ST WCS 2015 XT Systems Eni
ST WCS 2015 XT Systems Eni
ST WCS 2015 XT Systems Eni
Tree Systems
Egil Åsli
Completion System
Permanent
Installed
Equipment
2
XT System “On Template”, XT w / Choke Module
On Template Trees
• XT w / stiff vertical
connection and choke
module
• Flexibility in manifold
3
Horizontal Connection w/o BM
• Connects horizontal to
manifold with flexible loop on
EHXT
• Insert choke
• EHTH is used for the EHXT
with 2 off TH crown plugs
• 5” gate valve for production
• GL installation
4
Retrievable Flow Module (FM)
5
HXT w/Vert. Connection & Flow control Module
(FCM)
6
EVDT W/ Configurable Flow Module
Full Function
Valve
Configuration
7
EHXT w/ FM for Satellite Well
• ENI Argo Tree Concept !
• EHXT w/ Flow Module
• UCON Hub to Flow Line
Protection Cover
Tree Re-entry Hub
SCM
UCON Hub
8
EHXT w/ Choke Module ( fast track )
Choke Module
• Connect XT Prod.
line and hydraulic
lines to Manifold
• No El. Cables
routed through
Connectors
• Production choke
is installed in CM
• Easy retrieval for
replacement /
refurbishment if
failure
9
Satellite Trees
10
Tree Configuration/Types
Vertical XT (VXT) vs Horizontal XT (HXT)
• Vertical
– Production tubing and tubing PSV
XOV
ASV
hanger installed in WH through AWV
PWV
CROWN PLUG
• Horizontal P
TREE CAP TEST / VENT
13
Vertical XT (VXT) to Horizontal XT (HXT)
• VXT
– Production tubing hanger
(TH) is landed in the
wellhead
– PMV in the vertical bore
• HXT
– Production tubing hanger
(TH) is landed inside the
HXT
– PMV in the horizontal
bore
14
Comparison EVXT vs EVDT
EVDT Tree
EVXT Tree
15
EHXT / Kit Tree
– 10k EHXT
• EHXT Standard Kit Tree
• EH5 Penetrator D/H
Communication
• Tree Isolation Stab
• Drill Thru
• Annulus Monitoring
• Gas Lift
• Torus IV Connector
16
EHXT & EVDT ( Enhanced Deep Water Vertical
ROV Tree Cap Tree) Core Blocks
Master Valve
Wing Valve
Tubing Hgr.
Hydraulic coupling to
Wellhead
EHXT EVDT
17
Flow Module
EVDT w/ Tubing Head Tree Cap
Tubing Hanger
Tubing Head
EVDT Components
Tubing Head
19
EVDT for Template
20
Tree w/ Flow Module
• EVDT
– Custom configured EVDT, based on
FMC’s existing fullbore EVDT
product line
– Flow Module on Tree
– 7” vertical bore through the tree and
hanger to allow for TTRD
– ROV operated valves in vertical bore
– Production outlet diameter 5 1/8”
– All field specific requirements for
template trees shall be included on
the Tree mounted Flow Module.
– System shall be prepared for
annulus B monitoring
21
Hydr./El. Distribution Production mode
Choke
1 - switch on power
2 - open TRSCSSV
3 - open PMV HP
4 - open PWV LP
5 - adjust choke
22
Core Tree Components and Valves
M3000 Actuated Gate Valve
Valve
Piston XT
Bonnet
ROV Chamber Body
Interface
Gate
Seat
Spring &
Compensation
chamber
24
M3000 Actuated Gate Valves
25
E3 Hydraulic Deep Water
• Two Springs to close valve
• Mineral oil in Spring chamber
• Water based oil in piston
chamber
Spring Chamber
Piston Chamber
Springs
26
E3 Hydraulic Shallow Water
• One Spring to close valve
• Mineral oil in Spring chamber
• Water based oil in piston
chamber
• Shorter / more compact than
deep water version
Spring Chamber
Spring Chamber
Piston Chamber
Spring
27
X-mas Tree / Wellhead Connector
- Annular piston
- Integral to XT block
- Locking segments w/ disc springs in between
- Provision for mech. unlock
28
FMC Non-Retrievable Plug In Cage Choke
Upper Bonnet
Lower Bonnet
Stepping Actuator
Choke Body
Drive Nut
Stem
TC Plug
TC Cage Assembly
29
FMC Choke / Bolted bonnet /Plug in Cage
30
Tubing Hanger System
SBMS Protector
Down-hole Protector
32
VXT 5” x 2” Tubing Hanger
• Locking Dogs
Hydraulic Couplers (vertical) for lockdown in
Wellhead
• Body
• Seals,
elastomeric &
metal
• Prod.bore (pup
joint not
shown)
• Annulus bore
w/ sliding
sleeve
33
EVDT Tubing Hanger / Monobore
• 7”-10K Fullbore (18-3/4” OD)
Tubing Hanger System
Lock Ring
• Wireline plug profile
Hydr. couplers &
• 1-1/2” Annulus Access Valve el./ fibre
integrated in TH
Plug profile
• Soft land integrated into TH for
protection of primary M2M and
secondary Thermoplastic
Annulus Seals
Body seal
• 2 Electric / Optical DH Ports
34
EVDT TH w/Integral Annulus Isolation Valve
35
Horizontal TH w/EH-05
Penetrator
• 7” or 5” tubing hanger bore to match Riser System.
• Downhole line configurations will match tree
penetrators.
Production outlet
(injection inlet)
36
EH5 Horizontal Penetrator
Tubing EHXT EH-5
Hanger Penetrator
37
EHXT without and with Tubing Hanger
38
Additional Features
Annulus Monitoring-A & B
DHPBP
40
Well with Gas Lift
41
Tree On Wire
• Save deployment time
of XT in deep water
• No umbilical
• ROV locking of WH
connector
• ROV locking of XT/CM
to manifold hub
• First XT Deployment
April 22nd 2009 on
Ormen Lange
42
Tree Caps
Internal THISL
44
External ROV Tree Cap for Vertical Trees
45
Test Valve
EVDT Tree Cap
Hot Stab receptacle
• ROV
Installable/Retrievable
• 15K w/ SBMS II
• No orientation needed
• Parked on XT Frame
• Methanol Injection
available
Tree Cap ROV Handle
• Production and Annulus
bore sealed off by tree cap
• Circulation flow path thru
tree cap to verify pressure
is vented prior to removal
Re-entry Hub
46