RCM Process For Client Understanding
RCM Process For Client Understanding
RCM Process For Client Understanding
Engineering Consultancy, Detail Engineering and FEED study, Design Review and Certification
HSECES identification and management Systems.
AIMS (Asset integrity management Systems) compliance and bench marking audits/assessments
Integrity assessment of plants and pipelines.
Risk based Inspection (RBI) services in accordance with API 580 and API 581
Reliability Cantered Maintenance Services (RCM).
Fitness for service studies in accordance with API 579. As-Building via conventional methods as
well as Laser Scanning, Design/Drafting services for existing facilities.
Third Party Inspections, Certification & IVB Services.
Third Party Inspection and Expediting Services.
Boiler & Pressure Vessel Certification (ASME, BS, DIN and EN Standards).
Safety Integrity Level Assessment (SIL) in accordance with IEC 60508 and 60511.
Corrosion studies and preparation of corrosion loops.
Evaluation & Condition Monitoring of CP System.
External Corrosion Direct Assessment (ECDA).
Development of inspection data management system.
Safety and Environmental Engineering; HAZOP, QRAs, HSEIA, Hazards Identification and
Safety studies.
Specialized NDT inspections.
Review & Assessment of CP system.
Lifting Equipment Inspection and Certification.
Materials and Welding Technology.
Accreditation for Marking of Products.
Access Engineering (Riser & Topside Inspection/Repairs thro’ Abseiling technique).
Provision of Qualified Engineering Personnel on Contract.
API Certified Inspectors for Tubes, Casing & Crossover Pipes.
Indian Boiler “Inspection Authority” & “Competent Authority” approved by Central Boiler Board
of India.
Velosi’s Software
2 Task 2:
RCM Project Review of
Preparation of data base for RCM study Manager, TNB Asset
2.1 Velosi will prepare the data base for RCM as per the Project Criticality
fields which are necessary for the completion of RCM coordinator, Assessment.
Study. RCM
Asset register developed in first phase would be the base consultant,
asset register for the preparation of data base for FMECA RCM
Engineer,
RCM study.
Electrical
Below tasks explain the complete procedure of Engineer,
preparation and completion of RCM study. Rotary
Equipment
Engineer.
3 Task 3: FMECA based RCM analysis
c
Review/Development of Risk Matrices &
Acceptance Criteria
Velosi will study the HSE policy, Risk acceptance
criteria and decision parameters of TNB and hold
discussions with relevant discipline people at TNB Site.
Velosi will develop four risk matrices (first-safety,
second-environmental, third-business interruption and
the fourth-optional matrix to include either follow cost or
Task Resources/
Description of Approach and Method Deliverables
No. Location
consequences of the failure, such as: In what ways it
poses a threat to safety or the environment, In what
ways it affects production or operations, like
shutdown, reduced throughput, etc and what
physical damage is caused by the failure
- Having evaluated the failure effects, the next step is
to assign a POF (Probability of failure) and the
consequence (Consequence of failure) categories
using the risk matrices developed. For POF
evaluation, site specific failure rates and failure
modes will be gathered from TNB personnel.
VELOSI would also refer to OREDA database and
other generic databases such as PDS, EsREDA, T-
Book, ZEDB, Non-electronic parts reliability data,
Process equipment reliability data etc. VELOSI also
has experts who can assist to analyze and develop
data. Using generic numbers is seldom accurate and
hence it will be done only where necessary after
discussions with TNB.
Task Resources/
Description of Approach and Method Deliverables
No. Location
4.2 Delivering the final presentation of the RCM study
results, findings, recommendations, single point failure
identification, launching a living program etc. to TNB
RCM team and management. RCM Project
Manager,
Sub Task 4.3: Submission of final reports.
RCM
4.3 This activity is revising all the draft reports submitted by consultant,
VELOSI incorporating comments if any from TNB and RCM
submission of final reports. Engineer
One cycle of review process is considered, which covers RCM Project
first draft submission by VELOSI, review & release of Manager,
comments if any from TNB and incorporation of RCM
comments & submission of final reports by VELOSI consultant,
both in soft and hard forms. RCM
Engineer
5 Task5: Project close out activities RCM Project
Manager,
5.1 Sub Task 5.1: Project Close out Activities Project Close
RCM
The activities contained here will be to: consultant, out Report
Generate a “Road Map” for analysis of low risk RCM
Engineer,
equipment.
Electrical
Compile a list of all reported or otherwise Engineer
identified issues
The problems faced and their resolution
6 Task 6: Follow up support RCM Project Follow up
Follow up support will be provided to TNB after the Manager , support report
CMMS 1
RCM study (during defects liability period).
Consultant
7.1 Sub Task 7.1 Support during implementation & RCM Project
execution of RCM tasks Manager
- It is proposed to hold discussions with TNB to (Velosi, TNB
find out any issues that may require )
clarification towards successful
implementation of RCM strategies. This
support will be after the completion of CMMS
upload by TNB and during actual
implementation / execution of RCM results.
Reference Documents
RCM Standards
British Standard Analysis techniques for system reliability – Procedure for failure mode
BS EN 60812: 2006
and effects analysis ( FMEA )
CEI IEC 60300-3-11 International Standard Part 3-11 Application Guide – Reliability Centered Maintenance
Reference standards
API 610 Centrifugal Pumps for Petroleum, Petrochemical and Natural Gas industries
BS 4778-3.2:1991 British Standard Quality Vocabulary – Section 3.2: Glossary of International Terms
API 673 Centrifugal Fans for Petroleum, Chemical and Gas Industry Services
API 661 Air Cooled Heat Exchangers for General Refinery Services
API 682 Pumps—Shaft Sealing Systems for Centrifugal and Rotary Pumps
Project Manager
Muhammad Azhar Operation Manager-Lahore,Pak
Hafiz Akhtar