Unit I Software Process and Project Management: Hindusthan College of Engineering and Technology
The document appears to be an exam for a course on software analysis and design. It contains 31 questions across three parts about software engineering concepts like software processes, life cycle models, project management, estimation, scheduling, and risk management. The questions range from definitions to explanations of specific models and methods.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
168 views1 page
Unit I Software Process and Project Management: Hindusthan College of Engineering and Technology
The document appears to be an exam for a course on software analysis and design. It contains 31 questions across three parts about software engineering concepts like software processes, life cycle models, project management, estimation, scheduling, and risk management. The questions range from definitions to explanations of specific models and methods.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
Hindusthan College of Engineering and Technology
Approved by AICTE, New Delhi, Accredited with ‘A’ Grade by NAAC
(An Autonomous Institution, Affiliated to Anna University, Chennai) Coimbatore – 641 032 AUTONOMOUS III SEMESTER UG DEGREE EXAMINATIONS COURSE CODE AND NAME: 16CS3203 –SOFTWARE ANALYSIS AND DESIGN
UNIT I SOFTWARE PROCESS AND PROJECT MANAGEMENT
PART A Marks COs 1. What is software engineering? 2 CO1 2. What is Software? 2 CO1 3. What are the characteristics of the software? 2 CO1 4. What do you mean by software process? 2 CO1 5. What are the fundamental activities of a software process? 2 CO1 6. What are the umbrella activities of a software process? 2 CO1 7. State the various perspective and specialized process models. 2 CO1 8. What are the merits of incremental model? 2 CO1 9. List the task regions in the Spiral model. 2 CO1 10. What are the drawbacks of spiral model? 2 CO1 11. State the drawbacks of waterfall model. 2 CO1 12. What are the steps in component-based development model? 2 CO1 13. What is software project management? 2 CO1 14. What are the activities in Software project planning? 2 CO1 15. What is COCOMO Model? 2 CO1 16. What is meant by Software project estimation? 2 CO1 17. What is Software project scheduling? 2 CO1 What are the two project scheduling methods that can be applied to software 18. 2 CO1 development? 19. What is earned value analysis? 2 CO1 20. What is meant by Software Risk? 2 CO1 21. What is RMM? 2 CO1 PART B Explain iterative waterfall and spiral model and discuss various activities in each 22. 14 CO1 phase. 23. Explain in detail about various specialized process models. 14 CO1 24. Discuss in detail about the software process. 14 CO1 25. Explain COCOMO Model in detail. 14 CO1 26. Describe in detail about LOC and FP based estimation. 14 CO1 27. Explain in detail about Risk Management and RMM plan. 14 CO1 28. Describe in detail about project scheduling & EVA. 14 CO1 PART C Compare various life cycle models based on their distinguishing factors, strengths and 10 29. CO1 weakness. Explain Water fall Model. What are the problems that are sometimes encountered 30. 10 CO1 when the waterfall model is applied? 31. Explain Component Based Development model in detail. 10 CO1