Sales & Operations Planning in a Global Business

by

Christopher Michael Honstain


Bachelor of Science
Kettering University, 2003

Submitted to the Engineering Systems Division in Partial Fulfillment of the


Requirements for the Degree of

Master of Engineering in Logistics


at the
Massachusetts Institute of Technology
June 2007

© 2007
C. Honstain
All rights reserved

The author hereby grants to MIT permission to reproduce and to


distribute publicly paper and electronic copies of this thesis document in whole or in part.

It /ID // /
Signature of Author ............. ............. ,. ............. .......... ...................................... ....
Engineering Systems Division
May 11, 2007

C ertified by ...........................................................................................................................
Lwrence Lapide
Director, Demand Management, MIT Center for Transpo on & Logistics

A ccepted by .......................................................................... . . ...


.. ....
.. ...............
Yossi Sheffi
Professor of Civil and Environmental Engineering and Engineering Systems
Director, MIT Center for Transportation and Logistics

MASSACHUSETTS INSTTUTE.
OF TECHNOLOGY

JUL 312007 ARCHIVES


LIBRARIES
Sales & Operations Planning in a Global Business
by
Christopher Michael Honstain

Abstract
As companies become more global and begin to outsource manufacturing and other services, the
uncertainty in the supply resource increases. Demand uncertainties increase as these same
companies expand into new countries to serve new customers. The globalization of business has
created problems that many companies do not know how to overcome. One way of overcoming
these challenges is to implement a process called global sales and operations planning (S&OP).

Sales and operations planning is a collaborative process that aligns the supply side of an
organization with the demand side. Aligning the goals of the different departments eliminates
the "silo" mentality and creates a streamlined organization. This streamlined organization works
as one team with the goal of meeting the financial expectations set by the executive team.

Global sales and operations planning is a process used to match supply and demand throughout
the world. To do this effectively, the process must be divided into multiple processes based on
the characteristics of the supply chain for the product, the business units within the company, and
geography that the business unit is located in. When the S&OP process is divided correctly, it
allows the executive members of the company to communicate financial expectations to each of
the business units, while the individual business units can match the supply and demand
characteristics of the product.

Vascucorp. is a company that is facing the same problems that many other companies face when
trying to implement an S&OP process into their company. This thesis will focus on trying to
form a common platform that companies can use to implement a successful global sales and
operations planning process.

Thesis Supervisor: Dr. Lawrence Lapide


Title: Director of Demand Management, Center for Transportation and Logistics
Massachusetts Institute of Technology
Acknowledgements
I would like to thank Dr. Larry Lapide for all of his guidance and support he gave me while
working on this project. His knowledge of demand management and his ability to share that
knowledge was instrumental in my understanding of the topic. Furthermore, his extended
network of people in different industries that he shared with me was a main source of
information. Without him, this project would not have been possible.

Secondly, Annie V. and Carl F. from Vascucorp were extremely helpful throughout this project.
Their knowledge of the S&OP process at Vascucorp was the main focus of this project. I would
like to thank them for the support and information they were willing to share. In addition to Carl
and Annie, Victor C., Scott O., Christi P., Eric W., Shelby M., and Joep L., were all very helpful
in gathering data for the thesis. I would like to thank each of them as well.

Finally, many people in companies around the world were willing to share their knowledge about
their Global S&OP Processes. Those people include Tom Wallace of T.F. Wallace, Colleen
Crum of Oliver Wight, Mike Harsh of Bayer Material Science, Jay Nearnberg, Chris Williams,
Dick Clark, Paula Natoli of JDA, and Ajay Chidrawar of i2. Each of you has deepened my
understanding of S&OP, and I thank you for that.
Table of Contents
Abstract ..................................................................................... ............................... ii
Acknowledgements ................................................................................................ iii
Table of Contents ................................................................................................... iv
List of Tables .................................................................................................................. v
List of Figures ........................................................................ .................................. v
1 Introduction .................................................. ...................................................... 1
1.1 Scope ......................................................................... ................................... 1
1.2 Motivation ...................................................................... ................................ 1
1.3 Methodology ........................................................ .......................................... 2
1.4 O utline ......................................................................... .................................. 3
2 S&OP Case Study at Vascucorp ............................................ ............. 4
2.1 Organization and Product Background ............................................................. 4...
2.2 S&O P Process....................................................................................... .............. 5
2.2. 1 Product Family One: S&OP Meeting ............................................. ............ 7
2.2.2 Product Family Two: S&OP Meeting ............................................................. 12
2.3 S&OP Alignment with Financial Goals..........................................15
3 The S&OP Process in a Consumer Products Good Company................ 16
3.1 Criteria for Process Separation..........................................................................16
3.2 Process Evaluation ............................................................ 20
3.3 Financial Results of S&OP ..................................................... 21
4 The S&OP Process in Other Industries ............................................. 22
4.1 S&OP at Bayer Material Science ..................................................................... 22
4.2 S&OP at a Pharmaceutical Company.........................................24
5 Expert Opinions on S&OP ........................................................ 27
5.1 Criteria for Dividing S&OP Processes ........................................ ..... 27
5.1.1 Scenario One: Single Worldwide Source......................................29
5.1.2 Scenario Two: Multiple Regional Source........................30
5.1.3 Scenario Three: Dedicated Regional Source ................................................. 31
5.1.4 Scenario Four: Multiple Shared Sourcing ..... ......................................... .. 32
5.2 Evaluation of Global S&OP Process.............................................................35
5.3 Financial Aspects of Global S&OP ..................................................... 38
6 Results, Conclusions, and Future Research ...................................... .... 39
6 .1 Results .......................................... ...... ... ...................................................... 39
6.2 Conclusions .......................................................... ................... 42
6.3 Future Research ................................................................................................ 42
Bibliography........................................................... ................................................ 44
List of Tables
Table 1: The break-up of business units and regions in the CPG company ........... 16

List of Figures
Figure 1: The US and OUS supply chain ............. .............................................. 9...
Figure 2: S&OP process at the CPG company ................................................ 18
Figure 3: Scenario 1 .......................................................................... ........................ 29
Figure 4: Scenario 2 .......................................................................... ........................ 30
Figure 5: Scenario 3 .......................................................................... ........................ 3 1
Figure 6: The Oliver Wight Integrated Business Management Model................................ 32
Figure 7: Scenario 4 .......................................................................... ........................ 33
Figure 8: The Oliver Wight Global Sales and Operations Planning Model ........................... 34
Figure 9: The Oliver Wight Class A Checklist for Integrated Business Management ............ 36
Figure 10: How to separate a Global S&OP Process.........................................40
1 Introduction

1.1 Scope
This study of global sales and operations planning is the result of problems that a medical device

manufacturer is facing in its own S&OP process. The problems include multiple products

serving many different customers in dozens of countries all over the world. This thesis will

focus on what characteristics make a global sales and operations planning process most

successful, and how a company like this medical device manufacturer can divide a single S&OP

process to make it most effective in a global environment. In addition to dividing a global S&OP

process, the thesis aims to find an evaluation process that can be applied uniformly across many

different S&OP processes. Finally, the flow of financial information throughout a global S&OP

process will be examined.

