Construma Consultancy Pvt. LTD.: Design of Substructure and Foundation at P21
Construma Consultancy Pvt. LTD.: Design of Substructure and Foundation at P21
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
Contents
1 Introduction
2 Notations & Sign conventions
3 Construction Materials
4 Geotechnical data
5 Hydrological data
6 Loads from superstructure
7 Details of substructure and foundation & Evaluation of Dead loads
8 Evaluation of Water current forces
9 Evaluation of Wind forces (Fw)
10 Evaluation of Seismic forces (Feq)
11 Summary of forces at pier base & Check for maximum flexural and shear stresses
12 Summary of forces at foundation at top of curb & Founding Level
13 Check for maximum base pressure & minimum factor of safety against sliding and overturning
14 Check for maximum stresses in bottom plug & cover slab
15 Check for maximum stresses in well steining
16 Check for maximum stresses in well curb
17 Check for maximum stresses in well cap
18 Conclusions
pw21
2/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
1 Introduction
The following pages present the detailed design calculations pertaining to the well foundation of Pier P21d/s.The design takes into account
Dead & Superimposed Dead Loads, Live Loads, Water Current forces, Wind & Seismic Loads as applicable and as stipulated in IRC Codes
& Standards, referred below.
Founding Depth is decided on the basis of the Geotechnical Investigation Report. As per the Report, rock is available at 181.15m (d/s end)
and 184.9m (u/s end). The design has been done for the lowest founding level i.e.,180.5m (d/s end). Bearing Pressure considered in design as
per soil investigation report is 900kPa.
Since the well is resting on the rock, no soil support on the sides has been assumed in the design.
References
Design criteria for Foundataions & substructure YB/PC/92/R4 dated 14th March 2008 from CCPL
Codes
IRC 78-2000 Standard specifications & Code of practice for Road bridges - Section VII Foundations and Substructure
IRC 6 - 2000 Standard specifications & Code of practice for Road bridges - Section II Loads and stresses
IRC 21 - 2000 Standard specifications & Code of practice for Road bridges - Section III Cement concrete (plain and reinforced)
IS 1893: 1984 Criteria for earthquake resistant design of structures - superceded by 2002 version but referred for evaluating hydrodynamic force
Bibliography
Young, W.C., Roark's formulas for stress and strain , 6th edition, McGraw Hill Book Co., Singapore
pw21
3/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
fdc = permissible direect compressive stress ffc = permissible flexible compressive stress in concrete
ft = permissible tensile stress in plain concrete fft = permissble tensile stress in flexure, shear or combined bending
fs = permissible stress in reinforcement ffh = permissble tension in helical reinforcement
Mr = flexural moment in radial direction in well cap Mt = flexural moment in tangential direction in well cap
yn = depth of neutral axis of RC section under axial load & moment Mts = moment due to tilt & shift of the well
lozI = anchorage length in bonding zone I (favorable) lozII = anchorage length in bonding zone II (unfavorable) = 1.4*lozI
max = permissible maximum shear stress in concrete sbp = safe bearing pressure
HFL = high flood level LWL = low water level MSL = maximum scour level
HFL_ns & MSL_ns = HFL & MSL at check-flood condition (check flood) HFL_s & MSL_s = HFL & MSL at normal+seismic condition (normal flood)
Hl, Ht = horizontal force in the longitudinal (i.e., traffic) direction & transverse direction
Ml, Mt = moment in the longitudinal (i.e., traffic) direction & transverse direction
Hnet = net horizontal force = √(Hl2+Ht2) Mnet = net moment incl. Mts in the resultant direction = √(Ml2+Mt2) + Mts
pw21
