0% found this document useful (0 votes)
642 views1 page

Engineering Synoptic View

view

Uploaded by

mathew1965
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
642 views1 page

Engineering Synoptic View

view

Uploaded by

mathew1965
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

3 year EPC Project – Overall Engineering sequence

Project Month 6 12 18
Piping materials supply 70% piping
IFR P&ID IFD H
materials
A In-line In-line instr.
P&IDs review PIDs delivered
Z instr. POs Vendor dwgs Last
Piping 1st O nd Package IFC Start
classes Piping 2 1st
IFC
P Eqt Vendor vendor PIDs Piping
Line MTO (IFI) Piping P&IDs
dwgs dwgs fab.
Diagr. MTO
Fluids
General UG (IFP)
list Pipe supports MTO
networks
1st 50% up-
Fire Piping isos dates
PR PR str
Plot Protection PO Piping MTO
calcs dwgs
Plan Main cable Piping studies up-dates
PFDs IFC Piping
IFR routing PR
HMB Plot Plan Isometrics
Stress analysis found
Review IFC
Eqt 30% 60% 90%
IT system
sizing
& list
set-up model
review
3D MODEL XXX
model
review
XXXX model
review
Haz.
area HX sizing UG piping Piping
IFD Plot IFC Plot Process GADs
class Eqt Guide & cable
Plan Plan str IFC
drawings trench IFC
Eqt PDS Equipment GADs Eqt Final Equipment,
Eqt bids
Equipment POs found packages and in-line
Eqt spec Eqt setting IFC instrument vendor
MDS, Eqt plan & loads dwgs
MSD
MR TBTs © The Oil & Gas Engineering Guide, Editions Technip