China Pakistan Economic Corridor KKH Phase II (Havelian-Thakot Section) Section C

This document summarizes the results of 5 field density tests conducted on culvert backfilling along the China Pakistan Economic Corridor KKH Phase II (Havelian-Thakot Section) Section C. The tests were conducted using the sand cone method and measured properties such as wet density, dry density, moisture content and compaction level. Tests 1 and 3 achieved the specified 96% compaction level while Test 2 did not meet the required level at 93.1% compaction.

Uploaded by

bilal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views1 page

China Pakistan Economic Corridor KKH Phase II (Havelian-Thakot Section) Section C

This document summarizes the results of 5 field density tests conducted on culvert backfilling along the China Pakistan Economic Corridor KKH Phase II (Havelian-Thakot Section) Section C. The tests were conducted using the sand cone method and measured properties such as wet density, dry density, moisture content and compaction level. Tests 1 and 3 achieved the specified 96% compaction level while Test 2 did not meet the required level at 93.1% compaction.

Uploaded by

bilal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

China Pakistan Economic Corridor KKH Phase II (Havelian-Thakot Section)

Section C
CONSULTANT :
NATIONAL ENGINEERING SERVICES
PAKISTAN

FIELD DENSITY TEST BY THE SAND CONE METHOD

Description : Culvert Backfilling Compaction Date. : 16-08-2018

Test No. 1 2 3 4 5
Test Location K112+530 K113+673 K116+853 / /

Mass of wet soil from test pit (g) 9370 10020 8470 / /

Mass of sand before test (g) 19000 19000 19000 / /

Mass of sand after test (g) 10180 9620 10680 / /

Mass of sand in plate & cone (g) 2820 2820 2820 / /

Mass of sand in hole (g) 6000 6560 5500 / /

Unit weight of sand (g/cc) 1.37 1.37 1.37 / /

Volume of test pit (cc) 4379.6 4788.3 4014.6 / /

Wet density (g/cc) 2.14 2.09 2.11 / /

MC by Speedy Moisture Tester (%) 4.3 8.1 9.65 / /

Dry density (g/cc) 2.05 1.94 1.92 / /

Maximum dry density (g/cc) 2.08 2.08 2.08 / /

Optimum moisture content (%) 8.1 8.1 8.1 / /

Achieved compaction (%) 98.6 93.1 92.5 / /

Specified compaction (%) 96 96 96 / /


Status OK Not Ok Not OK / /