2-4mm
45o
37mm
2-3mm
Page 1 of 3
TOWER NO
DOOR BEFORE WELDING INSPECTION REPORT DATE
BAY
FIT UP REQUIREMENT
T104
W = 32mm (min)
T106
W = 37mm (min)
NAME OF BEVEL CUTTER :
GRINDING&SANDERING NAME : WELDER'S NAME:
FITTER NAME : ROOT WELDER’S NAME :
SUPPORTER NAME : DATE:
DATE&TIME : TIME:
CLEANING
10-11
11-12
12-13
13-14
14-15
15-16
16-17
17-18
18-19
9-10
19-0
INSPECTION STAGE SEGMENT
0-1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
ROOT FACE (mm)
AFTER BEVELLING
INSIDE BEVEL ANGLE MEASURED
WITH GAUGE
ROOT GAP (mm)
INSIDE BEVEL WIDTH (W) (mm)
AFTER FIT UP
INSIDE BEVEL DEPTH (mm)
AFTER ROOT WELD DEPTH (mm)
BG GRINDER'S NAME :
DATE :
TIME :
CLEANING
10-11
11-12
12-13
13-14
14-15
15-16
16-17
17-18
18-19
9-10
19-0
INSPECTION STAGE SEGMENT
0-1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
OUTSIDE BG DEPTH (mm)
AFTER BG OUTSIDE BG WIDTH (mm)
O/S WELD RESTART POINTS
DRAW ACTUAL FIT-UP & WELD LAYERS ACTUAL BG
QC Inspector’s sign,date and name
Page No 2 of 3
TOWER NO
DOOR DURING WELDING INSPECTION REPORT DATE
BAY
Joint No, Filler Gas Weld
Welding Filler Travel Deposit Restart
Mechine Welder Segment Door wire Flow
Pass No WPS No specifica wire Amps Voltage speed points Remarks
ID No i/s or o/s Rate
No & Batch No (mm/min) Thicknes
tion (LPM) s (mm) grinding
Location
Draw Segments
Capping pass welded with weaving avoiding multipasses (Yes/No): Inspector’s sign, date and name
Spatters removed from door frame in between each passes (Yes/No):
Interpass temperature maintained maximum as per WPS (Yes/No):
Page No 3 of 3
TOWER NO
DOOR DURING WELDING INSPECTION REPORT DATE
BAY
Joint No, Filler Filler Gas Travel Weld Restart
Welding Welder Segment Door Pass No WPS No wire wire Amps Voltage Flow speed Deposit points Remarks
Mechine No & ID No i/s or o/s specifica Batch No Rate (mm/min) Thickness grinding
Location tion (LPM) (mm)
Draw the weld sequence
Capping pass welded with weaving avoiding multipasses (Yes/No): Inspector’s sign,date and name
Spatters removed from door frame in between each passes (Yes/No):
Interpass temperature maintained maximum as per WPS (Yes/No):
TOWER NO :-
DOOR REPAIR TRACKING REPORT DATE :-
BAY :-
Date of start : Date of start :
R0 Date of clouse :
R1 Date of clouse :
Defect Result Result
Defect Type
Type UT INSPECTED Repair BG LPI inspected by UT inspected Repair bg LPI inspected Repair UT inspected by &
Spot No Segment Repair Grinder name(BG) Repair welder id Repair Grinder name(BG)
BY depth &date (Repair / by&date depth by & date welder id (Repair / date
Accepted) Accepted)
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
Tower no Bay
Date of start : Date of start :
R2 R3
Date of clouse : Date of clouse :
Defect Result Result
Defect Type
Type UT INSPECTED Repair BG LPI inspected by UT inspected Repair bg LPI inspected Repair UT inspected by &
Spot No Segment Repair Grinder name(BG) Repair welder id Repair Grinder name(BG)
BY depth &date (Repair / by&date depth by & date welder id (Repair / date
Accepted) Accepted)
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
Date of start : Date of start :
R4 R5
Date of clouse : Date of clouse :
Defect Result Result
Defect Type
Type UT INSPECTED Repair BG LPI inspected by UT inspected Repair bg LPI inspected Repair UT inspected by &
Spot No Segment Repair Grinder name(BG) Repair welder id Repair Grinder name(BG)
BY depth &date (Repair / by&date depth by & date welder id (Repair / date
Accepted) Accepted)
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH
DEPTH DEPTH
LENGTH LENGTH