmln
4,£·05 mglLmln.lfl9 MlSS
!MlSSl 3639 mg.'\. o 10 20 30 40 50 60 70 BO 90 100110120130140150160
MLSS ehiU1gn 124 hOUfl> 54<1 m!)lLday MLSS
SBR cycle lime (minutes)
Cyclelirnr: (A~.rllbl¢ t SeRki. 10 mktUtec fill and decant)
Cydeslday
nt: MlSSfc.ydt:
VSsrtss 0,80
Di'J MLS3 Volali!J! 50 tngtLll'{cle Figure A1.6-2 Air flow rate [ammonia nitrogen], and [COD]
Ra!;;) N In C1,H1NO. 0.12
fMNrh·N A 20 mgfLeyeleN «().) "'loliiottlH"'GII:inofN}
fMNOyN trIg/L.eycle N ((+) :eGal'lofN(.)""lonofn) The air flow rate profile provided an indication of the points of COD and
omNorN h'1p/l.cydc N ({tl '" Gam of N (-):::: lott of N)
Ii ~OS& A-(B,.q mlYLq'CieN ammonia depletion, points 1 and 2.
Eslim>lled ll.$$lfI"ohrlcd t~ mUll N to C~H1N~
UM.cc:OU!1\&d N btl< mglLN ((+)"!oMllfN(·)~G,.btcrNl
The nitrogen mass balance accounted for all but 3% of the systems
nrtrogen.
30 7.7
7.6 200
::J 25
0. TPN ORP
g 7.5
Z
20
b 7.4 100
~
Z
J; j5 7.3 ~
t'.
~,~-- ~
~ 5 DO
7.2
10 0 4 c.
t'.
7.1
Cl
'o"
'? NH,-N
:£
t'. 7.0 ·100
t:::::=;==-.--~--.~~=;:::=;:::=:=:;::=;:==;==;;=:::;:S~~" 6.9
o 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160
o ".. -~-~-----,----~~----- __ ._ ~ _____ ____
~ ~ ___ ~_._
SBR cycle time (minutes) o 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
SBR cycle lime (minutes)
135
APPENDIX A1.7 - TRACK STUDY SEVEN (TS7) DOSP 4.0
The biochemical data, nitrogen mass balance calculations, and online data for track study 7 follow
Table A1.7-1 Track study data and nitrogen mass balance calculations 9
TS7
TH/lCKSniOY
,
"
mgll Il'gIL f!'i01l,m/n m(JILlT'ln m9L.mn
0,19 nlqlLml~
The nitrogen mass balance accounted for all but 3% of the systems
nitrogen,
200
30 7.7
::i'
0, 7.6
.s <5 TPN 100
Z 7.5
0..
t::. <0
Z 7.4 :l 5 :>
'" §.
d; :x:c. §. DO "-
~ 15 6' 4 '0"
r
e.
~~ 10
7.2
·100
~ 7.1
2
:E
~
7.0
136
APPENDIX A2.1 - TRACK STUDY ONE (TS1) DOSP 2.5
The biochemical data, nitrogen mass balance calculations, and online data for track study 1 follow
Table A2.1-1 Track study data and nitrogen mass balance calculations 30
TS1
25
T~ACK6TUOY
130
"
,.
E5Ulli"\.e;:I asslmi!ated N
The nitrogen mass balance procedure accounted for all but 11 % of the
systems nitrogen.
30 1.7 200
r2 25
7.6
Z 7.5 100
n.
t. 20 6
Z 7.4
:J :>
~ 15 7.3 a ~5
0
E
~ 10
04 Q.
rr:
7.2 B 0
EO.
Z 7.1
·100
:£
b 7.0
NO,-N
6.9
0 20 40 60 ao 100 120 140
SBR cycle time (minutes)
o 20 40 60 ao 100 120 140
SBR cycle time (minutes)
137
APPENDIX A2.2 - TRACK STUDY TWO (TS2) DOSP
The biochemical data, nitrogen mass balance calculations, and online data for track study 2 follow
Table A2.2-1 Track study data and nitrogen mass balance calculations
TS2 30
r
25
::l
r!li' 20 :5
£
0
0
l:1.
1. ~
0
'"
Z'
4 :.'1
Loss G~ln
i: 10
,m 13
2S
mg/l <'nOll mgIL mgil
Airflow
0.12 mgk.!'nin
4E~ m;jilmn.lTyMlSS 20 40 60 80 100 120 140 160 180
!MlS51 z001 fY>OJL SBR cycle time (minutes)
;;:«): tnglL.6ayMlSS
'207 minutes {A'$ol;!lc .. SeWe: .. 10 mlnutli!'s flU anti d~anI)
Crcl~s Ida)' 7
OliIMLSS!cyck! 29 ll'g:'U:;yc!e
vssrrss Figure A2.2-2 Air flow rate [ammonia nitrogen], and [COD]
OM MlSS Vol3~lv
Rat't N In c!H 1rl0 1
Jet NHr~~ A 20 mgll.cycll'!N i(+l"'!csscrt.l(.)::GalnoIN) The air flow rate profile provided an indication of the point of COD
;)elIJOI"'1 mllfLc,'ele f,I I {"Ill< Gain orN H '" loss 01 N)
DdNOr·'i 13 mglLCiCleN (\~J"'Gi!lJnol}l{-I"~noIU) depletion, point 1.
lib.;,. A·(B---C) (t.gllcyd"'N
Eo.tim3teJ .,uml~ted I"l mgil N to C~Hlt--I01
Uf"I<:e:.'Jtl\ed N:lo~s m\l'tl~ {{-+J"'l.:Y..-acfNH'" GainQIN)
The nitrogen mass balance procedure accounted for all but 14% of the
systems nitrogen.
30
200
100
:; ;;-
0,5 E
S
D..
5'4 0:
B- 0
·100
NH,·N
Figure A2.2-1 pH profile and [soluble nitrogen] Figure A2.2-3 [DO] and ORP
The pH profile had an ammonia valley feature at the point of ammonia The ORP profile failed to show any features that could be correlated to
depletion, point 1. The detection algorithm successfully identified the the biochemical events.
138
APPENDIX A2.3 - TRACK STUDY THREE (TS3) DOSP 2.5
The biochemical data, nitrogen mass balance calculations, and online data for track study 3 follow
Table A2.3-1 Track study data and nitrogen mass balance calculations
9
T83
25
TRACK' STUDY
In
o
o
15
2.
~ 10
."
ffijj/l
17
IDglL mglLm!n t=.
0.132 mglt.rr!n
4E~ mglLmlnJng MLSS o 20 40 60 80 100 120 140 160
iMlSSj 3fl20 mg/l Time (minutes)
157 mg/Llla,\, MLSS
C.,.'C)etime 191 rrlnures (A~jblc.Se(l\4j+1llm!/'IlIt~!!lin&nd$!CMt)
C)'d~slday 6
;to mgll.,,~!e
VSS/TSS
Figure A2.3-2 Air flow rate [ammonia nitrogen], and [COD]
Dd MLSS Vcl~.i~e
The nitrogen mass balance procedure accounted for all but 4% of the
systems nitrogen.
30 7.7 9, 200
:J 7.6
t;, 25 ~ TPN
..sz ' 7.5 ORP
100
t 20 NO,·N
7.4
!?[
0 :x:
15
~ 7.3
'"
Z !l2
a
~
10
7.2 o
~
7.1
5
t=. 7.0
NO,·N
0 6.9
20 40 60 80 100 120 140 160 20 40 60 80 100 120 140 160
SBR cycle time (minutes) SBR cycle time (minutes)
Figure A2.3-1 pH profile and [soluble nitrogen] Figure A2.3-3 [DO] and ORP
The pH profile had an ammonia valley feature at the point of ammonia The ORP profile failed to show any features that could be correlated to
depletion. point 1. The detection algorithm successfully identified the the biochemical events.
valley and terminated the aeration phase. Note the test samples taken
at 160 minutes were lost due to an experimental error however points
indicate the ammonia valley occurred at the point of ammonia
depletion.
139
APPENDIX A2.4 ~ TRACK STUDY FOUR (TS4) DOSP 2.5
The biochemical data, nitrogen mass balance calculations, and online data for track study 4 follow
Table A2.4-1 Track study data and nitrogen mass balance calculations
9 200
T84
TRACK ST\)DY
100
rrPN) • - {So! TN] R,IIH1)lll RallHa~,
~
.§.
5
5" 4 8:
o
B
·100
:rAts!>j
AE.oo
3944
mlllLrrlnSl'lG I.1ls$
l1:>gtl
o 20 40 so 80 100 120 140
MlSS ..iullg!!! 24hDl1f~ 3m ITgfLdaF' MlSS SBR cycle lime (minutes)
10
DJt !.iLS$" f cyc!e
Figure A2.4-2 [DO] and ORP
V$.S{fSS
~IMLSSYofah!1I
The nitrogen mass balance procedure accounted for all but 1% of the
systems nitrogen.
30 1.1
~ 2'
1.S
E
ie
"!!.0 20 TPN
Z 7.4
t 'i
Z 15 7.3
d"'
i!i.
~
7.2
10
i!S.
7.1
!f
:£
i!'.. 7.0
6.9
20 40 so ao 100 120 140
SBR cycle tlmo (minutes)
140
APPENDIX A2.S - TRACK STUDY FIVE (TSS) DOSP
The biochemical data, nitrogen mass balance calculations, and online data for track study 5 follow
Table A2.5-1 Track study data and nitrogen mass balance calculations
9 200
T84
TRAC,(STllOY 7
100
[TPNj • ~ [Sol TN! Rate-lasli Rate.j(l$" • Rd!~
<:! ;;:-
§' 5 S
Q.
6' 4 0::
e. DO
0
!V -100
+-----~----r_----.-----r_----.-----.---__+.200
0,14 rtll1lLmln
5£4)5 mgIL'llm.iTlIIMLS$ o 20 40 60 80 100 120 140
!MlSS! l'lS"ll
SBR cycle time (minutes)
MLSScltl."gelZ4hpur$ 2M: mgtt.d~y MlSS
1&2 mlnLrtes (Anoble ~ Sellla .. 10mt'lules fI!I anljdecanlj
G)'clesl d~~
D~r MLSS t cycle
Figure A2.5-2 [DO] and ORP
VaS/TSS
Z2
Ra\JoUb,C!H,NO., 0.12
The ORP profile failed to show any features that could be correlated to
OtINK.\-14 18 rnglL.c)'C!IjN {(+)'" losJlo[N H"'GainorN)
De: ~JOrN molLcyete N «(+).,. GlIln of tl H "'!oJ, of N) the biochemical events.
DeIN0l't~ 12 mglLcycleN «(t}"'GiI;)!}oINH "'!oilnl N)
IHJS3 "dOtel m9lLcrclnf/
ESLmEledas"f"'i:al\1dfl
Un~cco,n;etlNj*,f>
The nitrogen mass balance procedure accounted for all but 10% of the
systems nitrogen.
r
30
- 7.6
1.5
1.4
l:
1.3 c.
7.2
1.1
7,0
20 40 60 60 100 120
N0 2-N
...
140
SBR cycle time {minutes}
141
APPENDIX A2.6 - TRACK STUDY SIX (TS6) DOSP 2.5
The biochemical data, nitrogen mass balance calculations, and online data for track study 6 follow
Table A2.6-1 Track study data and nitrogen mass balance calculations
30
TS6
rQAC';;STUDY
COD
f;;TR'OGEN MASS BALANCE
0.12 mglLrrlr;
4E,OS rnj}lLmlruflg MLSS
It!~sSj "04 o+-----,-----~----~- ___~-----.------~-L--+
mgil day o.,1LSS o 20 40 so 80 100 120 140
Cyc;",jr-.e
SBR cycle time (minutes)
CyclES I d1.y
Del MlSSlc;'t'e
vssrrss
ntl 1,'lSS Vol:W!"
