0% found this document useful (0 votes)
256 views117 pages

Weekly Report Format-Mudassar

The document is an employee time report for Mudassar Idris Raut, a mechanical engineer, for three consecutive weeks. It shows the number of hours worked each day on various projects, including the Riyadh Metro Tunnel Ventilation, Egypt Hospital fire suppression systems, and initial studies for the Jeddah Art Gallery HVAC system. The time breakdown includes 5 hours on quality documents for Riyadh Metro and 45 total hours for the week spent on the Egypt Hospital project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
256 views117 pages

Weekly Report Format-Mudassar

The document is an employee time report for Mudassar Idris Raut, a mechanical engineer, for three consecutive weeks. It shows the number of hours worked each day on various projects, including the Riyadh Metro Tunnel Ventilation, Egypt Hospital fire suppression systems, and initial studies for the Jeddah Art Gallery HVAC system. The time breakdown includes 5 hours on quality documents for Riyadh Metro and 45 total hours for the week spent on the Egypt Hospital project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 117

ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME: MUDASSAR IDRIS RAUT EMP# ZA1007 Cost Centre: PUNE DESIGNATION: MECHANICAL ENGINEER
Date: 17-Nov-17 (No. of Hrs,)
PROJECT DETAILS
36.LOC.668
Job#JRM1514
Details of hrs. to be
DATE Details of work done chargeable to
Customers/Other
RIYADH METRO RIYADH METRO Dept.
TUNNEL 3E2- REVB2 Miscelaneous
VENTILLATION

13-Nov-17 Plumbing Supply estimation of revised Drgs of Stn 3E2 9


14-Nov-17 Plumbing Supply estimation of revised Drgs of Stn 3E2 9
Plumbing Supply estimation of revised Drgs of Stn 3E2:
15-Nov-17
Plumbing Drainage Review fo Akif Work 9
Plumbing Supply estimation of revised Drgs of Stn 3E2:
16-Nov-17
Plumbing Drainage Review fo Akif Work 9
Riyadh Metro Tunnel Ventillation Review of HVAC done by peers
17-Nov-17
Preparation of Quality Assurance /Quality Checklist documents 5 0 4
18-Nov-17 Saturday 0
19-Nov-17 Sunday 0
Total No. of Hrs. 0 0 5 36 4 0 0 45

Prepared by:
Reviewed by:
Name of employee

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME: MUDASSAR IDRIS RAUT EMP# ZA1007 Cost Centre: PUNE DESIGNATION: MECHANICAL ENGINEER
Date: 27-Nov-17 (No. of Hrs,)
PROJECT DETAILS
36.LOC.668
Job#JRM1514
Details of hrs. to be
DATE Details of work done chargeable to
Customers/Other
Dept.
Egypt Hospital

20-Nov-17 FF Estimation of Egypt hospital 9


21-Nov-17 FF Estimation of Egypt hospital 9
Caculation of Fire Suppression of FM200 Gas facility in Egypt hospital; FF
22-Nov-17
Estimation of Egypt hospital 9
23-Nov-17 Caculation of Fire Suppression of co2 Gas facility in Egypt hospital, 9
24-Nov-17 Finalizinf fo Fire Fighting BOQ of Egypt Hospital, Al Farabi Documentation 9
25-Nov-17 Saturday 0
26-Nov-17 Sunday 0
Total No. of Hrs. 0 0 0 45 0 0 0 45

Prepared by:
Reviewed by:
Name of employee

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME: MUDASSAR IDRIS RAUT EMP# ZA1007 Cost Centre: PUNE DESIGNATION: MECHANICAL ENGINEER
Date: 1-Dec-17 (No. of Hrs,)
PROJECT DETAILS
36.LOC.668
Job#JRM1514
Details of hrs. to be
DATE Details of work done chargeable to
Customers/Other
Dept.
Jeddah Art Gallery Misscelaneous

Folder Movement from old Project Folder to New Project Folders:


