560 210 FS T 001

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

DRAWING No.

210-FS-T-001 210-FS-T-002 107 15


FROM RECIRCULATING PEBBLE CONVEYOR DUST SUPPRESSION SYSTEM CONVEYOR-
1 205-DN-001 PEBBLE RECIRCULATING
262-FS-T-002 310 7 210-CV-006
BY VENDOR
RAW WATER

265-FS-T-001 710
HP PLANT AIR CALCINED LIME
DELIVERY TRUCKS
SPILE BAR MACHINE HYDRAULIC POWER PACKS-
200-FS-T-001 105 2
205-ZM-003 APRON FEEDERS
FROM OVERLAND CONVEYOR 205-HP-001 TO 004

DISCHARGE CHUTE-
PEBBLE RECIRCULATING CONVEYOR
210-CH-032

HYDRAULIC POWER PACK-


SPILE BAR MACHINE
205-HP-006
COARSE ORE STOCKPILE TRUCK UNLOADING BY VENDOR
205-ST-001 TO ATMOS.
SAG MILL LIME SILO
210-ZM-011

AIR GANTRY CRANE-


FAN DUST COLLECTOR-
GRINDING AREA
SAG MILL LIME SILO
210-CN-001
210-FN-001

LIME SILO BALL CHARGE-


SAG MILL SAG MILL
DISCHARGE CHUTES-
210-LM-001 M 210-ZM-010
COARSE ORE STOCKPILE
205-CH-001 TO 205-CH-004
TO ATMOS. VIBRATING BIN BOTTOM
RECLAIM CHUTE APRON FEEDER-
LIME SILO
SCOARSE ORE STOCKPILE 1
AIR 210-AT-001

M
205-CH-005 TO 205-CH-008 BALLS BIN-
ROTARY BALL- SAG MILL

M
9
AIR ROTARY VALVE FEEDER- FEEDER 210-BN-001
APRON FEEDERS BLOWER AIR- SAG MILL LIME SILO 210-FE-004
205-FE-001 TO 205-FE-004 SAG MILL 210-ZM-012 TO 013
EXHAUST FANS- LIME TRUCK UNLOADED 45
DISCHARGE CHUTES- 210-GB-001 TO 002 DISCHARGE CHUTE-
RECLAIM TUNNEL 1 (NOTE 8) SAG MILL BALLS BIN
APRON FEEDERS 205-FN-001
TRANSFER CHUTE 210-CH-002
205-CH-009 TO 205-CH-012
LIME SILO
210-CH-040
3
DISCHARGE CHUTE-
SAG MILL CONVEYOR
210-CH-001
CONVEYOR-SAG MILL FEED 1
210-CV-001
1
BELT SCALE MOISTURE DETECTOR 18
1 210-SL-001 210-MH-001

262-FS-T-002 314 79 94 210-FS-T-003 XXX


RAW WATER TO BALL MILL MOTOR

262-FS-T-001 250 10
MILL WATER
1 SAG MILL
4
210-ML-001
86 87
13

TROMMEL
800-FS-T-001
210-TR-001
(NOTE 7) FEED CHUTE-
POTABLE WATER
SAG MILL SCREEN FEED CHUTE-
210-CH-008 SAG MILL
210-CH-010
EYEWASH STATION- MONORAIL HOIST- PORTABLE MONORAIL HOIST- 80 5
RECLAIM TUNNEL RECLAIM TUNNEL RECLAIM TUNNEL LINER HANDLER- 1
205-HS-001 SAG MILL
205-ES-001 TO 205-ES-002
210-LH-001
(NOTE 4) SCREEN-SAG MILL
411 210-SN-001
210-FS-T-002 FEED CHUTE BASE-
210-SN-101
FROM PEBBLE CRUSHING AREA SUMP PUMP SAG MILL
M 210-ZM-034
TRANSPORTER-
262-FS-T-001 264 FEED CHUTE G.M.D.-
HOSE STATIONS 210-ZM-033 SAG MILL
FROM MILL WATER
(NOTE 2) 210-ML-001-M
SCREEN OVERSIZE CHUTE-
1 IN SAG MILL
265-FS-T-001 711 SUMP PUMP-
(NOTE 5) 88 89 210-CH-014
COS RECLAIM TUNNEL
FROM PLANT AIR HOSE STATIONS
205-PP-011 SELF CLEANING
BY VENDOR
ELECTROMAGNET
210-MA-002