1.2 Motivation
In "Demand Management: A Cross-Industry Analysis of Supply-Demand Planning", Tan states

that S&OP has gained in importance over the past years due to three trends in the corporate

world: increase in demand uncertainties and variations, increase in supply uncertainties and

variations, and an increase in the cost of a lost sale and over supply. These trends are even more

apparent in a global business. As companies move supply sources to areas with cheaper labor
and customers all over the world come to expect more from companies, global S&OP processes

will become very important.

In addition to higher expectations and supply sources that are located throughout the world, a

recent law that was passed by the United States Congress has made global S&OP even more

important. That law is the Sarbanes-Oxley Act. This law was created to protect investors from

companies that mislead the public about the performance of their company. Public companies

that are traded on a stock exchange must release expected earnings figures to the public each

year. Prior to the Sarbanes-Oxley Act, executives within companies were not punished if the

numbers were incorrect. Now they will be. A global sales and operations planning process, if

used correctly, can eliminate the possibility of incorrectly reporting numbers that the company

cannot achieve.

1.3 Methodology
Sales and operations planning was pioneered in the early 1980's at a small company in Memphis,

Nevada called Bently. The process involved the sales department and the operations team, and

was meant to help determine a forecast that both could agree on. Since that time, the process has

evolved and in the late 1990's, consulting firms began marketing this process. Over the past

eight to ten years, very little academic research has been done, but many companies and

consultancies have written white papers about the subject.

This research began with a review of previous MIT Supply Chain 2020 theses that review sales

and operations planning. Secondly, Vascucorp's S&OP process was profiled and explained in

detail. Next, company experts presented their experiences and views on the subject, followed by

the views and experiences of management consultants and software consultants.


1.4 Outline
The thesis is organized into five chapters. Chapter Two profiles the S&OP process at a large

medical device manufacturer. This is an in-depth case study that is one example of how a global

S&OP process can work. Chapters Three and Four profile three different global S&OP

processes. Chapter Three focuses on a large consumer product goods company that has been

using S&OP for over twenty years, while Chapter Four explains the global S&OP process at a

pharmaceutical company and at a large material company. Chapter Five reviews the opinions of

the experts in the field. Two consultant's views on Global S&OP are summarized in this chapter

as well as the methods for developing and evaluating a Global S&OP process. Finally, Chapter

Six provides the summary and recommendations for dividing a global S&OP process.
2 S&OP Case Study at
Vascucorp

This research begins by analyzing the sales and operations planning process for a large medical

device manufacturer. The large medical manufacturer, which will be referred to as Vascucorp

throughout the thesis, has been in the medical device industry for close to fifty years and has

been a leader during most of that time. Currently, the company uses an S&OP process to

manage the supply and demand for its products. This process is profiled below.

2.1 Organization and Product Background


Vascucorp produces three main types of products. These products are grouped into three

families called product one, product two, and product three. Each of these products is explained

in detail below.

Product one is the most profitable product produced by Vascucorp. This product line consists of

roughly 40 SKUs that are manufactured in a five-step sequential process in eleven separate

plants located around the world. The main difficulty in the production planning process that

Vascucorp faces is that the drug-coated stents expire if they are not used within a certain time

period after the production process is complete.


The second product family that the company produces is made up of approximately 4500 stock

keeping units (SKUs). These SKUs are divided into nine product families, and are used for

diagnostic (DX) and interventional (IX) procedures. Three of these families are manufactured at

the company's own facilities and six are purchased from contracted manufacturers (OEMs).

Regardless of who produces the devices, the margins are much lower than the DES products.

Despite the small margins, Vascucorp implemented S&OP for these products as well. For the

past eight months, the S&OP process has been implemented and used to monitor the production

process and inventory levels.

The third product family is used for diagnostic and interventional procedures as well. This

product line is much like the second product family in that it manufactures products in the

company's plants and purchases products from OEMs. Despite the similarities, the process in

this division is less than six months old and is still developing its own S&OP process. Since the

process is so new, the focus of this research is on the first and second product families.

2.2 S&OP Process


As soon as Vascucorp launched the first product family, the demand for the product reached

hyper-growth levels. Despite the high cost to the customer, and high margins for the company,

the supply of the product could not meet the demand for the product. Eventually, a competitor

received approval for their competing product from the Food & Drug Administration and almost

instantaneously the competition took control of over fifty percent of the market. In April of

2005, after numerous customer service issues and a dramatic reduction in demand due to the

competitors' product, the marketing and supply chain departments began to meet to discuss

monthly demand. The goal was to develop a forecast that the operations group could produce to
so there would be a lower percentage of errors in the demand forecast. Eventually, the process

evolved into its current sales and operations planning process which consists of a series of

meetings run on a monthly cycle that consist of 4, 4, and 5 week periods. It is owned and run by

the supply chain group under the Vice-President of Operations.

Vascucorp is a global business that is divided into two markets, the US (United States), and OUS

(Outside the US) markets. The US market, which is where the S&OP process began, includes

the United States only. The OUS market includes four separate "umbrellas" with a total

membership of approximately 50 countries. The umbrellas include:

1) Europe, Middle East, and Africa (EMEA)

2) Asia Pacific (ASPASC)

3) Japan

4) Latin America

Each of these umbrella groups is responsible for selling all medical devices for the corporation in

their specific region. The umbrella group also has its own profit and loss statement (P&L) as

well as financial responsibility to the parent company. Finally, the separate umbrellas have their

own supply chain group, sales force, and marketing group. These groups determine their own

forecasts and relay them to the OUS planning organization. This method of dividing the

companies is due to regulations and other factors that the company must address individually.

The problem with the divisions is that the incentive system that is currently being used in the

company is very ineffective. Forecasters and business units are rewarded for beating goals and

punished for not meeting them. This causes the demand forecasters to error on the safe side and

under forecast on a regular basis. This leads to problems on the supply side of the business
because the forecasts are biased. Furthermore, the different OUS umbrellas face the difficulty of

communicating effectively across the different time zones and other complications while

communicating internationally.

