QUALITY CONTROL PROGRAM

Name of Project : Concreting of Brgy. Karaos - Sta. Ana Farm to Market Road
Limits : 0+006.7 - 1+006.7 Location: San Francisco, Agusan del Sur
Appropriation/Contact Amount: P 10,000,000.00 Source of Funds: DA-GAA FY 2016
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)

100(1) Clearing and Grubbing sq.m 11,052.21 PE Cert.-1


100(3)a Individual Removal of Trees ea 40.00 PE Cert.-1
101(6) Removal of Structures and Obstruction cu.m. 25.66 PE Cert.-1
101(4)c Removal of Actual Structures and Obstruction, 910mm. Dia. RCPC l.m. 4.00 PE Cert.-1
101(4)e Removal of Actual Structures and Obstruction, 1220mm. Dia. RCPC l.m. 4.00 PE Cert.-1
102(2) Surplus Common Excavation cu.m. 1,711.45 PE Cert.-1
103(1)a Structure Excavation cu.m. 499.44 PE Cert.-1
103(3) Foundation Fill cu.m. 13.55 GPC-1, D-1
103(6) Pipe Culverts and Drain Excavation cu.m. 65.92 GPC-1, D-2
104(1)a Embankment from Roadway Excavation cu.m. 2,245.38 GPC-2, D-68
105(1)a Subgrade Preparation sq.m 2,127.05 GPC-2, D-64
200(1) Aggregate Subbase Course cu.m 2,397.38 GP-8, C-2, D-96, CBR-1
311(1)a PCCP (Unreinforced) 0.15m thk sq.m 4,374.28 CBS-9 sets
a.) Portland Cement bags 6,255 *
b.) Screened & Washed Fine Aggregate cu.m 360.88 **
c.) Screened & Washed Coarse Aggregate cu.m 656.14 ***
d.) RSB kgs 1,443.51 ****
e.) Water - - PE Cert.-1
f.) Curing Chemical Compound ltr 1,268.54 *****
g.) Asphalt Sealant ltr 524.91 ******
500(1)a5 Pipe Culverts, Class II, 01220 mm. l.m. 31.00 CCS-1set, IR-1
505(5) Grouted Riprap, Class "A" cu.m 458.66
a.) Portland Cement bags 1,376 *
b.) Screened & Washed Fine Aggregate cu.m 114.67 **
c.) Gravel cu.m 6.88 ***
d.) Water - - PE Cert.-1
e.) Boulders cu.m 481.59 *******
506(1) Stone Masonry cu.m 25.66
a.) Portland Cement bags 141 *
b.) Screened & Washed Fine Aggregate cu.m 7.70 **
c.) Gravel cu.m 0.51 ***
d.) Water - - PE Cert.-1
e.) Boulders cu.m 26.94 *******
605(1)a1 Warning Signs, 600mm. W1 - 1A ea 6.00 PE Cert.-1
Construction of Combined Field Office, Laboratory and
A.1.1(1) Living Quarters Building for the Engineer ls. 1.00 PE Cert.-1
B.4(1) Construction Survey & Staking km. 1.00 PE Cert.-1
B.4(4) Culvert Survey & Staking each 31.00 PE Cert.-1
B.5 Project Billboard Signboard each 4.00 PE Cert.-1
B.7 Occupational Ssafety and Health Program months 3.10 PE Cert.-1
B.8 Traffic Management months 3.10 PE Cert.-1
B.9 Mobilization/ Demobilization ls 1.00 PE Cert.-1
Summary of item 311(1)a, 505(5) & 506(1):
a.) Portland Cement * bags 7,772 Q-4
b.) Screened & Washed Fine Aggregate ** cu.m 483.24 Q-1, G-7
c.) Screened & Washed Coarse Aggregate *** cu.m 663.54 Q-1, G-9
d.) RSB **** 1,443.51 Q-1 per 10,000 kgs./size
e.) Curing Chemical Compound ***** 1,268.54 Q-1
f.) Asphalt Sealant ****** 524.91 Q-1
e.) Boulders ******* 508.54 Spec.Grav.-1, IR-1
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 10,000,000.00 0.5000% Q.C Chart--------- P 50,000.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 32,500.00 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 7,500.00 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 10,000.00 (34%) (B-1A) - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 50,000.00 TOTAL - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1/ Accred. # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
l Sur

95.90
QUALITY CONTROL PROGRAM

Name of Project : Rehab./Concreting of Del Monte - Sawagan FMR


Limits : 0+000.00 - 2+670.00 Location: Veruela, Agusan del Sur
Appropriation/Contact Amount: P 26,700,000.00 Source of Funds: DA-GAA FY 2016
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)

100(1) Clearing and Grubbing sq.m 28,580.00 PE Cert.-1


101(6) Removal of Structures and Obstruction cu.m. 31.20 PE Cert.-1
101(4)c Removal of Actual Structures and Obstruction, 910mm. Dia. RCPC l.m. 38.00 PE Cert.-1
102(2) Surplus Common Excavation cu.m. 15,199.23 PE Cert.-1
103(1)a Structure Excavation cu.m. 1,504.22 PE Cert.-1
103(3) Foundation Fill cu.m. 49.19 GPC-1, D-1
103(6) Pipe Culverts and Drain Excavation cu.m. 258.17 GPC-1, D-8
104(1)a Embankment from Roadway Excavation cu.m. 7,477.30 GPC-5, D-225
105(1)a Subgrade Preparation sq.m 11,580.00 GPC-2, D-70
200(1) Aggregate Subbase Course cu.m 6,441.57 GP-22, C-5, D-258, CBR-3
311(1)a PCCP (Unreinforced) 0.15m thk sq.m 7,809.76 CBS-16 sets
a.) Portland Cement bags 11,168 *
b.) Screened & Washed Fine Aggregate cu.m 644.31 **
c.) Screened & Washed Coarse Aggregate cu.m 1,171.46 ***
d.) RSB kgs 2,577.22 ****
e.) Water - - PE Cert.-1
f.) Curing Chemical Compound ltr 2,264.83 *****
g.) Asphalt Sealant ltr 937.17 ******
500(1)a5 Pipe Culverts, Class II, 01220 mm. l.m. 111.00 CCS-1set, IR-1
505(5) Grouted Riprap, Class "A" cu.m 1,591.12
a.) Portland Cement bags 4,773 *
b.) Screened & Washed Fine Aggregate cu.m 397.78 **
c.) Gravel cu.m 23.87 ***
d.) Water - - PE Cert.-1
e.) Boulders cu.m 1,670.68 *******
506(1) Stone Masonry cu.m 66.21
a.) Portland Cement bags 364 *
b.) Screened & Washed Fine Aggregate cu.m 19.86 **
c.) Gravel cu.m 1.32 ***
d.) Water - - PE Cert.-1
e.) Boulders cu.m 69.52 *******
603(3)a1 Metal Guardrail (Metal Beam) Including Post l.m. 140.00 Q-1
603(3)b1 Metal Beam End Piece ea 8.00 PE Cert.-1
605(1)a1 Warning Signs, 600mm. W1 - 1A ea 8.00 PE Cert.-1

