Pile CAP Numbers Calculations

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

 

                            Pile edge distance per CRSI 2008 
 

 
Concrete Column Nodes – 21, 22, 23, 24, 25 

Pile Dia – 18” Dia Pile:   1. Axial Capacity = 315 Kips

2. Lateral Capacity = 12 Kips

Gravity Factored (Fy)  Pile #s 
 Nodes  Fx kip  Fy kip  Fz kip  315 
21  24.60  959.13  ‐2.62  3.04 

22  ‐6.024  1163.81  ‐0.646  3.69 

23  0.018  1088.704  0.114  3.46 

24  7.412  1144.449  ‐0.385  3.63 

25  ‐25.493  1206.346  2.243  3.83 

Lateral Service (Fx)  Pile #s 
Nodes  Fx kip  Fy kip  Fz kip  12 
21  22.70  674.86  ‐1.70  1.89 

22  17.19  398.615  ‐0.432  1.43 

23  13.78  216.815  0.507  1.15 

24  17.46  393.668  0.365  1.46 

25  23.29  839.606  1.116  1.94 

Lateral Service (Fz)  Pile #s 
Nodes  Fx kip  Fy kip  Fz kip  12 
21  5.95  285.06  32.73  2.73 

22  ‐1.39  235.53  28.14  2.35 

23  0.24  365.13  27.26  2.27 

24  1.89  235.00  24.64  2.05 

25  ‐5.59  316.05  23.33  1.94 


Concrete Column Nodes – 01, 02, 03, 04, 05

Pile Dia – 18” Dia Pile:   1. Axial Capacity = 315 Kips

2. Lateral Capacity = 12 Kips

Gravity Factored (Fy)  Pile #s 
Nodes  Fx kip  Fy kip  Fz kip  315 
1  29.59  648.61  39.08  2.06 

2  ‐2.569  825.225  48.555  2.62 

3  0.377  832.91  50.279  2.64 

4  4.821  894.541  51.449  2.84 

5  ‐16.469  732.508  53.882  2.33 

Lateral Service (Fx)  Pile #s 
Nodes  Fx kip  Fy kip  Fz kip  12 
1  18.15  498.41  31.31  1.51 

2  15.91  211.463  8.454  1.33 

3  15.42  189.272  8.697  1.29 

4  17.61  432.815  15.29  1.47 

5  18.96  540.826  36.859  1.58 

Lateral Service (Fz)  Pile #s 
Nodes  Fx kip  Fy kip  Fz kip  12 
1  10.88  496.04  44.43  3.70 

2  0.24  584.07  42.22  3.52 

3  1.36  555.08  41.30  3.44 

4  4.74  625.50  41.31  3.44 

5  ‐10.39  556.05  46.54  3.88 


Concrete Column Nodes – 41, 42, 43, 44, 45 

Pile Dia – 18” Dia Pile:   1. Axial Capacity = 315 Kips 

  2. Lateral Capacity = 12 Kips 

Gravity Factored (Fy)  Pile #s 
Nodes  Fx kip  Fy kip  Fz kip  315 
41  24.57  736.26  ‐43.25  2.34 
              
42  ‐13.24  951.166  ‐49.071  3.02 
              
43  3.19  884.161  ‐48.663  2.81 
              
44  1.338  927.663  ‐49.507  2.94 
              
45  ‐22.452  681.997  ‐56.803  2.17 
 

Lateral Service (Fx)  Pile #s 
Nodes  Fx kip  Fy kip  Fz kip  12 
41  23.44  563.58  ‐29.30  1.95 
              
42  21.11  517.316  ‐14.419  1.76 
              
43  16.90  214.037  ‐7.863  1.41 
              
44  16.08  450.357  ‐13.97  1.34 
              
45  23.47  486.964  ‐38.455  1.96 
 

Lateral Service (Fz)  Pile #s 
Nodes  Fx kip  Fy kip  Fz kip  12 
41  16.77  548.65  40.36  3.36 
              
42  ‐10.62  662.93  52.56  4.38 
              
43  ‐0.24  612.69  47.32  3.94 
              
44  1.67  648.98  37.92  3.16 
              
45  ‐13.85  500.31  46.29  3.86 
 

Recommendations and Observations:   

At nodes # 42 – 5 numbers of 18” Dia Piles are required with single combined Pile Cap. 

For all other nodes – 4 numbers of 18” Dia Pies are provided in single combined Pile‐Cap. 
Project Job Ref.

Section Sheet no./rev.


1
Calc. by Date Chk'd by Date App'd by Date
A 5/29/2018

PILE GROUP ANALYSIS Eccentric Pile Cap # 6 - Column Node # 42

263.631 kips 117.169 kips

1.75-ft
5 ft (TYP)

4 ft 6 ft

10-ft
952.000 kips
190.400 kips

5 ft

263.631 kips 117.169 kips

10-ft
Load details
No.; X - coordinate (ft); Y - coordinate (ft); Load (kips);

1; -1.000; 0.000; 952.000;

Total; -1.000; 0.000; 952.000;

Pile details
No.; X - coordinate (ft); Y - coordinate (ft); Pile load (kips);

1; 0.000; 0.000; 190.400;

2; 3.250; 3.250; 117.169;

3; -3.250; 3.250; 263.631;

4; -3.250; -3.250; 263.631;

5; 3.250; -3.250; 117.169;

Total; -1.000; 0.000; 952.000;

Max axial compression = 952 kips


Max lateral force = 52.5 kips.

Max Axial load per pile = 263.64 kips


Max Lateral load per pile = 52.5/5 = 10.5 kips < 12 Kips

You might also like