Currently, the process itself is not measured. In the past, the company was using a S&OP

maturity matrix score card to determine the success of the process. The scorecard was a list of

20 questions derived from the Oliver Wight Class A Checklist that could be ranked on a scale

from 0 to 5 to rate the effectiveness of the process. It was handed out at the end of the meeting

each week and filled out by the meeting attendees. This evaluation method was abandoned after

a few months because the results from the scorecard appeared useless. Instead of measuring the

performance and effectiveness of the process, Vascucorp measures the results of the business

that the S&OP process is involved with. These metrics include line item fill rate, back order

duration, forecast accuracy, and cost of goods sold. These metrics are considered to be practical

results from the process itself.

2.2.1 Product Family One: S&OP Meeting


As stated above, product family one consists of 40 SKUs that are manufactured in a five-step

sequential process in eleven different plants. There are two parallel processes, one for the US

market, and one for the OUS market. The entire supply chain consists of the following steps

over a 64 day time period (this is shown in Figure 1 as well):

1) Components are purchased from OEMs or manufactured by Vascucorp.

2) Product one is coated with a drug in one of three different locations.

3) The product is crimped onto the balloons and packed into packages at the Puerto Rico

facility for the US market and at the Mexico plant for the OUS market.
4) Suppliers sterilize the packaged products at the Texas facility for the US market, and at a

facility in Europe for the OUS market.

5) The finished product is sent to a lab to be tested for quality assurance. This step takes up

to three weeks to complete.

6) The finish products are distributed to the network of distribution centers located around

the world.

The 64-day supply time cycle is critical for multiple reasons. The first reason is that the long

lead-time prevents the company from reacting to a sudden increase or decrease in the demand for

the product. Secondly, the product expires in the third month1 after it is sterilized. The

expiration creates a problem in that if too much product is produced, it will sit in the distribution

centers and expire. If too little is produced, there will be missed sales - a typical "news boy"

problem. To make the situation even more difficult, the demand is very volatile. To decrease

the risk of either happening, large pools of inventory are held before and after crimp & pack as

well as after the coating process. Since the expiration date is set at the sterilization step, the

finished goods inventory is regulated at this process. To regulate the product flow through the

supply chain during the 64-day cycle, a separate group was created for this product family. This

new group is called the worldwide supply-planning group. The main responsibilities include

coordinating all master scheduling, component forecasts, supplier capacity, rough cut capacity

planning, and plant capacity. The supply-planning group is unique in the company and its sole

responsibility is to support the flow of goods for product family one.

1 This is for the US market only. In the Japanese market, the product expires exactly three months from the date of
sterilization, and in the European market, the date of expiration is in the 5t month after sterilization.
US Supply Chain

OUS Supply Chain

Figure 1: The US and OUS supply chain.

The S&OP process for product one consists of five meetings used to match supply and demand.

The process is described below.

1. Demand Pre-Meeting: The demand pre-meeting is the first meeting held at the beginning of

the first week of the monthly cycle. It is an informal meeting between the marketing product

director (equivalent to a brand manager), the supply chain demand planner, and the supply chain

product manager. At this meeting, the attendees decide on the competitive assumptions that will

be used as marketing intelligence to determine the unconstrained forecast. As stated above, the

demand is so volatile that the forecast is determined strictly from marketing intelligence. Since

the marketing information is used strictly to form the forecast, marketing is completely
responsible for the forecast. The statistical forecast from Manugistics, which is the forecast

software package used, is used only as a sanity check.

2. Demand S&OP: This meeting is held on the first Thursday of the monthly cycle to review

the unconstrained forecast for the proceeding 3-24 months and the results from the previous

months. The attendees include the US product directors and global marketing directors from the

marketing group; the vice president of supply chain, US supply chain directors, product

managers, and demand managers from the supply chain group; the finance controller; and the

vice president of sales. The meeting begins by reviewing the "deck" which includes

performance metrics. The deck is a report that includes metrics on actual sales, line item fill rate

(LIFR), backorder duration, actual financials versus business plan, and forecast accuracy of both

the revenue products (units that are sold) as well as non-revenue products (units that expire and

must be replaced for free). Once the metrics are reviewed, the unconstrained forecast is

reviewed and agreed upon. This forecast includes demand for new products as well as

replacements for product that are anticipated to expire in the upcoming month.

The day after the Demand S&OP is completed; the demand forecast for the OUS is incorporated

into the US demand forecast to create an aggregate forecast. The OUS forecast, from the OUS

planning organization group, has added all of the demand from the umbrella groups and

aggregated them together.

3. Demand Handoff: As stated above, this supply chain is very unique, and therefore is

managed that way. In this meeting, people from the supply chain group meet with the supply-
planning group to review the unconstrained forecast. The director of worldwide supply

facilitates this meeting.

4. Supply S&OP: The supply meeting is held on the second Thursday of the month. Operations

people attending the meeting are the Master Planners, Supply Planners, Materials Director,

Director of Manufacturing, Planning Manager, Director of Operations, and the Plant Manager.

For the supply chain group, the Demand Planners, Product Managers, and Supply Chain

Directors attend the meeting. The director of worldwide supply facilitates the meeting. In this

meeting, the main topics of discussion are the work in progress (WIP) inventory, the raw

materials inventory, and the whether or not the capacity can meet demand. The WIP inventory is

also a very important part of the discussion due to the complex 64-day manufacturing process.

The plants must all be aware what should be produced and at what time so the finished goods

inventory can be closely monitored. The meeting ends with a final number that represents the

constrained forecast for the month.

5. Executive S&OP: The executive meeting includes information about all three product lines;

one, two, and three. The president of the company, vice presidents from marketing, finance,

operations, sales, and manufacturing, the director of worldwide supply, and the product

managers from both regions attend the meeting. The focus is on the financial results of the

company, and whether or not the S&OP plan will meet the business plan (BP) that is reported to

Wall Street. These results or metrics are presented in a nine-page document that summarizes key

financial metrics. The group also reviews manufacturing utilization in the current time period as

well as capacity requirements in the future. Finally, and maybe most importantly, issues that
cannot be solved in prior meetings are escalated to this meeting so the executives running the

company can make the final decision. Typical issues that get escalated include significant

differences between the S&OP plan and business plan or a decision to continue production and

incur significant costs or cut production and allow customer service to slip.