Initial Study of HVAC System in Jeddah Art Gallery Project; Study of all
27-Nov-17 design Specs I HVAC System. 7 2
Till 7:00 PM finished parking Ventillation Layout except Parking
Accessories

28-Nov-17 Detailed Estimation of HVAC work in Jeddah Art Gallery 9


29-Nov-17 Detailed Estimation of HVAC work in Jeddah Art Gallery 9
Detailed Estimation of HVAC work in Jeddah Art Gallery, BOQ Finalization
30-Nov-17 & cross verification with Akif Work of his Jeddah Art Gallery Work 9
estimation.
1-Dec-17 Project history study of 1F4 after Lunch Hrs 8 1
2-Dec-17 Saturday 0
3-Dec-17 Sunday 0
Total No. of Hrs. 0 0 0 42 3 0 0 45

Prepared by:
Reviewed by:
Name of employee

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME: MUDASSAR IDRIS RAUT EMP# ZA1007 Cost Centre: PUNE DESIGNATION: MECHANICAL ENGINEER
Date: 8-Dec-17 (No. of Hrs,)
PROJECT DETAILS
36.LOC.668
Job#JRM1514
Details of hrs. to be
DATE Details of work done chargeable to
Customers/Other
Dept.
Shauiba Plant 3 1F4- Riyadh Metro Naval Base Plumbing Leave

MEP case study for Project 1F4 in Riyadh Metro Project as per
4-Dec-17 ADDENDUM-01 6 3
2. Initial Study of Naval Project in Bangladesh

5-Dec-17 Drainage Estimation - 1F4 - BUS STATION 9


6-Dec-17 Shuabah HVAC design revision of RO Electrical Bldg & 1 Additional Bldg 9
7-Dec-17 Leave 9
8-Dec-17 Leave 9
9-Dec-17 Saturday 0
10-Dec-17 Sunday 0
Total No. of Hrs. 0 0 9 15 3 18 0 45

Prepared by:
Reviewed by:
Name of employee

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

1-Jan-18

2-Jan-18

3-Jan-18

4-Jan-18

5-Jan-18

6-Jan-18
7-Jan-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

5-Jan-18

Details of work done

PLUMBING CONCEPTUAL DESIGN & ESTIMATION


HVAC CONCEPTUAL DESIGN & ESTIMATION - FINALIZATION OF BOQ

PLUMBING CONCEPTUAL DESIGN & ESTIMATION

PLUMBING CONCEPTUAL DESIGN & ESTIMATION

PLUMBING CONCEPTUAL DESIGN & ESTIMATION


FINALIZATION OF BOQ

HOLIDAY

Saturday
Sunday
Total No. of Hrs.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS
36.LOC.668
Job#JRM1514

BAISH RAMADA Leave

9
0
0
0 0 0 36 9
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

1-Jan-18

2-Jan-18

3-Jan-18

4-Jan-18

5-Jan-18

6-Jan-18
7-Jan-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

15-Jan-18

Details of work done

HVAC & PLUMBING CONCEPTUAL DESIGN & ESTIMATION

HVAC & PLUMBING CONCEPTUAL DESIGN & ESTIMATION

HVAC & PLUMBING CONCEPTUAL DESIGN & ESTIMATION

HVAC & PLUMBING CONCEPTUAL DESIGN & ESTIMATION

HVAC & PLUMBING CONCEPTUAL DESIGN & ESTIMATION

Saturday
Sunday
Total No. of Hrs.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS
36.LOC.668
Job#JRM1514

Naval , Bangladesh Leave

9
0
0
0 0 0 45 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

22-Jan-18

23-Jan-18

24-Jan-18

25-Jan-18

26-Jan-18

27-Jan-18
28-Jan-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

22-Jan-18

Details of work done

PLUMBING ESTIMATION OF AJDAN HIGH RISE - JEDDAH

PLUMBING ESTIMATION OF AJDAN HIGH RISE - JEDDAH

PLUMBING ESTIMATION OF AJDAN HIGH RISE - JEDDAH: 1st Delivery of


BOQ _Plumbing of Entire Hotel

leave

holiday - republic day

Saturday
Sunday
Total No. of Hrs.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS
36.LOC.668
Job#JRM1514

