Tutorial 2

The document provides instructions for using the critical path method (CPM) to analyze two projects. The first project involves manufacturing padlocks and identifies 10 activities with their durations in hours. The second project lists 12 activities by name and duration in days to construct an activity on arrow (AOA) network, calculate total float, and find the critical path. CPM is used to determine the longest sequence of dependent activities and the minimum time needed to complete the project.

Uploaded by

halina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
705 views

Tutorial 2

The document provides instructions for using the critical path method (CPM) to analyze two projects. The first project involves manufacturing padlocks and identifies 10 activities with their durations in hours. The second project lists 12 activities by name and duration in days to construct an activity on arrow (AOA) network, calculate total float, and find the critical path. CPM is used to determine the longest sequence of dependent activities and the minimum time needed to complete the project.

Uploaded by

halina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

TUTORIAL 2 : CRITICAL PATH METHOD

1. ASSA ABLOY SA is company specializing in door opening solutions. One part of the company
focuses on manufacturing pin tumbler and lever locks for multiple brands including Union, Yale
and Multi-Lock.

Using the CPM (critical path method), find the critical path and duration all of non-critical paths.

Activity Description Immediate Duration


predecessor (hours)
A Receive raw materials - 0.5
B Bolt cutting A 1.0
C Transfer Machine (Series of drilling and B 1.5
cutting operation)
D Transfer Machine (Barrels) B 1.4
E Barrel pinning D 1.2
F Shackle groove cutting B 0.8
G Shackle Bending F 1.0
H Insert shackle into body C,E,G 0.4
I Insert barrel into body and test key set H 1.4
J Packaging of padlock I 0.5

2. A project schedule has the following characteristics as shown in table below,

a) Construct AOA network


b) Compute Totol Lost (TL) for each activity
c) Find the critical path

Activity Name Time (days)


1-2 A 4
1-3 B 1
2-4 C 1
3-4 D 1
3-5 E 6
4-9 F 5
5-6 G 4
5-7 H 8
6-8 I 1
7-8 J 2
8-10 K 5
9-10 L 7
TUTORIAL 2 : CRITICAL PATH METHOD

2. ASSA ABLOY SA is company specializing in door opening solutions. One part of the company
focuses on manufacturing pin tumbler and lever locks for multiple brands including Union, Yale
and Multi-Lock.

Using the CPM (critical path method), find the critical path and duration all of non-critical paths.

Activity Description Immediate Duration


predecessor (hours)
A Receive raw materials - 0.5
B Bolt cutting A 1.0
C Transfer Machine (Series of drilling and B 1.5
cutting operation)
D Transfer Machine (Barrels) B 1.4
E Barrel pinning D 1.2
F Shackle groove cutting B 0.8
G Shackle Bending F 1.0
H Insert shackle into body C,E,G 0.4
I Insert barrel into body and test key set H 1.4
J Packaging of padlock I 0.5

2. A project schedule has the following characteristics as shown in table below,

a) Construct AOA network


b) Compute Totol Lost (TL) for each activity
c) Find the critical path
d)

Activity Name Time (days)


1-2 A 4
1-3 B 1
2-4 C 1
3-4 D 1
3-5 E 6
4-9 F 5
5-6 G 4
5-7 H 8
6-8 I 1
7-8 J 2
8-10 K 5
9-10 L 7