Rack Trafo Simulation Report
Rack Trafo Simulation Report
1 Bogor, 16152
APPVD
Workshop Facility : Jl. Raya Babakan Madang, Sentul KM. 2.7 No.11L, Bogor
Phone : +62 21 2909 5194
Fax : +62 21 2909 5172
Website : www.fiper.co.id
CHK'D
CHK'D
FiPER
BY
24/Feb/18
DATE
NO.
REVISIONS
DESIGN CALCULATION OF
PREPARED
BY: ANDRI
RACK TRAFO
DATE: 24.02.18
CHECKED
CENTRAL KITCHEN
BY: FIRMAN
DATE: 24.02.18
APPROVED
BY: FIRMAN
DATE: 24.02.18
BY:
DATE:
APPROVED (EBI)
BY:
DATE:
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
RACK TRAFO 1 of
USED FOR CONSTRUCTION
A CK EBI-CK-RT-1 0
OR FOR ORDERING
MATERIALS UNTIL APPROVED
CENTRAL KITCHEN 11
Ciracas Jakarta Timur JOB ORDER NO TBA DWG CONT SHT TBA
Office .: Jl. Pandu Raya No. 27 Ruko Grande Blok B.1 Bogor, 16152
APPVD
Workshop Facility : Jl. Raya Babakan Madang, Sentul KM. 2.7 No.11L, Bogor
Phone : +62 21 2909 5194
Fax : +62 21 2909 5172
Website : www.fiper.co.id
CHK'D
TABLE OF CONTENT
CHK'D
1 INTRODUCTION
2 DESIGN CODE
ISSUED FOR DETAIL DESIGN SUBMITTAL
3 DESIGN CRITERIA
ISSUED FOR BASE DESIGN SUBMITTAL
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DESCRIPTION
4 COMPUTER SIMULATION
4.1 COORDINATE SYSTEM
4.2 MEMBER PROPERTIES & MATERIALS
6 RESULT SUMMARY
6.1 RACK TRAFO ANALYSIS
6.1.1 STRESS
FiPER
BY
6.1.2 DEFLECTION
6.1.3 AXIAL FORCE
24/Feb/18
DATE
DATE: 24.02.18
APPROVED
BY: FIRMAN
DATE: 24.02.18
BY:
DATE:
APPROVED (EBI)
BY:
DATE:
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
RACK TRAFO 2 of
USED FOR CONSTRUCTION
A CK EBI-CK-RT-1 0
OR FOR ORDERING
MATERIALS UNTIL APPROVED
CENTRAL KITCHEN 11
Ciracas Jakarta Timur JOB ORDER NO TBA DWG CONT SHT TBA
Office .: Jl. Pandu Raya No. 27 Ruko Grande Blok B.1 Bogor, 16152
APPVD
Workshop Facility : Jl. Raya Babakan Madang, Sentul KM. 2.7 No.11L, Bogor
Phone : +62 21 2909 5194
Fax : +62 21 2909 5172
Website : www.fiper.co.id
CHK'D
1. INTRODUCTION
CHK'D
This calculation report aims to check the structural integrity of RACK TRAFO structures during Sustain
by centralized load. The Calculation report also specifies the design of Sustain load. The design
calculation done by means of computer simulation of SOLIDWORKS SIMULATION 2016 V8i and Excel
Spreadsheet. The Result summary will show the Utilization Ratio of Platform Structure from the
computer modelling. The design calculation will be carried out and base on the AISC ASD Design
Codes and Specification.
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DESCRIPTION
1. AISI 304 SUS -- The American Iron & Steel Institue (Stainless Steel)
3. DESIGN CRITERIA
Material Specifications :
AISI 304 STAINLESS STEEL
Property Value Units
Elastic Modulus 200 N/mm^2
Poisson's Ratio 0,29 N/A
Shear Modulus 86000 N/mm^2
Mass Density 0,8 kg/m^3
Tensile Strength 505 N/mm^2 (Mpa)
FiPER
BY
APPROVED
BY: FIRMAN
DATE: 24.02.18
BY:
DATE:
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
RACK TRAFO 3 of
USED FOR CONSTRUCTION
A CK EBI-CK-RT-1 0
OR FOR ORDERING
MATERIALS UNTIL APPROVED
CENTRAL KITCHEN 11
Ciracas Jakarta Timur JOB ORDER NO TBA DWG CONT SHT TBA
Office .: Jl. Pandu Raya No. 27 Ruko Grande Blok B.1 Bogor, 16152
APPVD
Workshop Facility : Jl. Raya Babakan Madang, Sentul KM. 2.7 No.11L, Bogor
Phone : +62 21 2909 5194
Fax : +62 21 2909 5172
Website : www.fiper.co.id
CHK'D
4. COMPUTER SIMULATION
CHK'D
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Figure 3.1:
DESCRIPTION
24/Feb/18
DATE
NO.