4/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
3 Construction Materials
Concrete: IRC:21 Poisson's ratio, = 0.15 modular ratio, m = Es/Ecd = 10
fck wt density
Element ffc(MPa) ft(MPa) fdc(MPa) max(MPa) Ecs(GPa) anchLoI/ LapL25%
(MPa) (kN/m³)
50 Pier & pier cap 24 16.67 0.67 12.50 2.5 35 42 58.8
40 Well cap & well curb 24 13.33 0.67 10.00 2.5 33 42 58.8
35 Well steining & cover slab over bottom plug 24 11.67 0.67 8.75 2.3 32 42 58.8
25 Bottom plug 22
10 top plug 22 anchrage length in zone II = 1.4*loI
Fy min reinforcement
(MPa) Reinforcement fft(MPa) fdc(MPa) fth(MPa) Es(GPa) beam slab column pedestal
500 Deformed bar 240 205 95 200 0.20% 0.12% 0.80% 0.15%
4 Geotechnical data
Foundation at ground Lvl(m) rock Lvl(m) fdg strata sbp(kPa)
Pier P22 d/s 204.10 181.15 rock 900 being deeper adopted for design
u/s 205.20 184.90 rock 900
5 Hydrological data
condtion checkFlood normal & seismic
HFL(m) 209.70 207.90 LWL(m) = 202.00
mean current velocity(m/s) 3.80 3.04
MSL(m): d/s pier 181.15 181.50
u/s pier 184.90 184.90
pw21
5/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
pw21
6/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
For calculation of transverse shear stress, eff.depth(m) = r+2*r s/= 1.565 concrete shear strength(MPa),c = 0.39
pw21
7/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
Well
Type of cross-section single 1circular Top Lvl(m) = 199.40 Steining factor,K = 0.033
sinking depth(m): total, l = 18.25 up to splay top 9.40 jackdown force(kN) used for enhancing sinking = 20,000
Outer dia(m): above curb, d = 11.0 below well cap, d1 = 9.0 Dredge hole dia(m) = 7.00
reduction in outer dia from RL 187.000 splay: 1 in 3 splay len(m) = 3.0 splay top lvl(m) 190.000
as per IRC78, minimum steining thk(m) reqd: below MSL=k*d*l = 1.55 above taper = k*d 1 *l = 0.91
max shift(m) @ bottom(i.e.,FL) = 0.15 max tilt(1H:nV) : 80
total tilt & shift(m) at FL: 0.378 at top of curb 0.328
pw21
8/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
pw21
9/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
Bottom plug:
projection(m)above curb = 0.3 SphrclDipHt(m) = 0.00 Total Ht(m) = 3.95
topLvl(m): 185.5 V(m³) = 275.5 Wt(kN) = 6,060
as per §705.3.2 of IRC:78: Dowel bars reqd 06T25 length(m/ea) (50% embedded in rock) 3.0
borehole dia(mm) 65 grouted with cement mortar 1:1.5
Cover slab over bottom plug to resist any direct upward pressure due to non-spherical shape of plug Thk(m) = 1.50 topLvl(m)= 187.000
int. projection(m) = 0.4 recess wid(m) 0.4 clear dia(m),D 7.00 wt(kN) 1,385
Sand filling:
thickness(m) = 11.900 Vol(m3) = 458 Wt(kN) = 8,243 topLvl(m): 198.900
pw21
10/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
Top plug:
thickness(m) = 0.5 V(m³) = 19.24 wt(kN) = 423 topLvl(m): 199.400
pw21
11/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
check flood condition top level HFL IL 205.85 pier base splay top splay bottom well
depth(m) from MSL 28.55 24.70 20.85 8.85 5.85
Square of velocity of water current(m²/s²) 28.9 25.0 21.1 9.0 5.9
Transverse direction: b(m) 2.0 2.0 2.0 9.0 11.0
9.0
water pressure, p(kN/m) 17.5 15.1 12.8 24.4 19.7
57.5
Ht(kN) 62.8 53.8 491.7 66.2 205.7
Acting @ RL(m) 207.82 203.98 195.37 188.55 185.05
Longitudinal direction: b(m) 2.00 2.00 2.00 9.0 11.0
9.00
water pressure, p(kN/m) 2.3 2.0 1.7 3.2 2.6
7.6
Hl(kN) 8.3 7.1 65.1 8.8 27.2
Acting @ RL(m) 207.82 203.98 195.37 188.55 185.05
normal / seismic condition top level HFL IL 204.95 pier base splay top splay bottom well
depth(m) from MSL 26.40 23.45 20.50 8.50 5.50
Square of velocity of water current(m²/s²) 18.5 16.4 14.4 6.0 3.9
Transverse direction: b(m)
pw21
12/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
Note: Direction of friction forces at top of pier may vary from 0 to 45o. Flow angle of 20o is predominant
on well and by adopting the same, results are not much compromised