22.22 Product Family Two: S&OP Meeting


The S&OP process for the second product family has evolved from the S&OP process of the first

product family and has been active for just over 6 months. Although the process was developed

from the original S&OP process, it has been modified to meet the needs of the second product

family. This S&OP process is also run on a 4, 4, 5, week quarterly cycle. The weekly meetings

follow the S&OP meetings for the first product family throughout the week. The demand for the

products in this family is relatively stable with some seasonality. This trend in demand allows a

software program from Manugistics to produce a reliable monthly forecast for the 4500 SKUs in

this product lineup. Once the forecast number is determined, the marketing department inputs

their knowledge to determine the unconstrained forecast. The marketing group uses promotions

and other tools to shape monthly demand. If the initial forecast is lower than what the business

plan calls for, it is their responsibility to increase demand.

This S&OP process faces a significant problem in their process that the other group doesn't.

That problem is that the company does not have visibility into the OEM's production capacity.

Since two-thirds (6 of 9) of the product families are produced at contract manufacturers, there are

many unknowns in the process. Currently, the OEMs are given a weekly production schedule

and are monitored by a person in a strategic sourcing role. This has worked in the past, but the
company cannot respond to an increase or decrease in production levels very quickly. Right

now, the company only reviews the financial impacts of the OEM produced products.

The S&OP process for product family two is as follows:

1. Demand Pre-Meeting: The demand pre-meeting is held at the beginning of the first week of

the cycle. The marketing product director for each product meets with the supply chain demand

planner to discuss the statistical forecast. The product director adds some market intelligence

and the unconstrained forecast for the US market is set.

2. Demand S&OP Meeting: The demand S&OP meeting is held on the first Thursday of the

monthly cycle. Members from four departments attend including the US product directors and

global marketing directors from the marketing group; the vice president of supply chain, US

supply chain directors, product managers, and demand managers from the supply chain group;

the finance controller; and the vice president of sales. The moderator of the meeting presents the

deck and reviews the metrics included in it. The deck includes the year-to-date financial

information for actual sales, financial targets from the business plan, and one page of

performance metrics for each of the products that the company produces. The metrics include

weekly sales units, forecast accuracy for lag 2 and lag 3 time periods2, line item fill rate (LIFR),

and average back order duration for each product. Each of the pages also includes a monthly

forecast for the 9 proceeding months and 5 proceeding quarters for a total of 24 months as well

as the business plan projected units. These two metrics can be compared to determine what

products aren't meeting the corporate financial goals.


Following the monthly demand meeting, the company takes the demand from the four umbrellas

in the OUS markets and rolls them up into one total forecast. As explained above, the demand

forecasts from the OUS markets are usually revised to show the true expected demand from the

region.

3. Demand Handoff Meeting: The demand handoff meeting occurs on the second Monday of

the monthly cycle. In this meeting, the supply chain product managers and demand planners

give the unconstrained monthly forecast to the director of manufacturing, the materials manager,

and the supply planners from the operations group. Assumptions and clarifications are explained

to the operations team. The supply chain product manager moderates this meeting.

4. Supply S&OP: The supply S&OP meeting occurs on the second Thursday of the monthly

cycle. During the time between the demand handoff and the supply S&OP, the three days are

spent reviewing the production capacity in the plant, and determining if supply can meet

demand. The operations group, which includes the materials planner, the materials director, the

director of manufacturing, the planning manager, the director of operations (for DX/IX/ENDO)

and the plant manager, presents this information in a deck much like the one from the S&OP

demand meeting. If the demand can't be met, the reasons are explained to the supply chain

group, which includes the directors, the product managers, and the demand planners, and

alternative plans are discussed. A decision is then made to change the product mix or decide

which products are the most important to produce.

2 Lag2 and Lag 3 represent the forecast that was made 2 or 3 months ago for the current month. These forecasts are
the most important because they represent the lead-time that is necessary for a change in the production schedule.
The deck also includes information about capacity utilization for the current month as well as for

the following 11 months. This information is used to predict when the plant will need to increase

or decrease capacity. If a significant amount of increased capacity is needed, the company will

use that information to plan accordingly.

5.Executive Meeting: The executive meeting for this process is combined with the executive

meeting from the other process and is explained above.

2.3 S&OP Alignment with Financial Goals


The Finance department at Vascucorp develops an annual business plan that is used to report the

expected financial results for the company to Wall Street. The marketing department is

responsible for shaping demand to meet the financial results that are set. Through the S&OP

meetings, the marketing directors are able to do this. The problem at Vascucorp is the

disconnect between the financial department and the marketing department. At the beginning of

the year, the business plan is created with no insight from the marketing department.

Throughout the year, the marketing department is struggling to make the business plan number.

The sales and operations planning meetings should bridge this gap, but currently there is very

little insight from the finance group at the S&OP meetings. As the year progresses and the

financial results change, the business plan is updated every quarter.


3The S&OP Process in a
Consumer Products Good
Company

More than fifteen years ago, a large consumer product goods (CPG) company began using

S&OP. Since that time, it has continued to improve its process and has developed it into one of

the most successful processes in the world. The following chapter profiles a sales and operations

planning process at this large CPG company.

3.1 Criteria for Process Separation


This CPG company defines sales and operations planning as a business process that supports a

specific business unit. The company is divided into seven global business units and seven

geographic regions. Each of these is listed in Table 1.

Table 1: The break-up of business units and regions in the CPG company

Global Business Units Markets Served by CPG Company


1. Household Care 1. North America
2. Baby 2. Latin America
3. Family 3. Western Europe
4. Feminine 4. Greater China
5. Beauty 5.Asia, Australia, & Malaysia
6. Health Care 6. Northeastern Asia
7. Skin Care 7. Central & Eastern Europe, Middle East

Within the business units, there are different categories of products that the company splits its

products into. This allows the company to run over 90 separate S&OP processes. The criteria
the company uses to decide how many different processes it needs depend on the number of

unique supply chains in the company. The supply chain is defined as the set of suppliers,

manufacturing facilities, and distribution network to support a certain group of products. If a

product line has similar supply chains, those products are combined into one business unit and

that business unit is supported with an S&OP process.

