Productivity Rate (Piping Works)
Productivity Rate (Piping Works)
Productivity Rate (Piping Works)
) m2 6000
OD 3
Manpower/day 5.86
I Equipment: @ Hrs
OD 3.00
Equipment/day 0.95
Mday
Mday
Mday
Mday
Mday
Mday
Mday
Mday
Mday
Eday
Eday
A Binder Course(Asphalt Conc.Pvmt.) m2 6000
OD 3
Manpower/day 4.86
I Equipment: @ Hrs
OD 3.00
Equipment/day 0.79
Mday
Mday
Mday
Mday
Mday
Mday
Mday
Mday
Eday
Eday
A Compaction m3 5000
OD 3
Manpower/day 3.13
I Equipment: @ Hrs
OD 3.00
Equipment/day 2.08
Mday
Mday
Mday
Mday
Mday
Mday
Mday
Eday
Eday
A Backfilling m3 500
OD 3
Manpower/day 2.50
I Equipment: @ Hrs
OD 3.00
Equipment/day 1.67
Mday
Mday
Mday
Mday
Mday
Eday
Eday
A MANHOLES & CLEANOUTS EA 10
B Daily Output EA 1
OD 3
Manpower/day 15.42
I Equipment: @ Hrs
I2
OD 3.00
Equipment/day 1.67
Mday
Mday
Mday
Mday
Mday
Mday
Eday
Eday
A STORM DRAINAGE LM 200
B Daily Output LM 48
OD 3
Manpower/day 3.65
I Equipment: @ Hrs
OD 3.00
Equipment/day 2.08
Mday
Mday
Mday
Mday
Mday
Mday
Mday
Mday
Eday
Eday
A Sewer/Drainage Piping Lm 500
B Daily Output Lm 54
OD 3
Manpower/day 12.73
I Equipment: @ Hrs
OD 3.00
Equipment/day 4.63
Mday
Mday
Mday
Mday
Mday
Mday
Mday
Mday
Mday
Eday
Eday
A PIPE LAYING LM 200
B Daily Output LM 42
OD 3
Manpower/day 4.17
I Equipment: @ Hrs
OD 3.00
Equipment/day 2.38
Mday
Mday
Mday
Mday
Mday
Mday
Mday
Mday
Eday
Eday
A Bedding m3 5000
OD 3
Manpower/day 25.00
I Equipment: @ Hrs
OD 3.00
Equipment/day 0.47
Mday
Mday
Mday
Mday
Mday
Eday
Eday
A Excavation m3 5000
OD 3
Manpower/day 11.49
I Equipment: @ Hrs
OD 3.00
Equipment/day 6.07
Mday
Mday
Mday
Mday
Mday
Mday
Eday
Eday
A Trench Excavation m3 5000
OD 3
Manpower/day 12.44
I Equipment: @ Hrs
OD 3.00
Equipment/day 6.22
Mday
Mday
Mday
Mday
Mday
Eday
Eday
Item Activity Activity SUB Unit
ID Description ACTIVITY
SITEWORKS
SUBSTRUCTURE
For Disposal M3
Formworks M2
Rebars kg
Deshuttering M2
QTY Prod. Rate Days (H) Tot. Man Crew Tot. Mdays
53,280.00 250 213.12 2.056 1 Steel Fixer, 1 Helper, .056 Operator 438.17
1,184.00 35 33.83 3.056 2 Carpenter, 1 Helper, .056 Operator 103.38
OD (O) Manpower MAN - DAYS
/day
(N/O) Carpenter Mason Steel Fixer Helper Operator Driver Technician Painter
1 42.76
Desc. (H x X)
0 0 0 0 0
E Q M T - DAYS
0.08
0.55
1.19
0.19
0 0 0 1.93 0.08 0 0