pier well
longitudinal transverse above splay splay portion belowSplay curb
radius(m) of enveloping cylinder , r 1.0 1.0 4.5 5 5.5 5.575
ht(m) from HFL to bottom of enveloping cylinder, Hbottom 5.90 17.90 20.90 22.70 26.40
Hbottom/r 5.90 5.90 3.98 4.18 4.13 4.74
coef., Ce from Table 7 of IS:1893-1984 0.730 0.730 0.729 0.730 0.730 0.730
C1 = Htop/Hbottom = 0.330 0.856 0.921 0.860
as per §6.5.2.1 of IS1893-1984, C3 = 0.215 0.828 0.905 0.832
horizontal force(kN), F = Ce*h*W ep: total height 814 1,176 1,545 1,846
top portion -175 -973 -1,398 -1,536
net value, F = Fb - Ft = 13 13 639 202 147 310
point(m) of application from bottom, C 4*H of force: Fb 2.53 2.53 7.67 8.96 9.73 11.32
Ft 14.193 10.509 10.660 13.228
i.e., net value acting at RL(m) 204.53 204.53 195.89 188.50 186.08 183.35
pw21
13/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
Unloaded structure
wind pressure(kPa): during service = 2.4 not governing compared to other load cases
RL(m)-LWL(m) = 14.80
Angle(°) of incidence = 0 Pressure coef: transverse 1.0 longitudinal: 0.0
pw21
14/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
11 Summary of forces at pier base & Check for maximum flexural and shear stresses
Summary of forces & moments @bottom of pier: RL(m) 202.00 pier cap top to pier base 11.85
Basic loads V(kN) Hl(kN) Ml(kNm) Ht(kN) Mt(kNm)
G Loads from superstructure: LC I 12,500 500 5,925 0 0
IIIA 13,000 0 0 520 6,162
VI SL 13,500 540 6,399 0 0
VI ST 13,500 0 0 540 6,399
substructure 893
Fwc Water current effects: with MSL_ns -36 15 63 117 472
with MSL_s -27 8 24 59 180
Fep Earth pressure
Fw Wind force on: substructure above LWL 0 0 7 53
Feq Seismic force on: substructure
longitudinal (Sx & -Sy) -45 103 563
transverse (Sz & -Sy) -45 103 563
pw21
15/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
12.1 Summary of forces at top of well curb 185.20 185.20 pier cap top to top of curb 28.65 28.65
Note: Hnet = √(Hl2+Ht2) Mnet = √(Ml2+Mt2) + Mts pore pressure at 15% considered
pw21
16/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
12.2 Summary of forces at founding lvl(m) 181.15 pier cap to fdg level: check-flood 32.70 normal & seismic 32.70
Item V(kN) Hl(kN) Ml(kNm) Ht(kN) Mt(kNm) Mts(kNm)
G Loads from superstructure: LC I 12,500 500 16,350 0 0 4,727
IIIA 13,000 0 0 520 17,004 4,916
VI SL 13,500 540 17,658 0 0 5,105
VI ST 13,500 0 0 540 17,658 4,421
substructure 893 0 338
Well foundation including well cap 34,328 4,368
Fwc Water current effects: with MSL_ns 117 1,482 880 11,189 0
with MSL_s 75 926 566 6,989 0
Fep Earth pressure
Fw Wind force on: substr/fdn above LWL
Feq Seismic force on: substr/fdn above MSL_s
longitudinal (Sx & -Sy) -1,735 4,782 47,054
transverse (Sz & -Sy) -1,735 4,782 47,054
longitudinal (Sx & +Sy) 1,735 4,782 47,054
transverse (Sz & +Sy) 1,735 4,782 47,054
Gb Buoyancy:at 50%: check-flood condition -7,953 -1,302
normal+seismic condition -7,925 -1,298
Buoyancy:at 100%: check-flood condition -15,906 -2,605
normal+seismic condition -15,850 -2,595
Load combination V(kN) Hl(kN) Ml(kNm) Ht(kN) Mt(kNm) Hnet(kN) Mnet(kNm)
Buoyancy at 50%
I (check flood condition) 39,769 617 17,832 880 11,189 1,075 29,183
IIIA (check flood condition) 40,269 117 1,482 1,400 28,193 1,405 36,552
VI (Sx & +Sy) 42,531 5,397 65,638 566 6,989 5,427 74,522
VI (Sz & + Sy) 42,531 75 926 5,888 71,702 5,889 80,221
Buoyancy at 100%
I (check flood condition) 32,316 617 17,832 880 11,189 1,075 27,880
IIIA (check flood condition) 32,316 117 1,482 1,400 28,193 1,405 35,250
VI (Sx & -Sy) 31,137 5,397 65,638 566 6,989 5,427 73,225
VI (Sz & -Sy) 31,137 75 926 5,888 71,702 5,889 78,923
pw21
17/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
13 Check for maximum base pressure & minimum factor of safety against sliding and overturning
Base area,A(m²) = 97.6 Z(m³) = 136.1 radius, r(m) = 5.575 buoyancy considered: 100%