In the seven different business units, there are two specific examples that illustrate this point very

well. The first is an example of laundry detergent. Laundry detergent is sold by this CPG

company in each of the seven markets listed above. Since it is so heavy, the product is very

expensive to ship. Instead of producing the detergent in one region and sending it to the different

regions, it is produced in each of the markets. To produce in each of the markets, the company

has manufacturing facilities in each of the seven regions as well as a supplier network and

distribution network. To support each of these business units in their respective regions, an

S&OP process is run on a monthly cycle. To bring together all of a business unit's supply and

demand information, the company runs a global S&OP meeting that presents all of the

information to the president of the business unit. In a completely different situation, the

company manufactures pills in one plant for customers around the world. Since the pills are

light, easy to transport, and generally have a long shelf life, they are easy to transport from one

continent to another. In this situation, one S&OP process is run to match supply with demand

for the entire world. In this situation, there is no need for individual meetings in each area, the

demand is forecast for the entire world.


Leading each of these S&OP processes is a general manager that reports to a president of one of

the global business units. These general managers have profit and loss (P&L) responsibility for

the plants and product lines that are involved in their processes. Since they have this

responsibility, they also have the authority to make financial decisions that impact their business.

The sales and operations planning process at the CPG company is much like S&OP at other

companies. The basic process is shown in Figure 2 below.

Sales & Operations Planning


"What If'
& Financial Implement
Implicatic S&OP sions
Meeting
n

Demand
Pre-S&OP Planning
m

"What If' Supply Mhat If"


inancial
& Financial
Implications
Planning .... plications

Figure 2: S&OP process at the CPG company

The difference is the attention to detail and importance that the leaders of the company place on

the fundamentals of the process. This CPG company stresses the importance of four main

factors in their process. Each of these factors is described below.


1. Inviting the right people to each meeting and making sure they attend. The people that

should be invited to the meeting should have the power to make decisions that directly

affect the supply and demand of the product.

2. Having the right data in the meeting so decisions can be made during the meeting. This

requires that the information is prepared prior to the meetings.

3. The finance group has input into all or most of the decisions. Since the finance group

develops the business plan, it is very important that they understand the decisions that are

made in the meeting and how they are going to affect the overall business plan of the

business unit. If a decision must be made regarding the amount of low margin product to

produce versus a high margin product, the finance group must be able to make that

decision or incorporate the impact of it into the financial plans.

4. The forecast focuses on the time from 3-18 months into the future. The forecast should

focus on the time after three months out due to supply issues. The production schedule

for a manufacturing plant is locked in two weeks from the production date. During the

time from 1-2 months out, the production schedule is set, but the product mix can change

if needed. This is done after the company analyzes the cost of responding and the

benefits outweigh the costs. The forecast must also extend up to eighteen months into the

future so appropriate decisions can be made regarding plant capacity and merchandising

decisions.

In addition to these fundamental skills, the meetings must focus on high level decisions as well

as decisions for individual SKU. The combination of high-level decisions and important

products is essential to running a successful meeting.


3.2 Process Evaluation
To evaluate the S&OP process, the CPG company has developed an assessment tool from the

Oliver Wight Class A Checklistfor Business Excellence and from its own knowledge of what a

successful S&OP process looks like. The Oliver Wight checklist is a series of questions focusing

on the success of different aspects of the business. These aspects include planning processes,

managing people, business improvement, and managing the supply chain among other topics.

This checklist is described more in Chapter 6. The knowledge from the CPG company is a set of

best practices from other S&OP processes within the company. The knowledge concentrates on

how specific jobs within the S&OP process should be done, how the different S&OP meetings

should be run, how planning should be done, and other parts of the process that are essential to a

successful process. The assessment tool is a list of 140 questions that rate different aspects of the

process on a scale from 0-5. In addition to the success of the process, the bottom line business

results are included into the rating. The goal of the assessment process is to understand how the

process is working and then determine how to make it better.

The assessment process consists of two different types of evaluations; the annual corporate

assessment and the self-assessment. The self-assessment tool is used to communicate

expectations to the people in the different positions within the process as well as to standardize

the process across the company. This is administered by people within the group and used to

train people in new positions. The corporate evaluation is done annually, and conducted by an

expert in sales and operations planning. This yearly evaluation rates each of the S&OP

processes. The results of the evaluation are used to as a basis to improve the process.
3.3 Financial Results of S&OP
Within each of the S&OP processes at the CPG company, there is a function that has the

responsibility to report the financial numbers to the General Manager of the business unit. The

numbers can be aggregated by either geographic location or by business unit. The financial

plans are done this way because the supply and demand is managed in each of the S&OP

processes and the overall business results are managed at a higher level. Although this model

may make it seem like the entire company is a holding company, it is not. The financial

expectations are communicated to each business unit from the executive management team. The

S&OP process enables the business units to meet those expectations by providing the

information necessary to make decisions.


4 The S&OP Process in Other
Industries

4.1 S&OP at Bayer Material Science


Bayer Material Science is a division within Bayer that produces polymers. The company

produces and ships their product all over the world. Because of this, the lead times to

manufacture the product and ship it to its final destination are very long. The company has

implemented S&OP to help coordinate the monthly planning process.

Bayer Material Science is a global business that is divided into four business units that produce

different materials like polyurethane and polycarbonate. Each of those business units is divided

into four regions - North America; South America; Europe, Middle East, and Africa; and Asia.

Each region has its own marketing department that shapes demand, and they are responsible for

reporting point of sale data for each of the customers in their region. Within each business unit,

there are at least two supply sources located in different regions, with some business units having

three supply sources or in some cases one supply source in every region.

One S&OP process is conducted for each business unit. The process is made up of five meetings

run on a monthly schedule. The first meeting is the demand review where the forecast for the

following 12 months is reviewed. The company focuses on the time from 3-12 months into the
future for two reasons. The company doesn't focus on the time from 1-2 months because in that

time, the product that is going to be sold is already in transit or is in the production process. The

time from 6-12 months is important for the company because in this time, the company can

create value by pre-building inventory or repositioning inventory if the company can foresee

supply constraints. The second and third meetings in the S&OP process are supply review

meetings. The second meeting is a global balancing review that looks at the supply constraints

and the inventory positions in the company. Decisions are made on where to produce product

and where to ship it. The third meeting is a regional balancing meeting where the company

looks at where to hold inventory in the region and which customers should be served in case of a

shortage. The fourth meeting is a consensus meeting that reviews the supply and demand

numbers and checks to see if they are aligned. In the meeting, the attendees also review

important decisions that need to be made and decide which ones should be escalated to the

executive meeting. Finally, there is an executive meeting that reviews the financial numbers and

makes decisions on issues that could not be resolved in the previous meetings.

The company evaluates the success of the S&OP process using two different methods. The first

is by looking at measurable metrics that include forecast accuracy, inventory management, and

customer service. The company looks at three parts of forecast accuracy - last month vs. sales,

accuracy of lag 3 and lag 6 forecasts, and the accuracy of manual vs. statistical forecasts.

