Facade System
Facade System
Facade System
BESAR,
FULL OF POTENTIAL FOR
PRECEDENCE STUDY DESIGN RELEVANCE:
A structural system that has a fast construction
STRUCTURAL SYSTEM
period that doesn't constrain design limitations,
impose on aesthetics and encourages human
interaction throughout the community library.
COMPOSITE STEEL COLUMN TO BEAM DETAIL FLOORING DETAIL BEAM TO ROOF DETAIL
FRAMING
Structural steel framing, which
includes structural stainless steel
framing, describes the creation of
a steel skeleton made up of
vertical columns and horizontal
beams.
ROOF SYSTEM
The design aimed to harness ‘daylighting’ - particular building strategies and techniques
which maximise the positive effects (namely light) while reducing problems like glare and
overheating, crucial for a library design.
DISADVANTAGES:
• Overheating of a space if not
designed correctly.
• Initial cost can be high as it is
made from mostly metal
construction.
• Water damage without sufficient
usage of gutters.
SECTION OF DESA HOUSE
PRECEDENCE STUDY DESIGN RELEVANCE:
The usage of plant wires are an option to create a green oasis
DISADVANTAGES:
• More cost due to irrigation and drainage
PROJECT TITLE : THE ROW purposes.
MATERIALS USED: INSTALLATION METHOD: • High maintenance of plants cause of dried
ARCHITECT : STUDIO BIKIN leaves and weeding.
Plant wires are made of The main vertical wires are placed
LOCATION : JALAN DORIASAMY weatherproof materials such as with hinges that are bolted onto the • Water damage and mould growth without
galvanised or powder-coated desired surface. Horizontal wires are sufficient drainage.
COMPLETED : 2015/16
steel, painted or treated wood. woven to keep distances apart equal
AREA : 30,707 SQFT Metal horizontal supports with and to allow the freedom of creepers RESPONSE DIAGRAMS:
bolts attached to the top and to cross from one wire to the other
bottom keeping the wires in giving it a more organic feel.
place.
DISADVANTAGES:
• More cost due to increase of materials.
PROJECT TITLE : CUT & FRAME • High maintenance of frames due to
ARCHITECT : ASHTON PORTER potential oxidation.
• Frames may have to be painted and oiled
LOCATION : LONDON, UK
frequently to give lasting impression.
COMPLETED : 2013
DESIGN IMPLEMENTATION
AREA : 178 SQM SKETCH: