Question bank

Smartzworld.com Smartworld.asia

UNIT II

ESTIMATE OF OTHER STRUCTURES

2 MARKS

1.What are factors to be considered in design of septic tank?


The following factors should be taken into consideration:
Material should be water proof and corrosion resistant.
Natural ventilation provided should be adequate
A manhole should be provided to permit inspection and cleaning.
Baffles should be limited to one at the inlet and one at the outlet.

2.Define lead.
Lead is the crow flying horizontal distance from the centre of borrow pit to the
centre of the earthwork at site, i.e centre of the area of excavation to the centre of placed
earth.

3.Define lift.
Lift is the distance through which the excavated soil is lifted beyond a certain
specified depth.
4.What is the size of septic tank for 50 users?
4 cum

5.. What is the size of septic tank for 25 users?


2.5 cum

6.A cement concrete road (1:2:3) is to be constructed over the existing water bound
macadam road .The thickness of slab =10cm.The length of the road is one km and the
width 3.60m.Calculate the quality of cement concrete and the material required,
Solution
Quality of cement concrete = 1 x 1000 x 3.60 x 0.10 = 360 cu.m

7.Calculate the quality of earthwork for the construction of an approach road


Length = 1Km
Width of formation = 10 m
Height of embankment = 60 cm
Side slope = 1:2

jntuworldupdates.org Specworld.in
Question bank
Smartzworld.com Smartworld.asia

Solution
Quantity of earth work = L (Bd+Sd2)
B=10cm ; d =0.60m ;S = 2
Quantity of earth work = 1000 x (10 x 0.60) +2 x 0.60 x 0.60 = 6720 cu.m

8.What are the main components of culvert?


1.Abutments
2.Wing walls
3.Arch

9.What are the types of culvert?


1. Arch culvert
2. Slab culvert
3. Pipe culvert
4. Box culvert

10. Workout the quality of stone metal required for 2Km.Length for wearing coat of a 4m
wide road. The thickness of the metal road required is 12cm loose.
Solution
Quality of metal = 1 X 2 X 1000 X 4 X 0.12 = 960.00cum

11.Write the formula for Mid ordinate rule and Prismoidal formula Rule.
Mid sectional area method:
Q = (Bdm+sdm
2) x L
Where
B – Formation width
S – Side slopes
dm – Mean depth
L – Length of the section
WWW.VIDYARTHIPLUS.COM
Prismoidal formula rule:
Q = L/6(A1 +A2+4Am)
A1 = Bd1 + sd1
2
A2 = Bd2+Sd2
2
Am = Bdm+sdm
2
dm = (d1+d2)/2

jntuworldupdates.org Specworld.in
Question bank
Smartzworld.com Smartworld.asia

16 MARKS
1.Calculate the quantities of box culvert.
a) Earth work in foundation
b) Sand filling
c) PCC in foundation
d) Brickwork cm 1:4 in foundation
d) RCC 1:2:4 cover slab
e) Brickwork cm 1:4 in parapet

2.Prepare a detailed estimate of a septic tank in the soak pit and calculate the quantities for
a) Earth work excavation
b) PCC in foundation 1:3:6
c) Brickwork cm 1:4 in septic tank
d) Brickwork cm 1:6 with second class brick in soak pit
e) Precast RCC work of roof cover slab
f) Plastering with cm 1:3 in 12mm thick

3. Draw the different types of sanitary fittings?


4. The cost of construction of an overhead water tank of capacity 100mm2 is Rs 5,75,000 find out
the unit rate/lr
5. Estimate the quantities of following items of septic tank in fig
a) Earth work excavation
b) PCC in 1:5:10
c) RCC work of roof cover slab

jntuworldupdates.org Specworld.in
Question bank
Smartzworld.com Smartworld.asia

6. Estimate the quantities of following items of septic tank in fig


d) Plastering.
e) Brickwork cm 1:6.
f) RCC work for soak pit cover.
7. Explain in detail about septic tank and dispersion trench?
8. Details of a R.C.C retaining wall 25m long. Prepare a detail estimate for the work.
9.What are the methods of estimation of roads?

jntuworldupdates.org Specworld.in
Question bank
Smartzworld.com Smartworld.asia

jntuworldupdates.org Specworld.in
Question bank
Smartzworld.com Smartworld.asia

jntuworldupdates.org Specworld.in