Secondly, the company reviews the inventory levels of the company against the inventory

targets. Finally, the company looks at a customer service metric that is called "on time and full".

This calculates the percentage of orders that are shipped on time with every line item included.

The second method of reviewing success of the S&OP process is by looking at the effectiveness
of the process. This effectiveness measure looks at communication between marketing,

procurement, logistics, production and other departments in the company to see how well the

company is working together.

Bayer Material Science, like many other companies, develops the business plan and the S&OP

plan separately. The difference however is that Bayer uses a five-year plan to project their goals

into the future. The business plan is developed from the five-year plan and the S&OP plan helps

the company achieve those goals. The difference between the two is that S&OP empowers the

company to make decisions to achieve the business plan while the business plan is made up of

the financial goals of the company. The difference between Bayer and many other companies is

that it can take 3-4 years to build a new plant to make materials. An S&OP plan does not project

that far into the future and therefore something must take its place. The five-year plan at Bayer

does that.

4.2 S&OP at a Pharmaceutical Company


In one specific company in the pharmaceutical industry, the S&OP process is run much

differently. In this example, the company's main customers are large retailers like Wal-Mart,

Target, and other warehouse clubs. The demand for the product, which is made up of

approximately 500 SKUs, is fairly hard to predict because the company does not have insight

into promotional events that the retailers are running. The combination of unpredictable demand

and a large number of SKU gave senior level managers the idea to implement S&OP.

This pharmaceutical company has multiple supply sources that include company owned

manufacturing plants as well as OEMs that manufacture products for the company. The S&OP
process is run on a monthly cycle and reviews demand for the company throughout North

America. The process is made up of four meetings that include the demand review, supply

review, consensus meeting, and followed by the executive review. The demand review

determines the 12-month unconstrained forecast for the specific region with a concentration on

the time from 4-5 months in to the future. The time that is 4-5 months into the future is

concentrated on because that is the time the company needs to lock in production schedules and

secure materials from suppliers. The supply review meeting looks at the capacity of the

company owned manufacturing sites that are located in Puerto Rico and Virginia as well as the

OEMs that are located throughout the US and Canada. Once the supply review is complete, the

consensus meeting takes place. At this meeting, the unconstrained forecast is reviewed to make

sure it is achievable and that it hits the financial goals of the company. The group in the

consensus meeting also decides what issues to escalate to the executive level and which issues

should be decided in the consensus meeting. Finally, in the executive meeting, the senior level

management team looks at key performance indicators of the business, and also reviews the

financial numbers.

To evaluate the S&OP process, this pharmaceutical company concentrates on one main metric to

determine the success of its process. That metric is the customer service perception the customer

has of the pharmaceutical company. Instead of using internally focused metrics, the company

asks the major retailers to rate the company on customer service, and this rating is reviewed in

the S&OP process. Although this evaluation method is unorthodox, it has served the company

well.
The business plan at this pharmaceutical company is developed using the S&OP forecast for the

upcoming year. The projected sales from the forecast are used to predict profits, and this number

is used to develop a conservative business plan that can be communicated to Wall Street. The

difference between the two numbers is that the business plan is conservative while the S&OP

numbers are a stretch that the company strives to achieve.


5 Expert Opinions on S&OP

5.1 Criteria for Dividing S&OP Processes


The way a global S&OP process is broken up has a direct impact on how well the process works.

Looking at the general purpose of the global S&OP process, a consultant from Oliver Wight

explains how it works in its simplest form: "When looking at the definition of S&OP, the goal is

to understand the current condition of the different business units, then to take actions to align

the future plans with the goals and strategies of the company. Each business unit has

responsibility to the larger corporate government. At the corporate level, the senior management

wants to understand the current condition of the business so they can take action to align future

plans with the goals and strategies of the business." According to many consultants working for

global companies, the most important aspect to look at when deciding how to separate an S&OP

process is the supply and demand characteristics of the products the company sells. The demand

characteristics that must be considered include whether or not the company is divided into

regions throughout the world, and secondly the number of products. Supply characteristics are

resources the company uses to produce its products. In the explanation below, manufacturing

resources are used as the example. These resources include the number of plants that are

supplying the products, who in the company is in control of the manufacturing plants, and

whether or not the plants are dedicated to the regions that they supply. Usually, the number of

manufacturing facilities is directly related to the characteristics of the product. For example, a

heavy product that is sold in large quantities is unlikely to be transported long distances, and
would therefore be produced in each of the regions. There are four different possibilities of how

an S&OP process should be split up, and each is explained below.

For the following examples of how an S&OP process should be split up, it should be assumed

that the demand for the product is worldwide and as Tom Wallace suggests, the world is divided

into four regions: North America, South America, EMEA (Europe, Middle East, and Africa), and

Asia. Furthermore, each of the regions has its own sales and marketing departments that are

dedicated to that specific region.


5.1.1 Scenario One: Single Worldwide Source
Scenario 1, shown in Figure 3, exists when a company has one manufacturing facility that

supplies product to the entire world. Demand information is gathered for each of the regions and

rolled up into one number for the supply review number. This information is collected from

each of the sales and marketing departments in the different regions. If there isn't a sales and

marketing department in each of the regions, then demand information should be gathered

centrally and communicated to the supply review meeting as one number. Regardless of how the

world is divided, one other important factor in making this S&OP process successful is that there

must be one person in charge of the meeting that has responsibility for the profit and loss of the

division that the S&OP process is run for. In this situation it would usually be the president of

the company.

Fngreh Ampririo
LDUJLUJE d~ iE

X~p

Figure 3: Scenario 1
5.1.2 Scenario Two: Multiple Regional Source
Scenario 2, shown in Figure 4, exists when a company has multiple supply sources that are

dedicated to specific areas. Dedicated facilities means that the plant only produces product for

that region or set of regions it is intended to serve. Production capacity is not shared regardless

of shortages or excess capacity in other regions. In this example, one manufacturing facility is

located in America that serves North America and South America, while one other independent

manufacturing facility is located in Europe that serves EMEA and Asia. This is essentially

dividing the world into two regions that need two separate S&OP processes. Demand data is

collected from each of the regions and communicated back to the process that supports its

respective region. Each of the processes should have one general manager in charge of the P&L

for the region, and he should report to a person at corporate headquarters.

