Productivity in EPC
Productivity in EPC
Productivity in EPC
Construction Projects
Examples:
• Kilograms of rebar fixed per manday
• Cu.m Concrete poured per manday
• Sq.m of formwork placed per manday
• Sq.m of block laid per manday
Building C Super
Sructure
• Sq.m of tiles laid per manday
Why Measure Productivity?
• You Can’t Correct a problem if you don’t know it exists
• By the time the job is over, you have lost the more
• You will have current information to manage and control
your project
• You should correct losses arising from internal problems
• You may be able to recover losses arising from external
causes.
•Extremely vital performance measurement tool within the
Building C Super
Sructure
construction industry
•Productivity growth is important to an individual
enterprise, an industry or an economy
Common causes of labour overruns
External:
• Overtime
• Changes
• Crowding
• Trade stacking
• Weather
• Site Access
Internal:
• Poor Planning & Management of
work
• Rework &Building
Errors
C Super
Sructure
• Bad Estimate
• Lack of Training
• Morale Problems
• Staff turnover
• Material and equipment availability
Themes for Productivity Improvement
• Consistent Practices
• Process versus Results Management
• Consistent Procedures and Practices
• Proactive versus Reactive Management
• Measurement and Analysis of a defect
• Risk or Variation Analysis
• Vital Few versus Useful Many
• Planning Versus Reacting
Building C Super
Sructure
Basement - 2 1,821,000 26,747 7,202 2.5 18,005 1,343,000 21,117 7,202 31,096 4.32
Basement - 1 2,615,000 30,285 9,093 2.5 22,733 1,923,000 18,466 6,821 34,285 5.03
Building - A 2,506,000 60,539 16,135 2.5 40,338 781,000 25,630 3,653 19,249 5.27
Building - B 2,408,000 51,804 13,610 2.5 34,025 524,000 15,078 2,218 10,897 4.91
Building - D 2,257,000 54,546 13,121 2.5 32,803 225,000 4,200 856 4,051 4.73
12,349,23
Total 20,105,230 276,638 92,824 2.5 232,060 110,736 48,603 169,050 3.48
0
3.50
5.00
3.00
4.00
2.50
3.00 2.00
1.50
2.00
1.00
1.00
0.50
Building C Super
Sructure