AJDAN HIGH RISE - Leave


JEDDAH

9 0

9
0
0
0 0 45 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

22-Jan-18

23-Jan-18

24-Jan-18

25-Jan-18

26-Jan-18

27-Jan-18
28-Jan-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

29-Jan-18

Details of work done

PLUMBING ESTIMATION OF AJDAN HIGH RISE - JEDDAH

PLUMBING ESTIMATION OF AJDAN HIGH RISE - JEDDAH

PLUMBING ESTIMATION OF AJDAN HIGH RISE - JEDDAH: 1st Delivery of


BOQ _Plumbing of Entire Hotel

leave

holiday - republic day

Saturday
Sunday
Total No. of Hrs.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS
36.LOC.668
Job#JRM1514

AJDAN HIGH RISE - Leave


JEDDAH

9 0

9
0
0
0 0 45 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

29-Jan-18

30-Jan-18

31-Jan-18

1-Feb-18

2-Feb-18

3-Feb-18
4-Feb-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

2-Feb-18

Details of work done

HVAC Ducting Estn of Ajdan High rise from HVAC team


Mentoring workshop on QA/QC of Plumbing Engg to entire team

HVAC Ducting Estn of Ajdan High rise from HVAC team

Work Log Sheet update


Revision of Plumbing QA/QC docs
HVAC Ducting Estn of Ajdan High rise from HVAC team

Attended Plumbing Design training from Ejaz.


Work planning & distribution for Entire Plumbing sow in 1F5 package

Plumbing - Drainage Side Estimation on 1F5- ON B03 ,B02, B01 level

Saturday
Sunday
Total No. of Hrs.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS
36.LOC.668
Job#JRM1514

RFQRD1856 - 1F5
Ajdan High Rise Leave
Metro Station

9
0
0
0 24 16 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

5 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

12-Feb-18

13-Feb-18

14-Feb-18

15-Feb-18

16-Feb-18

17-Feb-18
18-Feb-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

9-Feb-18

Details of work done

Alba Potline #6 - HVAC BOQ Finalization of Billet Mould Shop Bldg


#2 - 1F4 Plumbing BOQ update as per urgent requesr

Saturday
Sunday
Total No. of Hrs.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS

Riyadh Metro
Alba Potline # 6 Leave
1F4

6 3

0
0
0 6 3 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 9

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

12-Feb-18

13-Feb-18

14-Feb-18

15-Feb-18

16-Feb-18

17-Feb-18
18-Feb-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

16-Feb-18

Details of work done

Alba Potline #6 - HVAC BOQ Finalization of Billet Mould Shop Bldg


#2 - 1F4 Plumbing BOQ update as per urgent request

Alba Potline #6 - HVAC BOQ Finalization of Billet Mould Shop Bldg


#2 - 1F4 Plumbing BOQ update as per urgent request
#3 - 3E2 - Plumbing classification of work & discussion

#1. BOQ preperation of 5 Nos bldgs in ALBA Potline #6

#1.Applying QA/QC for ALBA Bahrain & updating all BOQ


#2. SWRO III technical Discussion.
#3. BOQ preperation of 1 Nos bldgs in ALBA Potline #6

#1. 1F4 - Plumbing Adden 04 - Initial Study of changes in Adden#4.

Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS

Riyadh Metro Riyadh Metro


SWRO III Alba Potline # 6 Leave
1F4 3E2

6 3

1 6 2

1 8

9
0
0
1 24 18 2 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

19-Feb-18

20-Feb-18

21-Feb-18

22-Feb-18

23-Feb-18

24-Feb-18
25-Feb-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

23-Feb-18

Details of work done

ALBA - NSH PROJECT

COSTING TRAINING FROM ENG.. MAHMOOD

COSTING TRAINING FROM ENG.. MAHMOOD

#1.ALBA - NSH PROJECT - Final Delivery of 3 bldgs with QC


#2. Overview on Official Meetings with Mr. Rahmuttah Shaikh Sir & Mr.
Abdul Bari Sir

Studying Plumbing Costing Template from Mahmood

Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS

Riyadh Metro Riyadh Metro


SWRO III Alba Potline # 6 Leave
1F4 3E2

0
0
0 19 0 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

26 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

26-Feb-18

27-Feb-18

28-Feb-18

1-Mar-18

2-Mar-18

3-Mar-18
4-Mar-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

1-Mar-18

Details of work done

ALBA - NSH PROJECT

ALBA - NSH PROJECT


Supply Estimation of EEC- Auditorium Bldg

Supply Estimation of EEC- Auditorium Bldg

Drainage Estimation of EEC- Auditorium Bldg


Costing of Plumbing Fixtures

HOLIDAY - HOLI

Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS

EEC Auditorium Riyadh Metro


SWRO III Alba Potline # 6 Leave
Bldg 3E2

5 4

9
0
0
0 14 22 0 9
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

5-Mar-18

6-Mar-18

7-Mar-18

8-Mar-18

9-Mar-18

10-Mar-18
11-Mar-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

9-Mar-18

Details of work done

EEC AUDITORIUM - DAMMAM- COSTING OF WATER SUPPLY SYSTEM

NSH ALBA POTLINE DESIGN MODIFICATION, BOQ UPDATE &


SUMMARISING

NSH ALBA POTLINE DESIGN MODIFICATION, BOQ UPDATE &


SUMMARISING

NSH ALBA POTLINE DESIGN MODIFICATION, BOQ UPDATE &


SUMMARISING

NOVOTEL - PLUMBING ESTIMATION

Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS

Riyadh Metro
EEC AUDITORIUM Alba Potline # 6 Novotel Leave
3E2

9
0
0
9 27 9 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

12-Mar-18

13-Mar-18

14-Mar-18

15-Mar-18

16-Mar-18

17-Mar-18
18-Mar-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

15-Mar-18

Details of work done

#1. Plumbing Supply Side Estimation on Novotel Hotel

#1. Plumbing Supply Side Estimation on Novotel Hotel

#1. 3E2 - Heat Load Estimate @22.4 level for FCU

#1. 3E2 - Heat Load Estimate @22.4 level for FCU


#2. ALBA potline Design modification

#1. 3E2 - Heat Load Estimate @22.4 level for FCU

#1. 3E2 - Heat Load Estimate @22.4 level for FCU


Sunday
Total No. of Hrs.

.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS

Riyadh Metro
EEC AUDITORIUM Alba Potline # 6 Novotel Leave
3E2

4.5 4.5

8.5 0.5

9
0 9
0
0 8.5 22.5 23 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 54

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

9-Apr-18

10-Apr-18

11-Apr-18

12-Apr-18

13-Apr-18

14-Apr-18
15-Apr-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

26-Mar-18

Details of work done

Ducting Layout Estimation

Ducting Layout Estimation

Ducting Layout Estimation

Chilled Water Pipe Estimation

Chilled Water Pipe Estimation & REF Pipe Estimation & Pipe Sizing

Sunday
Total No. of Hrs.