RE

Sou

Figure 4: Scenario 2
5.1.3 Scenario Three: Dedicated Regional Source
In scenario 3, shown in Figure 5, one plant exists in each of the regions and is completely

dedicated to that region. In this case, one S&OP process is run for each of the regions and run by

a general manager or division president. Four total processes would be run in this scenario to

accommodate the supply and demand in each of the regions. As mentioned above, the demand

information would be collected for each of the specific regions and communicated to the supply

meetings in the regions.

OPue5 Seai

,I',,

Figure 5: Scenario 3
The S&OP processes from each of the three previous scenarios are fairly simple and the meeting

schedule can be closely associated with the Figure 6. In this figure, it is clear that each S&OP

processes is independent of the other one and is run by the general manager or president of each

division. The only contact with the corporate headquarters is to relate financial numbers to the

parent company or for the company to communicated financial expectations for the year.

"2

Figure 6: The Oliver Wight Integrated Business Management Model

5.1.4 Scenario Four: Multiple Shared Sourcing


Scenario 4, shown in Figure 7, is much more complicated than the previous three. In this

example, many plants are located around the world and each can serve many or all of the regions

in the world. There is control at both the regional level and the corporate level. The book

Enterprise Sales and Operations Planning explains this best: "Sales and marketing are managed

and controlled in a regional business unit. Manufacturing or the supply of products is controlled

both regionally and centrally. Regional manufacturing or supply control is provided for local
manufacturing or supply management. There is also central control provided for global visibility

and decision making about the manufacturing of supply product". The reason the control is

separated in this manner is because as demand increases and decreases in the different regions,

the corporation can help the different regions communicate and share supply resources so the

company can meet its customer's expectations. In this scenario, each region with a supply

resource should run its own S&OP meetings, while regions that don't have a supply resource

should be grouped into regions that do. Once a regional S&OP meeting has been completed,

there should be an executive meeting that summarizes each of the regional meetings and

communicates the financial impact to the executive team. The production capacities for each of

the plants and regions, as well as overall trends in the business should be reviewed as well.

aU UII
~wET:l
*mA!
ill
I.+r mL=~

Figure 7: Scenario 4
Scenario 4 creates an additional step that is not included in Figure 6. To accommodate this extra

step, Oliver Wight has another illustration that shows this process. This is shown in Figure 8.

'Global' Corporate S&OP

Regionai/SBU S&OP

4-W

Regional/SBU S&OP
ANNEll-,

Regional/SBU S&OP

Figure 8: The Oliver Wight Global Sales and Operations Planning Model.

To help companies communicate and run the S&OP process more efficiently, many software

companies have either created software or created add-ons for their enterprise resource planning

(ERP) systems to support the sales and operations planning process. Although a simple

spreadsheet can work, once a global company begins entering data from global sources, it is

usually more effective for a company to use one of these systems when running the S&OP

process. This software usually pulls data from an ERP system and presents it in a logical order

for the people in the S&OP meetings. The advantage of this is that the data gathering process is
much simpler and more time can be spent making decisions and creating what-if scenarios help

senior managers make decisions.

5.2 Evaluation of Global S&OP Process


Sales and operations planning is a process that helps companies meet their goals and to make

money. An evaluation of a global S&OP process is not much different than an evaluation of a

domestic S&OP process. A regular, usually annual, evaluation of the process is necessary to

make sure the process is working correctly. According to consultants from T.F. Wallace and

Oliver Wight, the best approach is to use a balanced scorecard. In the balanced scorecard, there

are two areas to focus on; metrics traced directly to the results of the meetings, and metrics that

measure the effectiveness of the meetings. The metrics directly from the meeting include

forecast accuracy, inventory turns, and line item fill rate among others. This measurement alone

is not an accurate indication of the success of the process. Outside factors such as a new product

introduction (forecast accuracy), or the introduction of lean manufacturing (inventory turns)

could influence the results of these metrics. The effectiveness of the meetings is important to

measure along with the metrics because these are the true indicators of success. When a meeting

is run correctly, the results the company expects from S&OP usually follow. Trying to

determine if a process is run correctly is much harder to do than measuring business success.

Process success is often defined by debatable metrics. These metrics include attendance of the

correct people, ownership of the forecast, business strategy alignment in the meetings, regular

meeting schedule, length of forecast horizon, and spreadsheet layout among others. These

metrics generally don't have a direct impact on the business, but indirectly they do. If the

incorrect people are attending the meetings, decisions won't get made. In the long run this

affects the process and the business, but again, it cannot be measured directly.
According to Colleen Crum from Oliver Wight, the most effective way to measure the

effectiveness of the S&OP process is to use The Oliver Wight Class A Checklistfor Business

Excellence. In this book, there is a chapter focusing on Integrated Business Management - the

name Oliver Wight uses for sales and operations planning. This chapter explains 9 areas of

Integrated Business Management that a company should consider when evaluating their process.

These nine areas are shown in Figure 9.

Figure 9: The Oliver Wight Class A Checklist for Integrated Business Management

The 9 areas of Integrated Business Management are used to measure the success or failure of the

process. Each of the 9 areas has a subset of questions that are given a score from 0-5. The
higher the score, the more successful the process should be. The idea is that a successful process

will lead to a successful business. To measure the business, five areas within the Business

Performance Metrics (the center of the Figure 9) are measured. These 5 metrics include:

1. Sales Revenue - attainment of business plan

2. Operating Profit - attainment of business plan and as a benchmark against industry

standards.

3. Return on Net Assets - ratio of operating profit to the net trading assets as attainment of

business plan and as a benchmark against industry standards.

4. Cash - operating cash flow attainment of the business plan

5. Customer (OTIF) to Request - on-time-in-full against request is measured against a

standard established in the business strategy.

The five metrics are the core measurements in an S&OP plan along with other business specific

metrics. These five core metrics should be within 99.5% of the plan.

Tom Wallace of T.F. Wallace has a much simpler approach to evaluating an S&OP process. In

his book: Sales and Operations Planning- The How to Handbook, the approach Mr. Wallace

uses is a questionnaire that includes 25 questions. Each of the questions addresses a certain part

of the process and is meant to be a guide that companies can follow to have a successful process.

The different parts include meeting spreadsheets, process ownership, decision making, new

product issues, and many others. The complete list can be found in Chapter 16 of the book.

Each question can be answered yes, partial, or no and each is worth a certain number of points.

The total sum of the points is an indicator of the success of the process. This checklist should be
done on a monthly cycle to track improvements and to bring the weaknesses in the process to the

attention of the leaders.

