Resume of Nure Alam
Resume of Nure Alam
Resume of Nure Alam
CAREER OBJECTIVE:
To build career in the field of Oil and Gas Cross Country Pipe line Project Division as a Project
Engineer, Mechanical& Quality Control Inspection, ensure that this work are implemented in
accordance with the project integrated basis of design and all project requirement, standard, code,
procedure, budgets and schedule.
CAREER SUMMARY:
More than Eight years experience, working with Marine Industries, Oil and Gas field, Hydrocarbon Pipeline
,Plant & Process Piping, Structural welding and inspection, Plant Shutdown activities, Tank Installation and
Welding/Mechanical Inspection, Review of Sub-Contractor Procedure, Proper handling of Welding activities,
NDE activities and records, Review of different types Welding Procedure (WPS) and Welding process also
familiar with Pressure Test ( Pipeline Hydro static Test, Pneumatic Test, Pre Start up-Leak Test, Service test,
Strength & Tightness Test.
ACADEMIC PROFILE:
Bachelor of Science (B.Sc) in Mechanical Engineering, 2007 (4 Year course),
Dhaka University of Engineering & Technology (DUET), Bangladesh.
PERSONAL PROFILE:
Name : Mohammad Nure Alam
Home Address : S/O: Motiur Rahman, Vill: Pachani, P.O: Manghalargaon, PS: Sonargaon,
Dist: Narayangonj .Bangladesh
Nationality : Bangladesh
Current Job Site : Singapore
Total Experience : 8 Years
Page 1 of 8
EMPLOYMENT PROFILES:
1. Study and Review of Technical specification from Client, Prepare Project Construction
Procedure and work instructions specific for project requirements. Also prior to commence
fabrication, following documents and procedures used to submit to Client and Class to get
approval
ÿ Project Quality Plan
ÿ Inspection and Test Plans(ITP)
ÿ Project Specific procedures
ÿ WPS/PQR
ÿ Welder’s Qualification
ÿ NDT Procedures
ÿ NDT Operator Qualification Records
ÿ NDT Plans
2. Conduct project induction at the beginning of project and brief to all concern section about
project quality objectives and requirements.
3. Leading the project by doing coordination with project engineers (QA/QC) for all individual
disciplines
4. Prepare welding procedure qualification based on project requirement prior to commence
welding on site.
5. Develop and qualifying new welding procedures, the activity includes preparing proposed WPS,
witness the welding and mechanical test, prepare the PQR & final WPS for class surveyor
approval.
6. Co-ordinate, Plan, Assemble, Supervise and Control all the QA/QC work assigned under the
project.
7. Verify Piping Construction Drawings update prior to Inspection and responsible for proper
management of superseded drawings.
8. Ensure all the Inspections meet the Criteria of Construction Standards, Approved Procedure &
Drawings, Client’s Specifications, and Class Rules, Codes & Regulations (DNV, BV, ABS, and
AWS D1.1).
9. Coordinate all the day to day inspection and resolve the site issues.
10. Check and Endorse Inspection record prior to issue to the Customer.
11. Ensure the Subordinates comply with Company’s Procedure and Work Instruction.
12. Assessment of the Subordinates performance.
13. Co-ordinate with the Third Party/Vendor and all NDT issue and compiling the records
14. Plan the audit for project and carry out audit as per plan.
Page 2 of 8
15. Performed Surveillance audit, quality walk at work site by maintaining frequency of inspection
and make surveillance audit report, issuing CAR if any Non-conformity at site and perform CAR
management by using CAR log system and QAQC control management system.
16. Prepare the project final data book as per project requirements and handover to the client.
1. Supervise daily activities of 15 no’s QC Inspectors (Welding / Mechanical / Painting & Coating /
Civil / Electrical & Instrumentation / Telecommunication) as per project scope of work and
assign them daily basis as per Schedule Q requirements and site activities requirements.
2. Submits all project related procedure to clients and follow up with clients, if any comments from
clients then incorporate and resubmit it to clients.
3. Submits WPS along with request for welding procedure approval &Weld and Line description
table to clients for approval, prepare logbook for all approved WPS as per process, materials and
services to be used and maintain it.
4. Prepare two week look ahead schedule and submit to client.
5. Arrange welder qualification test and co-ordinate with Aramco approved third parties for WQT
and prepare welder/ welding operator JCC, Prepare JCC logbook and maintain it.
6. Monitor welder daily activities, prepare welder repair assessment and tracer weld report-weekly,
Weekly welder repair rate report, weekly and cumulative weld status report and submit weekly
basis to client.
7. Maintain a logbook for all ARAMCO RTFI assessments and place them in proper way to make
easy access for any future clarification by client and resolved any NDT related issue by
coordinating with NDT third party.
8. Supervise Gasket installation and Bolt Tightening activities.
9. Monitoring cold pipe bending as per SAES and maintain pipe bending records.
10. Arrange pressure gauge, relief valve, pressure recorder and temperature recorder as per hydro
test requirements. Prepare a logbook for all calibration certificates and maintain record.