pw21
18/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
b) Check for sliding under lateral forces with Buoyancy at 100% & -Sy
c) Check for FoS against overturning with Buoyancy at 100% & -Sy
pw21
19/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
T25-170
orthogonal reinft at centre: in each direction at top 2,887 deff(m) = 1.40 yn(m) = 0.174 Ieff(m4/m)= 0.0451
at midspan:max.compr.stress(MPa) in concrete = 3.4 max.tensile stress(MPa) in reinft. = 240.7
At bottom of splay: axial load(kN/m) = 890 horizontal component(kN/m) of the inclined strut from above = 148
peak value of longitudinal moment(kNm/m) in the shell = 94 max. flexural stress(MPa) = 0.14 < 0.67and hence ok
pw21
20/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
pw21
21/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
17 Check for maximum stresses in well cap Thickness(m) of well cap = 2.60
eff.span/2 = {dredge hole dia + min(width of support, effective depth)}/2 = a(m) = 4.0
Uniform load over a very small central circular area of radius ro Refer to Table 24 of Roark's formulas for stress and strain ,
radius(m) of load from pier, r o = 1.0 equivalent radius(m), ro' = if(ro<t/2, (1.6*r2o+t2)-0.675*t,ro) = 1.136
pw21
22/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
Since the well cap is constructed monolithic with the steining, the supports can be assumed to be partially fixed. Hence the
moment at centre can be taken as 80% of values form simply supported condition &
moment at support can be taken as 30% of values from encastre condition.
Load combination I IIIA VI - SL VI - ST remarks
V(kN) 13,358 13,858 14,322 14,322
M(kNm) 6,006 6,688 6,978 7,142
max.punching shear stress(MPa)at r(m) = 2.243 0.406 0.421 0.434 0.434
Mr(kNm/m) at r(m): 1.0 2,398 2,538 2,626 2,646
3.5 -351 -369 -381 -383
Mt(kNm) at r(m): 1.0 2,405 2,517 2,600 2,610
3.5 -27 -31 -32 -33
Mr: max.compr.stress(MPa) in concrete at midspan 2.30 2.43 2.52 2.54 OK
support 0.68 0.71 0.74 0.74
permissible 13.33 17.73 20.00 20.00
max.tensile stress(MPa) in reinft. at midspan 124.8 132.1 136.6 137.7 OK
support 78.6 82.6 85.4 85.8
permissible 240.0 319.2 360.0 360.0
Mt: max.compr.stress(MPa) in concrete at midspan 2.30 2.41 2.49 2.50 OK
max.tensile stress(MPa) in reinft. at midspan 125.2 131.0 135.3 135.8 OK
Note: spacing of radial bar is measured at the edge of the dredge hole max.punching shear stress(MPa) 1.01 side face hoop reinft: 4T16-450
pw21
23/23
Note No. Rev Sheet No
CONSTRUMA CONSULTANCY PVT. LTD. YB/PC/92/1+2+3/05 R3
PROJECT Bridge Over Yamuna River at Vazirabad, New Delhi. Date Calc. by: Chk by: App. by:
SUBJECT Detailed Design Calculations of Pier Well Foundation P21 2010.04.02 VVP/AMS GPS HSR
18 Conclusions
The well has been checked for various load combinations with service loads, wind forces, check flood & seismic loadings
The well foundation has been checked for maximum base pressure, minimum contact area and minimum factor of safety against sliding & overturning
for all the load combinations considering the founding rock strata to be completely shatterd and thoroughly porous
and found to within the acceptable limits as can be seen from the summary table here below:
Load Combination Maximum base Pressure (kPa) Minimum contact area Min.factor of safety vs
(as per IRC 6 : 2000) Obtained Permissible Obtained Permissible overturning sliding
I 622 900 100.0% 80% 6.5 21.1
IIIA 681 1,125 100.0% 80% 5.1 16.1
VI (Seismic Longitudinal) 991 1,125 77.6% 67% 2.4 4.0
VI (Seismic transverse) 1,042 1,125 72.2% 67% 2.2 3.7
The maximum flexural stresses in concrete & rebars of substructure and well foundation as well as maxumum shear stress have been checked for
all the load combinations and found to be within the permissible limits, as can be seen from the summary table here below:
pw21