Precedence Diagram Method PDF
Precedence Diagram Method PDF
Method(PDM)
Jati Utomo Dwi Hatmoko
Scheduling techniques
1. Bar chart (Gantt chart)
2. Network
Activity on Arrow (CPM - Critical Path Method)
Arrow Diagramming Method (ADM)
C D
C D
CPM vs PDM
Hubungan kegiatan (constraint) PDM
Finish to start (FS)
Keg (j)
Start to finish (SF)
Keg (i)
SF(i-j) = d
Keg (j)
Hubungan ini banyak digunakan oleh software penjadwalan (MS Project, Primavera, dll)
1 d 2 Direct link
1
11
Lead link
m 2
2 Lag link
11 n
excavate
p
r construct
base
q
s construct
wall
Layout of PDM - activity on node
(a)
(b)
(LS) Latest start - the latest the activity can start without delaying the project
(LF) Latest finish - the latest the activity can finish without delaying the project
NORTH ABUTMENT deck SOUTH ABUTMENT
wingwalls stem backfill
finished ground
embankment profile embankment
already already
constructed constructed
N N N
6 21 FS 21 33 FS 33 39 FS
stem wwall b/fill
2 15 4 12 8 6
6 FS
FS
SS+6
N&S S S S Sur-
0 bases
12 FS 21 stem
36 FS 36 wwall
48 FS 48 b/fill
54 56 Kerbs 58 58 facing
60
FS FS
1 12 3 15 5 12 7 6 9 2 10 2
-Initial ES = 0 FS
- ES max 36 Deck 56
FS
6 20
ES(j)
= EF(i) + FS(i-j)
= ES(i) + SS(i-j) EF(j) = ES (j) + durasi (j)
= EF(i) + FF(i-j) – durasi (j)
= ES(i) + SF(i-j) - durasi (j)
Latest start - the latest the activity can start without
delaying the project KEY
activity
name earliest
earliest
Latest finish - the latest the start
finish
N
activity can finish without 33
b/fill
39
delaying the project 8 6
N N N activity duration
6 21 FS 21 33 FS 33 39 FS reference
stem wwall b/fill
6 2 15 21 26 38 50 8 6 56
4 12
6 FS
FS
SS+6
N&S S S S Sur-
0 12 FS 21 36 FS 36 48 FS 48 54 56 Kerbs 58 58 60
bases stem wwall b/fill facing
0 21 36 38 50 50 56 9 2 58 FS 58 10 2 60
1 12 12 3 15 5 12 7 6 56 FS
LF min
FS
36 Deck 56
LF(i)
36 56 FS
= LF(j) – FF(i-j) 6 20
= LS(j) – FS(i-j)
= LF(j) – SF(i-j) + durasi(i)
= LS(j) – SS(i-j) + durasi (j) LS(i) = LF(i) - durasi (i)
Backward pass
Critical Path
KEY
Similar to CPM/AOA activity
ES=LS name earliest
earliest
finish
EF=LF start
N
33 b/fill 39
LF-ES=duration
50 8 6 56
latest latest
start finish
activity duration
N N N
6 21 21 wwall 33 33 reference
stem b/fill 39
6 2 15 21 26 4 12 38 50 8 6 56
N &S S S S Sur-
0 12 21 36 36 wwall 48 48 b/fill 54 56 Kerbs 58 58 60
bases stem facing
0 1 12 2112 21 3 15 36 38 5 12 50 50 7 6 56 56 9 2 58 58 10 2 60
Critical Path
36 Deck 56
36 6 20 56
Free float (FF) : the maximum time an activity can be delayed without
delaying any subsequent activities that are starting at their earliest times
6
FF= 0 FF= 0 FF=0 FF= 0 FF= 0
FF= 2
TF= 0 TF= 0 TF=2 TF= 0 TF= 0
TF= 2
N &S S S S Sur-
0 12 21 36 36 wwall 48 48 54 56 Kerbs 58 58 60
bases stem b/fill facing
0 1 12 2112 21 3 15 36 38 5 12 50 50 7 6 56 56 9 2 58 58 10 2 60
FF= 0
FF=ESj – EFi TF= 0
D
4 7
SF+11
SS+3 SS+5