Ra!ln NIn C~H1NOl 0.1;( Figure A2,6-2 Air flow rate [ammonia nitrogen], and [COD]
OelNHl,N MgILcyd1!N (('t)"'loslIvN{-j"-Ga!nofN)
O"IHOr-/l1 f't\ljILeydetl {it)"'OalnIlfHH:.luuotN)
OalNOrtl l11g/LcycieN {(+l"'Ga:'netNH=lo$SorN) The air flow rate profile provided an indication of the points of COD and
A-jEte)
("lm'raled 3u!m'laled N Mgt\.. N!o ClHrN~ ammonia depletion, points 1 and 2.
Una""':&I1!ed U los,. mpil N «+) =kin 01 tH')" Gain orN l:
rhe nitrogen mass balance procedure accounted for all but 16% of the
systems nitrogen.
30 7.7
pH 200
7.6
:J' 25
en
~ 7.5 100
Z ORP
~ 20
7.4 ;;-
Sf E
0 15
TPN
r 0
<S 7.3 0.
Sf NH,·N
" 0::
0
0 7,2 DO
,::;. 10
·100
~
<S
.. 7.1
5
7.0
o +----~... --_,_----_,_-....-_,_----_,_----_,_---"-+ .200
0 6.9 o 20 40 60 80 100 120 140
0 20 40 SO 80 100 120 140 SBR cycle time (minutes)
SBR cycle Urns (minutes)
The pH profile had an ammonia valley feature at the point of ammonia The ORP profile failed to show any features that could be correlated to
depletion, point 1. The detection algorithm successfully identified the the biochemical events.
142
APPENDIX A2.7 - TRACK STUDY SEVEN (TS7) DOSP 2.5
The biochemical data, nitrogen mass balance calculations, and online data for track study 7 follow
Table A2.7-1 Track study data and nitrogen mass balance calculations
30
TS6
TRACI(STUOY
151 11
mgll moll.
Cjl;lt~lo")' 7
De! MLSSJcycr,;
vss;-rss o.ro Figure A2.7-2 Air flow rate [ammonia nitrogen], and [COD)
,::llel Mi.SS VQ~tile
Kalin N In C~HlriO~
OflNH1"N HI f!1SlLJ;~I>lN «+)"'ka;JI;<J(N[-i=cG!iflQINi The air flow rate profile provided an indication of the points of COD and
(j mgil~yd!)N {(+) "'/33In c.i N (-j"'Io",QfN)
D~I tlC,.N C I'IIllILq:cle N {f+)=-Galn al N (-) ><lonolN) ammonia depletion, points 1 and 2.
h'GH A-(a+q
f$llr..netfanlmil:r,!).tftl mg/l Ntl! C~H1f'tOt
Ura:roun\ed N 1011$ '«\lit N {(-+-) '" l.:Iu cf II {-J .. Gt'n oj N)
The nitrogen mass balance procedure accounted for all but 11 % of the
systems nitrogen.
30
7.6
25 200
::1
I 7.5 8
Z
0.
20
to 7.4
7
100
~~ 15
Z ~5 :;:-
E
0• 10
§ 0
~ 0 4 0..
0::
Z
b
e. 0
:l: 3 00
~
-100
143
APPENDIX A3.i - TRACK STUDY ONE (TSi) DOSP 1.0
The biochemical data, nitrogen mass balance calculations, and online data for track study 1 follow
Table A3.1·1 Track study data and nitrogen mass balance calculations
30
TS1
25
1
;J
.,
g
10'
20
.~
C 15
0 NH,·N ~
~
;'i'"
,
Gam GJlin
\0
'0 ~i!'. 10
mgil mil'L mg;' m>' "'<Pl fllglLm,n mgfLrnIn mg/L!rin
tH'''ROGENMASS BALANCE
rng/lm'll
31£-0:5 m;vL min IY\: MlSS
l Ml5SJ 2912
20 40 60 80 100 120 140 160 180 200 220 240 260 230 300
!1'\ff'Ld~y MlSS
SBR cycle tlma (minutes)
rn:~IJI~" (A!?fO!:!:; • Sel1'e .. 10/T<'llule$ ffiI a~d decant)
Cp::~s I q~y
Db MLSSle'tcl"
VSSI;SS '"
0,60
mwLt$le
£5kMtel1
A-(fl-.<::)
~s~lm~llled N
'v fT'9'LcydeN
mglL N to C!H1NO,
ammonia depletion, points 1 and 2.
lIn;;;:col,mltd'~I""l;; mgiLN ((+)"'ltSilcti/(.) "GiJlno(t~)
The nitrogen mass balance procedure accounted for all but 27% of the
systems nitrogen.
7,60 . 200
:J
7,55
:1
1 TPN 71 ORP 100
Z
E
Sf
a '!i
~5 >"E
;;. E- o
Sf: o 4 0.
0::
0
~ 10 0
Z 31
:£
e 5 ·100
O+~-~~r--··'-~~···-c-~~~~~-~~--r~~_~r~,~+
o 20 40 60 lIO 100 120 140 160 180 200 220 240 260 280 300
SBR cyGln tIme (mlnules)
o 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
SBR cycle time !minutes)
Figure A3.1·1 pH profile anQ [soluble nitrogen]
Figure A3.1·3 [DO] and ORP
The pH profile had an ammonia valley feature at the point of ammonia
depletion. point 1. The detection algorithm successfully identified the The ORP profile failed to show any features that could be correlated to
144
APPENDIX A3.2 - TRACK STUDY TWO (TS2) DOSP 1.0
The biochemical data, nitrogen mass balance calculations, and online data for track study 2 follow
Table A3.2-1 Track study data and nitrogen mass balance calculations
30
TS2
25
T=<O\CKSTUDY
~ 20
C
g'"
15
~
0 NHJ~N
~
*"
!,!.
? '"
~
-£ 10
i!:.
0)18 'TIgllJnin
'JE.{J5 mg/L 1l'n,mgf,llS$
1~'\lSSI ~912 rrg!1.
MLSS dn'">jJ"j14 h01,;(5 111 lTIgILdlJ,MLSS
20 40 60 ao 100 120 140 160 180 200 220 240 260 280 300
SBR cycle Urne (mInutes)
ZO mglLtycje
VSSIlSS 0.60
DellhSS Vclane If mgJLcYC!1!
Figure A3.2-2 Air flow rate [ammonia nitrogenl. and [COO]
mglLq'CleN (('t)""!ass<:ffIH"GlI'incfH)
mglLC'ttleU \(");:G.,!nofNH"lossc/~J)
The air flow rate profile provided an indication of the points of COD and
OeltmrN rr,gILcyr.:ieN ((+)""GaJnoiNH"'IDSl!O(~J)
tjlOS$ A-{B+C)
2s!imalwa'f1'i,mhledN m!yt.. N 10 c,!i.NO:
ammonia depletion, points 1 and 2. The point of ammonia depletion
UI'I3cco<l!'lI;eu N 10m> mgflfl i(~)"'lcs~QrNH"'G;Jrj'1cfN)
was slight.
The nitrogen mass balance procedure accounted for all but 35% of the
systems nitrogen.
ORP 100
~5
g
04
o
-100
20 40 60 80 100 120 140 160 180 200 220 240 260 2aO 300
SBR cycle lime (mInutes] o 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
SSR cycle time (minutes)
145
APPENDIX A3.3 - TRACK STUDY (TS3) DOSP 1.0
The biochemical data, nitrogen mass balance calculations, and online data for track study 3 follow
Table A3.3·1 Track study data and nitrogen mass balance calculations
TS3 30
TRACK6TUOY
25
7
~
g 20
@'
0
0 15
~
!Z
ltl .. \.,
;I:
11
" 2:.
0.07 m;YLttin
Il.1lSSJ 3105 frgil o 20 40 60 BO 100 120 140 160 180 200 220 240 260 280 300
MlSS dUl(j\lil! /24 t.~1i mg/LdiIY !,lUIS
SBR cycle time {minutes)
Cyd"N/dllY
Dtl r.\LSSf~f';e
VSSISS
DciMlSS V~~e
1",\", N In C\'M~O. OX, Figure A3.3-2 Air flow rate [ammonia nitrogen], and [COD]
0", !<Hrtl 1& mgll..~tlN t(+)"'iOSfQfNO'"GamoIN)
O~l HO,.N mWLcye:eN (lfj"Gatnaffli-l"'louoIN)
Odil3j ,f( l'tIQfLcye!etl j(+l "'G:I'nofN H""buoIN) The air flow rate profile provided an indication of the points of COD and
,'.Ikm A·(IHC) rngiLeytieN
f~limale4 ",.,ltnilat!l6 N mglL U !¢ CtH,t.'O; ammonia depletion, points 1 and 2.
tt",,'lll {(.)=.jes$<llNH"'GalnorJ~i
The nitrogen mass balance procedure accounted for all but 37% of the
systems nitrogen.
200
ORP
100
:::
o
DO -100
Figure A3.3·1 pH profile and [soluble nitrogen] Figure A3.3·3 [DO] and ORP
The pH profile had an ammonia valley feature at the point of ammonia The ORP profile failed to show any features that could be correlated to
depletion, point 1. The detection algorithm successfully identified the the biochemical events.
valley and terminated the aeration phase.
146
APPENDIX A3.4 - TRACK STUDY FOUR (TS4) DOSP 1.0
The biochemical data, nitrogen mass balance calculations, and online data for track study 4 follow
Table A3.4-1 Track study data and nitrogen mass balance calculations
TS4
TRACK STUDY
:~
20
F
T7
~ \ '2
'5
§. 5 ;;;t
i5
l1f
0
~
.,
0
!1.
~
~
Lo!>s
143 11 "'"
11
10 NH"N
M;l'lVltS mg/L fT'gfL rnglLmln mglLmlh mgfUrnn ~
Q,Qa ml}'Lrn!n
A,f'ugemleniirilicllLcn
o 20 40 60 ao 100 120 140 160 180 200 220 240 260 280 300
2E·05 mg/l mln.rt'19 MlSS
SBR cycle time (minutes)
II..-'lSS!
Ml.ss.ch3nQ!l/24 flOUr..; i06 mgfLday ~),lSS
299 mlnlJlali {Attlll>in + Settle 1" 16 tr\!nlItes mand decanl)
Cy.:lulday
D":~LSS/C'fd1!, 22 mglLtyde
vSS/TSS a.an
Figure A3.4·2 Air flow rate [ammonia nitrogen], and [COD]
mg/Leyde
Del 'ilSS V\l!itUIe
Ratio Ii 10 C~HINOl "
(U2
The air flow rate profile provided an indication of the points of COD and
QeI~lH,"N A 20.4 mglLcycl!!N ((+):: loss of N (-) "" Ga~r; of N)
!lei ~JOI"N ,.S mglU:11'IeN ((+)-= Ga:nOrNi-l '" losso(N j
ammonia depletion, points 1 and 2,
Del tiOrN B, IfIgll.q'Glef.l {(+) '" Galn offj (-) "'-loss of N}
t1'oss A·(A+C) 1.;17 trg/d:yc;leN
£s!imlled as:;imi!aled N 22 mpll N 10 CsthHC J
Uh\ln:oiJn{ed 11 loss a.5 mglLN ((+) '" loss ()f N (-) "" Gain of N)
The nitrogen mass balance procedure accounted for all but 28% of the
systems nitrogen,
- 200
30 7.60
7.55
:j
Z 25 1 ' ORP
a.. 100
t:.
