CALCULATION SHEET
Project Name PLTU MALINAU 2X3 MW
Subject CHIMNEY
Perhitungan Foundation Chimney
Perhitungan Struktur Bawah bangunan Foundation Chimney dilakukan dengan langkah - langkah sebagai berikut :
1 Perhitungan Beban
1 Perhitungan Beban
Berikut ini adalah Data Equipment dari ME:
a. Berat Equipment
Empty = 60,000.00 kg 60 ton
Operation = 75,000.00 kg 75 ton
Test = 75,000.00 kg 75 ton
b. Beban Gempa
C = 0.31 Earthquake Respone Factor
I = 1.5 Importance Faactor
R = 2.2 Earthquake Reduction Factor
H = 40/2 20 Height of Chimney
Vt = Wt x C I/R = Wt x Cd
= 75.00 x
Hx = Vt = 15.85 ton
Mom = Vt x H = 15.85 x
Mx = 317.05 tm
CALCULATION SHEET
Project Name PLTU MALINAU 2X3 MW
Subject CHIMNEY
c. Beban Angin
UBC, 1997 Edition, Chapter 16 Div III shall be applied
Basic Wind Speed : 125 Km/h (77.64 mph)
Wind stagnation pressure (qs) 80.1 kg/m2
Exposure :C
Height variation : As per UBC - 1997
The wind force shall be calculated based on equation 20 -1 in UBC code, 1997.
W = Ce x Cg qs x I x A = PxA
Where :
P : Design wind pressure (kg/m 2)
Ce : Combined height, exposure and gust factor coefficient
Cq : Pressure coefficient
qs : Wind stagnation pressure
I : Importance factor
A : Projected area of all the elements of the wind ward face (m 2)
Wx = Ce x Cq x qs x I x A = PxA
Wx = 1.79 x 1.4 x 80.1
= 31916.17 kg
= 31.92 ton
Mom = Wx x H = 31.92 x
Mx = 638.32 tm
CALCULATION SHEET
Project Name PLTU MALINAU 2X3 MW
Subject CHIMNEY
Owner PT. PLN (Persero)
ngkah - langkah sebagai berikut :
Data By ME
Dari berat emty + 30 %=jadi untuk input
kombinasi hanya sebesar 15 ton
Dari berat emty + 30 %=jadi untuk input
kombinasi hanya sebesar 15 ton
eight of Chimney
0.21
20.00
Owner PT. PLN (Persero)
1.79 in UBC97
1.4 in UBC97
80.1 in UBC97
1.5 in UBC97
x 1.5 x 106
20
Owner PT. PLN (Persero)
CALCULATION SHEET
Project Name PLTU MALINAU 2X3 MW
Subject CHIMNEY
Perhitungan Foundation Chimney
Perhitungan Struktur Bawah bangunan Foundation Chimney dilakukan dengan langkah - langkah sebagai berikut :
1 Perhitungan Beban
1 Perhitungan Beban
Berikut ini adalah Data Equipment dari ME:
a. Berat Equipment
Empty = 60,000.00 kg 60 ton
Operation = 75,000.00 kg 75 ton
Test = 75,000.00 kg 75 ton
b. Beban Gempa
C = 0.31 Earthquake Respone Factor
I = 1.5 Importance Faactor
R = 2.2 Earthquake Reduction Factor
H = 40/2 20 Height of Chimney
Vt = Wt x C I/R = Wt x Cd
= 75.00 x
Hx = Vt = 15.85 ton
Mom = Vt x H = 15.85 x
Mx = 317.05 tm
CALCULATION SHEET
Project Name PLTU MALINAU 2X3 MW
Subject CHIMNEY
c. Beban Angin
UBC, 1997 Edition, Chapter 16 Div III shall be applied
Basic Wind Speed : 125 Km/h (77.64 mph)
Wind stagnation pressure (qs) 80.1 kg/m2
Exposure :C
Height variation : As per UBC - 1997
The wind force shall be calculated based on equation 20 -1 in UBC code, 1997.
W = Ce x Cg qs x I x A = PxA
Where :
P : Design wind pressure (kg/m 2)
Ce : Combined height, exposure and gust factor coefficient
Cq : Pressure coefficient
qs : Wind stagnation pressure
I : Importance factor
A : Projected area of all the elements of the wind ward face (m 2)
Wx = Ce x Cq x qs x I x A = PxA
Wx = 1.79 x 1.4 x 80.1
= 31916.17 kg
= 31.92 ton
Mom = Wx x H = 31.92 x
Mx = 638.32 tm
CALCULATION SHEET
Project Name PLTU MALINAU 2X3 MW
Subject CHIMNEY
Owner PT. PLN (Persero)
ngkah - langkah sebagai berikut :
eight of Chimney
0.21
20.00
Owner PT. PLN (Persero)
1.79 in UBC97
0.8 in UBC97
80.1 in UBC97
1.5 in UBC97
x 1.5 x 106
20
Owner PT. PLN (Persero)