Construction of Combined Field Office, Laboratory and


A.1.1(1) Living Quarters Building for the Engineer ls. 1.00 PE Cert.-1
B.4(1) Construction Survey & Staking km. 2.67 PE Cert.-1
B.4(4) Culvert Survey & Staking each 111.00 PE Cert.-1
B.4(10) Mics. Survey & Staking l.s. 1.00 PE Cert.-1
B.5 Project Billboard Signboard each 4.00 PE Cert.-1
B.7 Occupational Ssafety and Health Program months 4.90 PE Cert.-1
B.8 Traffic Management months 4.90 PE Cert.-1
B.9 Mobilization/ Demobilization ls 1.00 PE Cert.-1
Summary of item 311(1)a, 505(5) & 506(1):
a.) Portland Cement * bags 16,305 Q-9
b.) Screened & Washed Fine Aggregate ** cu.m 1,061.95 Q-1, G-15
c.) Screened & Washed Coarse Aggregate *** cu.m 1,196.66 Q-1, G-16
d.) RSB **** 2,577.22 Q-1 per 10,000 kgs./size
e.) Curing Chemical Compound ***** 2,264.83 Q-1
f.) Asphalt Sealant ****** 937.17 Q-1
e.) Boulders ******* 1,740.20 Spec.Grav.-1, IR-1
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 26,700,000.00 0.5000% Q.C Chart--------- P 133,500.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 86,775.00 Lab.(66%) (P-L) - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 20,025.00 Reg.l Lab. - - - - - - -- - - P
c.) Misc. & Other - (20%) - - - -- P 26,700.00 (34%) (B-1A) - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 133,500.00 TOTAL - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1/ Accred. # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
QUALITY CONTROL PROGRAM
Construction of Standard Two (2) Storey Six(6) Classrooms School Building - 9.5m x 36m. under
Name of Project :
Basic Educational Facilities Fund (BEFF) - Batch 1 at Sto. Tomas NHS
Limits : Location: Loreto, Agusan del Sur
Appropriation/Contact Amount: P 8,918,789.58 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801 Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803 Excavation of Cfooting, Wall Footing & SW Footing cu.m 543.87 PE Cert.-1
804(a) Backfilling of Excavated Materials cu.m 318.15 GPC-1, D-10
804(b) Gravel Bedding @ SOF, CF, WF, SW & FTB cu.m 58.43 PE Cert.-1
804(c ) Embankment cu.m 68.40 GPC-1, D-3
1000(a) Soil Poisoning sq.m 342.00 PE Cert.-1
900(a) RC Column Footing(fc'=3000 psi @ 28days) cu.m 111.35 *
404(a) Rein. Steel for Column Footing kgs 12,821.33 **
900(b) RC for Tie Beam & WF (fc'=3000psi @ 28days) cu.m 33.83 *
404(b) Rein. Steel for Tie Beam & WF kgs 5,668.20 **
900( c) RC Column,PC & Stiffener (fc'=3000psi @ 28days) cu.m 34.76 *
404(c ) Rein. Steel for Column,PC & Stiffener kgs 12,606.27 **
900(d) RC Beams(fc'=3000psi @ 28days) cu.m 24.96 *
404(d) Rein. Steel for Beams kgs 5698.47 **
RC for SOF, Slab (2nd flr.), Corridor, Stair, Sun Breaker, ST &
900( e) Ramp (fc=3,000 psi @ 28 days) cu.m 77.40 *
Rein. Steel for SOF, Slab (2nd Flr), Corridor, Stair, Sun
404( e) Breaker, ST & Ramp kgs 4,994.08 **
900( f) RC for Roof Beam (fc'=3000psi @ 28days) cu.m 19.14 *
404( f) Rein. Steel for Roof Beam kgs 3,336.87 **
506(1) Masonry Works (CHB) sq.m 870.93 for CHB, Q-1
1003 Carpentry for Ceiling sq.m 788.64 PE Cert.-1
1004.2.2 Finishing Hardware set 1.00 PE Cert.-1
1005 Jalousie Windows & Jamb sq.m 78.39 PE Cert.-1
1010(b) Panel Door Jamb sq.m 43.50 PE Cert.-1
1014 Prepainted Metal Sheet/Roofing sq.m 435.24 PE Cert.-1
403(a) Steel Trusses kgs. 11,307.85 Q-1
1018 Ceramic Tiles sq.m 120.00 PE Cert.-1
1027(a) Cement Plaster Finish kgs 1,502.40 PE Cert.-1
1032(a) Painting Works sq.m 1,352.16 Q-1
1016 Water Proofing sq.m 191.40 PE Cert.-1
1002 Plumbing Works lot 1.00 PE Cert.-1
1100 Conduits,Boxes and Fittings lot 1.00 PE Cert.-1
1101 Wires and Wiring Devices lot 1.00 PE Cert.-1
1102(a) Lighting Fixtures lot 1.00 PE Cert.-1
1102 Panel Boards & Cabinets lot 1.00 PE Cert.-1
SPL I Project Billboard sets 2.00 PE Cert.-1
SPL II Blackboard sets 6.00 PE Cert.-1
SPL III Safety & Health Officer hr 30.00 PE Cert.-1
SPL IV Personal Protective Equipment m.d 500.00 PE Cert.-1

Summary:
CCS-5 sets (Footing, Column,
900 Reinforced Concrete * cu.m 301.44 Beam & Slab)
(a,b,c,d,e) a.) Portland Cement bags 3,243 Q-2
b.) Screened & Washed Fine Aggregate cu.m 203.59 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 301.44 Q-1,G-4
d.) Water - - PE Cert.-1
404 Reinforcing Steel ** kgs 45,125.22 Q-5/size
(a,b,c,d,e)
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 8,918,789.58 0.5000% Q.C Chart--------- P 44,593.95
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 28,986.07 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 6,689.09 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 8,918.79 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 44,593.95 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:


LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section
SUBMITTED BY: APPROVED :
MANUEL C. NARIO MARCELINO M. OPERARIO
Engineer III District Engineer
Chief, Construction Section
er

mum)

[p;kl;l'

mn,

on

O
QUALITY CONTROL PROGRAM
Construction of Standard Two (2) Storey Six(6) Classrooms School Building - 9.5m x 36m. under
Name of Project :
Basic Educational Facilities Fund (BEFF) - Batch 1 at Bunawan NHS
Limits : Location: Bunawan, Agusan del Sur
Appropriation/Contact Amount: P 8,875,608.76 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801 Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803 Excavation of Cfooting, Wall Footing & SW Footing cu.m 614.86 PE Cert.-1
804(a) Backfilling of Excavated Materials cu.m 362.52 GPC-1, D-11
804(b) Gravel Bedding @ SOF, CF, WF, SW & FTB cu.m 44.46 PE Cert.-1
804(c ) Embankment cu.m 68.40 GPC-1, D-3
1000(a) Soil Poisoning sq.m 342.00 PE Cert.-1
900(a) RC Column Footing(fc'=3000 psi @ 28days) cu.m 126.88 *
404(a) Rein. Steel for Column Footing kgs 14,758.88 **
900(b) RC for Tie Beam & WF (fc'=3000psi @ 28days) cu.m 33.83 *
404(b) Rein. Steel for Tie Beam & WF kgs 5,668.20 **
900( c) RC Column,PC & Stiffener (fc'=3000psi @ 28days) cu.m 34.32 *
404(c ) Rein. Steel for Column,PC & Stiffener kgs 12,443.78 **
900(d) RC Beams(fc'=3000psi @ 28days) cu.m 24.96 *
404(d) Rein. Steel for Beams kgs 5698.47 **
RC for SOF, Slab (2nd flr.), Corridor, Stair, Sun Breaker, ST &
900( e) Ramp (fc=3,000 psi @ 28 days) cu.m 77.40 *
Rein. Steel for SOF, Slab (2nd Flr), Corridor, Stair, Sun
404( e) Breaker, ST & Ramp kgs 4,994.08 **
900( f) RC for Roof Beam (fc'=3000psi @ 28days) cu.m 19.14 *
404( f) Rein. Steel for Roof Beam kgs 3,336.87 **
506(1) Masonry Works (CHB) sq.m 870.93 for CHB, Q-1
1003 Carpentry for Ceiling sq.m 788.64 PE Cert.-1
1004.2.2 Finishing Hardware set 1.00 PE Cert.-1
1005 Jalousie Windows & Jamb sq.m 78.39 PE Cert.-1
1010(b) Panel Door Jamb sq.m 43.50 PE Cert.-1
1014 Prepainted Metal Sheet/Roofing sq.m 435.24 PE Cert.-1
403(a) Steel Trusses kgs. 11,307.85 Q-1
1018 Ceramic Tiles sq.m 120.00 PE Cert.-1
1027(a) Cement Plaster Finish kgs 1,502.40 PE Cert.-1
1032(a) Painting Works sq.m 1,502.40 Q-1
1016 Water Proofing sq.m 191.40 PE Cert.-1
1002 Plumbing Works lot 1.00 PE Cert.-1
1100 Conduits,Boxes and Fittings lot 1.00 PE Cert.-1
1101 Wires and Wiring Devices lot 1.00 PE Cert.-1
1102(a) Lighting Fixtures lot 1.00 PE Cert.-1
1102 Panel Boards & Cabinets lot 1.00 PE Cert.-1
SPL I Project Billboard sets 2.00 PE Cert.-1
SPL II Blackboard sets 6.00 PE Cert.-1
SPL III Safety & Health Officer hr 30.00 PE Cert.-1
SPL IV Personal Protective Equipment m.d 500.00 PE Cert.-1