'f
7.50
6 J
20
<5
z
pH 7.45 ~ 5 ~
~-
.E.
z~
0..
15 =s. 0" cr:
o~
~ E
7.40
e. 4
0
f:. 7,35
10
'f ,100
:£ 7.30
f:.
7.25
~···,,-~·~-r--'--.-~-'--r--'--.- _ _'---r--+,200
+-~~'--~-r--'--.-~--,---r-,---,--."'::::'>r--"'r'---J. 7.20
o 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
o 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
SBR cycle time (minutes) SBR cycle time (minules)
Figure A3.4-1 pH profile and [soluble nitrogen) Figure A3.4·3 [DO] and ORP
The pH profile had an ammonia valley feature at the point of ammonia The ORP profile failed to show any features that could be correlated to
depletion, point 1. The detection algorithm successfully identified the the biochemical events.
valley and terminated the aeration phase.
147
APPENDIX A3.5 - TRACK STUDY FIVE (TS5) DOSP 1.0
The biochemical data, nitrogen mass balance calculations, and online data for track study 5 follow
Table A3.5-1 Track study data and nitrogen mass balance calculations
T85
TRA.CKSTUD¥
~
g 20 '2'
'E
~
0
~
15 !<
!:l. 0
0::
~
:J: 10 ~
Ga'r, Loss
e.
" 5
3£·05
mgll-.m'n
rrglL.mln.moMLSS
o 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
3012 rr'lVl SBR cycle time (minut•• )
258 mqlLday MlSS
Gicffis!:ia),
Ott MlSS J c~cle 52 mGILcydc
V!.isrrss OBi) Figure A3.5-2 Air flow rate [ammonia nitrogen], and [COD)
De' "l~SS VV~\Le< 41 '1'I{I'1.,c\,cle
Rill!i,rHn CsHINo, 0.)2
Dtlt,'1,--N A 10 rrg;Lcycill N ((tj=I():$$Cffl (-) '" Gain 01 N) The air flow rate profile provided an indication of the points of COD and
0eliJD 1-N mglLC)'tltt~ ({+)"'Gai!loINi-j"IOUofUj
DilNOrN mJlL.C',t:leN (l+j"'GainoINH"'louoIN) ammonia depletion, points 1 and 2.
(~M'q!\!d llu1mH:Ilet ~ mail f~ 1::1 c.,H,I,o,
Ul'a~f.()unled N lass ((+) "1I;;.,.,nfUH"'Oain o[N)
The nitrogen mass balance procedure accounted for all but 22% of the
systems nitrogen.
30 7.60
200
7.55 8·
25
~ ORP
.§. 7.50 7
100
Z 20
"- 6
t:. 7.45
Z ::J >"
c\' 0,5 E
t:..
15 7.40 i g a
Z 5'4 !l.
~
c\' 10
7.35 e. 0
t:..
~ NO,·N
7.30
-100
:£ 2
t:.. 7.25
20 40 60 80 100 120 140 160 180 200 220 240 260 260 300
SBR cycle time (mInutes)
o 20 40 60 80 100 120 140 160 180 200 220 240 260 260 300
SBR cycle time (minutes)
Figure A3.5-1 pH profile and [soluble nitrogen) Figure A3.5-3 [DO) and ORP
The pH profile had an ammonia valley feature at the point of ammonia The ORP profile failed to show any features that could be correlated to
depletion, point 1. The detection algorithm successfully identified the the biochemical events.
valley and terminated the aeration phase.
148
APPENDIX A3.6 - TRACK STUDY SIX (TS6) DOSP 1.0
The biochemical data, nitrogen mass balance calculations, and online data for track study 6 follow
Table A3.6-1 Track study data and nitrogen mass balance calculations 30
T36
25
7
TRACK STuDY
~
AefafM ICOD) g 20 6 ?
~
!;j'
a0
15 ~
!:!. 4 0
5[ ""
L
;;:
G;tln
:x: 10
lo"" ~
Mgll rrglL 2
C,,:les/day ,
2ra mir~es (Ae,"oolc .. Seltle ~ 10 rrJrlJ!1m fi!l a'!d declmlj
DelMLS:Slc~cJe 41 mgILq'<:lr-
vssrrss Figure A3.6-2 Air flow rate [ammonia nitrogen], and [COD]
Dei MlSS V'o'aIW
Rtl.lkl N If! c,H1't0 1 Q,12
Cd NHy~. 15 mg!l.c~'JN !(+}"'!\tnI)(NH:Ga!nor~)
The air flow rate profile provided an indication of the point of COD
ON l~bt"N mll,Lc)'Glet1 i (+) = Gain of N (.)", kll.s uf N)
Defl10r N nglLq'l.:I!!:/i ((.)"'G/lmofNN"'losscfN)
depletion, point 1.
Nlo!!. A·(B+C) mglLC)"Cleti
Fsliroul«isssjrrJ,atedI. rrQ!l N to C!li;tiOl
UnaccO'"Tte<f N m'S mg/tll (t~),.ro$'(;'NO"'GlIh"rt~)
The nitrogen mass balance procedure accounted for all but 12% of the
systems nitrogen.
30 7.60 200
7.55
25
J
rZ 7.50
7 ORP 100
Q. 20
t. 7.45
~ ;;-
~ TPN 5
g E
15 7.40 i
~ 5' 4 0-
r.:
Z
6
B 0
0
7.35
10 3
r"
"'-
~
£
"'- DO
o 7.20 - -200
o 20 40 60 80 100 120 1411 160 180 200 220 240 260 280 300 o 20 40 60 80 100 120 140 160 180 200 220 240 260 2BO 300
SBR cycJe time (minutes)
SBR cycle time (minutes)
149
APPENDIX A3.7 - TRACK STUDY SEVEN (TS7) DOSP 1.0
The biochemical data, nitrogen mass balance calculations, and online data for track study 7 follow
Table A3.7-1 Track study data and nitrogen mass balance calculations
30
TS7
25
TRACK STUDY
The nitrogen mass balance procedure accounted for all but 24% of the
systems nitrogen,
91 200
30
25 ~
roo
7,55
ORP
100
~
7.50
g'" TPN
20
Z
~ :;-
I'"
jl,
t:. E
~
S
a 15 7.40 :a. 5' 4 1::
~ e. 0
zh 10
+7.35
0
~ -100
7,30 2
~
:£
~ 7,25
+-'~~'~'~-'~-~-'~~-"'--'-~~~-~-"''''''';F-+ 7.20
20 40 60 80 100 120 1.40 160 180 200 22Q 240 260 280 300 o 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
SBR cycle time (minutes) SBR cycle lime (minutes)
150
APPENDIX A4.1 - TRACK STUDY ONE (TS1) DOSP 0.5
The biochemical data, nitrogen mass balance calculations, and online data for track study 1 follow
r:
Table A4.2-1 Track study data and nitrogen mass balance calculations ~o
T82
~ L
25
rR,\CK sruOY
~ 20
g
-'-5;5
C' 15
0
!:!.
i 4 ~
t;::
NH,·N
3~
"4
L,,~~
21
Gain O~'11 LDn
13
~2:. 10
The nitrogen mass balance procedure accounted for all but 36% of the
systems nitrogen.
30 : 7.70
TPN 6
7.65
~
0)
25 ORP
g 7.60
Z
a. 20 S-
t:. 7.55 f:
0
!?f
0 15 &:0
~
~2:. 10
7.45
.100
7.40
'f
-£ DO
~ , 7.35
·200
0 +-----..,.-----,---_-.__-=:::-,-_...L 7.30 50 100 150 200 250 300 350 400 450
0 100 200 300 400 SBR cvcle time (minutes)
SBR cycle tim. (minutes)
Figure A4.2-1 pH profile and [soluble nitrogen] Figure A4.2-3 [DO] and ORP
The pH profile had an ammonia valley feature at the point of ammonia The ORP profile failed to show any features that could be correlated to
depletion, point 1. Tile detection algorithm successfully identified the the biochemical events.
151
APPENDIX A4.2 - TRACK STUDY TWO (TS2) DOSP 0.5
The biochemical data, nitrogen mass balance calculations, and online data for track study 2 follow
Table A4.2-1 Track study data and nitrogen mass balance calculations
1
TS2
TRACK STUDY
~
§.
30
25
20}
i r, 7
0Jj, mglLmln
-loss
" \4
mg;L "'91Ll'l'In InglLmln n".g.'LlT'in
5
-- 2
2£·0'5 mglLmln_tll9MlSS 50 100 150 200 250 300 350 400 450
(MlSSj "29 m,~
S13R cycle time (minutes)
MLSS tJnnge/24Imi.!f5 100 mgILdayMlSS
441 mirrut:&1l (Aerobic: + SmJ,;. t 10 minutes fill ~d de<::MI}
crdl;!> I day
Cd MlSS I CyClE 31 m!JIL~1a
VSSrTSS 0.80
Figure A4.2-2 Air flow rate [ammonia nitrogen], and [COD]
DeIMLS$VDI5:;lil 25 mgtLc~a
Rs,I 0 Ii ,0 C;H1NOl 0.i2
Illgf!"'cyc l eN
Dk~ NHrU A ((+)=IQ$SI)IN(-)-CalncfN)
The air flow rate profile provided an indication of the point of COD
mglLcydl'!N {(tj'=Gaifl!>fN{·)=klssnfN)
OF.INCA>j
ICi~S
mglL.eydeN {(t):;;Ga1nofNH=lostflfN)
depletion, point 1.
!J A,(B1Cl mgl~C;'!:leN
r,,\lfll'01J!o:{ assWaled N " mgll N 10 ~HltJOl
LJna<';"Q<H!!e;jtl!a~ ((+) "IoMtfti{.)"'GJll'jtIN)
" mg'lN
The nitrogen mass balance procedure accounted for all but 37% of the
systems nitrogen.
30 7.70
7.65
;g: 25
S 7.60
Z 100
~ 20
7.55
~
<5 TPN
i
tE, 15 7.50
Z
7.45
&
o
6' 10
tE,
z 7.40 ·100
:£
tE, 5
2
7.35 DO
+--~ .......~--~~-'--~--..---r----'-~"'....--+ 7.30 ¥'<--,----,-"'--~ --r--~--r--~-~--+i ·200
50 100 150 200 250 300 350 400 450 50 100 150 200 250 300 350 400 450
S13R cycle time (minutes) S13R cycl. time (minutes)
Figure A4.2-1 pH profile and [soluble nitrogen] Figure A4.2-3 [DO] and ORP
The pH profile had an ammonia valley feature at the point of ammonia The ORP profile failed to show any features that could be correlated to
depletion, point 1. The detection algorithm successfully identified the the biochemical events.
valley and terminated the aeration phase.
152
APPENDIX A4.3 - TRACK STUDY THREE (TS3) DOSP 0.5
The biochemical data, nitrogen mass balance calculations, and online data for track study 3 follow
Table A4.3-1 Track study data and nitrogen mass balance calculations
T83
30
,RACK STUDY
i 20 6_
<::
!?
8 15
5£ ~
15
" ~ 4 0
mg.'L mall mlJlL mgfl m.~ mg/L.mln mwt.·mJn mgfLmh
!f ""~
3 <;;
:E 10
i!:.
