0% found this document useful (0 votes)
59 views11 pages

Fem: Longitudinal Deadload and Liveload

The document contains calculations of bending moments (FEM) for various members of building frames in the longitudinal and transverse directions. In the longitudinal direction, the FEM is calculated for each grid line from the ground floor to the second floor and from the second floor to the roof deck. Values of FEM are provided for members in each direction. In the transverse direction, the FEM is calculated for sections A through D, with values provided for members in each section.

Uploaded by

Gie Andal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views11 pages

Fem: Longitudinal Deadload and Liveload

The document contains calculations of bending moments (FEM) for various members of building frames in the longitudinal and transverse directions. In the longitudinal direction, the FEM is calculated for each grid line from the ground floor to the second floor and from the second floor to the roof deck. Values of FEM are provided for members in each direction. In the transverse direction, the FEM is calculated for sections A through D, with values provided for members in each section.

Uploaded by

Gie Andal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 11

FEM: LONGITUDINAL

DEADLOAD and
LIVELOAD
GRID LINE A:
FROM 2ND FLOOR TO ROOF DECK FRAME

 FEMAB = FEMBC = FEMCD = FEMDE = FEMEF=- ωL2/12 = -14.711 (4)2/12 = -19.61kN.m


 FEMBA = FEMCB = FEMDC = FEMED = FEMFE= ωL2/12 = 14.711 (4)2/12 = 19.61kN.m
 FEMAG= FEMGA = FEMBH = FEMHB= FEMCI= FEMIC= FEMDJ = FEMJD = FEMEK= FEMKE = FEMFL= FEMLF= - ωL2/12 = 0
FROM GROUND FLOOR TO SECOND FLOOR FRAME

 FEMGH = FEMHI = FEMIJ = FEMJK = FEMKL= - ωL2/12 = -21.245(4)2/12 = -28.33kN.m


 FEMHG = FEMIH = FEMJI = FEMKJ = FEMLK= ωL2/12 = 21.245(4)2/12 = 28.33kN.m
 FEMGM= FEMMG = FEMHN = FEMNH= FEMIO= FEMOI= FEMJP= FEMPJ = FEMKQ= FEMQK = FEMLR= FEMRL= - ωL2/12 = 0

GRID LINE B:
FROM 2ND FLOOR TO ROOF DECK FRAME

 FEMAB = FEMBC = FEMCD = FEMDE = FEMEF=- ωL2/12 = -12.335(4)2/12 = -16.45kN.m


 FEMBA = FEMCB = FEMDC = FEMED = FEMFE= ωL2/12 = 12.335(4)2/12 = 16.45kN.m
 FEMAG= FEMGA = FEMBH = FEMHB= FEMCI= FEMIC= FEMDJ = FEMJD = FEMEK= FEMKE = FEMFL= FEMLF= - ωL2/12 = 0
FROM GROUND FLOOR TO SECOND FLOOR FRAME

 FEMGH = FEMHI = FEMJK = FEMKL= - ωL2/12 = -21.245(4)2/12 = -28.33kN.m


 FEMHG = FEMIH= FEMKJ = FEMLK = ωL2/12 = 21.245(4)2/12 = 28.33kN.m
 FEMIJ=- ωL2/12 = -12.335(4)2/12 = -16.45kN.m
 FEMJI= ωL2/12 = 12.335(4)2/12 = 16.45kN.m
 FEMGM= FEMMG = FEMHN = FEMNH= FEMIO= FEMOI= FEMJP= FEMPJ = FEMKQ= FEMQK = FEMLR= FEMRL= - ωL2/12 = 0

GRID LINE C:
FROM 2ND FLOOR TO ROOF DECK FRAME

 FEMAB = FEMBC = FEMCD = FEMDE = FEMEF=- ωL2/12 = -12.335(4)2/12 = -16.45kN.m


 FEMBA = FEMCB = FEMDC = FEMED = FEMFE= ωL2/12 = 12.335(4)2/12 = 16.45kN.m
 FEMAG= FEMGA = FEMBH = FEMHB= FEMCI= FEMIC= FEMDJ = FEMJD = FEMEK= FEMKE = FEMFL= FEMLF= - ωL2/12 = 0

