Commissioning Check List For Access Control System: Mapco Client Yes/No

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Commissioning Check List for

Access Control System

Doc No.: Form No.:

Location of Area: Dar Al Shifa Request No.: Date:


Hospital , Kahlifa City – Abu Dhabi

Activity/Item to be Checked Accept PKE MAPCO VAMED CLIENT


1. Check ACS devices location as specified in approved
Yes/No
drawings

2. Check for physical damage of materials Yes/No

3. Check if wires and devices are installed in accordance with


Yes/No
layout drawing

4. Check if devices are plump and secure Yes/No

5. Check if the connections are tight Yes/No

6. Check the continuity of wiring and wiring devices Yes/No

7. Check the termination of the cables for all devices including


Yes/No
controller, card reader, exit button, break glass, switches etc
8. Check the termination of all device cables to controllers/
Yes/No
switches

9. Check the device address Yes/No

10. Prepare punch list points for defects if any Yes/No

Comments:

ALL ITEMS CHECKED AND ACCEPTED


Prepared by Checked by Approved by Noted by
PKE Gulf MAPCO VAMED CLIENT
Name:
Title:
Signature:
Date:

You might also like