NITROGEN t,!ASS l1ALANCE
0.05 mg!L.rr.'n
ZE·OS rr.gtLmlnmg MLss
rMLSS) 3:'(10 m<ll
~,IU.:S "hilng,..124 hour~ 10. mgll.dily MlSS
421 mlrtul(lS (Aerobic ~ Sellle + lOm!rrJles fin and da:anI;
50 100 150 200 250 300 350 400 450
Op)MLSSi{;';'I':14 32 my1ley"'!'! SBR cycle time (minutes)
VSB/TS:; a.aD
Del MlSS Vru:!;,.. 25 mg.'Lt~c~
FilliQ N in Cl~h~lOl o.lZ
D?II'.1I1l,N 2D mg!U::ycIeN (\t)'" lot$ effi (-):G'-'n olNj Figure A4.3-2 Air flow rate [ammonia nitrogen], and [COD]
DelN01AJ msJ'L.q'ClttN ({+}=Ga{)ofNH'''105!1otNj
Del NO,N mglLpYde N ({1) "'-Gain tit N H=los.s.oHi)
rn!JrLcycl~N The air flow rate profile provided an indication of the point of COD
f!i1'na!ed a$sJm!lated ~l
" mg/L Nlo C~H1NOI
Ufl3ttO-lnted N1IJss 12 rn<J1LN i (t/" l(jss~f ~l (-j'" Gab 01 N) depletion, point 1. There was also a slight indication of the point of
ammonia depletion, point 2.
The nitrogen mass balance procedure accounted for all but 46% of the
systems nitrogen.
30 T7.70 200
7.65
~ 25
.§.
7.60 ORP
Z 100
b 20
7.55
;>
TPN
e
7.50 ~
!l1
0
7.45
7.40 ·100
NO,·N 7.35
o +--.. - - , - - - , - - - , - - - r - - - - , - - , - - - - , - - : - , . - . t 7.30
~~~--·--~--~----r---_r----.----:=--- --4·200 __
50 100 150 200 250 300 350 400 450
50 100 150 200 250 300 350 400 450
SBR cycle time (mlnutesj
SBR cycle time (minute.)
Figure A4.3-1 pH profile and [soluble nitrogen] Figure A4.3-3 [DO] and ORP
The pH profile had an ammonia valley feature at the point of ammonia The ORP profile failed to show any features that could be correlated to
depletion, point 1. The detection algorithm successfully identified the the biochemical events.
153
APPENDIX A4.4 - TRACK STUDY FOUR (TS4) DOSP 0.5
The biochemical data, nitrogen mass balance calculations, and online data for track study 4 follow
Table A4.4-1 Track study data and nitrogen mass balance calculations
30 \
TS4
25 ~\
TRAGKSTUOY
ICOO)
'"
mgil
l~'
2l)
mglL
0310
mg/l
,.
rnglL
,. MglLml,
wc¥l J:l;Yl.m!n fflUlLwJIl
"" 2
5
fJITROGEH MASS BALANCE
0.05 rrg!Ln'~fi
O+----r----r---.----.----~--~----~----,c~__+O
2E.05 fI".;tLmlrH"'!1ML.<;S
:'JLS!ij 295) 50 100 150 200 250 300 350 400 450
MlSS t'lanqf/2<:. hpl.Il~ 122 Jll9ILdayMLSS
SBR cycle time (minutes)
Cyck"!~:ly
,
470 mlnuiulO (/mable .. Se\t1,,-I-lllmiflVU;!l.(.;] !l;nd d~lIo'>tj
Ott"MlSS/cyCh'<
VSS!TSS "" mg/Lcycle
O~II,RSS \lcla/i,c Figura A4.4-2 Air flow rate [ammonia nitrogen), and [COD]
~1!Lo N In C~HINOl "
0.12
I"flfl't.cyde
The nitrogen mass balance procedure accounted for all but 39% of the
systems nitrogen,
30
r"
200
:::J . 7,65
'in 25
£ 7,SO ORP
!iF 100
a. 20
t::.
-c 7.55
;if ';;!
0
t:. 15 7.50 ?i r Ii
:>
E
0 a.
;if a 4
0 7.45 '"
0
10
t:.
;if 7.40
i!
i!E. 7.35
N0 2,N
-----~-~ --~.~.~~ ..
o +----;---~----,----,..._--,.---_,_---.----~-+ 7.30
o 50 100 150 200 250 300 350 400 450 50 100 150 200 150 300 350 400 450
Figure A4.4-1 pH profile and [soluble nitrogen) Figura A4.4-3 [DO] and ORP
The pH profile had an ammonia valley feature at the point of ammonia The ORP profile failed to show any features that could be correlated to
depletion, point 1, The detection algorithm successfully identified the the biochemical events.
valley and terminated the aeration phase.
154
APPENDIX A4.S - TRACK STUDY FIVE (TSS) DOSP O.S
The biochemical data, nitrogen mass balance calculations, and online data for track study 5 follow
Table A4.S-1 Track study data and nitrogen mass balance calculations
30 9
T85
25
TRACK STUDY 7
[COOl fTPtfl • -[BotlN] Rllht-lalls Rale-IMs • RallHOGS
~ 20 6_
.s ~
5~
II0 15 4
;:
0
!:!.
""
~
L,,, Ga'l' Galn
3 <C
". '"
rrj)'L mg!!. mY'l
13
rnJ!L "
moll rrglLlrln 1T1\jIL.mlfl rrgtLmtn
J:
~
10
5·
I.JITROOEN MASS B4lANCE
O,(l$ mglLw ln
~g{~,mln.m9 MLSS 0
100 150 250 300 350 400 450
""
83
mglL
mll1L31ayMlSS
50 200
SBR cycle time (minutes)
Cyc'Blirrle rrinU!es (Atroblc. 'I- Sf'ffil'! + 10 rrlnWHI fril and decl'll)
Cydu I u"r
OEI',\LSst')'(l~ 24 Ma'l,c~eli!'
vssrrss 060
rnglLcyele
Del MLS5 Vola'.'i"
Figure A4.S-2 Air flow rate [ammonia nitrogen), and [COD]
[(alioilin C;I-<,I.;O) 0.12-
DeIUH.-N ISUI mgll.cyde N (!.}"'!i;)'5l:lfN(.J=Oa.... (jfN)
Ol!-jNOyN 56 IT>lf1tcychlN 1 (+)= Ga'(\o!fl (-i'" km: of Nl
p, The air flow rate profile provided an indication of the point of COD
Oe:NorN mglLcyd\tN ((+} "'OjllnalH H '" Ios.S(.n~)
r. ,c,,~ A·(B~C-I 1J.l mglLcyc'.. N
EslillUl&d 1'I~$bnlalfd N
depletion, point 1.
Un3cc(>!m\c4 N h,lst; "
1Q})
Il".g!LNlc C$H,tlO1
""LN ((+)"'lvss\JfN(·): GMofNj
The nitrogen mass balance procedure accounted for all but 41 % of the
systems nitrogen,
30 7.70
200
i 25
7.65
7.60
[ 20 ORP
100
t::. TPN 7.55
Z
Ch5 7.50 =a ~5 :>
2;. .§. E
Z NO,-N 0.
7.45 04
J' 10 '"
~ --~p B. 0
z 7.40
:£ 5 ·100
~ ~NO,.N 7.35
o +--~--r---;---'--r--~'---r':::"'-r---l- 7.30
50 100 150 200 250 300 350 400 450 ... ~.....~~-'..... ...~~..~ ..~....~-.-.~ ..~_~ ....~--+ -200
SBR cycle time (minutes) 50 100 150 200 250 300 350 400 450
SBR cycle Urne (minutes)
155
APPENDIX A4.S - TRACK STUDY SIX (TSS) DOSP 0.5
The biochemical data, nitrogen mass balance calculations, and online data for track study 6 follow
Table A4.6-1 Track study data and nitrogen mass balance calculations
30 9
T86
25
TRAcKsruOY 7
::J
0, 20 6_
S
!1r 5~
"
c 15
0 II:
B 0
- ~ ""
11 :£ 10 ~
rr91L !'!Jllil
""'''
1J
m!>', " n'lgfl...mfl m~.mI1l m?'Lmh ~
(MlI'iSj
MLSS ll'lanQ"o 1241\OIJt&
Cyd~tlIr'It
cyclwtday
'elMLSSfcyel_
VSS/TSS
0,04
,,..
"'"
-
.. "'-
''''
""
oro
...."un'"
mgiLmhm\:l M~SS
f11QILdll}'MLS5
mgtl.t:lycla
(Aw.>bI",~St«.Io-+1{\mlr.J..tesMand~~
o 50 100 150 200 250 300
SBR cycle time (minutes)
350 400 450
CdIJLSSV<t,zt;. Figure A4.6-2 Air flow rate [ammonia nitrogen], and [COO]
fl-atio NIII C,H1NCtt "
0.12
Ill}'tcyeVi
'TlC,L,C)'CIt!N ((i;"'ID~'i"(lIN{·)"'G'f\llm}
OI:lWlrN A
" tnQiLqt!e N I (+j-" Ge1i'\t>fN(-j,.louMN) The air flow rate profile provided an indication of the point of COD
D.!NDj',N rrGil~.,'i ((t)"'GmmN{.)'" k1nofN 1
U~t A.:ihC) 12 mgA.A::ye'e N depletion, point 1.
E&!lmtltdaMImiJatadtJ 5 mgI\. N to C,lI,Ho,
Une.::t:<'lut1lOON :0)$1 InllilN ((+1'" IonoINH"Gll.lflofN)
The nitrogen mass balance procedure accounted for all but 32% of the
systems nitrogen.
30 .
f70
T200
7.65
7.35
7.30
o 60 100 150 200 250 300 350 400 450 o 50 100 150 200 250 300 350 400 450
SBR cycle timo {minutes)
SBR cycle time (minutes)
Figure A4.6·1 pH profile and [soluble nitrogen] Figure A4.6-3 [~O] and ORP
The pH profile had an ammonia valley feature at the point of ammonia The ORP profile failed to show any features that could be correlated to
depletion, point 1. The detection algorithm successfully identified the the biochemical events.
valley and terminated the aeration phase.
156
APPENDIX A4.7 - TRACK STUDY SEVEN (TS7) DOSP 0.5
The biochemical data, nitrogen mass balance calculations, and online data for track study 7 follow
Table A4.7-1 Track study data and nitrogen mass balance calculations
30
TS7
8
25
TfiACKSTlJDY
::i'
0, 20 6_
g c
!!!
g 15 5~
~
S<. 4 0
'? '"
.!:
147 2'
Gain Lou
11
"".
17
:£ 10 3«
mgll mgll m,1I. ,,"S/l mil;!. mg/Lmln m!O"l.tT;!n m(VL!T~n
~
COD
006 mQILmln
~lSS
lMlSSj ""'"
J25tl
rrglLmlruTlII
m,1e 50 100 150 200 250 300 350 400 450
1m; m\l'l..day MLES
471 mmtJie$ (ACi .. bie: + S.Et',ia + ,:.1 min..1ln foil and dl!eanl) SBR cycle time (minutes)
Crd"l<laa~
~: MLSS Valatie
O,H,tlO,
Rehc ,.., ,n
2'
R12
Ing!t.,eye!e
Figure A4.7-2 Airflow rate [ammonia nitrogen). and ICOD)
CdrJHj"N mg.'Ley::!eN i{+)::::tH&cfN(-)"'GainofN}
Oclflo,·ll mglLtyeklN ({+}"'G.tJn 01 N (.)"'JouofN)
DaiNo,.N mglLcycleN i (tl "" Ga!not h H "fMC. of N) The air flow rate profile provided an indication of the point of COD
Nlef.t A-{tHC) 17 mg1leydeN
e<lunated a.lJ!'milat..u N mllil N Ie CtH,N01 depletion, point 1.
