1mw Rooftop Solar PV Power Plant Permit
1mw Rooftop Solar PV Power Plant Permit
1mw Rooftop Solar PV Power Plant Permit
com
OM SAI SOLAR
+91 8116401052
LOCATION MAP VICINITY MAP GENERAL NOTES
INNOVATIVE TYRES –
THE APPROVAL OF THE ENGINEER AND CONTRACTING
PROJECT TITLE:
APPLICABLE OSHA REGULATIONS.
SHEET TITLE:
IMPROVEMENTS NOT DESIGNATED TO BE REMOVED OR
TITLE SHEET
MODIFIED SHALL BE RESTORED TO THEIR ORIGINAL
CONDITION OR BETTER.
DRAWN BY:
5 OF 09 E102 POWER ONE-LINE DIAGRAM (2)
CHECKED BY:
SUPERVISED BY:
6 OF 09 E103 POWER ONE-LINE DIAGRAM (3)
01 OF 09
GENERAL NOTES
[email protected]
OM SAI SOLAR
+91 8116401052
GENERAL NOTES:
1.DO NOT SCALE DRAWINGS, IF UNABLE TO LOCATE DIMENSIONS FOR ANY ITEM OF WORK, CONSULT ARCHITECT/
ENGINEER FOR DIRECTIONS BEFORE PROCEEDING.
2.IN THE ABSENCE OF THE EXACT ROOF DIMENSIONS, THE DRAWING WILL BASED ON GOOGLE MAP, THEREFORE THESE
MAY NOT BE ACCURATE. CONTRACTOR ON SITE TO VERIFY ALL OBSTACLES ON THE ROOF AND ENSURE ALL REQUIRED
CLEARENCES WITH AUTHORITY HAVING JURISDICTION(S) PRIOR TO INSTALLATION, ORDERING MATERIAL OR
FABRICATION
3. CONTRACTOR SHALL OBTAIN ELECTRICAL AND OTHER PERMITS PRIOR TO INSTALLATION AND SHALL COORDINATE ALL
INSPECTIONS BY THE CITY INSPECTORS, TESTING/ COMMISSIONING BY THE UTILITY CO. AND ACCEPTANCE BY THE
CLIENT , AS NEEDED.
4.ROUTING OR RACEWAYS MATERIAL SHALL BE AT THE OPTION OF THE CONTRACTOR, WITHIN THE CODE, UNLESS
OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER TRADES.
5. IF THE ROOF MATERIAL OR ROOF STRUCTURE IS NOT ADEQUATE FOR PV INSTALLATION, CALL ENGINEER PRIOR TO
INSATLL. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THAT ROOF IS CAPABLE OF WITHSTANDING THE EXTRA WEIGHT.
7.THIS DESIGN IS FULLY BASED ON THE INFORMATION PROVIDED BY THE DEVELOPER, ANY MODIFICATIONS OR REMOVAL
OF THE LOGO OF THE EPC; "VARIETAS PROJECT MANAGERS & ENGINEERS" IS NOT ALLOWED AND WILL RENDER THIS
DESIGN VOID.
8.THE WORKING CLEARANCE AROUND THE EXISTING ELECTRICAL EQUIPMENTS AS WELL AS THE NEW ELECTRICAL
EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH.
