Project: Mabini Pier (Conveyor Support) Location: Mabini, Batangas Owner
Project: Mabini Pier (Conveyor Support) Location: Mabini, Batangas Owner
Project: Mabini Pier (Conveyor Support) Location: Mabini, Batangas Owner
1. Loads:
a. Dead load
Self weight (steel) = 77 kN/m3
Self weight (concrete) = 23.6 kN/m3
Conveyor = 0.4 T/m
Grain = 7.50 kN/m3
b. Live load
Periodic Maintenance Activity = 0.75 kPa (Assumed)
2. Materials
a. Concrete:
Compressive strength, fc’ = 28 MPa
b. Reinforcement:
Tensile strength, fy = 275 MPa
c. Structural Steel
Yield strength, fy = 248 MPa
3. Pile
Allowable Capacity = 830 kN/pile (assumed)
4. Seismic
V = 2.5 Ca I W /R