UnilL1:oJrliedN"",s \3 n\{/'t..ti 1(+),. loGs;;!! N (.J'" Gain crN)
The nitrogen mass balance procedure accounted for all but 46% of the
systems nitrogen.
30 7.70
200
7.65
~ 25 8
g 7,60 ORP
~
b
~
~ 15
20
t
7.55
'5.
::i'
0,5
6
100
;;;-
E
7.50 g
~ 0'4 0-
a
~
10
7.45 B
3
Ct:
0
~
:c
NO,-N
JD 7.40 -100
5
~ 7.35 DO
Figure A4.7-1 pH profile and [soluble nitrogen) Figure A4.7-3 [DO) and ORP
The pH profile had an ammonia valley feature at the point of ammonia The ORP profile failed to show any features that could be correlated to
depletion, point 1. The detection algorithm successfully identified the the biochemical events.
valley and terminated the aeration phase.
157
APPENDIX 81 PHOTOS OF EXPERIMENTAL HARDWARE
To help identify items some photos also have numbers beside specific pieces of hardware, these numbers
can be cross referenced to the system diagram below to obtain a description,
OATA
REPORTS
(2)
(13)
PROCESS
CONTROL
SYSTEM
(1)
WASTE
SLUDGE
,~{~ J~~ ~
TREATED
EFFLUENT
AIR
SUPPLY
(4)
--~--~----~)-------~ (9)
i:i
(liD)
0..
~
(5)
i
BROMLEY WASTEWATER TREATMENT PLANT - CHRISTCHURCH
MUNICIPAL SEWAGE
KEY
(1) Process controlier, microprocessor control, controlled and monitored on Athlon PC. Box incorporates 16 analogue inputs, 16 digital inpuls, and 16 digital outputs,
(2) Online rea Hime data reports for Ihe analysis of lreatment process
(3) Network link allowIng for remote access to process control system, tor example via intranet and interneL
(4) Regulated compressed air supply
(5) 500Lcapacily cold waslewaler storage with submersible feed pumps
(6) Irnmersion Ilea ted water bath
(7) (PAC) Proportional air valve conlroller
(8) Waste solenoids
(9) Air solenoid
(10) Variable rate air solenoids
(11) (FRS) Electronic flow rale sensors
(12) 10L capacity sequencing batch reaclors
(13) Mixers
(14) DO meters
(15) pH meters
(16) ORP cables
(17) Fill control pressure transducers
158
APPENDIX 81 PHOTOS OF EXPERIMENTAL HARDWARE
159
APPENDIX 81 PHOTOS OF EXPERIMENTAL HARDWARE
Figure 81-5 Switched 230 volt outputs (Also Figure 81-8 On/Off upstream air solenoids
part of process control system)
Figure 81-6 Proportional air valve controller Figure 81-9 Variable rate air solenoid (1 of
2)
160
APPENDIX 81 PHOTOS OF EXPERIMENTAL HARDWARE
Figure 81-10 Computer linked to process Figure 81-13 Mixing and wasting hardware
control system
nu l .. EVE i
CONTFO!.
PRESSURE
161
APPENDIX 82 SEQUENCING BATCH REACTOR OPERATIONAL PARAMETERS
Two reactors were built, each had a usable volume of OIl Hydraulic residence time (HRT)
8L. This allowed for a wastewater consumption of day 24hours
=6hours 1
{ 8Lvo/llme - rct.-FloW'--f
32L day
around 32 L/day or 224 Llweek. With the operation of
Recommended HRT for full-scale (nitrifying) sequencing batch reactor
two reactors in parallel this amounted to the
Range 12-50 hours
consumption of approx 450 Llweek of wastewater.
Volumetric loading
The largest wastewater cooler that could be purchased 280m! BODs. 32L Flow.J.... Volume- rct.-g _.~. 1000L' = 1.12 kg BOD, - applied
{ L day EL JOOOmg lOOOg ml J mJ,day hi-volume
was 500 L, thus the decision to use an 8 L reactor Recommended volumetric loading for full-scale (nitrifying) sequencing batch reactor
limited the need for wastewater collection from the main Range 0.08 - 0.240 .::.:=-=:.:.
--?-....
II Percentage of volume decanted each cycle = Range 0.05 - 0.30 ~ ... '::::-CL=r:.'=
50%.
.. Estimated length of Cycle =3 hours, thus cycles
It was not physically possible to operate a lab scale reactor
_ {24hours CYCle} = Scycles within the ranges suggested for full-scale facilities. The
per day - day' 3hours day
ranges for full-scale facilities are provided as a comparison
" Estimated flow per day =4L per cycle, thus flow only and were obtained from Metcalf and Eddy (2001)
162
APPENDIX 83 DETERMINATION OF AERATION SYSTEM EFFICIENCY
The transfer of air from the gas to the liquid phase was necessary
to supply oxygen to the processes. Air was pumped into the
reactor through an aquarium type porous stone diffuser.
2 1.7 7.6
Figure 63·1 Experimental hardware used to determine oxygen 5 3.7 5.6
transfer parameters.
12 5.6 3.7
16 6.7 2.6
The procedure involved filling the reactor with clean water. The
dissolved oxygen was removed from the water by the addition of Cs == 9.3 mg/L @ 20 °c
sodium sulphite. The water was then re-oxygenated to near
Example calculation Determination of Kla for 857 mUmin
saturation level. This procedure was repeated for a series of DO
flow rate.
flow rates while readings were manually taken for [DO] versus
time. Figure 83-2 illustrates the oxygen transfer rates. The Using equation 83 -1 Kla:: 2.303(IOg7.6-logI.8!(60)
23-2 )
dissolved oxygen transfer rates were determined from the slope of
the profiles; the slope from 0-5 minutes was taken to calculate a
transfer rate in terms of mg/L.min. 8y difference of air supplied to
Table 63-2 Summary of the main dissolved oxygen transfer
air transferred the efficiency was able to be obtained directly. The
parameters.
oxygen mass transfer coefficient was determined using equation
83-1 from Metcalf and Eddy (1991). Table 83-1 shows the
experimental data for the 857 mLlmin flow rate while Table 63-2
contains a summary of the oxygen transfer parameters for the
different flow rates.
163
APPENDIX 84 PROCESS CONTROL SOFTWARE AND CONTROL ALGORITHMS
A software package was developed using the Lab The second derivative of pH has also been used by
View software package from National Instruments. Peng et al (2003) who detected the depletion of nitrate
nitrogen by using the second derivative of pH to identify
The software package allowed for ORT monitoring and the point at which the nitrate apex occurred. The pH
control via pH, air flow, [DO], and ORP. Control was control algorithm in this research allowed for the input of
achieved by the input of appropriate algorithms which three variables. The first variable was the line length;
provided for the detection of certain profile features this specified the size of the window the second
that had been correlated to biological events. derivative would cover, (usually set to around 30
minutes). The next variable was the second derivative
pH CONTROL ALGORITHM trip level or set point. When the calculated value
ORT control was only implemented into the mix- exceeded the set point it indicated the pH profile had
aeration phase and this was achieved by the use probably reached the ammonia valley. The trip level was
2
d pH usually set to about 0.001. The size of the trip level was
of 2
important as a low value could result in false triggers as
dt
a result of spikes or noise on the pH profile while a high
The sequence behind the algorithm is value could result in failure to detect the ammonia valley.
DO CONTROL ALGORITHM
• YES
Another sequence within the software allowed control of
the dissolved oxygen concentration, illustrated in Figure
Terminate aeration
84-2. Note that this sequence also included the output
from the pH control algorithm.
164
APPENDIX 84 PROCESS CONTROL SOFTWARE AND CONTROL ALGORITHMS
For example if the DOSP was 3.0 mg/L and the actual
[DO] was 0.6 mg/L the (difference) DO proportional gain
would be calculated as 3.0 - 0.6 :::: 2.4. Providing a
larger number than say DOSP 3.0 mg/L [DO] 2.5 mg/L
= 0.5. A larger DO proportional gain resulted in a larger
valve opening-air flow rate.
The control of the dissolved oxygen concentration The integral gain factor was used to maintain the DO
required the input of a number of variables; these have flow rate when the proportional gain reached zero, (i.e.
been presented in Table 84-1. when the DOSP was reached).
Table 84-1 Variables used to control the dissolved When the [DO] was higher than the DOSP the negative
oxygen concentration scale factor was implemented. (it activated when the
proportional gain was negative). The negative scale
MaxImum aeration time Terminate aeration If ORT control fails
factor was multiplied by the proportional gain before the
Proportional gain adjustment factor Used to adjust air flow When [DOJ < OOSP
Integral gain factor Used to adjust air flow When [DO] = DOSP
number was added to the dump, in effect adjusting the
Negallve scale factor Used to adjust air flow When [~O] > DOSP
rate at which the air flow rate was reduced and the rate
at which the [DO] was reduced.
To control the dissolved oxygen concentration the In some situations the proportional gain method could
system had to manage the air flow rate to the reactor not ramp up the air flow fast enough. For example in
by adjusting a variable rate air solenoid. This was situations were a low DOSP was specified the resulting
achieved by the use of a "number dump"; the degree proportional gain was also low. To ensure the DO flow
to which the valve would open was dependent upon a rate increased fast enough in these conditions a variable
value generated from this dump. Using this value the called the integral offset factor was included providing
control software could adjust the air flow rate from 0-9 an initial boost to the dump to jump start the process.
Llmin over 256 graduations (8 Bit system).
165
APPENDIX 84 PROCESS CONTROL SOFTWARE AND CONTROL ALGORITHMS
Figure 84-3 Main GUI display with ORT pH profile made bold
From the main control window there were icons to access other parts of the software; for example, the
ammonia valley detection algorithm variables are shown in Figure B4-4. This window could be opened from
the main screen via the "Air stop vals" icon, (bottom right on main GUI).
166
APPENDIX 84 PROCESS CONTROL SOFTWARE AND CONTROL ALGORITHMS
Figure 84-4 Ma in GUI display with ammonia valley detection window open
The primary control variables and calibration factors were accessed through the "Change values" icon, (lower
right main GUI) ; this opened another window as shown in Figure 84-5. The current sequence along with the
control variables could be changed from this window, (located at the bottom are the calibration factors for the
ORT parameters).
The force state icon (as shown at the bottom left of Figure 85-4) could be used to access a system over ride
window. This is illustrated in Figure 85-6. The over ride window enabled manual control of the main reactor
hardware, the manual control decisions superseded those sent by the main control software. This control
window was included for maintenance and calibration purposes. With reference to Figure 84-6 the variable
rate air valve control goes from 0-255 , there were 256 graduations (8 bit) but the scale went to 255 as the
software had to use the number 0 as the first graduation .
167
APPENDIX 84 PROCESS CONTROL SOFTWARE AND CONTROL ALGORITHMS
Figure B4-5 Main GUI display with primary control window open
Figure B4-6 Main GUI display with force state control window open
168
REFERENCES USED IN THIS RESEARCH
Alleman J.E. (1984) Elevated nitrite occurrence in biological
Abeling U., Seyfried C.F. (1992) Anaerobic-aerobic treatment wastewater treatment systems. Waf. Sci. Tech. 17,409-419.
of high-strength ammonia wastewater, nitrogen removal via
nitrite. Wat. Sci. Tech. 26(5-6), 1007-1015. Alleman J.E., Sweeny M.W., Kamber D.M. (1989) Automation
of batch waste water treatment systems using programmable
Abeling U., Seyfried C.F. (1993) Anaerobic-aerobic treatment logic controllers. Waf. Sci. Tech. 10(11),1271-1282.
of potato-starch wastewater. Wat. Sci. Tech. 28,165-176.