IEC 60364-7-712 REQUIREMENTS FOR SPECIAL INSTALLATIONS OR LOCATIONS – SOLAR PHOTOVOLTAIC (PV) POWER SUPPLY SYSTEMS
PROJECT TITLE:
IEC 60439-1 LOW VOLTAGE SWITCHGEAR & CONTROL GEAR ASSEMBLIES
IEC 60755 GENERAL REQUIREMENTS FOR RESIDUAL CURRENT – OPERATED PROTECTIVE DEVICES (OCPD)
IEC 61215 CRYSTALLINE SILICON TERRESTIAL PHOTOVOLTAIC (PV) MODULES – DESIGN QUALIFICATION AND TYPE APPROVAL
IEC 61683 EFFICIENCY MEASUREMENTS AND ENVIRONMENTAL TESTS OF POWER CONDITIONING UNITS (PCUs)
IEC 61724 PHOTOVOLTAIC SYSTEM PERFORMANCE MONITORING – GUIDELINES FOR MEASUREMENT, DATA EXCHANGE AND ANALYSIS
IEC 61730 PART-2 : REQUIREMENTS FOR CONSTRUCTION & PART-2: REQUIREMENTS FOR TESTING, FOR SAFETY QUALIFICATION
IEC 62446 GRID CONNECTED PHOTOVOLTAIC SYSTEMS – MINIMUM REQUIREMENTS FOR SYSYTEM DOCUMENTATION, COMMISSIONING TESTS AND INSPECTION
IEC 62109-1:2010 SAFETY OF POWER CONVERTERS FOR USE IN PHOTOVOLTAIC POWER SYSTEMS
IEC 62116 UTILITY-INTERCONNECTED PHOTOVOLTAIC INVERTERS – TEST PROCEDURE OF ISLANDING PREVENTION MEASURES
IEC 61643-11 LOW VOLTAGE SURGE PROTECTIVE DEVICES – REQUIREMNETS & TESTS FOR SPDs IN PHOTOVOLTAIC APPLICATIONS
GENERAL NOTES
SHEET TITLE:
TUV 2 PfG 1169 TUV INTERNAL CABLE STANDARD
ELECTRICAL
AS1319 SAFETY SIGNS FOR THE OCCUPATIONAL ENVIRONMENT
IEC 60269 COPPER BUS BARS /TERMINAL BLOCKS HOUSED IN THE JUNCTION BOX WITH SUITABLE TERMINATION THREADS
EN 60715
APPLICABLE SWITCHBOARD
STANDARDS
IEC 60439
LOW VOLTAGE AC SWITCHGEAR AND CONTROL GEARS SPECIFICATIONS
IEC EN 60269-1 AIR BREAK SWITCHES/DISCOONECTS FOR VOLTAGES < 1000VAC & 1200VDC Date Marks Revisions
IEC 60529 MAKING AND ARRANGEMENTS FOR SWITCHGGEAR, BUS BARS, MAIN CONNECTIONS
VOLTAGE AC CABLES XLPE INSULATED PVC SHEATHED CABLES FOR WORKING VOLTAGES <1100V
G101
Scale: Date:
AS SHOWN 02/06/2016
Sheet No.
02 OF 09
POWER ONE-LINE DIAGRAM
PV TO STRINGS
[email protected]
OM SAI SOLAR
+91 8116401052
STRING #G1, 20 MODULES
6 sq.mm PV WIRE
INNOVATIVE TYRES –
+ 1 + + + +
- - - - -
PROJECT TITLE:
BARE COPPER
RAIL GROUNDING WIRE
....
GROUNDING LUG
-
6 + +
- - - - -
POWER ONE-LINE
RAIL
....
DIAGRAM
PV to STRINGS
SHEET TITLE:
GROUNDING LUG
-
+ 11 + + + +
- - - - -
Engineer:
RAIL
.... I hereby certify that this drawing was prepared
by me or under my supervision
GROUNDING LUG
- Date Issue
E101
Scale: Date:
AS SHOWN 02/06/2016
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING Sheet No.
THE WORK AMONG THE VARIOUS TRADES AS NECESSARY TO
AVOID CONFICTS AND TO INSURE THE INSTALLATION OF ALL
WITHIN THE AVAILABLE SPACE.
