China Pakistan Economic Corridor KKH Phase II (Havelian-Thakot Section) Section C
China Pakistan Economic Corridor KKH Phase II (Havelian-Thakot Section) Section C
Section C
CONSULTANT :
NATIONAL ENGINEERING SERVICES
PAKISTAN
Test No. 1 2 3 4 5
Test Location K112+530 K113+673 K116+853 / /
Mass of wet soil from test pit (g) 9370 10020 8470 / /