.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS

Prince Sultan, AL Riyadh Metro


EEC AUDITORIUM Alba Potline # 6 Leave
hassa 1C3

9
0
0
0 0 0 45 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

9-Apr-18

10-Apr-18

11-Apr-18

12-Apr-18

13-Apr-18

14-Apr-18
15-Apr-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

13-Apr-18

Details of work done

Ducting Layout Estimation

Ducting Layout Estimation

Ducting Layout Estimation

Chilled Water Pipe Estimation

Chilled Water Pipe Estimation & REF Pipe Estimation & Pipe Sizing

Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

Prince Sultan, AL Riyadh Metro


EEC AUDITORIUM Alba Potline # 6 Leave
hassa 1C3

9
0
0
0 0 0 45 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

16-Apr-18

17-Apr-18

18-Apr-18

19-Apr-18

20-Apr-18

21-Apr-18
22-Apr-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

23-Apr-18

Details of work done

Heat Load Estimate of Maiden Substation

SLD of Ductign & Design of Air side Ducting system preperation &
Ducting Estimation

BOQ of Maiden Project

Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.
Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.

1C3 : Ducting Estimation


Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.

1C3 : Ducting Estimation


Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

1C3 RIYADH
EEC AUDITORIUM Maiden Substation Al Moosa Hospital Leave
METRO

4 5

4.5 4.5

4.5 4.5

0
0
0 22 9 14 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 45

Reviewed by:
Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

23-Apr-18

24-Apr-18

25-Apr-18

26-Apr-18

27-Apr-18

28-Apr-18
29-Apr-18

Prepared by:
Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

27-Apr-18

Details of work done

Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.

Auditorium Estimation

Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.

Auditorium Estimation

Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.

Auditorium Estimation

Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.

Auditorium Estimation

Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.

Auditorium Estimation

Saturday
Sunday
Total No. of Hrs.
.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

1C3 RIYADH
EEC AUDITORIUM Auditorium Al Moosa Hospital Leave
METRO

4.5 4.5

4.5 4.5

4.5 4.5

4.5 4.5

4.5 4.5

0
0
0 22.5 0 22.5 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 45
Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

30-Apr-18

1-May-18

2-May-18

3-May-18

4-May-18

5-May-18
6-May-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

4-May-18

Details of work done

PERSONNEL LEAVE

GOVT HOLIDAY

Detailed design in SWCC Main Pump house building based on Indirect


Evap Cooling & revised estimation of entire SWCC based on revised
notification
Detailed design in SWCC Main Pump house building based on Indirect
Evap Cooling & revised estimation of entire SWCC based on revised
notification
Detailed design in SWCC Main Pump house building based on Indirect
Evap Cooling & revised estimation of entire SWCC based on revised
notification
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

EEC AUDITORIUM Auditorium SWCC Al Moosa Hospital Leave

9
0
0
0 0 27 0 9
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Dept.
/Training/Public Holiday

9 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

14-May-18

15-May-18

16-May-18
17-May-18
18-May-18
19-May-18
20-May-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

4-May-18

Details of work done

LEED V4 complaince of Plumbing system, highlighting the difference with


existing & LEED compliance design requirement

LEED V4 complaince of Plumbing system, highlighting the difference with


existing & LEED compliance design requirement

Arab Open university - Plumbing Estimation


heat load estimate of Al Moosa Hospital- 2 floors
heat load estimate of Al Moosa Hospital- 2 floors
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

EEC AUDITORIUM Arab Open University SWCC Al Moosa Hospital Leave

4.5 4.5
9
9
0
0
0 4.5 0 40.5 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Dept.
/Training/Public Holiday

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

21-May-18

22-May-18

23-May-18
24-May-18
25-May-18
26-May-18
27-May-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

25-May-18

Details of work done

heat load estimate of Al Moosa Hospital- 3rd floors

heat load estimate of Al Moosa Hospital- 3rd - 5th floors

heat load estimate of Al Moosa Hospital- 5th floors


heat load estimate of Al Moosa Hospital-9th floors
heat load estimate of Al Moosa Hospital- 10th floors
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

EEC AUDITORIUM Arab Open University SWCC Al Moosa Hospital Leave

9
9
9
0
0
0 0 0 45 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Dept.
/Training/Public Holiday

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

28-May-18

29-May-18

30-May-18
31-May-18
1-Jun-18
2-Jun-18
3-Jun-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