Anderson I.C., Levine J.S. (1980) Relative rates of nitric oxide
Abeliovich A, Vonshak A (1992) Anaerobic metabolism of and nitrous oxide production by nitrifiers, denitrifiers, and
Nitrosomonas europea. Arch. Microbiology. 158,267-270. nitrate respirers. Applied Environmental Microbiology. 51, 938-
945.
Addiscott T. (5 February 2000) Making a meal of it. New
Scientist- Opinion point-www.newscientist.com 48-49. Anderson I.C., Homstead J., Burdige D. (1993) A comparison
of NO and N2 0 production by the autotrophic nitrifier
Agrawal G.D., Lunkad S.K., Malkhed T. (1999) Diffuse Nitrosomonas europaea and the heterotrophic nitrifier
agricultural nitrate pollution of groundwater's in India Wat. ScI. Alcaligenes faecalis. Applied Environmental Microbiology. 59,
Tech. 39(3), 67-75. 3525-3533.
Akunna J.C., Bizeau C., Moletta R. (1993) Nitrate and nitrite Andreottola G., Foladori P., Ragazzi M. (2001) On-line control
reductions with anaerobic sludge using various carbon of a SBR system for nitrogen removal from industrial
sources: glucose, glycerol, acetic acid, lactic acid and wastewater Waf. Sci. Tech. 43(3), 93-100.
methanol. Waf. Res. 1303-1312.
Anthonisen AC., Loehr R.C., Prakasam T.B.S., Srinath E.C.
Alex J., Jumar U., Schutze M. (2003) On-line measurement (1976) Inhibition of nitrification by ammonia and nitric acid. J.
data of wastewater systems via WAP mobile phones. Wat. Sci. Waf. Poll. Con. Fed. 48, 835-853.
Tech. 47(2), 205-211.
Amant P.P., McCarty P.L (1969) Treatment of high nitrate
AI-Ghusain lA, Huang J., Hao O.J., Lim B.S. (24-30 July waste. Journal of the American Wastewater Association. 61,
1994) Using pH as a real-time control parameter for 659-663.
wastewater treatment and sludge digestion processes. In 1ih
Biennial Conference of the International Association on Water Andreadakis AD. (1993) Physical and chemical properties of
Quality, Budapest (Hungary). Water Quality International. pp. activated sludge flocs. Wat. Res. 27, 1797-1714.
159-168.
169
Asano and levine. (1996) Wastewater reclamation, recycling Bliss P., Barnes D. (1986) Modeling nitrification in plant scale
and reuse: past, present, and future. Wat. Sci. Tech. 33(10- activated sludge. Wat. Sci. Tech. 18(6),139-148.
11),1-15.
Blume D.J.w., Speece RE. (1991) A database of chemical
Asher B., Chozick R, Irvine RL. (1992) Treatment of a high- toxicity to environmental bacteria and its use in interspecies
strength, mixed phenolic waste in an SBR Wat. Env. Res. 64, comparisons and correlations. Research Journal WPCF. 63(3),
128-133. 198-207.
Carter J.P., Hsiao YH, Spiro S., Richardson D.J. (1995) Soil
Ballmelle B., Nguyen KM., Capdeville B., Cornier J.C., Deguin
and sediment bacteria capable of aerobic nitrate respiration.
A (1992) Study of factors controlling nitrite build-up in
Applied Environmental Microbiology. 61 (8),2852-2858.
biological processes for water nitrification. Wat. Sci. Tech.
26(5-6),1017-1025.
Castignetti D., Hollocher T.C. (1984) Heterotrophic nitrification
among denitrifiers. Applied Environmental Microbiology 47,
Barker PS., Dold P.l. (1996) Denitrification behaviour in
620-623.
biological excess phosphorus removal activated sludge
systems. Wat. Res. 27, 617-624.
Cecil D. (2003) Controlling nitrogen removal using redox and
ammonium sensors. Wat. Sci. Tech. 47(11),109-114.
Bilanovic D., Battistoni F., Cecchi F., Pavan P., Mata-alvarez J.
(1999) Denitrification under high nitrate concentration and
Chambers B. (1993) Batch operated activated sludge plant for
alternating anoxic conditions, Wat. Res. 33(15), 3311-3320.
production of high quality effluent at small works. Wat. Sci.
Tech. 28(10), 251-258.
BIOlAB Scientific (2003) Product technical information.
170
pollution removal and energy savings in the low load activated Clark H.M" Cooper D., Cutler R. (1996) Dictionary of
sludge process, Wat, Sci, Tech. 19, 645-655, Chemistry (Text) Third Edition. Oxford University Press. ISBN
0-19-280031-0.
Charpentier J" Godart H" Martin G" Mongo Y. (1989)
Oxidation Reduction Potential (ORP) Regulation as a way to Collivignarelli C., Bertanza G, (1999) Simultaneous nitrification-
optimize aeration and C,N and P removal: Experimental basis denitrification process in activated sludge plants: Performance
and various full scale examples, Wat. Sci. Tech, 21, 1209- and applicability, Wat. Sci. Tech. 40(4-5),187-194.
1223,
Cost (2003) European cooperation in the field of scientific and
Charpentier J" Menardiere M" Vachon A" Martin G, (1991) tech nical research. http://www. ensic.inpl-nancy Jr/COSTl!VVVTP I
ORP as a control parameter in a single sludge biological
nitrogen and phosphorus removal activated sludge system, Cohen A, Hegg D., Michele M.de" Song Q" Kasabov N,
Water SA 17(2), 123-132, (2003) An intelligent controller for automated operation of
sequencing batch reactors, Wat. Sci. Tech. 47(12), 57-63.
Charpentier J" Martin G" Wacheux H" Gilles p, (1998) ORP
Regulation of Activated Sludge 15 years of experience, IAWQ Davis L.M., Cornwell AD. (1998) Introduction to environmental
19th Biennial Conference of Vancouver. June 1998, engineering, Third Edition. McGraw Hill. ISBN 0-07-015918-1.
Chen F, Xia Q" Ju Lu-Kwang, (2003) Aerobic denitrification of Delgenes J.P., Patureau D, (2004a) Laboratory of
Pseudomonas aeruginosa Monitored by Online NAD(P) H environmental biotechnology. The laboratory specializes in the
Fluorescence, Applied Environmental Microbiology, 69(11), research and development of biological processes for treating
6715-6722, effluent and solid waste coming from agricultural, industrial or
urban activities. Director: J.P, Delegenes Assistant-Director:
Chen, S, K., Juaw, C,K" Cheng, S,S, (1991) Nitrification and D, Patureau LBE-INRA Avenue des Etangs 11100
denitrification of high strength ammonium and nitrite NARBONNE Phone: +33 (0) 468.425.151 Fax: +33 (0)
wastewater with biofilm reactor. Wat, Sci. Tech. 23,1417-1425, 468.425.160 http://www.montpellier.inraJr/narbonne/GMGB03.htmi
Christensen I\I1,H" Harremoes p, (1977) Biological Delgenes J.P., Patureau D. (2004b) Laboratory of
denitrification of sewage: A literature review, Prog, Wat, Tech, environmental biotechnology. LBE-INRA Avenue des Etangs
8,509-555, 11100 NARBONNE Phone: +33 (0) 468.425.151 Fax: +33 (0)
468.425.160 http://www,montpeilier.inra.fr/narbonne/GM_GB02,html
Chudoba J, (1989) Activated sludge bulking control.
Wastewater treatment technology Encyclopedia of Demoulin G., Mervyn Goronszy K.W" Forsthuber E,
environmental centrol technology, Chereminsoff, Gulf (1997) Co-current nitrification I denitrification and biological P-
Publishing, Vol 3, Chapter 6. Removal in cyclic activated sludge plants by redox controlled
cycle operation, Wat. Sci. Tech. 35(1),215-224.
Csikor Z" Czako L" Mihaltz P., Holo J, (1996) Complete
nitrogen removal from waste and drinking water in a fluidized- Demoulin G., Rudiger A, Goronszy M.C., (2001) Cyclic
bed bioreactor. Food. Sci. Tech. Int, 2(3), 165-171. activated sludge technology - recent operating experience with
a 90,000 p.e. plant in Germany. Wat. Sci. Tech. 43(3). 331-
337.
171
Dijkman H., Strous M. (1999) Process for ammonium removal nitrification, and denitrification by Thiosphaera pantofropha.
from wastewater. htlp:llwww.anammox.com/application.html. Patent Biotech. Bioeng. 36, 921-930.
PCT/NL99/00446. Paper covering this process also available in
Environmental Science and Biotechnology. (2002). 1, 51-63. Gerber A, Mosert ES., Winter CT, de Villiers R.H. (1986)
The effect of acetate and other short-chain carbon compounds
Downes MT (1988) Aquatic nitrogen transformation at low on the kinetics of biological nutrient removal. Waf. SA. 12, 7-
oxygen concentrations. Applied Environmental Microbiology. 12.
54,172-175.
Glass C., Silverstein J. (1998) Denitrification, Kinetics of high
Drysdale G.D., Kasan H.C., Bux F. (1999) Denitrification by
heterotrophiC bacteria during activated sludge treatment. Wat. nitrite concentration water: pH effect on inhibition and nitrite
Focht D.O., Verstraete W. (1977) Biological ecology of Goronzy M.C., Demoulin G., Newland M. (1997) Aerated
nitrification and denitrification, Adv. Microb. Ecol. 1,135-214. denitrification in full-scale activated sludge facilities. Wat. Sci.
Tech. 35(10), 103-110.
Frette L., Gejlsbjerg B., Westermann P. (1997) Aerobic Gunatilaka A, Dreher J. (2003) Use of real-time data in
denitrifiers isolated from an alternating activated sludge environmental monitoring: current practices. Waf. Sci. Tech.
Fuerhacker M., Bauer H., Ellinger R, Sree U., Schmid H., Gupta S.K., Raja S.M., Gupta AB. (1994) Simultaneous
Zibuschka F., Puxbaum H. (2000) Approach for a novel control nitrification and denitrification in a rotating biological contactor.
Gejlsbjerg B., Frette L., Westermann P. (1998) Dynamics of sludge process-3 single sludge denitrification. Waf. Res. 15,
2121.
Halling S.B., Hjuler H. (1992) Simultaneous nitrification and
Geraats S.G.M., Hooijmans C.M., Van Neil EW,J., Robertson denitrification with an upflow fixed bed reactor applying
L.A, Heijnen J.J., Luyben K.CHAM., Kuenen J.G. (1990) The clinoptilolite as media. Water Treatment. 7, 77-88.
172
Hanaki K., Wantawin C. (1990) Nitrification at low levels of Henze M. (1989) Carbon sources for denitrification of
dissolved oxygen with and without organic loading in a wastewater. Seminar on nutrient removal from municipal
suspended growth reactor, Waf. Res, 24(3), 297-302, wastewater. 4-6 September 1989.Tampere University. Finland.
Hanaki K., Wantawin C., Ohagaki S. (1990) Waf. Res. 24, 289- Henze M. (1991) Capabilities of biological nitrogen removal
296, processes from wastewater. Waf. Sci. Tech. 23, 669-679.
Hao O.J., Huang J, (1996) Alternating aerobic-anoxic process Ho K.M. (1994-5) Biological nutrient removal in activated
for nitrogen removal: Process evaluation. Wat, Env. Res. sludge processes with low F/M sludge bulking control. Ph.D.
