SPU/SDOT As-Built Drawing Requirements
SPU/SDOT As-Built Drawing Requirements
Red-Lines
Design Drawings
As-Built Drawings
Record Drawings
90% & 100% contractor in the weeks, submit City of Seattle
drawings to City of field sample as-built Data exported to
Seattle for CAD drawings to the City City of Seattle GIS
reviews of Seattle for review
Plan set stored in
Submit all design Completed as-built the SPU Engineering
change drawings to drawings shall be Records Center
the City of Seattle submitted to the
As-designed data City of Seattle per
exported to City of the contract
Seattle GIS agreement
General Requirements
As-Built drawings shall incorporate all deviations to the original design without any references to
RFIs, FCRs, payment items, DCs, etc. As-Built drawings shall be accurate, clean, clear and easily
readable. In congested areas, additional blow-up details may be required for readability.
Items not built shall be crossed out.
All As-Built drawing sheets shall be stamped “AS-BUILT DRAWING”.
Submittals
Submit to [email protected] in one of four formats: AutoCAD DWG, DWF, PDF or print
(paper). AutoCAD DWG files are required if available.
Page 1 of 2
SPU/SDOT Red-Line/As-Built Drawing Requirements
Sheet bar codes shall be correct (prior to printing, the “Barcode Modifier” field in the Sheet Set
Custom Properties of Sheet Set Manager must be updated to: -A).
PDF, DWF or a hard-copy of the plan set created for reference per Section 8: Plotting/Printing in the
CAD Manual with the standard plot style table.
Page 2 of 2