FROM GROUND FLOOR TO SECOND FLOOR FRAME

 FEMGH = FEMHI = FEMIJ = FEMJK= - ωL2/12 = -12.335(4)2/12 = -16.45kN.m


 FEMHG = FEMIH= FEMJI = FEMKJ = ωL2/12 = 12.335(4)2/12 = 16.45kN.m
 FEMKL=- ωL2/12 = -21.245(4)2/12 = -28.33kN.m
 FEMLK= ωL2/12 = 21.245(4)2/12 = 28.33kN.m
 FEMGM= FEMMG = FEMHN = FEMNH= FEMIO= FEMOI= FEMJP= FEMPJ = FEMKQ= FEMQK = FEMLR= FEMRL= - ωL2/12 = 0

GRID LINE D:
FROM 2ND FLOOR TO ROOF DECK FRAME

 FEMAB = FEMBC = FEMCD = FEMDE = FEMEF=- ωL2/12 = -12.335(4)2/12 = -16.45kN.m


 FEMBA = FEMCB = FEMDC = FEMED = FEMFE= ωL2/12 = 12.335(4)2/12 = 16.45kN.m
 FEMAG= FEMGA = FEMBH = FEMHB= FEMCI= FEMIC= FEMDJ = FEMJD = FEMEK= FEMKE = FEMFL= FEMLF= - ωL2/12 = 0
FROM GROUND FLOOR TO SECOND FLOOR FRAME

 FEMGH = FEMHI = FEMJK = FEMKL= - ωL2/12 = -21.245(4)2/12 = -28.33kN.m


 FEMHG = FEMIH= FEMKJ = FEMLK = ωL2/12 = 21.245(4)2/12 = 28.33kN.m
 FEMIJ=- ωL2/12 = -12.335(4)2/12 = -16.45kN.m
 FEMJI= ωL2/12 = 12.335(4)2/12 = 16.45kN.m
 FEMGM= FEMMG = FEMHN = FEMNH= FEMIO= FEMOI= FEMJP= FEMPJ = FEMKQ= FEMQK = FEMLR= FEMRL= - ωL2/12 = 0

GRID LINE E:
FROM 2ND FLOOR TO ROOF DECK FRAME

 FEMAB = FEMBC = FEMCD = FEMDE = FEMEF=- ωL2/12 = -12.335(4)2/12 = -16.45kN.m


 FEMBA = FEMCB = FEMDC = FEMED = FEMFE= ωL2/12 = 12.335(4)2/12 = 16.45kN.m
 FEMAG= FEMGA = FEMBH = FEMHB= FEMCI= FEMIC= FEMDJ = FEMJD = FEMEK= FEMKE = FEMFL= FEMLF= - ωL2/12 = 0
FROM GROUND FLOOR TO SECOND FLOOR FRAME

 FEMGH = FEMHI = FEMIJ = FEMJK= - ωL2/12 = -12.335(4)2/12 = -16.45kN.m


 FEMHG = FEMIH= FEMJI = FEMKJ = ωL2/12 = 12.335(4)2/12 = 16.45kN.m
 FEMKL=- ωL2/12 = -21.245(4)2/12 = -28.33kN.m
 FEMLK= ωL2/12 = 21.245(4)2/12 = 28.33kN.m
 FEMGM= FEMMG = FEMHN = FEMNH= FEMIO= FEMOI= FEMJP= FEMPJ = FEMKQ= FEMQK = FEMLR= FEMRL= - ωL2/12 = 0

GRID LINE F:
FROM 2ND FLOOR TO ROOF DECK FRAME
 FEMAB = FEMBC = FEMDE -ωL2/12 = -12.335(4)2/12 = -16.45kN.m
 FEMCD = FEMEF = -ωL2/12 = -21.245 (4)2/12 = -28.33kN.m
 FEMBA = FEMCB = FEMDE= ωL2/12 =12.335(4)2/12 = 16.45kN.m
 FEMDC = FEMFE= ωL2/12 = 21.245 (4)2/12 = 28.33kN.m
 FEMAG= FEMGA = FEMBH = FEMHB= FEMCI= FEMIC= FEMDJ = FEMJD = FEMEK= FEMKE = FEMFL= FEMLF= - ωL2/12 = 0
FROM GROUND FLOOR TO SECOND FLOOR FRAME