Summary:
CCS-5 sets (Footing,
900 Reinforced Concrete * cu.m 316.53 Column, Beam & Slab)
(a,b,c,d,e) a.) Portland Cement bags 3,375 Q-2
b.) Screened & Washed Fine Aggregate cu.m 211.13 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 316.53 Q-1,G-5
d.) Water - - PE Cert.-1
404 Reinforcing Steel ** kgs 46,900.28 Q-5/size
(a,b,c,d,e)
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 8,875,608.76 0.5000% Q.C Chart--------- P 44,378.04
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 28,845.73 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 6,656.71 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 8,875.61 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 44,378.04 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:


LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section
SUBMITTED BY: APPROVED :
MANUEL C. NARIO MARCELINO M. OPERARIO
Engineer III District Engineer
Chief, Construction Section
Sur
QUALITY CONTROL PROGRAM
Construction of Standard Two (2) Storey Six(6) Classrooms School Building - 9.5m x 36m. under
Name of Proj:
Basic Educational Facilities Fund (BEFF) - Batch 1 at Sta. Josefa NHS
Limits : Location: Sta. Josefa, Agusan del Sur
Appropriation/Contact AmountP 9,025,229.63 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801 Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803 Excavation of Cfooting, Wall Footing & SW Footing cu.m 543.87 PE Cert.-1
804(a) Backfilling of Excavated Materials cu.m 318.15 GPC-1, D-10
804(b) Gravel Bedding @ SOF, CF, WF, SW & FTB cu.m 40.02 PE Cert.-1
804(c ) Embankment cu.m 188.10 GPC-1, D-6
1000(a) Soil Poisoning sq.m 342.00 PE Cert.-1
900(a) RC Column Footing(fc'=3000 psi @ 28days) cu.m 111.35 *
404(a) Rein. Steel for Column Footing kgs 12,821.33 **
900(b) RC for Tie Beam & WF (fc'=3000psi @ 28days) cu.m 33.83 *
404(b) Rein. Steel for Tie Beam & WF kgs 5,668.20 **
900( c) RC Column,PC & Stiffener (fc'=3000psi @ 28days) cu.m 35.76 *
404(c ) Rein. Steel for Column,PC & Stiffener kgs 12,974.00 **
900(d) RC Beams(fc'=3000psi @ 28days) cu.m 24.96 *
404(d) Rein. Steel for Beams kgs 5698.47 **
RC for SOF, Slab (2nd flr.), Corridor, Stair, Sun Breaker, ST &
900( e) Ramp (fc=3,000 psi @ 28 days) cu.m 77.40 *
Rein. Steel for SOF, Slab (2nd Flr), Corridor, Stair, Sun
404( e) Breaker, ST & Ramp kgs 4,994.08 **
900( f) RC for Roof Beam (fc'=3000psi @ 28days) cu.m 19.14 *
404( f) Rein. Steel for Roof Beam kgs 3,336.87 **
506(1) Masonry Works (CHB) sq.m 870.93 for CHB, Q-1
1003 Carpentry for Ceiling sq.m 788.64 PE Cert.-1
1004.2.2 Finishing Hardware set 1.00 PE Cert.-1
1005 Jalousie Windows & Jamb sq.m 78.39 PE Cert.-1
1010(b) Panel Door Jamb sq.m 43.50 PE Cert.-1
1014 Prepainted Metal Sheet/Roofing sq.m 435.24 PE Cert.-1
403(a) Steel Trusses kgs. 11,307.85 Q-1
1018 Ceramic Tiles sq.m 120.00 PE Cert.-1
1027(a) Cement Plaster Finish kgs 1,502.40 PE Cert.-1
1032(a) Painting Works sq.m 1,502.40 Q-1
1016 Water Proofing sq.m 191.40 PE Cert.-1
1002 Plumbing Works lot 1.00 PE Cert.-1
1100 Conduits,Boxes and Fittings lot 1.00 PE Cert.-1
1101 Wires and Wiring Devices lot 1.00 PE Cert.-1
1102(a) Lighting Fixtures lot 1.00 PE Cert.-1
1102 Panel Boards & Cabinets lot 1.00 PE Cert.-1
SPL I Project Billboard sets 2.00 PE Cert.-1
SPL II Blackboard sets 6.00 PE Cert.-1
SPL III Safety & Health Officer hr 30.00 PE Cert.-1
SPL IV Personal Protective Equipment m.d 500.00 PE Cert.-1

Summary:
CCS-5 sets (Footing, Column,
900 Reinforced Concrete * cu.m 302.44 Beam & Slab)
(a,b,c,d,e) a.) Portland Cement bags 3,252 Q-2
b.) Screened & Washed Fine Aggregate cu.m 204.09 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 302.44 Q-1,G-5
d.) Water - - PE Cert.-1
404 Reinforcing Steel ** kgs 45,492.95 Q-5/size
(a,b,c,d,e)
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 9,025,229.63 0.5000% Q.C Chart--------- P 45,126.15
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 29,332.00 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 6,768.92 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 9,025.23 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 45,126.15 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:


LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section
SUBMITTED BY: APPROVED :
MANUEL C. NARIO MARCELINO M. OPERARIO
Engineer III District Engineer
Chief, Construction Section
QUALITY CONTROL PROGRAM
Construction of Standard Two (2) Storey Six(6) Classrooms School Building - 9.5m x 36m. under
Name of Proj:
Basic Educational Facilities Fund (BEFF) - Batch 1 at La Fortuna NHS
Limits : Location: Sta. Josefa, Agusan del Sur
Appropriation/Contact AmountP 9,025,229.63 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801 Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803 Excavation of Cfooting, Wall Footing & SW Footing cu.m 506.14 PE Cert.-1
804(a) Backfilling of Excavated Materials cu.m 294.57 GPC-1, D-9
804(b) Gravel Bedding @ SOF, CF, WF, SW & FTB cu.m 37.66 PE Cert.-1
804(c ) Embankment cu.m 102.60 GPC-1, D-4
1000(a) Soil Poisoning sq.m 342.00 PE Cert.-1
900(a) RC Column Footing(fc'=3000 psi @ 28days) cu.m 103.10 *
404(a) Rein. Steel for Column Footing kgs 12,327.36 **
900(b) RC for Tie Beam & WF (fc'=3000psi @ 28days) cu.m 33.83 *
404(b) Rein. Steel for Tie Beam & WF kgs 5,668.20 **
900( c) RC Column,PC & Stiffener (fc'=3000psi @ 28days) cu.m 34.90 *
404(c ) Rein. Steel for Column,PC & Stiffener kgs 12,657.58 **
900(d) RC Beams(fc'=3000psi @ 28days) cu.m 24.96 *
404(d) Rein. Steel for Beams kgs 5698.47 **
RC for SOF, Slab (2nd flr.), Corridor, Stair, Sun Breaker, ST &
900( e) Ramp (fc=3,000 psi @ 28 days) cu.m 77.40 *
Rein. Steel for SOF, Slab (2nd Flr), Corridor, Stair, Sun
404( e) Breaker, ST & Ramp kgs 4,994.08 **
900( f) RC for Roof Beam (fc'=3000psi @ 28days) cu.m 19.14 *
404( f) Rein. Steel for Roof Beam kgs 3,336.87 **
506(1) Masonry Works (CHB) sq.m 870.93 for CHB, Q-1
1003 Carpentry for Ceiling sq.m 788.64 PE Cert.-1
1004.2.2 Finishing Hardware set 1.00 PE Cert.-1
1005 Jalousie Windows & Jamb sq.m 78.39 PE Cert.-1
1010(b) Panel Door Jamb sq.m 43.50 PE Cert.-1
1014 Prepainted Metal Sheet/Roofing sq.m 435.24 PE Cert.-1
403(a) Steel Trusses kgs. 11,307.85 Q-1
1018 Ceramic Tiles sq.m 120.00 PE Cert.-1
1027(a) Cement Plaster Finish kgs 1,502.40 PE Cert.-1
1032(a) Painting Works sq.m 1,502.40 Q-1
1016 Water Proofing sq.m 191.40 PE Cert.-1
1002 Plumbing Works lot 1.00 PE Cert.-1
1100 Conduits,Boxes and Fittings lot 1.00 PE Cert.-1
1101 Wires and Wiring Devices lot 1.00 PE Cert.-1
1102(a) Lighting Fixtures lot 1.00 PE Cert.-1
1102 Panel Boards & Cabinets lot 1.00 PE Cert.-1
SPL I Project Billboard sets 2.00 PE Cert.-1
SPL II Blackboard sets 6.00 PE Cert.-1
SPL III Safety & Health Officer hr 30.00 PE Cert.-1
SPL IV Personal Protective Equipment m.d 500.00 PE Cert.-1