5.3 Financial Aspects of Global S&OP


As stated above, an S&OP meeting can be split up in many different ways. The financial aspects

of the process vary depending on the way the process is separated as well. In an ideal case, a

global company looks at the forecast for the following fiscal year then sets the financial goals

and business plan based on those numbers. This business plan is based primarily on the forecast

from the S&OP process. Although this is the ideal way of developing the business plan, it rarely

happens this way. More often than not, the finance group develops the business plan in the

beginning of the year, and then the rest of the company struggles to meet the goals set by the

finance group. This method of developing the business plan has become riskier in recent years

due to the Sarbanes-Oxley laws. These laws hold executives responsible for the numbers they

report to Wall Street and it is therefore more important for them to report the most accurate

numbers possible.
6 Results, Conclusions, and
Future Research

6.1 Results
Sales and operations planning is a process that is used by companies to match supply and

demand. To use this process effectively in a global business, the process must be broken apart to

support the business in the most effective manner. One interviewee recommends to "break up

the process in a logical way based on business unit and geography". The following four-step

plan is a framework for a company to setup a global S&OP process.

1. Identifying Regions:

The company must look at its customer base and determine what locations the company plans to

serve. Generally, the regions of the world are divided into continents or as Tom Wallace

suggests in Sales and OperationsPlanning: The How-To Handbook, into four regions that would

include North America; South America; Asia; and Europe, Africa, and the Middle East. This

divides the world into more manageable areas that the company can serve more effectively.

Although four regions can be used, this is not the only way it should be done. Companies can

define regions in their own way based on how the demand for the product is spread throughout

the world. These regions are areas that the company will collect demand data from and

eventually communicate to the supply meetings.


2. Determine the Supply Sources

This step of the process is used to determine how many different processes the company will run.

To do this, the one main factor that must be evaluated for each of the products that the company

plans to sell is the supply chain. The supply chain, which includes the suppliers, the

manufacturing sites, and the distribution channels, must be considered because products with

similar supply chains should generally be grouped into the same S&OP process. Within the

supply chain, the characteristics of the manufacturing sites are the deciding factors for number of

S&OP processes. The specific characteristics that are important are the number of plants within

each region, whether the plant is dedicated to the region or it is shared between the regions, and

whether or not the plant is centrally controlled or decentralized. The different scenarios are

shown in Figure 10below:

Multaiple
Onehga ___ a__ AUhub s.
*One S&OP *One S&OP *One S&OP Process
ProcesslPlant Process/Plant .Centrally Controlled
Owmg *Decentralized Control *Decentralized Control *Run by the President of
*Run by the General *Run by the General the Company
Phat Manager of the Business Manager of the Business
Unit Unit

*One S&OP *One S&OP *One S&OP


Process/Region/Supply Process/Region/Supply Process/Supply Chain
Chain Chain .Centrally Controlled
*Decentralized Control
SIl~~ *Run by the General
'Decentralized Control
-Run by the General
.Run by the President of
the Company
Manager ofthe Business Manager of the Business
Unit Unit

Figure 10: How to separate a Global S&OP Process


3. S&OP Executive Support
The third important factor of developing a global S&OP process is that there must be an

executive that leads and supports the process that has P&L responsibilities. This is important for

two reasons. The first is because the success of the S&OP process is most likely determined by

the support from the executives of the company. According to Tom Wallace, "The major cause

of sub par performance [in S&OP] is the lack of hands-on involvement by executives". The

second reason it is important to have an executive in charge of the process is that they are

responsible for the profit and loss statement for their division or business unit. The S&OP

process enables the people in the business unit to make decisions that have a direct impact on the

profit or loss of the division and company. If the person in charge of the business unit is not

there to make the decisions, those decisions will not be made. Furthermore, the general manager

or president of the business unit must communicate to the corporate headquarters. If this person

is not involved in the S&OP process, they cannot communicate the success or failure of the

division effectively.

4. Evaluation Process

Once the global S&OP processes are separated and running and the policies have been put in

place to make the process consistent in each of the regions, it is important to have an evaluation

process. This evaluation process should consist of a balanced scorecard that measures business

metrics and process effectiveness. As stated in the Oliver Wight Checklist, business metrics

should include sales revenue, operating profit, return on net assets, cash, and line-item-fill-rate in

addition to business specific measures. Process effectiveness can be measured looking at the
attendance of the correct people, ownership of the forecast, business strategy alignment in the

meetings, regular meeting schedule, length of forecast horizon, and spreadsheet layout among

many others. The process should be evaluated annually, and should be done in conjunction with

a person inside the meeting and one person that is from another process. In addition to the

scorecard being used on an annual schedule, the evaluation method should be made available to

each of the people that are in the process so each of the participating members know their

responsibilities.

6.2 Conclusions
As stated by Tan (2006), "If both demand and supply are certain, then a company's goals and

objectives would be optimal through one-time optimization." This is no different in Global

S&OP, and perhaps it is more difficult in a global business due to communication and language

barriers. To run an effective S&OP meeting in a global business requires much planning and

upfront planning to decide how the process will be separated. In conclusion, the most effective

global S&OP meetings are ones that match demand with supply sources and plan accordingly.

6.3 Future Research


This research has looked at how an S&OP process can be separated most effectively in a global

business. In addition to the separation process, the evaluation methods of the process and the

financial alignment have been discussed as well.


Future research efforts should be focused on how the S&OP process is evolving into a real-time

decision making process instead of a monthly process. In addition, research on developing what-

if scenarios in the S&OP meetings will allow executive level managers to be better prepared and

therefore make better decisions.


Bibliography
Wallace T.F. (2004). Sales & Operations Planning - The How-to Handbook. T.F. Wallace &
Company

Wallace T.F. and Stahl B. (2006). Sales and Operations Planning - The Executive's Guide. T.F.
Wallace & Company

Crum C. and Palmatier G. (2003). Enterprise Sales and Operations Planning. J Ross Publishing,
Inc. (2003)

Wight 0. (2005). The Oliver Wight Class A Checklist for Business Excellence 6th Edition. J
Wiley and Sons (2005)

Tan P.K. (2006). Demand Management: A Cross-Industry Analysis of Supply-Demand Planning,


MIT Masters Thesis in Engineering Systems Division

Lapide L. (2006). Top-Down and Bottom-Up Forecasting. Journal of Business Forecasting. Vol.
25, Issue 2; 14-17

Lapide L. (1998). Forecasts, budgets, and goals: Is there a difference? Journal of Business
Forecasting Methods and Systems. Vol.17, Issue 3; 28-30