REVISIONS
PREPARED
BY: ANDRI
DATE: 24.02.18
CHECKED
BY: FIRMAN
DATE: 24.02.18
APPROVED
BY: FIRMAN
DATE: 24.02.18
BY:
DATE:
APPROVED (EBI)
BY:
DATE:
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
RACK TRAFO 4 of
USED FOR CONSTRUCTION
A CK EBI-CK-RT-1 0
OR FOR ORDERING
MATERIALS UNTIL APPROVED
CENTRAL KITCHEN 11
Ciracas Jakarta Timur JOB ORDER NO TBA DWG CONT SHT TBA
Office .: Jl. Pandu Raya No. 27 Ruko Grande Blok B.1 Bogor, 16152
APPVD
Workshop Facility : Jl. Raya Babakan Madang, Sentul KM. 2.7 No.11L, Bogor
Phone : +62 21 2909 5194
Fax : +62 21 2909 5172
Website : www.fiper.co.id
CHK'D
Rack trafo simulation are being carried out by SOLIDWORKS software. The Properties and
element of Structure are being assigned base on the software Property Library as per
Structure Drawings.
Lengt W (Kg)/
Total W/
No. Description Specification Qty h/ (Unit or
(Kg)
(Mtr) Mtr)
ISSUED FOR DETAIL DESIGN SUBMITTAL
ISSUED FOR BASE DESIGN SUBMITTAL
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
HOLO 50 x 50 12 0,5 2,5 30,0
DESCRIPTION
24/Feb/18
DATE
0,146 Ton
NO.
REVISIONS
PREPARED
BY: ANDRI
DATE: 24.02.18
CHECKED
BY: FIRMAN
BY: Note:
DATE:
All Material are conservatively assigned as STAINLES STEEL or equivalent with Yield Strength of 21 ksi
APPROVED (EBI)
= 215 MPa as stated in the RACK TRAFO Datasheet Doc. No: XXX.XXXX.XX/XX Rev. 0
BY:
DATE:
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
RACK TRAFO 5 of
USED FOR CONSTRUCTION
A CK EBI-CK-RT-1 0
OR FOR ORDERING
MATERIALS UNTIL APPROVED
CENTRAL KITCHEN 11
Ciracas Jakarta Timur JOB ORDER NO TBA DWG CONT SHT TBA
Office .: Jl. Pandu Raya No. 27 Ruko Grande Blok B.1 Bogor, 16152
APPVD
Workshop Facility : Jl. Raya Babakan Madang, Sentul KM. 2.7 No.11L, Bogor
Phone : +62 21 2909 5194
Fax : +62 21 2909 5172
Website : www.fiper.co.id
CHK'D
Equipment such As Trafo and or other Equipment weight is considered in the non-modelled weight.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Total of the Non Modelled Weight is the remaining of weight of Rack Trafo 189 Kg deducted by Self
DESCRIPTION
24/Feb/18
DATE
REVISIONS
PREPARED
BY: ANDRI
DATE: 24.02.18
CHECKED
BY: FIRMAN
DATE: 24.02.18
APPROVED
BY: FIRMAN
DATE: 24.02.18
BY:
DATE:
APPROVED (EBI)
BY:
DATE:
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
RACK TRAFO 6 of
USED FOR CONSTRUCTION
A CK EBI-CK-RT-1 0
OR FOR ORDERING
MATERIALS UNTIL APPROVED
CENTRAL KITCHEN 11
Ciracas Jakarta Timur JOB ORDER NO TBA DWG CONT SHT TBA
Office .: Jl. Pandu Raya No. 27 Ruko Grande Blok B.1 Bogor, 16152
APPVD
Workshop Facility : Jl. Raya Babakan Madang, Sentul KM. 2.7 No.11L, Bogor
Phone : +62 21 2909 5194
Fax : +62 21 2909 5172
Website : www.fiper.co.id
CHK'D
6. RESULT SUMARY
CHK'D
6.1.1 STRESS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Rak Trafo_Simulation-Static 1-Stress-Stress1
DESCRIPTION
FiPER
BY
24/Feb/18
DATE
NO.