Summary:
CCS-4 sets (Footing, Column,
900 Reinforced Concrete * cu.m 293.33 Beam & Slab)
(a,b,c,d,e) a.) Portland Cement bags 3,172 Q-2
b.) Screened & Washed Fine Aggregate cu.m 199.53 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 293.33 Q-1,G-4
d.) Water - - PE Cert.-1
404 Reinforcing Steel ** kgs 44,682.56 Q-5/size
(a,b,c,d,e)
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 9,025,229.63 0.5000% Q.C Chart--------- P 45,126.15
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 29,332.00 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 6,768.92 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 9,025.23 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 45,126.15 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:


LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section
SUBMITTED BY: APPROVED :
MANUEL C. NARIO MARCELINO M. OPERARIO
Engineer III District Engineer
Chief, Construction Section
QUALITY CONTROL PROGRAM
Construction of Standard Two (2) Storey Six(6) Classrooms School Building - 9.5m x 36m. under
Name of Proje:
Basic Educational Facilities Fund (BEFF) - Batch 1 at Libertad NHS
Limits : Location: Bunawan, Agusan del Sur
Appropriation/Contact Amount: P 9,127,210.40 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801 Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803 Excavation of Cfooting, Wall Footing & SW Footing cu.m 202.73 PE Cert.-1
804(a) Backfilling of Excavated Materials cu.m 65.25 GPC-1, D-2
804(b) Gravel Bedding @ SOF, CF, WF, SW & FTB cu.m 18.70 PE Cert.-1
804(c ) Embankment cu.m 131.67 GPC-1, D-4
1000(a) Soil Poisoning sq.m 342.00 PE Cert.-1
900(a) RC Column Footing(fc'=3000 psi @ 28days) cu.m 37.64 *
404(a) Rein. Steel for Column Footing kgs 2,534.99 **
900(b) RC for Tie Beam & WF (fc'=3000psi @ 28days) cu.m 33.83 *
404(b) Rein. Steel for Tie Beam & WF kgs 5,668.20 **
900( c) RC Column,PC & Stiffener (fc'=3000psi @ 28days) cu.m 35.76 *
404(c ) Rein. Steel for Column,PC & Stiffener kgs 12,974.00 **
900(d) RC Beams(fc'=3000psi @ 28days) cu.m 24.96 *
404(d) Rein. Steel for Beams kgs 5698.47 **
RC for SOF, Slab (2nd flr.), Corridor, Stair, Sun Breaker, ST &
900( e) Ramp (fc=3,000 psi @ 28 days) cu.m 77.40 *
Rein. Steel for SOF, Slab (2nd Flr), Corridor, Stair, Sun
404( e) Breaker, ST & Ramp kgs 4,994.08 **
900( f) RC for Roof Beam (fc'=3000psi @ 28days) cu.m 19.14 *
404( f) Rein. Steel for Roof Beam kgs 3,336.87 **
506(1) Masonry Works (CHB) sq.m 870.93 for CHB, Q-1
1003 Carpentry for Ceiling sq.m 788.64 PE Cert.-1
1004.2.2 Finishing Hardware set 1.00 PE Cert.-1
1005 Jalousie Windows & Jamb sq.m 78.39 PE Cert.-1
1010(b) Panel Door Jamb sq.m 43.50 PE Cert.-1
1014 Prepainted Metal Sheet/Roofing sq.m 435.24 PE Cert.-1
403(a) Steel Trusses kgs. 11,307.85 Q-1
1018 Ceramic Tiles sq.m 120.00 PE Cert.-1
1027(a) Cement Plaster Finish kgs 1,502.40 PE Cert.-1
1032(a) Painting Works sq.m 1,502.40 Q-1
1016 Water Proofing sq.m 191.40 PE Cert.-1
1002 Plumbing Works lot 1.00 PE Cert.-1
1100 Conduits,Boxes and Fittings lot 1.00 PE Cert.-1
1101 Wires and Wiring Devices lot 1.00 PE Cert.-1
1102(a) Lighting Fixtures lot 1.00 PE Cert.-1
1102 Panel Boards & Cabinets lot 1.00 PE Cert.-1
SPL I Project Billboard sets 2.00 PE Cert.-1
SPL II R.C. Piles lm 202.50 PE Cert.-1
SPL III Blackboard set 6.00 PE Cert.-1
SPL IV Safety & Health Officer hr 30.00 PE Cert.-1
SPL V Personal Protective Equipment md 500.00 PE Cert.-1
Summary:
CCS-4 sets (Footing,
900 Reinforced Concrete * cu.m 228.73 Column,Beam & Slab)
(a,b,c,d,e) a.) Portland Cement bags 2,607 Q-2
b.) Screened & Washed Fine Aggregate cu.m 167.23 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 228.73 Q-1,G-4
d.) Water - - PE Cert.-1
404 Reinforcing Steel ** kgs 35,206.61 Q-4/size
(a,b,c,d,e)
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 9,127,210.40 0.5000% Q.C Chart--------- P 45,636.05
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 29,663.43 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 6,845.41 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 9,127.21 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 45,636.05 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:


LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section
SUBMITTED BY: APPROVED :
MANUEL C. NARIO MARCELINO M. OPERARIO
Engineer III District Engineer
Chief, Construction Section
QUALITY CONTROL PROGRAM
Construction of Standard Two (2) Storey Six(6) Classrooms School Building - 9.5m x 36m. under
Name of Proje:
Basic Educational Facilities Fund (BEFF) - Batch 1 at Bayugan III NHS
Limits : Location: Rosario, Agusan del Sur
Appropriation/Contact Amount: P 8,992,958.12 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801 Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803 Excavation of Cfooting, Wall Footing & SW Footing cu.m 614.86 PE Cert.-1
804(a) Backfilling of Excavated Materials cu.m 362.52 GPC-1, D-11
804(b) Gravel Bedding @ SOF, CF, WF, SW & FTB cu.m 44.46 PE Cert.-1
804(c ) Embankment cu.m 136.80 GPC-1, D-5
1000(a) Soil Poisoning sq.m 342.00 PE Cert.-1
900(a) RC Column Footing(fc'=3000 psi @ 28days) cu.m 126.88 *
404(a) Rein. Steel for Column Footing kgs 14,778.50 **
900(b) RC for Tie Beam & WF (fc'=3000psi @ 28days) cu.m 33.83 *
404(b) Rein. Steel for Tie Beam & WF kgs 5,668.20 **
900( c) RC Column,PC & Stiffener (fc'=3000psi @ 28days) cu.m 24.78 *
404(c ) Rein. Steel for Column,PC & Stiffener kgs 7,904.28 **
900(d) RC Beams(fc'=3000psi @ 28days) cu.m 24.96 *
404(d) Rein. Steel for Beams kgs 5698.47 **
RC for SOF, Slab (2nd flr.), Corridor, Stair, Sun Breaker, ST &
900( e) Ramp (fc=3,000 psi @ 28 days) cu.m 77.40 *
Rein. Steel for SOF, Slab (2nd Flr), Corridor, Stair, Sun
404( e) Breaker, ST & Ramp kgs 4,994.08 **
900( f) RC for Roof Beam (fc'=3000psi @ 28days) cu.m 19.14 *
404( f) Rein. Steel for Roof Beam kgs 3,336.87 **
506(1) Masonry Works (CHB) sq.m 870.93 for CHB, Q-1
1003 Carpentry for Ceiling sq.m 788.64 PE Cert.-1
1004.2.2 Finishing Hardware set 1.00 PE Cert.-1
1005 Jalousie Windows & Jamb sq.m 78.39 PE Cert.-1
1010(b) Panel Door Jamb sq.m 43.50 PE Cert.-1
1014 Prepainted Metal Sheet/Roofing sq.m 435.24 PE Cert.-1
403(a) Steel Trusses kgs. 11,307.85 Q-1
1018 Ceramic Tiles sq.m 120.00 PE Cert.-1
1027(a) Cement Plaster Finish kgs 1,502.40 PE Cert.-1
1032(a) Painting Works sq.m 1,502.40 Q-1
1016 Water Proofing sq.m 191.40 PE Cert.-1
1002 Plumbing Works lot 1.00 PE Cert.-1
1100 Conduits,Boxes and Fittings lot 1.00 PE Cert.-1
1101 Wires and Wiring Devices lot 1.00 PE Cert.-1
1102(a) Lighting Fixtures lot 1.00 PE Cert.-1
1102 Panel Boards & Cabinets lot 1.00 PE Cert.-1
SPL I Project Billboard sets 2.00 PE Cert.-1
SPL II Blackboard sets 6.00 PE Cert.-1
SPL III Safety & Health Officer hr 30.00 PE Cert.-1
SPL IV Personal Protective Equipment(PPE) md 500.00 PE Cert.-1
Summary:
CCS-5 sets (Footing, Column,
900 Reinforced Concrete * cu.m 306.99 Beam & Slab)
(a,b,c,d,e) a.) Portland Cement bags 3,315 Q-2
b.) Screened & Washed Fine Aggregate cu.m 206.36 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 306.99 Q-1,G-5
d.) Water - - PE Cert.-1
404 Reinforcing Steel ** kgs 42,380.40 Q-5/size
(a,b,c,d,e)
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 8,992,958.12 0.5000% Q.C Chart--------- P 44,964.79
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 29,227.11 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 6,744.72 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 8,992.96 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 44,964.79 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:


LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section
SUBMITTED BY: APPROVED :
MANUEL C. NARIO MARCELINO M. OPERARIO
Engineer III District Engineer
Chief, Construction Section
QUALITY CONTROL PROGRAM
Construction of Standard Two (2) Storey Six(6) Classrooms School Building - 9.5m x 36m. under
Name of Proje:
Basic Educational Facilities Fund (BEFF) - Batch 1 at Magaud NHS
Limits : Location: Loreto, Agusan del Sur
Appropriation/Contact Amount: P 6,367,120.15 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801 Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803 Excavation of Cfooting, Wall Footing & SW Footing cu.m 511.92 PE Cert.-1
804(a) Backfilling of Excavated Materials cu.m 233.10 GPC-1, D-7
804(b) Gravel Bedding @ SOF, CF, WF, SW & FTB cu.m 28.54 PE Cert.-1
804(c ) Embankment cu.m 42.75 GPC-1, D-2
1000(a) Soil Poisoning sq.m 213.75 PE Cert.-1
900(a) RC Column Footing(fc'=3000 psi @ 28days) cu.m 81.59 *
404(a) Rein. Steel for Column Footing kgs 9,114.33 **
900(b) RC for Tie Beam & WF (fc'=3000psi @ 28days) cu.m 21.66 *
404(b) Rein. Steel for Tie Beam & WF kgs 3,354.52 **
900( c) RC Column,PC & Stiffener (fc'=3000psi @ 28days) cu.m 33.24 *
404(c ) Rein. Steel for Column,PC & Stiffener kgs 10,224.00 **
900(d) RC Beams(fc'=3000psi @ 28days) cu.m 15.97 *
404(d) Rein. Steel for Beams kgs 2651.62 **
RC for SOF, Slab (2nd flr.), Corridor, Stair, Sun Breaker, ST &
900( e) Ramp (fc=3,000 psi @ 28 days) cu.m 69.26 *
Rein. Steel for SOF, Slab (2nd Flr), Corridor, Stair, Sun
404( e) Breaker, ST & Ramp kgs 3,863.41 **
900( f) RC for Roof Beam (fc'=3000psi @ 28days) cu.m 13.20 *
404( f) Rein. Steel for Roof Beam kgs 2,764.02 **
506(1) Masonry Works (CHB) sq.m 566.23 for CHB, Q-1
1003 Carpentry for Ceiling sq.m 491.04 PE Cert.-1
1004.2.2 Finishing Hardware set 1.00 PE Cert.-1
1005 Jalousie Windows & Jamb sq.m 49.40 PE Cert.-1
1010(b) Panel Door Jamb sq.m 27.30 PE Cert.-1
1014 Prepainted Metal Sheet/Roofing sq.m 277.29 PE Cert.-1
403(a) Steel Trusses kgs. 6,564.37 Q-1
1018 Ceramic Tiles sq.m 89.47 PE Cert.-1
1027(a) Cement Plaster Finish kgs 725.00 PE Cert.-1
1032(a) Painting Works sq.m 725.00 Q-1
1016 Water Proofing sq.m 191.40 PE Cert.-1
1002 Plumbing Works lot 1.00 PE Cert.-1
1100 Conduits,Boxes and Fittings lot 1.00 PE Cert.-1
1101 Wires and Wiring Devices lot 1.00 PE Cert.-1
1102(a) Lighting Fixtures lot 1.00 PE Cert.-1
1102 Panel Boards & Cabinets lot 1.00 PE Cert.-1
SPL I Project Billboard sets 2.00 PE Cert.-1
SPL II Blackboard sets 4.00 PE Cert.-1
SPL III Safety & Health Officer hr 25.00 PE Cert.-1
SPL IV Personal Protective Equipment(PPE) md 350.00 PE Cert.-1
Summary:
CCS-4 sets (Footing, Column,
900 Reinforced Concrete * cu.m 234.92 Beam & Slab)
(a,b,c,d,e) a.) Portland Cement bags 2,443 Q-2
b.) Screened & Washed Fine Aggregate cu.m 152.30 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 234.92 Q-1,G-4
d.) Water - - PE Cert.-1
404 Reinforcing Steel ** kgs 31,971.90 Q-4/size
(a,b,c,d,e)
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 6,367,120.15 0.5000% Q.C Chart--------- P 31,835.60
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 20,693.14 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 4,775.34 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 6,367.12 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 31,835.60 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:


LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section
SUBMITTED BY: APPROVED :
MANUEL C. NARIO MARCELINO M. OPERARIO
Engineer III District Engineer
Chief, Construction Section
QUALITY CONTROL PROGRAM

Name of Project: Concreting of Brgy. Hubang - Kaagapmuco Farm to Market Road


Limits : 0+000 - 0+880 Location: San Francisco, Agusan del Sur
Appropriation/Contact Amount: P 8,800,000.00 Source of Funds: PCA - GAA 2015
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)