1-Jun-18

Details of work done

heat load estimate of Al Moosa Hospital- 11rd floors

heat load estimate of Al Moosa Hospital- 12th floors

heat load estimate of Al Moosa Hospital- 13th floors


heat load estimate of Al Moosa Hospital-14th floors
heat load estimate of Al Moosa Hospital- 15th floors
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

EEC AUDITORIUM Arab Open University SWCC Al Moosa Hospital Leave

9
9
9
0
0
0 0 0 45 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Dept.
/Training/Public Holiday

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

4-Jun-18

5-Jun-18

6-Jun-18
7-Jun-18
8-Jun-18
9-Jun-18
10-Jun-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

8-Jun-18

Details of work done

Plumbing Estimation of Boiler Bldg

Plumbing Estimation of Boiler Bldg

Plumbing Estimation of Boiler Bldg


3E2 - FLOORWISE/ROOM WISE HVAC ESTIMATION DISTRIBUTION
3E2 - FLOORWISE/ROOM WISE HVAC ESTIMATION DISTRIBUTION
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

3E2 - RIYADH
EEC AUDITORIUM Arab Open University Medical Center Leave
METRO

9
9
9
0
0
0 0 18 27 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Dept.
/Training/Public Holiday

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME: MUDASSAR IDRIS RAUT EMP# ZA1005 Cost Centre: PUNE DESIGNATION: MECHANICAL ENGINEER

Date: 22-Jun-18 (No. of Hrs,)


PROJECT DETAILS

Details of hrs. to be
DATE Details of work done chargeable to
Customers/Other
1z1- RIYADH 1y1- RIYADH Missceleneous Dept.
EEC AUDITORIUM New Egypt Hospital METRO METRO Leave /Training/Public Holiday

18-Jun-18 Personnel leave 9

19-Jun-18 New Egypt Hopital : HVAC BOQ review of Renovation Bldg. 9

20-Jun-18 1Z1 - Supply side Plumbign Estimation 9


21-Jun-18 1Z1 - Supply side Plumbign Estimation 9
22-Jun-18 1Z1 - Supply side Plumbign Estimation 5 4
23-Jun-18 Saturday 0
24-Jun-18 Sunday 0
Total No. of Hrs. 0 9 23 4 9 0 0 45

Prepared by:
. Reviewed by:
Name of employee

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

25-Jun-18

26-Jun-18

27-Jun-18
28-Jun-18
29-Jun-18
30-Jun-18
1-Jul-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

29-Jun-18

Details of work done

New Egypt hospital - BOQ preparation as per AHRAE Healtch Care stds
170-2008 & ASHRAE Health Care guidelines

HVAC Room Wise estimation in 3E2

Plumbing Costing Data Gathagering


Plumbing Costing Data Gathagering
Plumbing Costing Data Gathagering
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

1z1- RIYADH 3E2- RIYADH


EEC AUDITORIUM New Egypt Hospital Leave
METRO METRO

0
0
0 9 0 9 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Dept.
/Training/Public Holiday

9
9
9

27 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

2-Jul-18

3-Jul-18

4-Jul-18

5-Jul-18
6-Jul-18
7-Jul-18
8-Jul-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

6-Jul-18

Details of work done

Plumbing Costing Data Gathagering

Plumbing Costing Data Gathagering


Variation Analysis of 1A1 for missing details
Ducting Estimation of Muhammed Bin Zayed mall - Egypt

Variation Analysis of 1A1 for missing details


Ducting Estimation of Muhammed Bin Zayed mall - Egypt
Ducting Estimation of Muhammed Bin Zayed mall - Egypt
Ducting Estimation of Muhammed Bin Zayed mall - Egypt
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

1A1- RIYADH 3E2- RIYADH


EEC AUDITORIUM New Egypt Hospital Leave
METRO METRO

0
0
0 0 9 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Plumbing Cost Dept.
/Training/Public Holiday Data gathering

5
9
9

23 13 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

16-Jul-18

17-Jul-18

18-Jul-18

19-Jul-18

20-Jul-18
21-Jul-18
22-Jul-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

20-Jul-18

Details of work done

NEW EIC 380KW - 380 KV GIS Bldg design & Estimation.