04 OF 09
POWER ONE-LINE DIAGRAM
[email protected]
STRINGS TO INVERTER TO SUB-PANEL
+91 8116401052
"INV#1" NEW PV SUB-PANEL, "SP1"
INGETEAM 24TL-U-M480 WITH BOTH DC & AC DISCONNECT 200A BUS MINUMUM, 277/480V 4W
& ARC-FUALT INTEREPTER
DC.1
STRING #A1 , 2 MODULES
+
-
+
1 - .... +
-
.... +
- 20 (n)
200A 3P
RAIL #10 AWG THWN CONDUIT
GROUNDING LUG MODULE/RACKING
EGC
L1 (n)
DC.1
AC DISC. L2
L3 1- ¼ " EMT
+
STRING #B1, 20 MODULES
+ DC DISC. N 40A/3P
1 - .... + .... + G CONDUIT
- - - 21 MPPT MPPT AC.1 40A/3P
+- +- +- +- +- +- +- +- G
1 2
RAIL 1-½" EMT
GROUNDING LUG
#10 AWG THWN
MODULE/RACKING
40A/3P
CONDUIT
DC.1
EGC 40A/3P AC.2
STRING #C1, 20 MODULES
+ + .... + .... +
114" EMT 40A/3P
- 1 - - - 21
RAIL
.... #10 AWG THWN DC.2
-
GROUNDING -
LUG MODULE/RACKING
EGC
NEU G
INNOVATIVE TYRES –
+ 1 -
+ .... + .... +
- - - 21
RAIL #10 AWG THWN
-
GROUNDING -
LUG MODULE/RACKING
EGC
PROJECT TITLE:
+ 1 -
+ .... + .... +
- - - 21
RAIL #10 AWG THWN
GROUNDING LUG MODULE/RACKING CONDUIT
EGC
141" EMT
PV MODULE RATINGS @ STC
DC.2
MODULE MFR: ZINKO SOLAR
MODEL: 250Wp
"INV#2" VOC = 37.7V
INGETEAM 24TL-U-M480 WITH BOTH DC & AC DISCONNECT
& ARC-FUALT INTEREPTER VMP = 30.5V
STRING #A2, 20 MODULES ISC = 8.85A
POWER ONE-LINE
STRING #C2, 20 MODULES
DIAGRAM
STRING #E2, 20 MODULES
PV INVERTER RATINGS
SHEET TITLE:
"INV#3" INVERTER MFR: INGETEAM
INGETEAM 24TL-U-M480 WITH BOTH DC & AC DISCONNECT
& ARC-FUALT INTEREPTER INVERTER MODEL: 24TL U M480
STRING #A3, 20 MODULES DC VOLT RATING = 1000V
STRING #B3, 20 MODULES OPERATING VOLTAGE =580-950V
STRING #C3, 20 MODULES
DC MAX USABLE INPUT CURRENT:
STRING #D3, 20 MODULES
STRING #E3, 20 MODULES
PER MPPT
PER INVERTER
= 27A
= 54A Engineer:
I hereby certify that this drawing was prepared
AC MAX RATED OUTPUT POWER = 24000W
by me or under my supervision
"INV#4" AC MAX OUTPUT CURRENT = 29A
INGETEAM 24TL-U-M480 WITH BOTH DC & AC DISCONNECT
& ARC-FUALT INTEREPTER
STRING #A4, 20 MODULES MIN WIRE SIZE = 29A * 125% = 36.25A Date Issue
STRING #B4, 20 MODULES
STRING #C4, 20 MODULES MIN (OCPD) = 40A, AVAILABLE (OCPD) =40A
STRING #D4, 20 MODULES Date Marks Revisions
STRING #E4, 20 MODULES
VOLTAGE CURRENT
CIRCUIT DESCRIPTION CONDUCTOR SIZE/TYPE CONDUIT SIZE*/QTY 1-WAY WIRE TRAVEL VOLTAGE DROP (%)
@MAX POWER @MAX POWER
(DC) SOLAR STRING
"INV#5" (A)
WIRING
2-CORE 6 sq.mm FA - 622 Vdc 8.53A 0.5%
DESIGNED BY
INGETEAM 24TL-U-M480 WITH BOTH DC & AC DISCONNECT (DC) STRING TO INVERTER (5
& ARC-FUALT INTEREPTER
(B)
STRINGS) (5) 2-CORE 6 sq.mm (2) 1-¼ in 350 ft 622 Vdc 2*8.53A 0.5%
DRAWN BY:
(AC) INVERTER TO
STRING #A5, 20 MODULES (C)
COMBINER BOX (5 INVERTERS) (5) 4-CORE 16 sq.mm (1) 1-¼ in 140 ft 480VAC 29A 0.80% CHECKED BY:
STRING #B5, 20 MODULES
STRING #C5, 20 MODULES (D) (AC) GEC GROUNDING (1) BARE COPPER 10mm (1) 1 in 65 ft 480VAC - - SUPERVISED BY:
STRING #D5, 20 MODULES (E) (DC) GEC GROUNDING (1) BARE COPPER 6mm (1) ½ in 450 ft 622 Vdc - -
STRING #E5, 20 MODULES
Drawing Number
E102
*Please note that the size of the conduit calculated by considering 30% Fill Factor
Scale: Date:
AS SHOWN 02/06/2016
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING Sheet No.
