UNIT II
2 MARKS
2.Define lead.
Lead is the crow flying horizontal distance from the centre of borrow pit to the
centre of the earthwork at site, i.e centre of the area of excavation to the centre of placed
earth.
3.Define lift.
Lift is the distance through which the excavated soil is lifted beyond a certain
specified depth.
4.What is the size of septic tank for 50 users?
4 cum
6.A cement concrete road (1:2:3) is to be constructed over the existing water bound
macadam road .The thickness of slab =10cm.The length of the road is one km and the
width 3.60m.Calculate the quality of cement concrete and the material required,
Solution
Quality of cement concrete = 1 x 1000 x 3.60 x 0.10 = 360 cu.m
jntuworldupdates.org Specworld.in
Question bank
Smartzworld.com Smartworld.asia
Solution
Quantity of earth work = L (Bd+Sd2)
B=10cm ; d =0.60m ;S = 2
Quantity of earth work = 1000 x (10 x 0.60) +2 x 0.60 x 0.60 = 6720 cu.m
10. Workout the quality of stone metal required for 2Km.Length for wearing coat of a 4m
wide road. The thickness of the metal road required is 12cm loose.
Solution
Quality of metal = 1 X 2 X 1000 X 4 X 0.12 = 960.00cum
11.Write the formula for Mid ordinate rule and Prismoidal formula Rule.
Mid sectional area method:
Q = (Bdm+sdm
2) x L
Where
B – Formation width
S – Side slopes
dm – Mean depth
L – Length of the section
WWW.VIDYARTHIPLUS.COM
Prismoidal formula rule:
Q = L/6(A1 +A2+4Am)
A1 = Bd1 + sd1
2
A2 = Bd2+Sd2
2
Am = Bdm+sdm
2
dm = (d1+d2)/2
jntuworldupdates.org Specworld.in
Question bank
Smartzworld.com Smartworld.asia
16 MARKS
1.Calculate the quantities of box culvert.
a) Earth work in foundation
b) Sand filling
c) PCC in foundation
d) Brickwork cm 1:4 in foundation
d) RCC 1:2:4 cover slab
e) Brickwork cm 1:4 in parapet
2.Prepare a detailed estimate of a septic tank in the soak pit and calculate the quantities for
a) Earth work excavation
b) PCC in foundation 1:3:6
c) Brickwork cm 1:4 in septic tank
d) Brickwork cm 1:6 with second class brick in soak pit
e) Precast RCC work of roof cover slab
f) Plastering with cm 1:3 in 12mm thick
jntuworldupdates.org Specworld.in
Question bank
Smartzworld.com Smartworld.asia
jntuworldupdates.org Specworld.in
Question bank
Smartzworld.com Smartworld.asia
jntuworldupdates.org Specworld.in
Question bank
Smartzworld.com Smartworld.asia
jntuworldupdates.org Specworld.in