800-FS-T-001
TRASH DISCHARGE CHUTE
POTABLE WATER (NOTE 1) SAFETY SHOWER & EYEWASH STATION-
CONVEYOR- TRAMP MAGNET
LIME SILO AREA BRAKE SYSTEM- JACKING CRADLE- SAG MOTOR 210-CH-048
PEBBLE COLLECTING
210-ES-008 SAG MILL SAG MILL COOLING SYSTEM 210-CV-004
210-ZM-003 210-ZM-005 210-ML-001-M

1 SCREEN UNDERSIZE CHUTE- DISCHARGE CHUTE-


SAG MILL PEBBLE COLLECTING CONVEYOR
210-CH-016 TRASH BIN-
210-CH-012
METAL SCRAP
LUBRICATION SYSTEM- TEMPORARY LUBRICATION SYSTEM- 210-BN-005
SAG MILL SAG MILL
210-LU-001 210-LU-002 TO 003 210-FS-T-002
11 106
LEGEND: NOTES: 1 TO PEBBLE CRUSHER FEED BIN
OUT (NOTE 6)

PRIMARY FLOW SOLID 1.- TRANSFER LINE IS HEAT TRACED AND INSULATED. 210-FS-T-003
12 120
2.- FOR USE IN SAG MILL AND BALL MILL TO REMOVE FEED CHUTE. TO BALL MILL CYCLONE FEED PUMP BOX
SECONDARY FLOW SOLID 3.- LIME CHEMICAL REACTION ALTERE MASS BALANCE BECAUSE WATER CONSUMPTION.
1 92 210-FS-T-003
4.- SAG MILL WITH SHORT TROMMEL.
PRIMARY FLOW LIQUID TO HYDROCYCLONE FEED TANK
5.- RAW WATER INPUT TO SAG MILL WATER COOLING SYSTEM.

6.- RAW WATER OUTPUT FROM SAG MILL WATER COOLING SYSTEM. DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
CONSUMABLES QUALITY CONTROL

7.- TRANSFER LINE IS INSULATED.


INTERMITTENT OR DISCIPLINE MANAGER NAME SIGN
1 8.- IT HAS BEEN CONSIDERED BALL COUNTER.
ALTERNATE FLOW DOCUMENT CONTROL

THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN NAME SIGN & STAMP

SCALE: PROJECT
R E F E R E N C E S R E V I S I O N S R E V I S I O N S SHEET SIZE

DWG. NO. T I T L E NO. D E S C R I P T I O N BY CHECK APPROVED DATE NO. D E S C R I P T I O N BY CHECK APPROVED DATE
A1
TOROMOCHO PROJECT
NOTICE
AREA
THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES
HERE TO SHALL BE PERFORMED USING CADD ONLY.
DRAWN BY: A.P. DATE: 12/15/08
210 - COS RECLAIM & GRINDING CIRCUIT C-560 REVISION

1 RE-ISSUED FOR DESIGN. M.R. H.A. J.C. M.D. 06/23/09


THIS DRAWING IS THE PROPERTY OF AND EMBODIES TITLE CAD NO.
PROPRIETARY INFORMATION BELONGING TO AKER
0 ISSUED FOR DESIGN. A.P. H.A. P.Z. A.F. 03/09/09 SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON
CHECKED BY: H.A. DATE: 12/15/08
REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN
210-FS-T-001_1.dgn
J RE-ISSUED FOR CLIENT APPROVAL. A.P. H.A. P.Z. A.F. 02/27/09 PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED
TO THIRD PARTIES EXCEPT WITH THE WRITTEN APPROVED BY: J.C. DATE: COS RECLAIM & SAG MILL 1
PERMISSION.

H ISSUED FOR CLIENT APPROVAL. A.P. H.A. P.Z. A.F. 01/19/09

G RE-ISSUED FOR INTERNAL COORDINATION. A.P. J.C. P.Z. A.F. 12/15/08


AUTHORIZED BY: M.D. DATE:
MINERA CHINALCO PERU S.A.
FLOW SHEET DWG. NO.

210-FS-T-001 SAG MILL AREA FLOW SHEET (BASIC ENG.). F ISSUED FOR DESIGN (BASIC ENG.). P.M. G.H. G.H. 10/10/08 MCP APPROVED: DATE:
210-FS-T-001
User: $USERNAME$ $DATE$ $TIME$ $FILE$

You might also like