THE WORK AMONG THE VARIOUS TRADES AS NECESSARY TO
AVOID CONFICTS AND TO INSURE THE INSTALLATION OF ALL
WITHIN THE AVAILABLE SPACE.
05 OF 09
POWER ONE-LINE DIAGRAM
[email protected]
A#1, 20 SPV MODULES NEW PV SUB-PANEL, "SP1"
200A BUS MINUMUM, 277/480V 4W
OM SAI SOLAR
CONSULTING
B#1, 20 SPV MODULES
(n)
COMPLETE SOLAR PV SYSTEM
+91 8116401052
C#1, 20 SPV MODULES
200A 3P
D#1, 20 SPV MODULES
(n)
NEU G
D#2, 20 SPV MODULES
INNOVATIVE TYRES –
AC.2
G G (n)
D#4, 20 SPV MODULES
AC.2
E#4, 20 SPV MODULES
PROJECT TITLE:
C#5, 20 SPV MODULES
INV#6
TOTAL STRING SIZE = 25kWp, NEW PV SUB-PANEL, "SP2"
5x20 SPV 200A BUS MINUMUM, 277/480V 4W
INPUT SIDE
200A 3P (e)
SWITCHBOARD 11000/440V 3PH LOCKABLE & 120A, 11kV FUSED AC CIRCUIT BREAKER
INV#7
M1
TOTAL STRING SIZE = 25kWp,
5x20 SPV 40A/3P 2500A BUS BAR
40A/3P
40A/3P
INV#8
TOTAL STRING SIZE = 25kWp, 40A/3P
5x20 SPV
40A/3P
CONDUIT
INV#9 OUTPUT SIDE
TOTAL STRING SIZE = 25kWp,
5x20 SPV
200A 3P
POINT OF CONNECTION
2" EMT
TOTAL STRING SIZE = 25kWp, INV#10
PER 690.64; 705.12(D)
5x20 SPV
POWER LINE
(3) POLARIS STACKED GUTTER
INV#11 CONNECTORS IPLDS
DIAGRAM
TOTAL STRING SIZE = 25kWp, NEW PV SUB-PANEL, "SP3"
5x20 SPV 200A BUS MINUMUM, 277/480V 4W
INPUT SIDE
SHEET TITLE:
INV#12
TOTAL STRING SIZE = 25kWp,
5x20 SPV 40A/3P
40A/3P
40A/3P
INV#13
TOTAL STRING SIZE = 25kWp, 40A/3P
5x20 SPV
40A/3P
N
OUTPUT SIDE G
TOTAL STRING SIZE = 25kWp,
5x20 SPV
INV#14
LOADS
200A 3P
INPUT SIDE
Engineer:
TOTAL STRING SIZE = 25kWp,
5x20 SPV
INV#17
40A/3P
3/4"
40A/3P
C-1#4
40A/3P
INV#18
TOTAL STRING SIZE = 25kWp, 40A/3P
5x20 SPV
40A/3P
G G
INV#19 OUTPUT SIDE
(e) I hereby certify that this drawing was prepared
TOTAL STRING SIZE = 25kWp,
5x20 SPV GROUND RODS 6'-0" by me or under my supervision
200A 3P
(2) 3/4" x 10'
TOTAL STRING SIZE = 25kWp, INV#20 APART TYPICAL Date Issue
5x20 SPV
INV#21
TOTAL STRING SIZE = 25kWp,
5x20 SPV
NEW PV SUB-PANEL, "SP5"
200A BUS MINUMUM, 277/480V 4W
Date Marks Revisions
INPUT SIDE
INV#22
TOTAL STRING SIZE = 25kWp,
5x20 SPV 40A/3P
40A/3P INV#31
TOTAL STRING SIZE = 25kWp, NEW PV SUB-PANEL, "SP7"
