Pemasangan Bronjong: Standard Operating Procedure

The document provides standard operating procedures for installing gabion baskets. It outlines responsibilities, personal protective equipment, tools, definitions, and procedures. The procedures include marking installation areas, ensuring slopes of at least 45 degrees, keeping digging areas dry, shaping baskets along slopes, tying wire mesh, filling baskets, connecting baskets, adding bottom supports for long baskets, and compacting fill around baskets. The document aims to guide gabion installation work safely and efficiently.

Uploaded by

mahandhie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
249 views5 pages

Pemasangan Bronjong: Standard Operating Procedure

The document provides standard operating procedures for installing gabion baskets. It outlines responsibilities, personal protective equipment, tools, definitions, and procedures. The procedures include marking installation areas, ensuring slopes of at least 45 degrees, keeping digging areas dry, shaping baskets along slopes, tying wire mesh, filling baskets, connecting baskets, adding bottom supports for long baskets, and compacting fill around baskets. The document aims to guide gabion installation work safely and efficiently.

Uploaded by

mahandhie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

STANDARD OPERATING PROCEDURE

PEMASANGAN BRONJONG

DOCUMENT TYPE SOP


DOCUMENT TITLE PEMASANGAN BRONJONG
DOCUMENT NUMBER PB-CONS-SOP-013

A IFR 07/03/2015 First Issue for Review GIL MHD

Rev Status Issue Date Description Prepared Checked


Approvals

Remarks
A,B,C,… Revision for all preliminary version
0 First official version
1,2,3,… Revision for official version
Revisi :A
PEMASANGAN BRONJONG Date : 07/03/2015
Document No PB-CONS-SOP-013 Page 2 of 5
Department: Construction

Revision Sheet

REVISION DATE DESCRIPTION OF CHANGE


A 07/03/2015 First Issue for Review

Print Format Section 2


Revisi :A
PEMASANGAN BRONJONG Date : 07/03/2015
Document No PB-CONS-SOP-013 Page 3 of 5
Department: Construction

Contents
1 TUJUAN ........................................................................................................................................................ 4
2 TANGGUNG JAWAB ..................................................................................................................................... 4
3 ALAT PELINDUNG DIRI ................................................................................................................................. 4
4 PERALATAN KERJA........................................................................................................................................ 4
5 DEFINISI ........................................................................................................................................................ 4
6 PROSEDUR KERJA ......................................................................................................................................... 5

Print Format Section 2


Revisi :A
PEMASANGAN BRONJONG Date : 07/03/2015
Document No PB-CONS-SOP-013 Page 4 of 5
Department: Construction

1 TUJUAN

Prosedur ini bertujuan menyediakan panduan untuk pekerjaan pemasangan bronjong agar bekerja
dengan efisien dan aman.

2 TANGGUNG JAWAB

- Project Manager
- Site Manager
- Supervisor

3 ALAT PELINDUNG DIRI

- Safety Shoes
- Helm
- Sarung tangan
- Kacamata Safety
- Coveralls

Syarat Khusus
- Barikade tape
- Papan tanda

4 PERALATAN KERJA

- Benang
- Kawat
- Tang

5 DEFINISI

Bronjong adalah sistem konstruksi yang terbuat dari anyaman kawat baja berlapis zenk yang
berbentuk matras keranjang persegi/ persegi panjang yang diisi dengan batu dan dipasang pada
tebing-tebing dan tepi-tepi sungai, yang berfungsi sebagai dinding penahan dan memberikan
perlindungan terhadap gerusan dan erosi sungai.

Print Format Section 2


Revisi :A
PEMASANGAN BRONJONG Date : 07/03/2015
Document No PB-CONS-SOP-013 Page 5 of 5
Department: Construction

6 PROSEDUR KERJA

1) Lakukan pemasangan patok dan benang untuk menandakan daerah penggalian untuk
pemasangan gabion berdasarkan dimensi jaring dan desain, termasuk juga tempat untuk
pemadatan material pada bagian luar penempatan bronjong.
2) Pastikan kemiringan paling tidak 45 derajat. Gunakan penopang dan lembaran papan untuk
penahan jika diperlukan.
3) Pastikan daerah penggalian selalu kering dengan menggunakan pompa listrik dan generator.
4) Selama proses penggalian, letakkan bronjong pada pinggir slope dan mulai dibentuk
memanjang.
5) Bungkus jaring hingga berbentuk kotak dan ikatkan bersama bagian tepinya menggunakan
kawat yang telah digavanisir d = 3 mm. Jepit dan ikat, serta potong dengan tang.
6) Lakukan pengisian jaring gabion, kemudian ikat secara bersama-sama dengan sejajar.
7) Bronjong yang diletakkan di atas harus dihubungkan juga dengan yang lainnya.
8) Jika bronjongdibentuk secara memanjang, sisi bawah jaring juga harus dipasang penahan untuk
memperkuat struktur.
9) Ketika struktur gabion telah selesai, pastikan semua celah di sekeliling gabion ditimbun kembali
dan dipadatkan dengan sempurna.

Gambar : Alur Pemasangan Bronjong