NEW EIC 380KW - 380 KV GIS Bldg design & Estimation.

NEW EIC 380KW - 115 KV GIS Bldg design & Estimation.

Revit Plumbing estimation & BOQ preperation as per Revit Estimation.

NEW EIC 380KW - cable tunnel design & Estimation


Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

1C4- RIYADH 3E2- RIYADH


NEW EIC 380KW New Egypt Hospital Leave
METRO METRO

9
9
9
0
0
36 0 9 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Plumbing Cost Dept.
/Training/Public Holiday Data gathering

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

30-Jul-18

31-Jul-18

1-Aug-18
2-Aug-18
3-Aug-18
4-Aug-18
5-Aug-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

27-Jul-18

Details of work done

HARADH GAS COMPRESSION PLANT

HARADH GAS COMPRESSION PLANT

HARADH GAS COMPRESSION PLANT


Al Futtaim - City Center CHW Estimation
Al Futtaim - City Center CHW Estimation
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

HARADH GAS 1C4- RIYADH 3E2- RIYADH


AL Futtain City Center Leave
COMPRESSION PLANT METRO METRO

9
9
9
0
0
45 0 0 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Plumbing Cost Dept.
/Training/Public Holiday Data gathering

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

30-Jul-18

31-Jul-18

1-Aug-18
2-Aug-18
3-Aug-18
4-Aug-18
5-Aug-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

3-Aug-18

Details of work done

HARADH GAS COMPRESSION PLANT

HARADH GAS COMPRESSION PLANT

HARADH GAS COMPRESSION PLANT


Al Futtaim - City Center CHW Estimation
Al Futtaim - City Center CHW Estimation
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

HARADH GAS 1C4- RIYADH 3E2- RIYADH


AL Futtain City Center Leave
COMPRESSION PLANT METRO METRO

9
9
9
0
0
18 27 0 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Plumbing Cost Dept.
/Training/Public Holiday Data gathering

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

6-Aug-18

7-Aug-18

8-Aug-18

9-Aug-18

10-Aug-18

11-Aug-18
12-Aug-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

10-Aug-18

Details of work done

Al Futtaim - City Center CHW Estimation

SWCC- DESIGN & ESTIMAITON OF ARAFAT, RABIGH & HOUSING


COMPOUN

SWCC- DESIGN & ESTIMAITON OF ARAFAT, RABIGH & HOUSING


COMPOUN
SWCC- DESIGN & ESTIMAITON OF ARAFAT, RABIGH & HOUSING
COMPOUN
SWCC- DESIGN & ESTIMAITON OF ARAFAT, RABIGH & HOUSING
COMPOUN
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

1C4- RIYADH 3E2- RIYADH


AL Futtain City Center SWCC Leave
METRO METRO

9
9
9
0
0
9 36 0 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Plumbing Cost Dept.
/Training/Public Holiday Data gathering

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

13-Aug-18

14-Aug-18

15-Aug-18

16-Aug-18

17-Aug-18
18-Aug-18
19-Aug-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

17-Aug-18

Details of work done

Drainage, after 3G2 Ramp to E. Depot, RFQ_REv.01


Drainage Estimation

Drainage, after 3G2 Ramp to E. Depot, RFQ_REv.01


Drainage Estimation

Drainage, after 3G2 Ramp to E. Depot, RFQ_REv.01


Drainage Estimation
Drainage, after 3G2 Ramp to E. Depot, RFQ_REv.01
Drainage Estimation
Sick Leave
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

3E2- RIYADH
AL Futtain City Center SWCC RIYADH METRO Leave
METRO

9
9
9
0
0
0 0 36 0 9
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Plumbing Cost Dept.
/Training/Public Holiday Data gathering

0 0 45

Reviewed by:

Engineering in charge

You might also like