40A/3P 5x20 SPV 200A BUS MINUMUM, 277/480V 4W
INV#23
TOTAL STRING SIZE = 25kWp, 40A/3P
5x20 SPV INPUT SIDE
40A/3P
INV#32
DESIGNED BY
TOTAL STRING SIZE = 25kWp,
INV#24 OUTPUT SIDE 5x20 SPV 40A/3P
TOTAL STRING SIZE = 25kWp,
5x20 SPV
200A 3P
40A/3P DRAWN BY:
40A/3P
INV#33
TOTAL STRING SIZE = 25kWp, 40A/3P
TOTAL STRING SIZE = 25kWp,
5x20 SPV
INV#25 5x20 SPV
40A/3P CHECKED BY:
TOTAL STRING SIZE = 25kWp,
INV#34 OUTPUT SIDE SUPERVISED BY:
5x20 SPV
200A 3P
INV#36
No. of Inverters:40 Drawing Number
TOTAL STRING SIZE = 25kWp, NEW PV SUB-PANEL, "SP8"
E103
40A/3P
40A/3P
INV#29 OUTPUT SIDE
TOTAL STRING SIZE = 25kWp,
5x20 SPV
200A 3P
TOTAL STRING SIZE = 25kWp,
5x20 SPV
INV#38
40A/3P
40A/3P
40A/3P
String Vmpp @STC: 615Vdc
TOTAL STRING SIZE = 25kWp,
5x20 SPV
INV#30
TOTAL STRING SIZE = 25kWp,
5x20 SPV
INV#39 OUTPUT SIDE
String Impp @STC: 8.62A Scale: Date:
200A 3P
06 OF 09
SITE LAYOUT
[email protected]
WITH SUGGESTED PV ARRAY LAYOUT
OM SAI SOLAR
+91 8116401052
SOLAR PV POWER SYSTEM
1MW GRID CONNECTED
INNOVATIVE TYRES –
DESIGNED BY
DRAWN BY:
CHECKED BY:
SUPERVISED BY:
Drawing Number
S101
Scale: Date:
AS SHOWN 02/06/2016
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING Sheet No.
THE WORK AMONG THE VARIOUS TRADES AS NECESSARY TO
AVOID CONFICTS AND TO INSURE THE INSTALLATION OF ALL
WITHIN THE AVAILABLE SPACE.
03 OF 09
[email protected]
BURDWAN, WB, INDIA
OM SAI SOLAR
+91 8116401052
CONSULTING
SOLAR PHOTOVOLTAIC MODULE – DATA SHEET
PHOTO VOLTAIC
DATASHEET –
MODULE
SOLAR
SHEET TITLE:
Engineer:
I hereby certify that this drawing was prepared
by me or under my supervision
Date Issue
DESIGNED BY
DRAWN BY:
CHECKED BY:
SUPERVISED BY:
Drawing Number
D101
Scale: Date:
AS SHOWN 02/06/2016
Sheet No.
07 OF 09
[email protected]
BURDWAN, WB, INDIA
OM SAI SOLAR
SOLAR INVERTER – DATA SHEET
+91 8116401052
CONSULTING
SHEET TITLE:
SOLAR INVERTER
DATA SHEET –
Engineer:
I hereby certify that this drawing was prepared
by me or under my supervision
Date Issue
DESIGNED BY
DRAWN BY:
CHECKED BY:
SUPERVISED BY:
Drawing Number
D102
Scale: Date:
AS SHOWN 02/06/2016
Sheet No.
