0% found this document useful (0 votes)
55 views1 page

Daily Report Aug 9 2018

Cascade Air Lines is an airline company. The document is an onshore operations daily maintenance report for Mitha 01 Well No. 1. It details the daily inspection and maintenance tasks carried out to ensure the safety of breathing air supplies and gas monitoring systems. H2S training was also provided to new employees and visitors.

Uploaded by

shahzad sultan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views1 page

Daily Report Aug 9 2018

Cascade Air Lines is an airline company. The document is an onshore operations daily maintenance report for Mitha 01 Well No. 1. It details the daily inspection and maintenance tasks carried out to ensure the safety of breathing air supplies and gas monitoring systems. H2S training was also provided to new employees and visitors.

Uploaded by

shahzad sultan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CASCADE Air Lines

DATE VERIFIED
ONSHORE OPERATION DAILY MAINTENANCE REPORT
Company man Name Aamir Ameen
RIG NAME SLR-215

EEBA
SABA

SCBA
LOCATION Mitha 01 WELL No.: 1
USL H2S Support Engineer Amir Hamza STATIONS
Status DATE 9-Aug-18
Monkey Board 1 1 8/9/2018
DAILY REQUIREMENTS Rig Floor 4 6 8/9/2018
Dog house 1 1 8/9/2018
Carried out regular inspection for all mesh guard devices overall around of RIG's H2S Office 1 8/9/2018
Regulary monitoring and inspect all Breathing Air supply - all HP & LP gauges, lines, manifolds, regulators, fittings, cascade racks for leaks and appropriate pressure readings. Shale shakers 2 3 8/9/2018
To Check fixed gas monitoring system for all stations . Muster station A 3 8/9/2018
To inspect & maintain all SCBAs & SABAs. Muster Station B 3 8/9/2018
Conducting, H2S awarness training as mandatory requirements for new commer, Visitor Orientations & H2S Refresh Trainings as required - and recorded accordingly Mud logging unit 8/9/2018
Actively monitoring the RIG operation Medic 1 8/9/2018
Actively and participate for all safety meetings
#REF!
and provide relevant input accordingly Company man office 2 8/9/2018
Rig manager office 1 8/9/2018
Cementing unit dowel 2 8/9/2018
Mud pits 2 3 8/9/2018
ACTIVITIES FOR 24 HOURS : DAY & Night Amir Hamza Pump room 8/9/2018
Sack area 1 2 8/9/2018
* Participated in daily morning safety meeting. * Training Room 1 1 1 8/9/2018
* Discussed about h2s awareness training for crew on board. * Choke manifold 1 3 8/9/2018
* Refreshed, trained 18 personnel on board. * Client HSE 1 8/9/2018
* Organized BA's after training at meeting room. * Rig HSE 1 8/9/2018
* Relocated some BA's at different work station at rig site. * Step oil tool 2 8/9/2018
* Inspected BA's at different work station areas. * Enviromental office 1 8/9/2018
* Ran electric compressor just to check working good. * Material man office 1 8/9/2018
* Relocated 01 h2s sensor from entrance of rig floor to main deck. * Mud engineer 2 8/9/2018
* Keep safety watch on fmc controller & all h2s detectors. security 1 8/9/2018
* Keep safety watch on air loop delivery system at rig site. Geologist 1 8/9/2018
* Done paper work & updated computer logs. Rig ware house 1 8/9/2018
PMS office 2 8/9/2018
Radio Room 1 8/9/2018
Mud logger 3 8/9/2018
DD unit 2 8/9/2018
Engine area 2 8/9/2018
Well head area 1 2 8/9/2018

MONTHLY REPORTS & SUBMISSION Fire, Abandon & H2S Drill

Mesh Guard calibration was done on 6 Aug 2018 & next due on 6 Sept Last Fire drill was conducted on 3 Aug 2018
Gas alert micro 5 & single gas clip bump tested on 6 Aug 2018 & next due on 6 Sept

TOTAL : 14 12 23 22

QUARTERLY ACCOMMODATIONS*
Cabin # Occupy N0. Cabin # Occup.N0. Cabin # Occup.N0

TOOLS & EQUIPMENT ONBOARD DETECTION SYSTEM Fixed sensors, ITX & GAS badges sensor calibration
NO. ITEMS QTY SERIAL NO. Station QTY TYPE LAST DATE NEXT DATE
Wire Brush 1 Main Deck 1 H2S 6-Aug-18 6-Sep-18
Bug Blowers - 30 inches in size 2 Rig Floor 1 H2S 6-Aug-18 6-Sep-18
Bull Hornes 1 Shale Shakers 1 H2S 6-Aug-18 6-Sep-18
Windsock w/Poles - Windsocks & Poles 2 Mud Pits 1 H2S 6-Aug-18 6-Sep-18
Intrinsically safe Torches - Flash Lights Well Head 1 H2S 6-Aug-18 6-Sep-18
Screw drivers 1 Choke Manifold 1 H2S 6-Aug-18 6-Sep-18
Rescue Stretcher
Oxygen Resuscitator
Air analysis Kit 1
Air analysis Test tubes 1
Digital Anometer 1
Allen Key Set 1
Cutter 1 Single Gas Clip 12 H2S 6-Aug-18 6-Sep-18
Pliers 1 Multi Gas Detector 3 H2S,LEL,CO,O2 6-Aug-18 6-Sep-18
Crescent Wrench 1 Rae Pump 2 Multi Tubes Nill Nill
Tool Bag 1
Printer 1
Voice amplifiers 3

PENDING ISSUES ACTION TAKEN

* POB in Chambers:
POB Total onboard = Max. allowable POB =

BA on board & operational ( SCBA 2216psi & SABA 4500psi )


DAILY OPERATIONS SUMMARY MISCELLANEOUS / OTHER Cascade racks 3 ( With 6 cylinders)
Cascade Air Lines 23

Day Shift Rescue Team : Night Shift Rescue Team :


Crane C
Team # 1: Rig Manager, Roustabouts Team # 2: Doctor, Electrician, Mechanic
Rig: Drilling

Amir Hamza
H2S Support Engineer