0% found this document useful (0 votes)
158 views3 pages

SHA Projects

The document provides updates on several road resurfacing and repair projects in Maryland's District 3. It outlines projects to resurface and rehabilitate sections of MD 187, MD 190, MD 189, and I-270 by patching, grinding, and overlaying deteriorated pavement surfaces. It also describes a project to improve traffic operations and pedestrian safety at the intersection of MD 190 and Braeburn Parkway by adding concrete curbs and pedestrian signals. Additionally, it provides status on an ongoing project to resurface I-495 between I-270 and Seminary Road that is over 90% complete. The projects aim to repair deteriorated pavement and enhance safety, with estimated costs mostly under $3 million except for one I-270 project estimated
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
158 views3 pages

SHA Projects

The document provides updates on several road resurfacing and repair projects in Maryland's District 3. It outlines projects to resurface and rehabilitate sections of MD 187, MD 190, MD 189, and I-270 by patching, grinding, and overlaying deteriorated pavement surfaces. It also describes a project to improve traffic operations and pedestrian safety at the intersection of MD 190 and Braeburn Parkway by adding concrete curbs and pedestrian signals. Additionally, it provides status on an ongoing project to resurface I-495 between I-270 and Seminary Road that is over 90% complete. The projects aim to repair deteriorated pavement and enhance safety, with estimated costs mostly under $3 million except for one I-270 project estimated
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Maryland State Highway Administration

District 3 - Project Updates

System Preservation
Projects

Legislative District 16

Montgomery County
July 2018

Maryland Department of Transportation


State Highway Administration
District 3● 9300 Kenilworth Avenue● Greenbelt, MD 20770
RESURFACE/REHABILITATE

MO1575177: MD 187 from Johnson Avenue to I-495


WHAT: Patch, grind, and overlay existing roadway with asphalt.

WHY: The existing pavement condition is deteriorated and is in need of repair.

WHEN: Candidate for Resurfacing Project for FY20

COST: Under $3 Million (Engineer’s Construction Estimate)

XY5155177: MD 190 from Seven Locks Road to I-495


WHAT: Maintenance patch, grind, and overlay existing roadway with asphalt.

WHY: The existing pavement condition is deteriorated and is in need of repair.

WHEN: Candidate for Resurfacing Project for FY19

COST: Under $3 Million (Engineer’s Construction Estimate)

XY5155177: MD 189 from MD 190 to Wootton Parkway


WHAT: Maintenance patch, grind, and overlay existing roadway with asphalt.

WHY: The existing pavement condition is deteriorated and is in need of repair.

WHEN: Candidate for Resurfacing Project for FY19

COST: Under $3 Million (Engineer’s Construction Estimate)

XY5155177: MD 190 from Marwood Hill to Gary Road


WHAT: Maintenance patch, grind, and overlay existing roadway with asphalt.

WHY: The existing pavement condition is deteriorated and is in need of repair.

WHEN: Candidate for Resurfacing Project for FY20

COST: Under $3 Million (Engineer’s Construction Estimate)

2
MO1845177: I-270 Ramp 2 (Ramp from MD 355 NB to IS 270 WB) to Mile Marker 6.0
(Ramp from MD 28 WB to IS 270 NB)
WHAT: Patch, grind, and overlay existing roadway with asphalt.

WHY: The existing pavement condition is deteriorated and is in need of repair.

WHEN: Candidate for Resurfacing Project for FY22

COST: Over $5 Million (Engineer’s Construction Estimate)

GEOMETRIC IMPROVEMENTS

MO9815187: MD 190 at Braeburn Parkway_


WHAT: Installation of concrete curb to channelize left turn movement from MD 190 onto
Braeburn Parkway. Installation of pedestrian signals on eastbound and
westbound MD 190 at the existing marked pedestrian crossing.

WHY: Improve traffic operations for motorists and enhancing pedestrian safety within
this segment of roadway.

WHEN: In design
Funded for Construction

COST: Under $3 Million (Engineer’s Construction Estimate)

CONSTRUCTION

MO1865177: I-495 from I-270 to Seminary Road (Outer Loop)

WHAT: Patch, grind, and overlay existing roadway with asphalt.

WHY: The existing pavement condition is deteriorated and is in need of repair.

WHEN: In Construction (91% complete)


Estimated completion – Summer 2018

COST: $6,997,446.30 (Bid Amount)