The document is an inspection report for the installation of a marshalling cabinet and control system. It details checks made for the cabinet/panel location and installation, tag numbers and dimensions, scratches or damage, fastener tightening, lock functionality, and wiring connection tightness. Inspectors from both the company and Saudi Aramco signed off on the inspection.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
86 views1 page
Inspection Report For Installation of Panel
The document is an inspection report for the installation of a marshalling cabinet and control system. It details checks made for the cabinet/panel location and installation, tag numbers and dimensions, scratches or damage, fastener tightening, lock functionality, and wiring connection tightness. Inspectors from both the company and Saudi Aramco signed off on the inspection.