68(1), 83-88. Thesis. The University of Queensland Australia.
microorganisms. Journal of Applied Chemistry and and denitrification within sequencing batch reactors and the
Biotechnology. 22, 417-440. use of ORP as a process control and monitoring parameter.
ME Thesis. The University of Canterbury New Zealand.
Irvine RL., Ketchum (Jr) L.H., Arora M.L., Barth E.F. (1985)
Heinen N., Norgaard P. (1998) Sequence Sequel. WQI May-
An organic loading study of full-scale sequencing batch
June.
reactors. Wat. Poll. Con. Fed. 57, 847-853.
173
Jenkins D., Sezgin M., Parker D.S. (1978) A Unified theory of
filamentous activated sludge bulking. Waf. Poll. Con. Fed. 50, Ketchum L.H. (1997) Design and physical features of
362-381. sequencing batch reactors. Wat. Sci. Tech. 35(1), 11-18.
Jenkins D, Palm J.C., Parker D.S. (1980). Relationship Khalil M.A.K., Rasmussen R.A. (1988) Nitrous oxide:trends
between organic loading and dissolved oxygen concentration and global mass balance over 300 years. Annuals of
and sludge settleability in the completely mixed activated glaciology. 10,73-79.
sludge process. Wat. Poll. Can. Fed.. 52, 2482-2506.
Jenkins C.J., Mavinic D.S. (1989) Anoxic-aerobic digestion of Killham K. (1986) Heterotrophic nitrification, Nitrification (lRL
waste activated sludge: Part II-Supernatant characteristics, Press Oxford). 117-126.
ORP monitoring results and overall rating system.
Environmental. Tech. Lett. 10,371-384. Koch FA, Oldham WK. (1985) Oxidation reduction potential a
tool for monitoring control and optimization of biological nutrient
Kawakami Y., * (1985) * Ferment. Tech. 63, 437-442. *other removal systems. Wat. Sci. Tech. 17, 259-279.
information unavailable.
Koch FA, Oldham WK., Wang HZ, (1988) ORP as a tool for
Kim H., Hao O.J. (2001) pH and Oxidation-reduction potential monitoring and control in bio-nutrient removal systems.
control strategy for optimization of nitrogen removal in an ASCEICSCE Environmental Engineering. Conference. July 12-
alternating aerobic-anoxic system. Wat. Env. Res. 73 (1), 95- 19, Vancouver BC. 162-170.
102.
Knowles R (1982) Denitrification. MicrobRev. 46, 43-70.
Kim D.J., Chang J.S., Lee 0.1., Han DW., Yoo I.K., Cha G.C.
(2003) Nitrification of high strength ammonia wastewater and Krishnamachari S., Clarkson WW. (1992) Effluent nitrite
nitrite accumulation characteristics. Wat. Sci. Tech. 47(11), 45- accumulation in the heterotrophic denitrification of high
51, strength industrial wastewaters. Environmental Engineering.
370-375.
Hayward K. (1998) BNR's Control Key. WQI Sep-Oct 1998
issue. Pages 14-15. Krul J,M. (1976) The relationship between dissimilalatory
nitrate reduction and oxygen uptake by cells of an Alcaligenes
Ketchum (Jr) L.H., Irvine R.L., Breyfogle RE., Manning (Jr) strain in flocs and in suspension and by activated sludge flocs.
J.F. (1987) A comparison of biological and chemical Wat. Res. 10(4), 337-341.
phosphorus removals in continuous and sequencing batch
reactors. Wat. Poll. Can. Fed. 59, 13-18. Kshirsagar M., Gupta A.B., Gupta S.K. (1995) Aerobic
denitrification studies on activated sludge mixed with
Ketchum (Jr) L.H" Irvine RL., Dennis RW (1979) Sequencing Thiosphaera pantotropha, Environmental Technology. 16, 35-
batch reactors to meet compliance. Water-1978, Amer. Inst,. of 43.
Chem Engr. Symposium Series. 75(190), 186-191.
Kugleman I.J., Spector M. (1988) Nutrient removal in staged
rd
biological reactors. Proceedings 3 WPCF joint technical
Ketchum (Jr) L. H., Liao P.C., Irvine R.L. (1978) Economics
seminar on sewage treatment technology May 12-14 1988
evaluation of sequencing batch reactors. Proc 33rd Industrial
Tokyo Japan. 4-27.
Waste Conf Purdue University, West Lafayette, Ind, 357-376.
174
Kugleman I.J., Spector M., Harvilla A, Parees D. (1991) aerobic rotating biological contactors. Waf. Sci. Tech. 23,
Aerobic denitrification in activated sludge. Environmental 1355-1363.
engineering special conference (Edited by Krenkel PAl. 312-
319. Am. Soc. Civil. Engrs. Matsuo Y., Hosobora K (1988) Proc 3rd WPCFIJSWA Joint
tech sem on sewage treat tech. Tokyo. 84-121.
Kuenen J.G., Robertson LA (1987) Ecology of nitrification and
denitrification. Cambridge University Press. pp 161-218. Meinardi C.R., Beusen AH.W., Bollen M.J.S., Klepper 0.,
Willems w.J. (1995) Vulnerability to diffuse pollution and
Langner C. L .. , and Hendrix P. F. (1982). Evaluation of a average nitrate contamination of European soils and
persulfate digestion method for particulate nitrogen and groundwater Waf. Sci. Tech. 31(8), 159-165.
phosphorus. Waf. Res. 16, 1451-1454.
Meirlaen J., Assel V.J., Vanrolleghem PA (2002) Real time
Lo K.V., Liao P.H., Van Kleeck R.J. (1990) A full scale control of the integrated urban wastewater system using
sequencing batch reactor treatment of diluted swine simultaneously simulating surrogate models Waf. Sci. Tech.
wastewater. Can. Agric. Eng. 33, 193. 45(3), 109-116.
Lo C.K., Yu C.w., Tam N.F.Y., Traynor S. (1994) Enhanced Metcalf and Eddy (1991) Wastewater engineering treatment
nutrient removal by oxidation reduction potential (ORP) disposal and reuse. Third Edition (Text). McGraw Hill
controlled aeration in a laboratory scale extended aeration Publishers. ISBN 0-07-041690-7.
system. Wat. Res. 28(10), 2087.
Metcalf and Eddy (2001) Wastewater engineering treatment
Lloyd D, Boddy L., Davies K.J.P. (1987) Persistence of and reuse. McGraw Hill Publishers. ISBN 0-07-112250-8.
bacterial denitrification capacity under aerobic conditions: The
rule rather than the exception. FEMS Microb. Ecol. 45, 185- Moriyama K., Sa to K, Harada Y, Washiyama K., Okamoto K.
190. (1990) Renovation of an extended aeration plant for
simultaneous biological removal of nitrogen and phosphorus
using oxic-anaerobic-oxic process. Wat. Sci. Tech. 22(7-8), 61-
Lukow T., Diekmann H. (1997) Aerobic denitrification by a 66.
newly isolated heterotrophic bacterium strain TL 1. Bio. Tech.
Lett. 19( 11), 1157-1159.
Moriyama K, Takahashi M., Harada Y. (1993) Retrofitting and
operation of small extended aeration plants for advanced
treatment some experiences in Japan. In: Preprints of Small
Massone AG., Gernaey K., Bogaert H., Vanderhasselt A,
Wastewater Treatment Plants. Trondheim (Norway). Tapir
Rozzi A., Verstraete W. (1996) Biosensors for nitrogen control
Publisher.
in wastewaters. Water Quality International 1 at h Biennial
Confenerce and Exhibition 23-28 June 1996 Singapore. 1,
Morris J.C., Stumm W. (1967) Redox equilibria and
183-190.
measurements of potentials in the aquatic environment. Adv.
Chem. Series. No. 67, Article 13, 270-285.
175
Munch EV., Lant p" Keller J, (1996) Simultaneous nitrifiation units with intermittent aeration process. Wat. Res. 25(11),
and denitrification in bench scale sequencing batch reactors, 1377-1388.
Wat. Res, 30(2), 227-284,
otlanabo N.L., (1993) Denitrification of ground water for
Nakanishi H" Fukagawa M., Takeuchi M" Ishikawa M., Ukita potable purposes. WRC report No.40311193.
M" Murakami S. (1990) Biological nitrogen removal in a
complete mixing type aeration with ORP control. Wat. Sci. Oxford dictionary of chemistry (1996) Third edition. Oxford
Tech. 22(7-8), 269. University Press ISBN 0-19-280031-0,
Neef et al (1996). This reference used in discussion on page Painter HA, (1977) Microbial transformations of inorganic
97" Please contact the author for further details with respect to nitrogen, Waf. Sci. Tech. 8(4-5), 3-29.
this reference, [email protected] (0064-27-241-
7043). Paul E., Plisson-Saune S., Mauret M" Cantet J. (1998)
Process state evaluation of alternating oxic-anoxic activated
Ng w'J., Sim T.S., Ong S.L., Ng KY., Ramasamy M., Tam sludge using ORP, pH and DO, Wat. Sci. Tech. 38(3), 299-
K.N. (1993) Efficiency of sequencing batch reactor (SBR) in 306.
the removal of selected microorganisms from domestic
sewage. 27(10),1591-1600. Payne w,J. (1981) Denitrification. Wiley. New York,
Nielsen w'M., Jansen C,J. (1996) The role of the sludge in Patureau D., Davison J., Bernet N., Moletta R. (1994)
nitrification inhibition tests, Wat. Sci. Tech. 33(6),93-100. Denitrification under various aeration conditions in
Comamonas sp., strain Sgly2. FEMS. Microb, Ecol. 14(1), 71-
Nielsen M" Revsbech N.P., Larsen L.H., Jensen LA (2002)
78.
Online determination of nitrite in wastewater treatment by use
of a biosensor. Waf. Sci. Tech. 45(4-5), 69-76,
Patureau D" Bernet N., Moletta R. (1996a) Study of the
denitrifying enzymatic system of Comamonas SP" strain
Norcross K,L" (1992) Sequencing Batch Reactors - An
SGL Y2, under various aeration conditions with a particular
overview, Waf, Sci. Tech. 26(9-11),2523-2526.
view on nitrate and nitrite reductases, Curr, Microb. 32(1), 25-
32,
Novak L., Larrea L, Wanner J" Garcia Heras ,I.L. (1993) Non-
filamentous activated sludge bulking in a laboratory scale
Patureau D., Bernet N., Moletta R. (1996b) Effect of oxygen on
system. Wat. Res. 27(8), 1339-1347.
denitrification in continuous chemostat culture with
Comamonas sp., strain SGL Y2. Journal of Industrial
NZWWA (1997) Nitrogen elimination in sewage treatment
Microbiology. 16, 124-128,
plants, Water and Wastes in New Zealand. No 97, September.
Patureau D" Godon J,J., Dabert P., Bouchez T., Bernet N.,
O'Neil M., Horan N. (1995) Achieving simultaneous nitrification Delgenes J.P., Moletta R. (1998) Microvirgula aerodenitrificans
and denitrification of wastewater at reduced cost. Waf. Sci. gen. nov., sp. nov., a new gram-negative bacterium exhibiting
Tech. 32(9-10), 303-312.
co-respiration of oxygen and nitrogen oxides up to oxygen-
saturated conditions. International Journal of Systematic
Osada 1., Haga K, Harada Y., (1991) Removal of nitrogen and Bacteriology. 48, 775-782.
phosphorus from swine wastewater by the activated sludge
176
Patureau D., Bernet N., Delgenes cI.P., Moletta R. (2000)
Effect of dissolved oxygen and carbon-nitrogen loads on Pochana K., Keller J., Lant P. (1997) Effect of level and range
denitrification by an aerobic consortium. Applied Microbiology of dissolved oxygen (DO) on simultaneous nitrification I
and Biotecl1nology. 54(4), 534-542. denitrification (SND). Proceeding of BNR3 conference.
