Taking Off List: D - Groundwork
Taking Off List: D - Groundwork
Taking Off List: D - Groundwork
D - Groundwork
D.1 - Site Preperation (D20.9.1.1)
(D20.1.3)
D.4.4 - Filling to make up
D.2 - Excavations levels
D.2.1 - Topsoil for (D20.10.1.3)
preservation
(D20.2.1.1) E - Insitu concrete
E.1 - In-situ concrete
D.2.2 - To reduce levels,
maximum depth not E.1.1- Insitu concrete for
exceeding 0.25 m foundation
(D20.2.2.1) (E10.4.1)
.
D.2.3 - Excavating pits for E.1.2 - In-situ concrete for
column and staircase beds for column base
foundations (E10.4.1)
(D20.2.4.1)
(D20.6.1) (E10.4.1)
D.3 - Earthwork support
(D20.9.2.3) (E20.1.1.1)
T D S Description T D S Description
(E30.1.1.1)
SUPERTRUCTURE
E – In-situ Concret
(E20.1.1)
4800
2/3225 6850 SUBSTRUCTURE
2/600 1200
2/3225 6850 D – Groundwork
2/750 1500 D.1. – Site Preparation
1056
1550 21.9 D.1.1 -Clearing site
384 7.59 vegetation for site
33840 166.2 preperation
(D20.1.3)
2/7590 15900
49740
7950
Ddt. Walls
2/2/0.5/225 450
49290 18890
3/
0.5/ 0.45 Ddt. T junctions
1050 0.6
1.05 0.21
7.42
2000
2500
3125
13875
T D S Description T D S Description
775 Total Length
1500 49740
13000
Add Wall 62740
2/2/0.5/112.5 225
16375
D.4 - Filling to excavation
1/
0.5/ 0.45 Ddt. T junctions
0.45
D.4.1 - Filling to Excavation
1.05 0.11
column pits using Quarry
7.63
dust, average thickness
3/
exceeding 0.25 m
0.5/ 0.45 Ddt. T junctions
0.6 (D20.9.2.3)
1.05 0.21
7.42 11/ 1.05 Footing 1
1.05
6/
0.5/ 0.6 Ddt. T junctions 1.5
0.6 18.19
1.05 1.13
6.29 6/ 1.2 Footing 2
1.2
1.5 12.96
62.74 D.2.5 - Excavating trenches 31.15
0.6 for typical 225 mm brick
1.2 wall foundation, width
45.17 exceeding 0.30 m, D.4.2 - Filling to excavation,
maximum depth not avarage thickness not
exceeding 2.00 m and exceeding 0.25 m generally
Disposal of excavated selected material arising out
materials off site of excation other than
topsoils or rock
(D20.2.6.2)
(D20.9.1.1)
2/ 16.38
0.50 D.4.2.1 - 112.5 mm brick wall
0.08 300 mm
1.32
500mm
2/ 62.74
0.5 D.4.2.1 - 225 mm brick wall
0.08 50.02
51.34 450 mm
500mm
T D S Description T D S Description
D.4.8 - Filling to make up 0.23 2.25 Ddt.
levels for average 17.25 2/0.5/300 300
thickness not exceeding 2125
0.25 selected materials to
be hardbroken compacted 2850
with an 200 mm tonne 450
roller in 150 mm layers. 1550
4850
Ddt. T junctions
2/0.5/300 300 62.74 E.1.1.2 - Grade 25
4550 0.6 reinforcement concrete mix
1.2 45.17 with 1:1 1/2: 3 with minimum
cement content of 300 Kg/m
D.5 - Earthwork supports for 18 mm sized aggregates for
query dust pits 225 mm brick wall
foundation
11/
4/ 1.05 Footing 1
1.5 69.3
(E10.1.)
6/
4/ 1.2 Footing 1
1.5 43.2
112.5 E.1.2.1 - 50 mm thick screed
concrete of grade 15 1:3:6
mix 25 mm maximum sized
aggregates of concrete for
beds for Screed concrete
E.1 - In-situ concrete (E10.4.1)
11/ 1.05 Footing 1
E.1.1- Insitu concrete for 1.05
foundation 0.05 6.06
(E10.4.1)
6/ 1.2 Footing 2
1.2
16.38 0.05 0.43
0.45 E.1.1.1 - Grade 25 6.49
0.1 0.74 Reinforcemnt concrete
mix with 1:1 1/2: 3 with
minimum cement content
of 300 Kg/m 18 mm sized
aggregates for 112.5 mm
brick wall foundation
(E10.1.)
1/
0.5/ 0.45 Ddt. T junctions
0.45
0.1 0.01
0.73
3/
0.5/ 0.45 Ddt. T junctions
0.6
0.1 0.04
0.69
6/
0.5/ 0.6 Ddt. T junctions
0.6
0.1 0.12
0.57
T D S Description T D S Description
Footing 2
D = (D1 +D2)÷2
6/ 1.2 =(225+250)÷2
1.2 =237.5
0.24 2.07
4.37
E.1.3 - Grade 25
Reinforcemnt concrete
mix with 1:1 1/2: 3 wit 18
mm sized aggregates for
column shaft upto DPC
(E10.3.1)
11/ 0.23 Footing 1
0.23
1.2 0.7
6/ 0.23 Footing 2
0.23
1.2 0.38
1.08
T D S Description T D S Description
E.2- Formwork for E.2.6 - Formwork for
substructure staircase shaft up to DPC
(E20.1.1)
(E20.1.1.1)
2/ 16.38
0.1 3.28
(E20.1.1)
R6 @ 150 mm
Length of the bar
1/450 450
1200 Ddt. Covers
` 450 2/37.5 75
375
No: of Bars
11/
4/ 1.56 68.64
R6 @ 150 mm
Length of the bar
1/450 450
1200 Ddt. Covers
2/37.5 75
375
0.53 R6 @ 150 mm
11/
11/ 1.02 123.4 R6 @ 150 mm Length of the bar
1/600 450
Length of the strirrups Ddt. Covers
a.b.d 2/37.5 75
1020 525
No: of stirrups
a.b.d
11
11 9
//
2/ 0.98 (E30.1.1.1)