REVISIONS
PREPARED Name Maximum Stress Allowable Stress Remarks
BY: ANDRI
Stress 17,5 Mpa 215 Mpa Safe
DATE: 24.02.18
DATE: 24.02.18
APPROVED
BY: FIRMAN
DATE: 24.02.18
BY:
DATE:
APPROVED (EBI)
BY:
DATE:
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
RACK TRAFO 7 of
USED FOR CONSTRUCTION
A CK EBI-CK-RT-1 0
OR FOR ORDERING
MATERIALS UNTIL APPROVED
CENTRAL KITCHEN 11
Ciracas Jakarta Timur JOB ORDER NO TBA DWG CONT SHT TBA
Office .: Jl. Pandu Raya No. 27 Ruko Grande Blok B.1 Bogor, 16152
APPVD
Workshop Facility : Jl. Raya Babakan Madang, Sentul KM. 2.7 No.11L, Bogor
Phone : +62 21 2909 5194
Fax : +62 21 2909 5172
Website : www.fiper.co.id
CHK'D
CHK'D
6.1.2 DEFLECTION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DESCRIPTION
FiPER
BY
24/Feb/18
DATE
REVISIONS
PREPARED Name Max. Deflection Allow. Deflection Remarks
BY: ANDRI
Displacement 0,08 mm 2,27 mm Safe
DATE: 24.02.18
DATE: 24.02.18
APPROVED
BY: FIRMAN
DATE: 24.02.18
BY:
DATE:
APPROVED (EBI)
BY:
DATE:
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
RACK TRAFO 8 of
USED FOR CONSTRUCTION
A CK EBI-CK-RT-1 0
OR FOR ORDERING
MATERIALS UNTIL APPROVED
CENTRAL KITCHEN 11
Ciracas Jakarta Timur JOB ORDER NO TBA DWG CONT SHT TBA
Office .: Jl. Pandu Raya No. 27 Ruko Grande Blok B.1 Bogor, 16152
APPVD
Workshop Facility : Jl. Raya Babakan Madang, Sentul KM. 2.7 No.11L, Bogor
Phone : +62 21 2909 5194
Fax : +62 21 2909 5172
Website : www.fiper.co.id
CHK'D
CHK'D
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DESCRIPTION
FiPER
BY
24/Feb/18
DATE
NO.
REVISIONS
PREPARED
BY: ANDRI
DATE: 24.02.18
CHECKED
BY: FIRMAN
DATE: 24.02.18
APPROVED
BY: FIRMAN
DATE: 24.02.18
BY:
DATE:
APPROVED (EBI)
BY:
DATE:
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
RACK TRAFO 9 of
USED FOR CONSTRUCTION
A CK EBI-CK-RT-1 0
OR FOR ORDERING
MATERIALS UNTIL APPROVED
CENTRAL KITCHEN 11
Ciracas Jakarta Timur JOB ORDER NO TBA DWG CONT SHT TBA
Office .: Jl. Pandu Raya No. 27 Ruko Grande Blok B.1 Bogor, 16152
APPVD
Workshop Facility : Jl. Raya Babakan Madang, Sentul KM. 2.7 No.11L, Bogor
Phone : +62 21 2909 5194
Fax : +62 21 2909 5172
Website : www.fiper.co.id
CHK'D
CHK'D
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DESCRIPTION
FiPER
BY
24/Feb/18
DATE
NO.
REVISIONS
PREPARED
BY: ANDRI
DATE: 24.02.18
CHECKED
BY: FIRMAN
DATE: 24.02.18
APPROVED
BY: FIRMAN
DATE: 24.02.18
BY:
DATE:
APPROVED (EBI)
BY:
DATE:
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
RACK TRAFO 10 of
USED FOR CONSTRUCTION
A CK EBI-CK-RT-1 0
OR FOR ORDERING
MATERIALS UNTIL APPROVED
CENTRAL KITCHEN 11
Ciracas Jakarta Timur JOB ORDER NO TBA DWG CONT SHT TBA
Office .: Jl. Pandu Raya No. 27 Ruko Grande Blok B.1 Bogor, 16152
APPVD
Workshop Facility : Jl. Raya Babakan Madang, Sentul KM. 2.7 No.11L, Bogor
Phone : +62 21 2909 5194
Fax : +62 21 2909 5172
Website : www.fiper.co.id
CHK'D
CHK'D
6.1.5 MOMENTS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF FiPER INDONESIA. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DESCRIPTION
FiPER
BY
24/Feb/18
DATE
NO.
REVISIONS
PREPARED
BY: ANDRI
DATE: 24.02.18
CHECKED
BY: FIRMAN
DATE: 24.02.18
APPROVED
BY: FIRMAN
DATE: 24.02.18
BY:
DATE:
APPROVED (EBI)
BY:
DATE:
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT TO BE
RACK TRAFO 11 of
USED FOR CONSTRUCTION
A CK EBI-CK-RT-1 0
OR FOR ORDERING
MATERIALS UNTIL APPROVED
CENTRAL KITCHEN 11
Ciracas Jakarta Timur JOB ORDER NO TBA DWG CONT SHT TBA