100(1) Clearing and Grubbing sq.m 3,520.00 PE Cert.-1


103(1)a Structure Excavation cu.m. 26.26 PE Cert.-1
103(3) Foundation Fill cu.m. 12.70 GPC-1, D-1
103(6) Pipe Culverts and Drain Excavation cu.m. 23.27 PE Cert.-1
104(1)a Embankment from Roadway Excavation cu.m. 751.17 GPC-1, D-23
104(1)b Embankment (Borrow) cu.m. 751.17 GPC-1, D-21
105(1)a Subgrade Preparation sq.m 2,962.50 GPC-1, D-18
200(1) Aggregate Subbase Course cu.m 2,096.59 GP-7, C-2, D-84, CBR-1
311(1)b PCCP (Unreinforced) 0.20m thk sq.m 4,714.56 CBS-13 sets
a.) Portland Cement bags 8,958 *
b.) Screened & Washed Fine Aggregate cu.m 518.60 **
c.) Screened & Washed Coarse Aggregate cu.m 942.91 ***
d.) RSB kgs 1,838.68 ****
e.) Water - - PE Cert.-1
f.) Curing Chemical Compound ltr 1,367.22 *****
g.) Asphalt Sealant ltr 565.75 ******
500(1)b5 Pipe Culverts, Class II, 1220 mm. Dia (48" dia) l.m. 26.00 CCS-1set, IR-1
505(5) Grouted Riprap, Class "A" cu.m 9.76
a.) Portland Cement bags 29 *
b.) Screened & Washed Fine Aggregate cu.m 2.44 **
c.) Gravel cu.m 0.15 ***
d.) Water - - PE Cert.-1
e.) Boulders cu.m 10.25 *******
506(1) Stone Masonry cu.m 19.00
a.) Portland Cement bags 105 *
b.) Screened & Washed Fine Aggregate cu.m 5.70 **
c.) Gravel cu.m 0.38 ***
d.) Water - - PE Cert.-1
e.) Boulders cu.m 19.95 *******
612(1) Reflectorized Thermoplastic Pavement Marking (white) sq.m 205.95 Q-1
612(2) Reflectorized Thermoplastic Pavement Marking (yellow) sq.m 84.28Q-1
A.1.1(3) Construction for Field Office for the Engineer ls. 1.00PE Cert.-1
B.4 Construction Survey & Staking km. 0.88PE Cert.-1
B.4(4) Culvert Survey & Staking each 26.00PE Cert.-1
B.5 Project Billboard each 4.00PE Cert.-1
B.7 Occupational Ssafety and Health Program months 3.00PE Cert.-1
B.8 Traffic Management months 3.00 PE Cert.-1
B.9 Mobilization/ Demobilization ls 1.00 PE Cert.-1
Summary of item 311(1)a, 505(5) & 506(1):
a.) Portland Cement * bags 9,091 Q-5
b.) Screened & Washed Fine Aggregate ** cu.m 526.74 Q-1, G-8
c.) Screened & Washed Coarse Aggregate *** cu.m 943.44 Q-1, G-13
d.) RSB **** kgs. 1,838.68 Q-1 per 10,000 kgs./size
e.) Curing Chemical Compound ***** lit 1,367.22 Q-1
f.) Asphalt Sealant ****** lit 565.75 Q-1
e.) Boulders ******* cu.m. 30.20 Spec.Grav.-1, IR-1
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 8,800,000.00 0.5000% Q.C Chart--------- P 44,000.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 28,600.00 Lab.(66%) (P-L) - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 6,600.00 Reg.l Lab. - - - - - - -- - P
c.) Misc. & Other - (20%) - - - -- P 8,800.00 (34%) (B-1A) - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 44,000.00 TOTAL - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1/ Accred. # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
l Sur
QUALITY CONTROL PROGRAM
Name of Project :
Construction of One(1)-Storey TechVoc Workshop/Laboratory Building (Batch 6) @ Bunawan
National High School, Bunawan, ADS(A)
Limits : Location: Bunawan, Agusan del Sur
Appropriation/Contact Amount: P 2,510,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801(1) Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803(1)a Structure Excavation cu.m 26.36 PE Cert.-1
803(3) Foundation Fill cu.m 16.33 GPC-1, D-1
804(1)b Embankment cu.m 110.38 GPC-1, D-4
900(1) Reinfroce Concrete * cu.m 55.58 CCS - 1 set
1043(2)a CHB Non-Load bearing sq.m 82.42 Q-1
1043(2)b CHB Non-Load bearing sq.m 256.56 Q-1
1044(1) Forms & Falseworks bd.ft. 1,137.33 PE Cert.-1
1003(1)b Carpentry for Ceiling sq.m 179.55 PE Cert.-1
1003(3) Cabinets sq.m 5.10 PE Cert.-1
1004(2)e Finishing Hardware set 10.00 PE Cert.-1
1004(2)g Finishing Hardware set 21.00 PE Cert.-1
1009(1)a Jalousie Windows & Jamb sq.m 24.53 PE Cert.-1
1010(1) Windows & Door Jamb bd.ft. 508.00 PE Cert.-1
1010(2)a Flush Door sq.m 6.30 PE Cert.-1
1010(2)b Panel Door sq.m 6.30 PE Cert.-1
1013(2)a Fabricated Metal Roofing Accesory sq.m 18.18 PE Cert.-1
1013(2)b Fabricated Metal Roofing Accesory pcs. 24.00 PE Cert.-1
1013(2)c Fabricated Metal Roofing Accesory pcs. 17.73 PE Cert.-1
1014(1)a1 Prepainted Metal Sheets/Roofing sq.m 218.78 PE Cert.-1
403(a) Steel Trusses kgs. 3,123.94 Q-1
1018(1) Ceramic/Granite Tiles sq.m 17.92 PE Cert.-1
1018(2) Ceramic/Granite Tiles sq.m 5.20 PE Cert.-1
1027(1) Cement Plaster Finish sq.m 286.54 PE Cert.-1
1032(1) Painting Works sq.m 424.49 Q-1
1001(1)a5 Pipe mts 72.00 PE Cert.-1
1001(1)a7 Pipe mts 24.00 PE Cert.-1
1001(2)a1 Fittings each 5.00 PE Cert.-1
1001(2)a3 Fittings each 3.00 PE Cert.-1
1001(2)b1 Fittings each 24.00 PE Cert.-1
1001(2)b3 Fittings each 3.00 PE Cert.-1
1001(2)c1 Fittings each 5.00 PE Cert.-1
1001(2)c3 Fittings each 7.00 PE Cert.-1
1001(2)e1 Fittings each 14.00 PE Cert.-1
1001(2)e3 Fittings each 2.00 PE Cert.-1
1001(2)g1 Fittings each 16.00 PE Cert.-1
1001(2)g3 Fittings each 4.00 PE Cert.-1
1001(2)I2 Fittings each 8.00 PE Cert.-1
1002(7)a2 PVC Pipes(Blue) piece 28.00 PE Cert.-1
1002(7)b2 PVC Pipes(Blue) piece 32.00 PE Cert.-1
1002(7)d2 PVC Pipes(Blue) piece 12.00 PE Cert.-1
1002(7)h2 PVC Pipes(Blue) piece 16.00 PE Cert.-1
1002(2) Plumbing Fixtures set 4.00 PE Cert.-1
1001(6)b Catch Basin each 10.00 PE Cert.-1
1100(1)a2 Rigid Steel Conduit(RSC) length 2.00 PE Cert.-1
1100(2)a1 Piece piece 2.00 PE Cert.-1
1100(4)d1 PVC Elbow piece 4.00 PE Cert.-1
1100(6) Conduits Clamp piece 10.00 PE Cert.-1
1100(7)b1 Polyvinyl Chloride Pipes (PVC) piece 6.00 PE Cert.-1
1100(8) G.I. Wire kgs. 1.00 PE Cert.-1
1100(12) PVC Solvent Cement can 1.00 PE Cert.-1
1100(14) Octagonal Junction Boxes piece 10.00 PE Cert.-1
1100(15) Utility Boxes piece 15.00 PE Cert.-1
1100(22) Grounding Rod Copperweld length 1.00 PE Cert.-1
1101(1)a2 Electrical Wire roll 3.00 PE Cert.-1
1101(1)a3 Electrical Wire roll 1.00 PE Cert.-1
1101(1)a4 Electrical Wire roll 0.60 PE Cert.-1
1101(2) Tumbler Switch Single Pole piece 4.00 PE Cert.-1
1101(3) Tumbler Switch Two-Gang piece 6.00 PE Cert.-1
1101(6) Duplex Convenience Receptacles set 6.00 PE Cert.-1
1101(11) Rubber Tape rolls 12.00 PE Cert.-1
1102(1) Panel Board Breaker Type set 1.00 PE Cert.-1
1103(2)a1 Pin Light 6 inch. Dia w/ single CFL Bulb set 7.00 PE Cert.-1
1103(1)b4 Flourescent Lighting Fixture set 12.00 PE Cert.-1
1208(2)b1 G.I. Steel Pipes for Railings meter 91.66 PE Cert.-1
B.5 Project Billboard/Signboard sets 2.00 PE Cert.-1
B.7 Occpational Safety and Health Program month 3.00 PE Cert.-1
B.9 Mobilization/Demobilization ls. 1.00 PE Cert.-1
SPL V Blackboard sets 1.00 PE Cert.-1
Summary:

900 Reinforced Concrete *


(a,b,c,d,e) a.) Portland Cement bags 782.62 Q-1
b.) Screened & Washed Fine Aggregate cu.m 39.30 Q-1,G-1
c.) Screened & Washed Coarse Aggregate cu.m 37.06 Q-1,G-1
d.) Water - - PE Cert.-1
e.) Reinforcing Steel kgs 5,885.52 Q-1/size per 10,000 kgs.

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 2,510,000.00 0.5000% Q.C Chart--------- P 12,550.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 8,157.50 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 1,882.50 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 2,510.00 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 12,550.00 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:


LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section
SUBMITTED BY: APPROVED :
MANUEL C. NARIO MARCELINO M. OPERARIO
Engineer III District Engineer
Chief, Construction Section
QUALITY CONTROL PROGRAM
Name of Project :
Construction of One(1)-Storey TechVoc Workshop/Laboratory Building (Batch 6) @ Bunawan
National High School, Bunawan, ADS(B)
Limits : Location: Bunawan, Agusan del Sur
Appropriation/Contact Amount: P 2,510,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801(1) Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803(1)a Structure Excavation cu.m 26.36 PE Cert.-1
803(3) Foundation Fill cu.m 16.33 GPC-1, D-1
804(1)b Embankment cu.m 18.58 GPC-1, D-1
900(1) Reinfroce Concrete * cu.m 54.99 CCS - 1 set
1043(2)a CHB Non-Load bearing sq.m 80.34 Q-1
1043(2)b CHB Non-Load bearing sq.m 246.56 Q-1
1044(1) Forms & Falseworks bd.ft. 1,137.33 PE Cert.-1
1003(1)b Carpentry for Ceiling sq.m 179.55 PE Cert.-1
1003(3) Cabinets sq.m 5.10 PE Cert.-1
1004(2)e Finishing Hardware set 10.00 PE Cert.-1
1004(2)g Finishing Hardware set 21.00 PE Cert.-1
1009(1)a Jalousie Windows & Jamb sq.m 24.53 PE Cert.-1
1010(1) Windows & Door Jamb bd.ft. 508.00 PE Cert.-1
1010(2)a Flush Door sq.m 6.30 PE Cert.-1
1010(2)b Panel Door sq.m 6.30 PE Cert.-1
1013(2)a Fabricated Metal Roofing Accesory sq.m 18.18 PE Cert.-1
1013(2)b Fabricated Metal Roofing Accesory pcs. 24.00 PE Cert.-1
1013(2)c Fabricated Metal Roofing Accesory pcs. 17.73 PE Cert.-1
1014(1)a1 Prepainted Metal Sheets/Roofing sq.m 218.78 PE Cert.-1
403(a) Steel Trusses kgs. 3,123.94 Q-1
1018(1) Ceramic/Granite Tiles sq.m 17.92 PE Cert.-1
1018(2) Ceramic/Granite Tiles sq.m 5.20 PE Cert.-1
1027(1) Cement Plaster Finish sq.m 274.46 PE Cert.-1
1032(1) Painting Works sq.m 412.41 Q-1
1001(1)a5 Pipe mts 72.00 PE Cert.-1
1001(1)a7 Pipe mts 24.00 PE Cert.-1
1001(2)a1 Fittings each 5.00 PE Cert.-1
1001(2)a3 Fittings each 3.00 PE Cert.-1
1001(2)b1 Fittings each 24.00 PE Cert.-1
1001(2)b3 Fittings each 3.00 PE Cert.-1
1001(2)c1 Fittings each 5.00 PE Cert.-1
1001(2)c3 Fittings each 7.00 PE Cert.-1
1001(2)e1 Fittings each 14.00 PE Cert.-1
1001(2)e3 Fittings each 2.00 PE Cert.-1
1001(2)g1 Fittings each 16.00 PE Cert.-1
1001(2)g3 Fittings each 4.00 PE Cert.-1
1001(2)I2 Fittings each 8.00 PE Cert.-1
1002(7)a2 PVC Pipes(Blue) piece 26.00 PE Cert.-1
1002(7)b2 PVC Pipes(Blue) piece 32.00 PE Cert.-1
1002(7)d2 PVC Pipes(Blue) piece 12.00 PE Cert.-1
1002(7)h2 PVC Pipes(Blue) piece 16.00 PE Cert.-1
1002(2) Plumbing Fixtures set 4.00 PE Cert.-1
1001(6)b Catch Basin each 10.00 PE Cert.-1
1100(1)a2 Rigid Steel Conduit(RSC) length 2.00 PE Cert.-1
1100(2)a1 Piece piece 2.00 PE Cert.-1
1100(4)d1 PVC Elbow piece 4.00 PE Cert.-1
1100(6) Conduits Clamp piece 10.00 PE Cert.-1
1100(7)b1 Polyvinyl Chloride Pipes (PVC) piece 6.00 PE Cert.-1
1100(8) G.I. Wire kgs. 1.00 PE Cert.-1
1100(12) PVC Solvent Cement can 1.00 PE Cert.-1
1100(14) Octagonal Junction Boxes piece 10.00 PE Cert.-1
1100(15) Utility Boxes piece 15.00 PE Cert.-1
1100(22) Grounding Rod Copperweld length 1.00 PE Cert.-1
1101(1)a2 Electrical Wire roll 3.00 PE Cert.-1
1101(1)a3 Electrical Wire roll 1.00 PE Cert.-1
1101(1)a4 Electrical Wire roll 0.60 PE Cert.-1
1101(2) Tumbler Switch Single Pole piece 4.00 PE Cert.-1
1101(3) Tumbler Switch Two-Gang piece 6.00 PE Cert.-1
1101(6) Duplex Convenience Receptacles set 6.00 PE Cert.-1
1101(11) Rubber Tape rolls 12.00 PE Cert.-1
1102(1) Panel Board Breaker Type set 1.00 PE Cert.-1
1103(2)a1 Pin Light 6 inch. Dia w/ single CFL Bulb set 7.00 PE Cert.-1
1103(1)b4 Flourescent Lighting Fixture set 12.00 PE Cert.-1
1208(2)b1 G.I. Steel Pipes for Railings meter 91.66 PE Cert.-1
B.5 Project Billboard/Signboard sets 2.00 PE Cert.-1
B.7 Occpational Safety and Health Program month 3.00 PE Cert.-1
B.9 Mobilization/Demobilization ls. 1.00 PE Cert.-1
SPL V Blackboard sets 1.00 PE Cert.-1
Summary:

900 Reinforced Concrete *


(a,b,c,d,e) a.) Portland Cement bags 878.20 Q-1
b.) Screened & Washed Fine Aggregate cu.m 113.71 Q-1,G-2
c.) Screened & Washed Coarse Aggregate cu.m 36.67 Q-1,G-1
d.) Water - - PE Cert.-1
e.) Reinforcing Steel kgs 5,899.45 Q-1/size per 10,000 kgs.