 FEMGH = FEMHI = FEMKL =-ωL2/12 = -21.245 (4)2/12 = -28.33kN.m


 FEMIJ = FEMJK= -ωL2/12 = -12.335(4)2/12 = -16.45kN.m
 FEMHG = FEMIH = FEMLK = ωL2/12 = 21.245 (4)2/12 = 28.33kN.m
 FEMIJ = FEMJK= -ωL2/12 = -12.335(4)2/12 = -16.45kN.m
 FEMGM= FEMMG = FEMHN = FEMNH= FEMIO= FEMOI= FEMJP= FEMPJ = FEMKQ= FEMQK = FEMLR= FEMRL= - ωL2/12 = 0

GRID LINE G:
FROM 2ND FLOOR TO ROOF DECK FRAME

 FEMAB = FEMBC = FEMDE -ωL2/12 = -14.711 4)2/12 = -19.61kN.m


 FEMCD = FEMEF = -ωL2/12 = -21.245 (4)2/12 = -28.33kN.m
 FEMBA = FEMCB = FEMDE= ωL2/12 = 14.711(4)2/12 = 19.61kN.m
 FEMDC = FEMFE= ωL2/12 = 21.245 (4)2/12 = 28.33kN.m
 FEMAG= FEMGA = FEMBH = FEMHB= FEMCI= FEMIC= FEMDJ = FEMJD = FEMEK= FEMKE = FEMFL= FEMLF= - ωL2/12 = 0
FROM GROUND FLOOR TO SECOND FLOOR FRAMEFEMDE -ωL2/12 = -14.711 4)2/12 = -19.61kN.m

