Contract WW300W - Sewerage Project at Highlands: Sewer Reticulation Network Approval Sheet
Contract WW300W - Sewerage Project at Highlands: Sewer Reticulation Network Approval Sheet
Contract WW300W - Sewerage Project at Highlands: Sewer Reticulation Network Approval Sheet
QUALITY CHECKS
QUALITY CHECK DATE REMARKS
CROWN ALIGNMENT
COVER
JOINT ASSEMBLY
AIR TESTS
LIGHT TESTS
SETTING OUT
FORMATION LEVEL
BEDDING
PIPE LAYING
BACKFILLING
COMPACTION TESTS
REINSTATEMENT
Name: Name:
Designation Designation:
Signature: Signature:
EDDNG MATERIAL:
ATE:
REMARKS
GERENAL REMARKS
Contract WW346W - Design and Construction of Sewer Reticulation
at Tranquebar
10
11
12
13
14
Sig: Sig:
PASS/FAIL
Contract WW346W - Design and Construction of Sewer
Reticulation at Tranquebar
10
Sig: Sig:
Contract WW300W - Sewerage Project at `
Highlands
WATER RETICULATION NETWORK APPROVAL SHEET
DATE:
ROAD SECTION:
TRENCH CHECKLIST
A N/A REMARKS
SETTING OUT
TRENCH DIMENSIONS
FORMATION
BEDDING TYPE / THICKNESS
PIPE ALIGNMENT
PIPES QUALITY
WARNING TAPE
BACKFILLING
VALVE POSITION
ELECTROFUSION
COMMENTS
Sig: Sig:
CWA Representative
Name:
Sig:
Contract WW300W - Sewerage Project at
Highlands
WATER RETICULATION PRESSURE TEST CONTROL SHEET
PIPE
S/No. ROAD CH START CH FINISH LENGTH DIMENSION
TOTAL
LENGTH
Drop to
REMARKS
OVERALL
RESULTS
Sig: Sig:
CWA Representative
Name:
Sig:
Interval 5 mins Interval 10 mins
20 25 30 40 50 60 70 80 90
Contract WW346W - Design and Construction of
Sewer Reticulation at Tranquebar
Site: Date:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Sketch
Contractor Representative WMA Representative
Name: Name:
Sig: Sig:
Apparatus:
Remarks