Page 3 of 8
Witnessing calibration of pressure gauge and relief valve in Aramco approved project calibration
lab.
11. Arrange and monitor valve field hydrostatic test also maintain log sheet for tested, accepted and
rejected valve and maintain valve delivery status to site.
12. Co-ordinate with construction team for internal cleaning of pipe lines and piping.
13. Co-ordinate with construction team for internal gauging of pipe lines and select the gauging plate
as per pipe size. Keep record for each string that was internal gauged and the results or findings
14. Preparation and review of Hydro Test packages. Submits hydro test package to client for
approval.
15. Communicate with construction team to close “A” punch prior to commence hydro static test.
16. Collect daily basis all quality documents (SAIC, SATR) from QC Inspector and submits daily
basis to clients for approval and signature.
17. Arrange weekly Quality tool box meeting with QC Inspectors (both client approved and non-
approved personnel) on how to avoid nonconformance in project.
18. If any NCR and Violation from clients, then performing root cause analysis for the same and co-
ordinate with project QA/QC manager for quality deficiencies and non-conformances to prepare
Corrective Action Report (CAR) and submit the same to clients.
19. Prepare ARAMCO NCR & internal NCR logbook and maintain it.
20. Attend weekly construction meeting with Construction team and subcontractor representatives.
21. Attending weekly construction meeting with Client and update quality issue in Minutes of
meeting (MOM).
22. Update quality part in weekly CQI (Contractor Quality Indicator), MOM (Minutes of Meeting)
or Construction Progress Meeting and Monthly QMR (Quality Management Report) and submit
to Clients.
23. Supervise different type of Lay-up activities as per project requirements.
24. Co-ordinate with construction team to close MCC YES and NO punch items.
Name of the Project: Install Riyadh Refinery Crude Oil Pipeline EWRR-1.BI 10-00421 KSA.
Name of the Client: Saudi Aramco.
Name of Contractor: Faysal M.Al Qahtani Sons Co. Kingdom of Saudi Arabia.
Position: QA/QC Supervisor.
Inclusive Date: June 2012 to Dec 2014.
Name of the Project: Install Riyadh Refinery Crude Oil Pipeline EWRR-1.BI 10-00421 KSA.
Name of the Client: Saudi Aramco.
Name of Contractor: Faysal M.Al Qahtani Sons Co. Kingdom of Saudi Arabia.
Position: QA/QC Mechanical &Welding Inspector.
Inclusive Date: May 2011 toJune 2012.
Name of the Project: Karan off Shore Platform & Subsea Pipeline Project.BI-10-00580 .KSA
Name of the Client: Saudi Aramco.
Name of Contractor: J.Ray Mccder moot Saudi Arabia Co.
Name of Sub-Contractor: Faysal M.Al Qahtani Sons Co. Kingdom of Saudi Arabia.
Position: QA/QC Mechanical &Welding Inspector.
Inclusive Date: May 2010 to May 2011.
Page 6 of 8
Name of the Project: Eastern Province Water Transmission Facilities Phase-2 (25000 m³ Water Tank)
Name of the Client: Saline Water ConversionCorporation (SWCC) KSA.
Name of Contractor: YUKSEL Insatt Saudi Arabia co.
Position: QA/QC Mechanical &Welding Inspector.
Inclusive Date: From Oct 2009 to May, 2010.
Name of the Project: Khurais upstream facility north / south, BI-10-003004. KSA
Name of the Client: Saudi Aramco
Name of Contractor: Faysal M.Al Qahtani Sons Co. Kingdom of Saudi Arabia.
Position: QA/QC Mechanical Inspector.
Inclusive Date: From Dec 2008 to. Sept 2009
Name of the Project: SGP TO JGP C2 + NGL P/L capacity Increase, BI-10-03184 K.S.A.
Name of the Client: Saudi Aramco
Name of Contractor: Fawzi M.Al Qahtani Co. Kingdom of Saudi Arabia.
Position: QA/QC Mechanical Inspector.
Inclusive Date: From Nov 2007 to April 2008
08 to 11 June, 2015 Shipyard Supervisor Safety Course (SSSC).48 Toh Guan Road Est
#03-132, Singapore 608586.
10 Apr, 2009 Welding Insprctor Cadetship & Job Rotational Exposure Program
FMQ Training Center –C9 Room #3; Site office; Khurais Project; KSA
LANGUAGE PROFENCY:
1) ABS,DNV-GL,BV
2) ASME B16.5,B16.20, B31.3, B31.4, B 31.8
3) ASME SECTION II ,V & IX
4) ASTM
5) API 1104, 598 ,594 ,620 & 650
6) AWS D1.1,A 2.4 & A 3.0
7) BS 2654 ,7570
8) SAUDI ARAMCO Standards & Procedures.
REFERNCES:
2. Asad Zaka
Senior Mechanical Inspector.
ABS Group,Saudi Arabia.
Cell: +966530140347
[email protected]
I am Mohammad Nure Alam declare that the information given above as far I know is accurate.
Signature By
---------------------------------
Mohammad Nure Alam
Page 8 of 8