PLTU Malinau Chimney Foundation Calculations

This document contains calculations for the foundation of a chimney structure. It calculates loads from equipment weight, earthquake forces, and wind forces. The equipment weight is 60 tons empty and 75 tons operational. Earthquake forces are calculated based on factors from the chimney height and weight. Wind forces use parameters from the UBC 1997 code to calculate pressure and force based on speed, exposure, and chimney height and area. The resulting bending moments are 317.05 ton-meters for earthquake and 638.32 ton-meters for wind.

Uploaded by

Gunarso Narso
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
125 views12 pages

PLTU Malinau Chimney Foundation Calculations

This document contains calculations for the foundation of a chimney structure. It calculates loads from equipment weight, earthquake forces, and wind forces. The equipment weight is 60 tons empty and 75 tons operational. Earthquake forces are calculated based on factors from the chimney height and weight. Wind forces use parameters from the UBC 1997 code to calculate pressure and force based on speed, exposure, and chimney height and area. The resulting bending moments are 317.05 ton-meters for earthquake and 638.32 ton-meters for wind.

Uploaded by

Gunarso Narso
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

CALCULATION SHEET

Project Name PLTU MALINAU 2X3 MW

Subject CHIMNEY

Perhitungan Foundation Chimney

Perhitungan Struktur Bawah bangunan Foundation Chimney dilakukan dengan langkah - langkah sebagai berikut :

1 Perhitungan Beban

1 Perhitungan Beban

Berikut ini adalah Data Equipment dari ME:

a. Berat Equipment
Empty = 60,000.00 kg 60 ton
Operation = 75,000.00 kg 75 ton

Test = 75,000.00 kg 75 ton

b. Beban Gempa

C = 0.31 Earthquake Respone Factor


I = 1.5 Importance Faactor
R = 2.2 Earthquake Reduction Factor
H = 40/2 20 Height of Chimney

Vt = Wt x C I/R = Wt x Cd
= 75.00 x
Hx = Vt = 15.85 ton

Mom = Vt x H = 15.85 x
Mx = 317.05 tm
CALCULATION SHEET
Project Name PLTU MALINAU 2X3 MW

Subject CHIMNEY

c. Beban Angin
UBC, 1997 Edition, Chapter 16 Div III shall be applied
Basic Wind Speed : 125 Km/h (77.64 mph)
Wind stagnation pressure (qs) 80.1 kg/m2
Exposure :C
Height variation : As per UBC - 1997
The wind force shall be calculated based on equation 20 -1 in UBC code, 1997.
W = Ce x Cg qs x I x A = PxA
Where :
P : Design wind pressure (kg/m 2)
Ce : Combined height, exposure and gust factor coefficient
Cq : Pressure coefficient
qs : Wind stagnation pressure
I : Importance factor
A : Projected area of all the elements of the wind ward face (m 2)

Wx = Ce x Cq x qs x I x A = PxA
Wx = 1.79 x 1.4 x 80.1
= 31916.17 kg
= 31.92 ton

Mom = Wx x H = 31.92 x
Mx = 638.32 tm
CALCULATION SHEET
Project Name PLTU MALINAU 2X3 MW

Subject CHIMNEY
Owner PT. PLN (Persero)

ngkah - langkah sebagai berikut :

Data By ME
Dari berat emty + 30 %=jadi untuk input
kombinasi hanya sebesar 15 ton
Dari berat emty + 30 %=jadi untuk input
kombinasi hanya sebesar 15 ton

eight of Chimney

0.21

20.00
Owner PT. PLN (Persero)

1.79 in UBC97
1.4 in UBC97
80.1 in UBC97
1.5 in UBC97

x 1.5 x 106

20
Owner PT. PLN (Persero)
CALCULATION SHEET
Project Name PLTU MALINAU 2X3 MW

Subject CHIMNEY

Perhitungan Foundation Chimney

Perhitungan Struktur Bawah bangunan Foundation Chimney dilakukan dengan langkah - langkah sebagai berikut :

1 Perhitungan Beban

1 Perhitungan Beban

Berikut ini adalah Data Equipment dari ME:

a. Berat Equipment
Empty = 60,000.00 kg 60 ton
Operation = 75,000.00 kg 75 ton
Test = 75,000.00 kg 75 ton

b. Beban Gempa

C = 0.31 Earthquake Respone Factor


I = 1.5 Importance Faactor
R = 2.2 Earthquake Reduction Factor
H = 40/2 20 Height of Chimney

Vt = Wt x C I/R = Wt x Cd
= 75.00 x
Hx = Vt = 15.85 ton

Mom = Vt x H = 15.85 x
Mx = 317.05 tm
CALCULATION SHEET
Project Name PLTU MALINAU 2X3 MW

Subject CHIMNEY

c. Beban Angin
UBC, 1997 Edition, Chapter 16 Div III shall be applied
Basic Wind Speed : 125 Km/h (77.64 mph)
Wind stagnation pressure (qs) 80.1 kg/m2
Exposure :C
Height variation : As per UBC - 1997
The wind force shall be calculated based on equation 20 -1 in UBC code, 1997.
W = Ce x Cg qs x I x A = PxA
Where :
P : Design wind pressure (kg/m 2)
Ce : Combined height, exposure and gust factor coefficient
Cq : Pressure coefficient
qs : Wind stagnation pressure
I : Importance factor
A : Projected area of all the elements of the wind ward face (m 2)

Wx = Ce x Cq x qs x I x A = PxA
Wx = 1.79 x 1.4 x 80.1
= 31916.17 kg
= 31.92 ton

Mom = Wx x H = 31.92 x
Mx = 638.32 tm
CALCULATION SHEET
Project Name PLTU MALINAU 2X3 MW

Subject CHIMNEY
Owner PT. PLN (Persero)

ngkah - langkah sebagai berikut :

eight of Chimney

0.21

20.00
Owner PT. PLN (Persero)

1.79 in UBC97
0.8 in UBC97
80.1 in UBC97
1.5 in UBC97

x 1.5 x 106

20
Owner PT. PLN (Persero)