0% found this document useful (0 votes)
46 views1 page

Daily Report Aug 6 2018

Cascade Air Lines provides daily maintenance reports for their offshore drilling rigs. This report summarizes the daily inspection and maintenance of breathing air equipment conducted on August 6th at the Mitha 01 drilling site. Key tasks included inspecting mesh guards, breathing air systems, fixed gas monitors, self-contained breathing apparatuses, and conducting safety trainings. Activities over the 24 hours included starting rig up and distributing respiratory protective equipment to work stations.

Uploaded by

shahzad sultan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views1 page

Daily Report Aug 6 2018

Cascade Air Lines provides daily maintenance reports for their offshore drilling rigs. This report summarizes the daily inspection and maintenance of breathing air equipment conducted on August 6th at the Mitha 01 drilling site. Key tasks included inspecting mesh guards, breathing air systems, fixed gas monitors, self-contained breathing apparatuses, and conducting safety trainings. Activities over the 24 hours included starting rig up and distributing respiratory protective equipment to work stations.

Uploaded by

shahzad sultan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CASCADE Air Lines

DATE VERIFIED
ONSHORE OPERATION DAILY MAINTENANCE REPORT
Company man Name Aamir Ameen
RIG NAME SLR-215

EEBA
SABA

SCBA
LOCATION Mitha 01 WELL No.: 1
USL H2S Support Engineer Amir Hamza STATIONS
DATE 6-Aug-18
Monkey Board 1 1 8/6/2018
DAILY REQUIREMENTS Rig Floor 4 6 8/6/2018
Dog house 1 1 8/6/2018
Carried out regular inspection for all mesh guard devices overall around of RIG's H2S Office 1 8/6/2018
Regulary monitoring and inspect all Breathing Air supply - all HP & LP gauges, lines, manifolds, regulators, fittings, cascade racks for leaks and appropriate pressure readings. Shale shakers 2 3 8/6/2018
To Check fixed gas monitoring system for all stations . Muster station A 3 8/6/2018
To inspect & maintain all SCBAs & SABAs. Muster Station B 3 8/6/2018
Conducting, H2S awarness training as mandatory requirements for new commer, Visitor Orientations & H2S Refresh Trainings as required - and recorded accordingly Mud logging unit 8/6/2018
Actively monitoring the RIG operation Medic 1 8/6/2018
Actively and participate for all safety meetings
#REF!
and provide relevant input accordingly Company man office 2 8/6/2018
Rig manager office 1 8/6/2018
Cementing unit dowel 2 8/6/2018
Mud pits 2 3 8/6/2018
ACTIVITIES FOR 24 HOURS : DAY & Night Amir Hamza Pump room 8/6/2018
Sack area 1 2 8/6/2018
* Started Rig up at rig. * Training Room 1 1 1 8/6/2018
* Take out all SCBA's, EEBA's & SABA's from united safety container to main deck. * Choke manifold 1 3 8/6/2018
* Distributed all SCBA's, EEBA's & SABA's at different work station area's & offices. * Client HSE 1 8/6/2018
* Relocated all h2s sensors, fmc controller & alarm bar from hse office to united safety office. * Rig HSE 1 8/6/2018
* Function tested FMC controller & alarm bar. * Step oil tool 2 8/6/2018
* Calibrated 06 h2s sensors & 03 gas alert micro 5 detectors at united safety container. * Enviromental office 1 8/6/2018
* Bump tested single gas clips at united safety container * Material man office 1 8/6/2018
* Organized United Safety container on rig site. * Mud engineer 2 8/6/2018
security 1 8/6/2018
Geologist 1 8/6/2018
Rig ware house 1 8/6/2018
PMS office 2 8/6/2018
Radio Room 1 8/6/2018
Mud logger 3 8/6/2018
DD unit 2 8/6/2018
Engine area 2 8/6/2018
Well head area 1 2 8/6/2018

MONTHLY REPORTS & SUBMISSION Fire, Abandon & H2S Drill

Mesh Guard calibration was done on 6 Aug 2018 & next due on 6 Sept Last Fire drill was conducted on 3 Aug 2018
Gas alert micro 5 & single gas clip bump tested on 6 Aug 2018 & next due on 6 Sept

TOTAL : 14 12 23 22

QUARTERLY ACCOMMODATIONS*
Cabin # Occupy N0. Cabin # Occup.N0. Cabin # Occup.N0

TOOLS & EQUIPMENT ONBOARD DETECTION SYSTEM Fixed sensors, ITX & GAS badges sensor calibration
NO. ITEMS QTY SERIAL NO. Station QTY TYPE LAST DATE NEXT DATE
Wire Brush 1 Main Deck 1 H2S 6-Aug-18 6-Sep-18
Bug Blowers - 30 inches in size 2 Rig Floor 1 H2S 6-Aug-18 6-Sep-18
Bull Hornes 1 Shale Shakers 1 H2S 6-Aug-18 6-Sep-18
Windsock w/Poles - Windsocks & Poles 2 Mud Pits 1 H2S 6-Aug-18 6-Sep-18
Intrinsically safe Torches - Flash Lights Well Head 1 H2S 6-Aug-18 6-Sep-18
Screw drivers 1 Choke Manifold 1 H2S 6-Aug-18 6-Sep-18
Rescue Stretcher
Oxygen Resuscitator
Air analysis Kit 1
Air analysis Test tubes 1
Digital Anometer 1
Allen Key Set 1
Cutter 1 Single Gas Clip 12 H2S 6-Aug-18 6-Sep-18
Pliers 1 Multi Gas Detector 3 H2S,LEL,CO,O2 6-Aug-18 6-Sep-18
Crescent Wrench 1 Rae Pump 2 Multi Tubes Nill Nill
Tool Bag 1
Printer 1
Voice amplifiers 3

PENDING ISSUES ACTION TAKEN

* POB in Chambers:
POB Total onboard = 146 Max. allowable POB =

BA on board & operational ( SCBA 2216psi & SABA 4500psi )


DAILY OPERATIONS SUMMARY MISCELLANEOUS / OTHER Cascade racks 3 ( With 6 cylinders)
Cascade Air Lines 23

Day Shift Rescue Team : Night Shift Rescue Team :


Crane C
Team # 1: Rig Manager, Roustabouts Team # 2: Doctor, Electrician, Mechanic
Rig: Drilling

Amir Hamza
H2S Support Engineer