08 OF 09
[email protected]
WB, INDIA
+91 8116401052
, BURDWAN
LABEL AND MARKINGS LEGEND:
SYSTEM OWNER PHOTOVOLTAIC
PROVIDES THE LOCATION OF THE SERVICE
GENERATION METER AC DISCONNECT
CAUTION
POWER TO THIS SERVICE IS ALSO
DISCONNECTING MEANS AND THE
PHOTOVOLTAIC DISCONNECTING MEANS. THIS
PLAQUE SHALL BE APPLIED TO THE MAIN
SERVICE DISCONNECTING MEANS AND THE
SUPPLIED FROM THE FOLLOWING AC DISCONNECT RATINGS: PHOTOVOLTAIC DISCONNECTING MEANS; (2
TOTAL)
SOURCES WITH DISCONNECTS OPERATING CURRENT: 1600 AMPS
FACILITY NET OPERATING VOLTAGE: 480 VOLTS AC LABEL FOR UTILITY AC DISCONNECT; 1 PER AC
LOCATED AS SHOWN DISCONNECT.
GENERATION METER MAXIMUM CURRENT: 1000 AMPS/POLE
MAXIMUM VOLTAGE: 480 VOLTS AC UTILITY AC DISCONNECT WARNING LABEL. 1
PER AC DISCONNECT AND ALL 3 AC LOAD
CENTERS.
SOLAR PHOTOVOLTAIC
ARRAYLOCATION
LOCATION OF THIS LABEL IS ON THE AC DISCONNECT PLACED UTILITY AC DISCONNECT OPERATING
PROJECT TITLE:
1000 kWdc
SITE ADDRESS:
,
SYSTEM SIZE:
UTILITY AC DISCONNECT CONDUIT RUN FROM SOURCE CIRCUT TO
INVERTER. (AS NEEDED)
PHOTOVOLTAIC
AC DISCONNECT
INV.XX NEEDED)
CAUTION LABEL
LABELS
SHEET TITLE:
ELECTRIC SHOCK HAZARD, DO NOT ASSEMBLIES AND JUNCTION BOXES TO ALERT
FIRE SERVICE. MARKINGS SHALL BE PLACED
TOUCH TERMINALS. TERMINALS ON EVERY 10 FEET, AT TURNS, ADJACENT TO
PENETRATIONS, AT ALL DC COMBINER BOXES,
BOTH THE LINE AND LOAD SIDES MAY AND AT ALL DC JUNCTION BOXES. MARKING
BE ENERGIZED IN TH OPEN POSITION 1000 VOLTS DC CONTENT SHALL READ, "CAUTION: SOLAR
CIRCUIT" IN NON-BOLD ARIAL OR SIMILAR FONT
WITH 3/8" ALL CAPS WHITE LETTERING ON RED
BACKGROUND
GENERAL NOTES FOR LABELS AND
MARKINGS:
PHOTOVOLTAIC
AC DISCONNECT 208 VOLTS AC 1. LABELS AND MARKINGS SHALL BE APPLIED TO
THE APPROPRIATE COMPONENTS IN Engineer:
ACCORDANCE WITH THE NEC.
I hereby certify that this drawing was
2. SOLAR MODULES ARE SUPPLIED FROM THE prepared by me or under my supervision
AC DISCONNECT RATINGS: MANUFACTURER WITH MARKINGS PRE-APPLIED TO
MEET THE REQUIREMENTS OF THE NEC.
OPERATING CURRENT: 200 AMPS
OPERATING VOLTAGE: 480 VOLTS AC 3. NEXTRONEX AND SOLAR EDGE INVERTERS ARE
SUPPLIED FROM THE MANUFACTURER WITH THE
MAXIMUM CURRENT: 1000 AMPS/POLE APPROPRIATE LABELS AND MARKINGS TO MEET
Date Issue
THE REQUIREMENTS OF THE NEC.
MAXIMUM VOLTAGE: 480 VOLTS AC
4. TEXT LABELS WILL BE ETCHED WITH WHITE
GRAPHICS ONTO 1/16" RED PLASTIC PLACARDS.
Date Marks Revisions
THE LABEL WILL BE MECHANICALLY ATTACHED TO
THE APPROPRIATE COMPONENT ENCLOSURES IN
CONSPICUOUS PLACES.
Drawing Number
L100
Scale: Date:
AS SHOWN 02/06/2016
Sheet No.
09 OF 09