 FEMAB= -ωL2/12 = -12.335(4)2/12 = -16.45kN.m


 FEMGH = FEMHI = FEMIJ= FEMJK = FEMKL =-ωL2/12 = -21.245(4)2/12 = -28.33kN.m

FEM: TRANSVERSE
DEADLOAD and
LIVELOAD
 SECTION A

 FEMAB = FEMBC = FEMCD = ωL2/12 = 19.82(4)2/12 = 26.43 kN.m


 FEMBA = FEMCB = FEMDC = -ωL2/12 = -19.82(4)2/12 = - 26.43 kN.m

 FEMDE = ωL2/12 = 9.26(2)2/12 = 3.09 kN.m


 FEMED = -ωL2/12 = -9.26(2)2/12 = - 3.09 kN.m

 FEMFG = ωL2/12 = 30.24(4)2/12 = 40.32 kN.m


 FEMGF = -ωL2/12 = -30.24(4)2/12 = - 40.32 kN.m

 FEMGH = FEMHI = ωL2/12 = 30.24(4)2/12 = 40.32 kN.m


 FEMHG = FEMIH = -ωL2/12 = -30.24(4)2/12 = - 40.32 kN.m

 FEMIJ = ωL2/12 = 9.45(2)2/12 = 3.15 kN.m


 FEMJI = -ωL2/12 = -9.45(2)2/12 = - 3.15 kN.m
 SECTION B

 FEMAB = FEMBC = FEMCD = ωL2/12 = 35.28(4)2/12 = 47.04 kN.m


 FEMBA = FEMCB = FEMDC = -ωL2/12 = -35.28 (4)2/12 = - 47.04 kN.m

 FEMDE = FEMIJ = ωL2/12 = 14.16(2)2/12 = 4.72kN.m


 FEMED = FEMJI = -ωL2/12 = -14.16(2)2/12 = - 4.72 kN.m

 FEMFG = FEMGH = FEMHI = ωL2/12 = 50.08(4)2/12 = 66.77 kN.m


 FEMGF = FEMHG = FEMIH = -ωL2/12 = -50.08 (4)2/12 = - 66.77 kN.m

 SECTION C

 FEMAB = FEMBC = FEMCD = ωL2/12 = 35.28(4)2/12 = 47.04 kN.m


 FEMBA = FEMCB = FEMDC = -ωL2/12 = -35.28 (4)2/12 = - 47.04 kN.m

 FEMDE = FEMIJ = ωL2/12 = 14.16(2)2/12 = 4.72 kN.m


 FEMED = FEMJI = -ωL2/12 = -14.16(2)2/12 = - 4.72 kN.m

 FEMFG = FEMGH = FEMHI = ωL2/12 = 50.08(4)2/12 = 66.77 kN.m


 FEMGF = FEMHG = FEMIH = -ωL2/12 = -50.08 (4)2/12 = - 66.77 kN.m

 SECTION D

 FEMAB = FEMBC = FEMCD = ωL2/12 = 35.28(4)2/12 = 47.04 kN.m


 FEMBA = FEMCB = FEMDC = -ωL2/12 = -35.28 (4)2/12 = - 47.04 kN.m

 FEMDE = FEMIJ = ωL2/12 = 14.16(2)2/12 = 4.72 kN.m


 FEMED = FEMJI = -ωL2/12 = -14.16(2)2/12 = - 4.72 kN.m

 FEMFG = FEMGH = FEMHI = ωL2/12 = 50.08(4)2/12 = 66.77 kN.m


 FEMGF = FEMHG = FEMIH = -ωL2/12 = -50.08(4)2/12 = - 66.77 kN.m

 SECTION E

 FEMAB = ωL2/12 + PL/8 = 14.16(4)2/12 + 72.288(4)/8 = 55.024 kN.m


 FEMBA = - [ωL2/12 + PL/8] = - [14.16(4)2/12 + 72.288(4)/8] = - 55.024 kN.m

 FEMBC = FEMCD = ωL2/12 = 30(4)2/12 = 40 kN.m


 FEMCB = FEMDC = -ωL2/12 = -30(4)2/12 = - 40 kN.m

 FEMDE = FEMIJ = ωL2/12 = 14.16(2)2/12 = 4.72 kN.m


 FEMED = FEMJI = -ωL2/12 = -14.16(2)2/12 = - 4.72 kN.m
 FEMFG = ωL2/12 + PL/8 = 44.8(4)2/12 + 72.288(4)/8 = 95.88 kN.m
 FEMGF = - [ωL2/12 + PL/8] = - [44.8 (4)2/12 + 72.288(4)/8] = - 95.88 kN.m

 FEMGH = FEMHI = ωL2/12 = 44.8(4)2/12 = 59.73 kN.m


 FEMHG = FEMIH = -ωL2/12 = -44.8(4)2/12 = - 59.73 kN.m

 SECTION F

 FEMAB = ωL2/12 + PL/8 = 23.61(4)2/12 + 72.288(4)/8 = 67.624 kN.m


 FEMBA = - [ωL2/12 + PL/8] = - [23.61(4)2/12 + 72.288(4)/8] = - 67.624 kN.m

 FEMBC = FEMCD = ωL2/12 = 14.54(4)2/12 = 19.39 kN.m


 FEMCB = FEMDC = -ωL2/12 = -14.54(4)2/12 = - 19.39 kN.m

 FEMDE = ωL2/12 = 9.26(2)2/12 = 3.09 kN.m


 FEMED = -ωL2/12 = -9.26(2)2/12 = - 3.09 kN.m

 FEMIJ = ωL2/12 = 10.4(2)2/12 = 3.47 kN.m


 FEMJI = -ωL2/12 = -10.4(2)2/12 = - 3.47 kN.m

 FEMFG = ωL2/12 + PL/8 = 14.16(4)2/12 + 72.288(4)/8 = 55.024 kN.m


 FEMGF = - [ωL2/12 + PL/8] = - [14.16(4)2/12 + 72.288(4)/8] = - 55.024 kN.m
 FEMGH = FEMHI = ωL2/12 = 15.68(4)2/12 = 20.91 kN.m
 FEMHG = FEMIH = -ωL2/12 = -15.68(4)2/12 = - 20.91 kN.m

LIVE LOAD FOR ALL SECTIONS: (DUE TO CRITICAL LOADINGS)

SECTION C (Note: The FEMs of spans in 2nd floor are equal to 3rd floor and 4th floor respectedly)

 FEMAB = FEMBC = FEMCD = ωL2/12 = 28.8(4)2/12 = 38.04 kN.m


 FEMBA = FEMCB = FEMDC = -ωL2/12 = -28.8 (4)2/12 = - 38.04 kN.m

 FEMDE = FEMIJ = ωL2/12 = 9.6(2)2/12 = 3.2 kN.m


 FEMED = FEMJI = -ωL2/12 = -9.6(2)2/12 = - 3.2 kN.m

 FEMFG = FEMGH = FEMHI = ωL2/12 = 28.8(4)2/12 = 38.4 kN.m


 FEMGF = FEMHG = FEMIH = -ωL2/12 = -28.8 (4)2/12 = - 38.4 kN.m