West Karoun Area NGL 3200 Project

Water Pipelines-Material Take Off For Line Pipe

PROJ. UNIT DISC. DOC. SEQ. REV. Class: 3


Page: 1 of 4
NGWK 0025 ENPN MTPN 7530 D03 Status: AFC

WATER PIPELINES-MATERIAL TAKE OFF FOR


LINE PIPE

Contract No. : ‫ن‬.‫ت‬.‫ – م‬91 – 754 Date: 20/01/2013


Client : Petroleum Engineering & Development Company (PEDEC)
Site Location :

M. M. M. J. M.
D03 06/07/2015 Approved For Construction Mesbahzadeh Jazayeri
Roshanali Amini Sakhaie
M. M. M. J. M.
D02 30/05/2015 Approved For Construction Mesbahzadeh Jazayeri
Roshanali Amini Sakhaie
M. M. M. P. M.
D01 09/05/2015 Approved For Construction Mesbahzadeh Heydari
Roshanali Amini Sakhaie
M. M. M. P. M.
D00 18/04/2015 Issued For Information Mesbahzadeh Heydari
Roshanali Amini Sakhaie
Contractor’s PEDEC
Rev. Issue Date Purpose of Issue Prepared Checked Approved
Approval Approval
West Karoun Area NGL 3200 Project

Water Pipelines-Material Take Off For Line Pipe

PROJ. UNIT DISC. DOC. SEQ. REV. Class: 3


Page: 2 of 4
NGWK 0025 ENPN MTPN 7530 D03 Status: AFC

TABLE OF REVISED PAGE

REVISION REVISION REVISION


PAGE PAGE PAGE
D00 D01 D02 D03 D04 D05 D06 D00 D01 D02 D03 D04 D05 D06 D00 D01 D02 D03 D04 D05 D06
1 X 40 79
2 X 41 80
3 X 42 81
4 X X X 43 82
5 44 83
6 45 84
7 46 85
8 47 86
9 48 87
10 49 88
11 50 89
12 51 90
13 52 91
14 53 92
15 54 93
16 55 94
17 56 95
18 57 96
19 58 97
20 59 98
21 60 99
22 61 100
23 62 101
24 63 102
25 64 103
26 65 104
27 66 105
28 67 106
29 68 107
30 69 108
31 70 Appendix
32 71 1 X
33 72 2 X
34 73 3
35 74 4
36 75 5
37 76 6
38 77 7
39 78 8
West Karoun Area NGL 3200 Project

Water Pipelines-Material Take Off For Line Pipe

PROJ. UNIT DISC. DOC. SEQ. REV. Class: 3


Page: 3 of 4
NGWK 0025 ENPN MTPN 7530 D03 Status: AFC

1. MATERIAL TAKE OF FOR POLYETHYLENE PIPE ....................................................... 4


West Karoun Area NGL 3200 Project

Water Pipelines-Material Take Off For Line Pipe

PROJ. UNIT DISC. DOC. SEQ. REV. Class: 3


Page: 4 of 4
NGWK 0025 ENPN MTPN 7530 D03 Status: AFC

1. MATERIAL TAKE OF FOR POLYETHYLENE PIPE


D03

ITEM OD THICKNESS
TYPE DESCRIPTION SDR Unit QTY
NO. (mm) (mm)
HDPE PIPE-DIN 8074-PE 100,
1 PIPE Design pressure: 5.5 barg, 250 14.8 17 Meters 13248
Design temperature: 40°C
HDPE PIPE-DIN 8074-PE 100,
2 PIPE Design pressure: 7.6 barg, 200 18.2 11 Meters 13248
Design temperature: 40°C
HDPE PIPE-DIN 8074-PE 100,
3 PIPE Design pressure: 9.2 barg, 140 15.7 9 Meters 13248
Design temperature: 40°C

Note: Vendor shall confirm suitability of pipes for the mentioned design condition.