Brisbane. Australia.
Patureau D., Helloin E., Rustrian E, Bouchez T., Delegenes
J.P., Moletta R. (2001) Combined phosphate and nitrogen Pochana K., Keller J. (1999) Study of factors affecting
removal in a sequencing batch reactor using the aerobic simultaneous nitrification and denitrification (SND). Wat. Sci.
denitrifier Microvirgula aerodenitrificans. Wat. Res. 35(1), 189- Tech 39(6), 61-68.
197.
Pochana K., Keller J., Lant P. (1999) Model development for
Peddie CC., Koch FA, Jenkins C.J., Mavinic D.S. (1988) simultaneous nitrification and denitrification. Wat. Sci. Tech
ORP as a tool for monitoring and control of SBR systems for 39(1),235-243.
aerobic sludge digestion. In proceedings of tl1e joint
ASCEICSCE Environmental Engineering Conference, July 12- Poth M. (1986) Dinitrogen production from nitrite by a
19 Vancouver Canada. p.171. Nitrosomonas isolate. Applied Environmental Microbiology.
52(4),957-959.
Peddie C.C., IVlavinic D.S., Jenkins C.J. (1990) Use of ORP for
monitoring and control of aerobic sludge digestion. Ra C.S., Lo K.V., Shin J.S., OH J.S., Hong B.J. (2000)
Environmental Engineering. 116(3), 461-471. Biological nutrient removal with an internal organic carbon
source in piggery wastewater treatment. Wat. Sci. Tech 34(3),
965-973.
Pedersen D.P., Jensen K., Lyngsie P., Johansen H. (2003)
Nitrogen removal in industrial wastewater by nitration and
Randal CW., Buth D. (1984) Nitrite build-up in activated
denitration 3 years of experience. Wat. Sci. Tech 47(11),181-
sludge resulting from temperature effects. Wat. Poll. Con. Fed.
188.
56, 1039-1044.
Peng Y.Z., Gao J.F., Wang S.Y., Sui M.H. (2002) Use of pH
Randal CW., Barnard J.L., Stensel H.D. (1992) Design and
and ORP as fuzzy control parameters of denitrification in SBR
retrofit of wastewater treatment plants for biological nutrient
process Wat. Sci. Tech 46(4-5),131-137.
removal. Water quality management library. Volume 5.
Technomic Pub. Co. Lancaster PA USA 25-56.
Peng Y.Z., Gao J. Wang S.Y., Sui M.H. (2003) Use of pH as
fuzzy control parameter for nitrification under different alkalinity
Rhee K.S., Lee J.J., Lee ST (1997) Nitrite accumUlation in a
in SBR process. Wat. Sci. Tech 47(11), 77-84.
sequencing batch reactor during the aerobic phase of
biological nitrogen removal. Biotechnology letters. 19(2), 195-
Pipes W.O. (1967) Bulking of activated sludge. Advanced
198.
Applied Microbiology. 9, 185-234.
177
Rittmann BE, Langeland w.E. (1985) Simultaneous
denitrification with nitrification in single-channel oxidation Sekine T., Iwahorik K, FUjimoto E., Inamori Y. (1985)
ditches. Wat. Poll. Can. Fed. 57(4), 300-308. Advanced control strategies for the activated sludge process:
instrumentation and control of water and wastewater treatment
Robertson LA, Kuenen J.G. (1983) Thiosphaera pantotropha and transport systems. In Proceedings of the 4th IA WPRC
gen. nov., a facultatively anaerobic, faculatatively autotrophic Workshop, Houston and Denver. USA. p.269.
sulphur bacterium. Gen. Microb. 129,2847-2855.
Stensel D.H., Coleman Denham B.W., Fleischman D.
Robertson LA, Kuenen J.G. (1984) Aerobic denitrification a (1995) Innovative process used to upgrade oxidation ditch for
controversy. Arch Microb. 139,351-354. nitrogen removal and SVI control. Presented at the Water
Environment Federation 68th annual conference and exposition
Robertson LA (1988) Aerobic denitrification and heterotrophic October 241995 Miami Beach Florida.
nitrification in Thiosphaera pantotropha and other bacteria.
Ph.D. thesis. Delft University of Technology. The Netherlands. Stouthamer AH., de Boer AP.N., Van der Oost J. (1997)
Emerging principles of inorganic nitrogen metabolism in
Robertson LA, Van Neil E.W.J., Torremans RAM., Kuenen paracoccus denitrificans and related bacteria. National institute
J.G. (1988) Simultaneous nitrification and denitrification in of informacia. Kluwer Academic Publishers 71 (1/2), p.33-41.
aerobic chemostat cultures of Thiosphaera pantoropha.
Applied Environmental Microbiology. 54(11), 2812-2818. Strous M., Van Gerben E., Kuenen J.G., Jettern M.S.M. (1997)
Effects of aerobic and micro-aerobic conditions on anaerobic
Robertson LA, Cornelisse R.DeVos P., Hadioetomo R., ammonium-oxidizing (Anammox). Applied Environmental
Kuenen J.G., (1989) Aerobic denitrification in various Microbiology. 63, 2446-2448.
heterotrophic nitrifiers. Antionie van Leeuwenhoek 56, 289-
299. Stross M., Van Gerven E., Zheng P., Kuenen J.G. Jetten
M.S.M. (1997) Ammonium removal from concentrated waste
Robertson LA, Kuenen J.G. (1990). Combined heterotrophic streams with the anaerobic ammonium oxidation (ANAMMOX)
nitrification and aerobic denitrification in Thiosphaera process in different reactor combinations. Waf. Res. 31, 1955-
pantotropha and other bacteria. Antonie van Leeuwenhoek. 57, 1962.
139-152.
Strous M., Fuerst J. A, Kramer EH.M., Logemann S., Muyzer
Robertson LA, Kuenen J.G. (1992) Nitrogen removal from G., van de Pas-Schoonen K, Webb R., Kuenen G.J., JeUen M.
water and waste microbial control of pollUtion. Cambridge S. (1999) Missing lithotroph identified as new planctomycete,
University Press. Nature. 29 July, 400, 446-449.
Rohlich GA (1948) Measurement and control of sewage Strous M. (2000) Microbiology of anaerobic ammonium
treatment process efficiency by oxidation reduction potential. oxidation. PhD Thesis. Delft University. The Netherlands.
Sewage Works Journal. 20(4), 650-653.
Stumm W. (1966) Redox potential as an environmental
Sasaki K, Yamamoto Y, Tsumuara K, Ouchi S., Mori Y parameter: Conceptual significance and operational limitation.
(1996) Development of 2-reactor intermittent-aeration activated Adv. in Wat. Poll. Res. Proc. of 3rd Int. Cont. of IAWPRC. Munich
sludge process for simUltaneous removal of nitrogen and Germany. 1, 283-308.
phosphorus. Waf. Sci. Tech. 34(1-2), 111.
178
Snoeyink V.L., David J. (1980) Water Chemistry (Text). John using a sequencing batch reactor. Wat. Sci. Tech. 47(10), 101-
Wiley and Son Publishers. ISBN 0-471-05196-9. 108.
Tam N.F.Y., Wong Y.S., Leung G. (1992) Significance of Turk 0., Mavinic D.S. (1987) Selective inhibition: a novel
external carbon sources on simUltaneous removal of nutrients concept for removing nitrogen from highly nitrogenous wastes.
from wastewater. Wat. Sci. Tech. 26(5-6),1047-1055. Environmental Technology Letters. 8, 419-426.
179
Van Niel E.W.J., Sraber K.J., Robertson L.A, Kuenen J.G. Watanabe Y., Masuda S., Ishiguro M. (1992) Simultaneous
(1992) Heterotrophic nitrification and aerobic denitrification in nitrification and denitrification in micro-aerobic biofilms. Wat.
Alcaligenes faecalis strain TUD Antonie van Leeuwenhoek Sci. Tech. 26(3-4), 511-522.
62(3),231-237.
Water and Wastes in NZ (September 1997) page 39. Figure
Vanrolleghem PA, Lee D.S. (2003) On-line monitoring illustrating typical ORP profile, (Original figure slightly
equipment for wastewater treatment processes: state of the modified).
art. Wat. Sci. Tech. 47(2),1-34.
Wentzel M.C" Ekama GA (1997) Principle in the design of
Verstraete W (1975) Heterotrophic nitrification in soil and single sludge systems for biological removal of carbon,
aqueous media- A Review. Bull. Acad. Sci, U.S.SR. Bioi. Ser. nitrogen and phosphorus. Waf. Res, 69, 1222-1231,
4.515-530.
Westgarth WC., Sulzer DA, Okun DA (1964) Anaerobiosis
nd
Wanner J., Gran P. (1989) Identification of filamentous in the activated sludge process, Paper presented at the 2
microorganisms from activated sludge: A compromise between IAWPRC Conference, Tokyo.
wishes, needs and possibilities. Wat Res. 23(7), 883-891.
WRC (1984) Theory design and operation of nutrient removal
Wanner J, Kucman K., Ottoua U., Gran P. (1987) Effect of activated sludge processes. Water Research Commission of
anaerobic conditions on activated sludge in filamentous bulking South Africa.
in laboratory systems. Wat. Res. 21(12),1541-1546.
Yang L., Alleman E. (1992) Investigation of a batch wise nitrite
Wareham D.G., Hall K.J., Mavinic D.S. (1993) Real-Time control build-up by an enriched nitrification culture. Wat. Sci. Tech.
of aerobic-anoxic sludge digestion using ORP Environmental 26(5-6),997-1005,
Engineering. 119( 1),120-136.
Yoo H" Ahn KH., Lee H,J., Lee KH., Kwak YJ., Song K,G,
Wareham D.G., Mavinic D.S., Hall KJ. (1994) Sludge digestion (1999) Nitrogen removal from synthetic wastewater by
using ORP regulated aerobic anoxic cycles. Wat. Res. 28, 373- simUltaneous nitrification and denitrification (SND) via nitrite in
384. an intermittently-aerated reactor. Wat, Res, 33(1), 145-154,
Watanabe A, Miya A, Matsuo Y. (1984) Laboratory scale Yu R F., Liaw S.L., Chang C,N., Lu H.J., Chang WY (1997a)
study on biological phosphate removal using synthetic The monitoring and control using on-line ORP in the
wastewater. Newsletter of the IAWPRC study group on continuous flow activated sludge batch reactor system, Wat,
phosphate removal. 2, 40-43. Sci, Tech. 35(1),57-66.
Watanabe S., Saba K, Nogita S. (1985) Basic studies on an Yu RF., Liaw S.L., Chang C,N., Cheng W.Y. (1998) Applying
ORP/external carbon source control system for the biological real-time control to enhance the performance of nitrogen
denitrification process. Instrumentation and control of water removal in the continuous-flow SBR system, Wat. Sci, Tech,
and wastewater treatment and transport systems. Proceedings 38(3),271-280,
4th IAWPRC Workshop Houston and Denver, 641-644.
Zhao W,H" Mavinic D.S., William K.O., Frederic AK, (1999)
Controlling factors for simUltaneous nitrification and
180
denitrification in a two stage intermittent aeration process
treating domestic sewage. Waf. Res. 33(4), 961-970.
181