Test List
Test List
Test List
SL. NO EQUIPMENT
1 CIRCUIT BREAKER-SWITCHYARD
2 ISOLATOR-SWITCHYARD
3 EARTH SWITCH-ISOLATOR
4 CURRENT TRANSFORMER-SWITCHYARD
5 EMVT-SWITCHYARD
6 CVT-SWITCHYARD
7 LIGHTNING ARRESTER-SWITCHYARD
8 EARTHING
9 POWER TRANSFORMER
9 POWER TRANSFORMER
10 INVERTER TRANSFORMER
11 AUXILARY TRANSFORMER
12 HT SWITCHBOARD/SWITCHGEAR
13 CONTROL & RELAY PANEL
15 AC HT CABLE
16 AC LT CABLE
18 INVERTER
19 AC / DC DISTRIBUTION BOARD
20 BATTERY
21 CHARGER
22 SCADA SYSTEM
23 PLC SYSTEM
24 SCB
Note : Above mentioned tests are the minimum tests which are to be conducted at site. However, any other tests which may
needed to perform at site as per ACME engineer’s discretion/ site requirements/KPTCL requirement is also to be performed
vendor without any cost and time implication.
O BE CONDUCTED ON VARIOUS EQUIPMENTS
TESTS TO BE PERFORMED
CB TIMING TEST
POLARITY TEST
RATIO TEST
POLARITY TEST
RATIO TEST
POLARITY TEST
RATIO TEST
LA COUNTER CHECK
CT TEST (POLARITY/RATIO/WR/IR)
PT TEST(IR/POLARITY/RATIO/WR)
SCHEME CHECK
OPERATIONAL CHECK
SCHEME WIRING
COMPONENT HEALTHINESS
RELAY TEST
OPERATIONAL CHECKS
FUNCTIONAL CHECKS
HIPOT TEST
IR
CT TEST (POLARITY/RATIO/WR/IR)
PT TEST(IR/POLARITY/RATIO/WR)
LA TEST (IR)
SCHEME CHECK
OPERATIONAL CHECKS
IR OF BUS BAR
INVERTER TEST
SCHEME CHECK
HEALTHINESS OF COMPONENT
WIRING CHECK
OPERATIONAL CHECK
CABLE TIGHTNESS CHECK
VOC MEASUREMENT
ests which are to be conducted at site. However, any other tests which may be
s discretion/ site requirements/KPTCL requirement is also to be performed by