9 a Abstract
Sl.No Main Item of work Unit Qty Rate in Amount in Rs
Rs
2
Excavation in all kinds of soils including boulders not
exceeding 0.15 cum but not exceeding 1 cum in volume
including placing neately or disposing off the excavated Cum 179610.22
stuff etc., as directed including cost of all materials,
machinery, labour,dewatering, desilting, bailing out water
etc., complete with all leads and lifts
3
Providing embankment with homogenous soil from
approved borrow areas in layers of 25 to 30 cm including
cost of all materials, machinery, labour, all operations
such as excavation, sorting transportation, dozing to the Cum 736237
required depth, breaking clods, sectioning, watering &
compaction to the required density control not less than
97% using sheep foot / pad foot roller as stipulated etc.
complete with all leads and lifts.
10
Providing and constructing rock toe with rubble from
approved quarry including placing, hand[packing and
handfinishing the top and sides to requried slopoes Cum 10972.98
including cost of all materials, machinery labouretc.,
complete with initial lead upto 1 km and all lifts.
18 Rcc work for Toe wall & Circular Stilling Wall (M25) Cum 1390.83
20 Pcc work for Toe wall & Circular Stilling Wall Cum 116.31
ROADS
1 Preparation of Subgrade by trimming earth in all types of soil,
dressing to required cambers and consolidating with vibrator roller,
duly adding water to get 97% degree of compaction, including
carting away the excavated earth within or away from the site; sqm 12240.38 0.00
loading and unloading, spreading and levelling, making good the
undulations if any, the cost of water etc, complete.
Annexure-VIII
10 c Split Up For LIGHTING SYSYTEM RWR at Taranagar as per Specification -15.3.2
UNIT EX TOTAL
QUANTITY
SL NO DESCRIPTION UNITS WORKS PRICE
LENGTH IN M
PRICE IN IN
Length of Bund 200.00 m (In the drg the the point where the qty of bund
no of bunds 2 nos excluding ramp is ended from there the length of
Qty 150867.6 Cum bund is 200m is considered and actual length of
Ramp is 146.25)
Total Bund Area 911954.70349 Cum
Nos 4 nos
Total Qty of Stairs 272.06229792 Cum
Surface Finish
1st coat 13.2mm
2nd coat 11.2mm
Dia of wall 5 m
Height of Wall 8 m
Well inside NGL 2 m
Thickness of Wall 0.30 m
Thickness of footing 0.45
Projection of footing 1 m on either side
21.0 Masonry apron alround well Dia 10.2 m
7
Bund
65.5
ad on top of bund +
outside to reach top of