Column Loading:: Distribution of Load On Individual Pile of A Pile Group

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 16

--------- ----------------------------------------------------------------------------------------------------------------- --------------------------------------

--------- ----------------------------------------------------------------------------------------------------------------- --------------------------------------


PROJECT :
PILECAP NO:
PILECAP TYPE:
CHECKED BY:
ALLOWABLE PILE WORKING LOAD =
NUMBER OF PILES =
NUMBER OF VERTICAL LOAD =

Column Loading: 38530 kN

Location of point load w.r.t 0,0


x= 0.0 mm
y= 0.0 mm

SX2 = 0.0000 m2
SY2 = 0.0000 m2

Location of pile group C.G w.r.t 0,0


x-bar = 0.00 mm
y-bar = 0.00 mm

REACTION OF PILES

No. PILE No. Working Concrete Modulus Vertical


Load Grade, fcu Young, E Stiffness
(kN) (kN/mm2) (kN/mm2)
--------- ----------------- ------------------------------------ -------------------- -----------------------------------------------------------------------------
1 P1 2700 90.00 38.00 102.60
2 P2 2700 90.00 38.00 102.60
3 P3 2700 90.00 38.00 102.60
4 P4 2700 90.00 38.00 102.60
5 P5 2700 90.00 38.00 102.60
6 P6 2700 90.00 38.00 102.60
7 P7 2700 90.00 38.00 102.60
8 P8 2700 90.00 38.00 102.60
9 P9 2700 90.00 38.00 102.60
10 P10 2700 90.00 38.00 102.60
11 P11 2700 90.00 38.00 102.60
12 P12 2700 90.00 38.00 102.60
13 P13 2700 90.00 38.00 102.60
14 P14 2700 90.00 38.00 102.60
15 P15 2700 90.00 38.00 102.60
16 P16 2700 90.00 38.00 102.60
17 P17 2700 90.00 38.00 102.60
18 P18 2700 90.00 38.00 102.60
19 P19 2700 90.00 38.00 102.60
20 P20 2700 90.00 38.00 102.60
21 P21 2700 90.00 38.00 102.60
22 P22 2700 90.00 38.00 102.60
23 P23 2700 90.00 38.00 102.60
24 P24 2700 90.00 38.00 102.60
Total = 513
--------- ---------------------------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------
DISTRIBUTION OF LOAD ON INDIVIDUAL PILE OF A PILE GROU
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------
LOT 15, SJCC
39
3 SP600
Fadzil
2700 kN
26 no.
1 no.

Myy = 0.00 kNm


Mxx = 0.00 kNm

X
ecc between point load and pile group C.G
ecc X = 0.00 mm
ecc Y = 0.00 mm
no of pile 26 nos

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------------------------------- ------------------ ------------------- ----------------------- ------------------- ------------------------ -----------------
PILE OF A PILE GROUP
---------------------------------- ------------------ ------------------- ----------------------- ------------------- ------------------------ -----------------
07/20/18
01:49 AM

+ Value 1
Y

Myy
2
Mxx

X X

X
0,0 + Value

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
-------------- ----------------------------------------

-------------- ----------------------------------------

---------------------------------------------------------------------
---------------------------------------------------------------------
--------- ----------------------------------------------------------------------------------------------------------------- --------------------------------------

--------- ----------------------------------------------------------------------------------------------------------------- --------------------------------------


PROJECT :
PILECAP NO:
PILECAP TYPE:
CHECKED BY:
ALLOWABLE PILE WORKING LOAD =
NUMBER OF PILES =
NUMBER OF VERTICAL LOAD =

Column Loading: 7060 kN

Location of point load w.r.t 0,0


x= 0.0 mm
y= 0.0 mm

SX2 = 1.1628 m2
SY2 = 1.1365 m2

Location of pile group C.G w.r.t 0,0


x-bar = 0.33 mm
y-bar = 53.33 mm

REACTION OF PILES

No. PILE No. Working Concrete Modulus Vertical Stiffness AREA


Load Grade, fcu Young, E Stiffness Ratio
(kN) (kN/mm2) (kN/mm2)
--------- ----------------- ------------------------------------ -------------------- ------------------ ------------------ ---------------
1 P1 2700 90.00 38.00 102.60 0.33 1.00
2 P2 2700 90.00 38.00 102.60 0.33 1.00
3 P3 2700 90.00 38.00 102.60 0.33 1.00
--------- ----------------------------------------------------------------------------------------------------------------- --------------------------------------
Total = 307.8
--------- ----------------------------------------------------------------------------------------------------------------- --------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------
DISTRIBUTION OF LOAD ON INDIVIDUAL PILE OF A PILE GROU
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------
LOT 15, SJCC
46
3 SP600
Fadzil
2700 kN
3 no.
1 no.

Myy = -2.35 kNm


Mxx = -376.53 kNm

X
ecc between point load and pile group C.G
ecc X = -0.33 mm
ecc Y = -53.33 mm
no of pile 3 nos

Pile Coordinate SX2


Org X Org Y Ecc x Ecc Y X Y (m2)

------------------ ------------------- ----------------- --------------- ------------------- ------------------- ------------------


0.0 866.0 4.00 57.00 4.0 923.0 0.00001
-750.0 -433.0 -14.00 83.00 -764.0 -350.0 0.58421
750.0 -433.0 11.00 20.00 761.0 -413.0 0.57861
-------------------------------------------------------------------------------------------------------------------------------- ------------------
0.33333333 53.333333 1.0 160.0 1.16283
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------------------------------- ------------------ ------------------- ----------------------- ------------------- ------------------------ -----------------
PILE OF A PILE GROUP
---------------------------------- ------------------ ------------------- ----------------------- ------------------- ------------------------ -----------------
07/20/18
01:49 AM

+ Value 1
Y

Myy
2
Mxx

X X

X
0,0 + Value

SY2 P/A exx Myy*exx/Sx2 eyy Mxx*eyy/Sy2 Total


(m2) (kN)

------------------- ------------------ ------------------- ----------------------- ------------------- ------------------------ -----------------


0.75632 2353.33 3.67 -0.01 869.67 -288.14 2065.19
0.16268 2353.33 -764.33 1.55 -403.33 133.63 2488.51
0.21747 2353.33 760.67 -1.54 -466.33 154.51 2506.30
------------------------------------------------------------------------------------------------------- ------------------------ -----------------
1.13646 7060 kN 7060
---------------------------------------------------------------------------------------------------------------------- ------------------------ -----------------
-------------- ----------------------------------------

-------------- ----------------------------------------