A B FS+1 E F
15 2 6 56 68
FF+2
No Act Dur Constrain
C 1 A 5 -
FS+2 36 2 B 6 SS(1-2) = 3
3 C 6 FS(1-3) = 2
FF(2-3)= 2
SF+9 4 D 7 SF(2-4) = 11
5 E 6 FS(2-5) = 1
SF(3-5) = 9
SS(4-5) = 4
6 F 8 SS(5-6) = 5
SS+4
Forward Pass
7 D 14
4 7
11
10
SF+11 10
SS+3 SS+5
0 A 5 3 B 9 FS+1 11 E 17 16 F 24
15 2 6 56 68
FF+2
7 C 13 No No Act Dur
1 A 5 -
FS+2 36 2 B 6 SS(1-2) = 3
3 C 6 FS(1-3) = 2
SF+9 FF(2-3)= 2
4 D 7 SF(2-4) = 11
5 E 6 FS(2-5) = 1
SF(3-5) = 9
SS(4-5) = 4
6 F 8 SS(5-6) = 5
SS+4
Hitungan Mundur
7 D 14
7 4 7 14
SF+11
SS+3 SS+5
0 A 5 3 B 9 FS+1 11 E 17 16 F 24
9
0 15 5 3 2 6 9 10
11 5 6 17 16 6 8 24
12
5
6 FF+2
7 C 13 No No Act Dur
1 A 5 -
FS+2 8 3 6 14 2 B 6 SS(1-2) = 3
3 C 6 FS(1-3) = 2
SF+9 FF(2-3)= 2
4 D 7 SF(2-4) = 11
5 E 6 FS(2-5) = 1
SF(3-5) = 9
SS(4-5) = 4
6 F 8 SS(5-6) = 5
SS+4
Kegiatan Kritis?
7 D 14
7 4 7 14
SF+11
SS+3 SS+5
0 A 5 3 B 9 FS+1 11 E 17 16 F 24
0 15 5 3 2 6 9 11 5 6 17 16 6 8 24
FF+2
7 C 13 No No Act Dur
1 A 5 -
FS+2 8 3 6 14 2 B 6 SS(1-2) = 3
3 C 6 FS(1-3) = 2
SF+9 FF(2-3)= 2
4 D 7 SF(2-4) = 11
5 E 6 FS(2-5) = 1
SF(3-5) = 9
SS(4-5) = 4
6 F 8 SS(5-6) = 5
Reviewing a network
Planned
Reviewing a network
Time now = 40
Actual
time
now
a 8 a
b 5 7 9 10 b
c 6 c
time (days)
0 10 20 30 40 50 60
• all activities completed given zero duration Activity Status Remaining time to completion (days)
• activities underway to have durations reassessed 1 completed 0
2 completed 0
• activities not yet started to have durations reassessed
3 completed 0
• reassess plan logic 4 completed 0
• make early start of first activity = time of review 5 underway 13
6 underway 17
• make lead/lag durations relating to completed
activities = zero 7 not started 6
8 underway 4
• do new forward and backward pass 9 not started 2
Note that critical path may change! 10 not started 2
N N N
40 40 40 40 40 44
stem wwall b/fill
40 40 40 40 55 59
2 0 4 0 8 4
0
N&S S S S Sur-
40
bases
40 40
stem
40 40
wwall
53 53
b/fill
59 59 Kerbs 61 61
facing
63
40 40 40 40 40 53 59 59 61 61 63
1 0 3 0 5 13 53 7 6 9 2 10 2
40 Deck 57
42 6 17 59
• all activities completed given zero duration Activity Status Remaining time to completion (days)
• activities underway to have durations reassessed 1 completed 0
2 completed 0
• activities not yet started to have durations reassessed
3 completed 0
• reassess plan logic 4 completed 0
• make early start of first activity = time of review 5 underway 13
6 underway 17
• make lead/lag durations relating to completed
activities = zero 7 not started 6
8 underway 4
• do new forward and backward pass 9 not started 2
Note that critical path may change! 10 not started 2
N N N
40 40 40 40 40 44
stem wwall b/fill
40 40 40 40 55 59
2 0 4 0 8 4
0
N&S S S S Sur-
40
bases
40 40
stem
40 40
wwall
53 53
b/fill
59 59 Kerbs 61 61
facing
63
40 40 40 40 40 53 59 59 61 61 63
1 0 3 0 5 13 53 7 6 9 2 10 2
40 Deck 57
42 6 17 59