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 2,510,000.00 0.5000% Q.C Chart--------- P 12,550.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 8,157.50 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 1,882.50 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 2,510.00 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 12,550.00 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:


LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section
SUBMITTED BY: APPROVED :
MANUEL C. NARIO MARCELINO M. OPERARIO
Engineer III District Engineer
Chief, Construction Section
QUALITY CONTROL PROGRAM
Name of Project : Construction of One(1)-Storey TechVoc Workshop/Laboratory Building (Batch 12) @ Bunawan
National High School
Limits : Location: Bunawan, Agusan del Sur
Appropriation/Contact Amount: P 2,642,641.45 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801(1) Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803(1)a Structure Excavation cu.m 26.36 PE Cert.-1
803(3) Foundation Fill cu.m 16.33 GPC-1, D-1
804(1)b Embankment cu.m 95.08 GPC-1, D-1
CCS - 1 set(Footing &
900(1) Reinfroce Concrete * cu.m 57.35 Column, Beam)
1043(2)a CHB Non-Load bearing sq.m 80.34 Q-1
1043(2)b CHB Non-Load bearing sq.m 276.56 Q-1
1044(1) Forms & Falseworks bd.ft. 1,137.33 PE Cert.-1
1003(1)b Carpentry for Ceiling sq.m 179.55 PE Cert.-1
1003(3) Cabinets sq.m 5.10 PE Cert.-1
1004(2)e Finishing Hardware set 10.00 PE Cert.-1
1004(2)g Finishing Hardware set 21.00 PE Cert.-1
1009(1)a Jalousie Windows & Jamb sq.m 24.53 PE Cert.-1
1010(1) Windows & Door Jamb bd.ft. 508.00 PE Cert.-1
1010(2)a Flush Door sq.m 6.30 PE Cert.-1
1010(2)b Panel Door sq.m 6.30 PE Cert.-1
1013(2)a Fabricated Metal Roofing Accesory sq.m 18.18 PE Cert.-1
1013(2)b Fabricated Metal Roofing Accesory pcs. 24.00 PE Cert.-1
1013(2)c Fabricated Metal Roofing Accesory pcs. 17.73 PE Cert.-1
1014(1)a1 Prepainted Metal Sheets/Roofing sq.m 218.78 PE Cert.-1
403(a) Steel Trusses kgs. 3,123.94 Q-1
1018(1) Ceramic/Granite Tiles sq.m 17.92 PE Cert.-1
1018(2) Ceramic/Granite Tiles sq.m 5.20 PE Cert.-1
1027(1) Cement Plaster Finish sq.m 304.46 PE Cert.-1
1032(1) Painting Works sq.m 442.41 Q-1
1001(1)a5 Pipe mts 72.00 PE Cert.-1
1001(1)a7 Pipe mts 24.00 PE Cert.-1
1001(2)a1 Fittings each 5.00 PE Cert.-1
1001(2)a3 Fittings each 3.00 PE Cert.-1
1001(2)b1 Fittings each 24.00 PE Cert.-1
1001(2)b3 Fittings each 3.00 PE Cert.-1
1001(2)c1 Fittings each 5.00 PE Cert.-1
1001(2)c3 Fittings each 7.00 PE Cert.-1
1001(2)e1 Fittings each 14.00 PE Cert.-1
1001(2)e3 Fittings each 2.00 PE Cert.-1
1001(2)g1 Fittings each 16.00 PE Cert.-1
1001(2)g3 Fittings each 4.00 PE Cert.-1
1001(2)I2 Fittings each 8.00 PE Cert.-1
1002(7)a2 PVC Pipes(Blue) piece 26.00 PE Cert.-1
1002(7)b2 PVC Pipes(Blue) piece 32.00 PE Cert.-1
1002(7)d2 PVC Pipes(Blue) piece 12.00 PE Cert.-1
1002(7)h2 PVC Pipes(Blue) piece 16.00 PE Cert.-1
1002(2) Plumbing Fixtures set 16.00 PE Cert.-1
1001(6)b Catch Basin each 10.00 PE Cert.-1
1100(1)a2 Rigid Steel Conduit(RSC) length 2.00 PE Cert.-1
1100(2)a1 Piece piece 2.00 PE Cert.-1
1100(4)d1 PVC Elbow piece 4.00 PE Cert.-1
1100(6) Conduits Clamp piece 10.00 PE Cert.-1
1100(7)b1 Polyvinyl Chloride Pipes (PVC) piece 6.00 PE Cert.-1
1100(8) G.I. Wire kgs. 1.00 PE Cert.-1
1100(12) PVC Solvent Cement can 1.00 PE Cert.-1
1100(14) Octagonal Junction Boxes piece 10.00 PE Cert.-1
1100(15) Utility Boxes piece 15.00 PE Cert.-1
1100(22) Grounding Rod Copperweld length 1.00 PE Cert.-1
1101(1)a2 Electrical Wire roll 3.00 PE Cert.-1
1101(1)a3 Electrical Wire roll 1.00 PE Cert.-1
1101(1)a4 Electrical Wire roll 0.60 PE Cert.-1
1101(2) Tumbler Switch Single Pole piece 4.00 PE Cert.-1
1101(3) Tumbler Switch Two-Gang piece 6.00 PE Cert.-1
1101(6) Duplex Convenience Receptacles set 6.00 PE Cert.-1
1101(11) Rubber Tape rolls 12.00 PE Cert.-1
1102(1) Panel Board Breaker Type set 1.00 PE Cert.-1

1103(2)a1 Pin Light 6 inch. Dia w/ single CFL Bulb set 7.00 PE Cert.-1
1103(1)b4 Flourescent Lighting Fixture set 12.00 PE Cert.-1
1208(2)b1 G.I. Steel Pipes for Railings meter 91.66 PE Cert.-1
B.5 Project Billboard/Signboard sets 2.00 PE Cert.-1
B.7 Occpational Safety and Health Program month 3.00 PE Cert.-1
B.9 Mobilization/Demobilization ls. 1.00 PE Cert.-1
SPL V Blackboard sets 1.00 PE Cert.-1
Summary:
900 Reinforced Concrete *
(a,b,c,d,e) a.) Portland Cement bags 918.68 Q-1
b.) Screened & Washed Fine Aggregate cu.m 47.65 Q-1,G-1
c.) Screened & Washed Coarse Aggregate cu.m 38.24 Q-1,G-1
d.) Water - - PE Cert.-1
e.) Reinforcing Steel kgs 6,095.70 Q-1/size per 10,000 kgs.

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 2,642,641.45 0.5000% Q.C Chart--------- P 13,213.21
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 8,588.58 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 1,981.98 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 2,642.64 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 13,213.21 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
QUALITY CONTROL PROGRAM

Repair/Maintenance of Road Slip along Butuan City - Talacogon - Loreto - Veruela - Sta.Josefa
Name of Project : Road (S00440MN)
Limits : K1355+560 - K1355+660 Location: Osmeῆa, La Paz, Agusan del Sur
Appropriation/Contact Amount: P 13,220,460.00 Source of Funds: NDRRM Fund
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
101(3)a Removal of Actual Structures/Obstruction, PCCP sq.m 536.00 P.E. Cert-1
103(1)a Structure Excavation cu.m. 381.58 P.E. Cert-1
103(3) Foundation Fill cu.m. 29.04 GPC-1, D-1
103(6) Pipe Culverts and Drain Excavation cu.m. 524.76 P.E. Cert-1
104(1)a Embankment from Roadway Excavation cu.m. 234.30 GPC-1, D-7
104(1)b Embankent from Borrow cu.m. 58.33 GPC-1, D-2
105(1)a Subgrade Preparation sq.m 541.26 GPC-1, D-4
200(1) Aggregate Subbase Course cu.m 462.65 GP-2, C-1, CBR-1, D-19
201(1) Aggregate Base Course cu.m 317.85 GP-1, Q-1, C-1, D-13
300(1) Aggregate Surface Course cu.m. 56.00 GP-1, Q-1, D-3
301(2)a Bituminous Prime Coat - RC - Cut back asphalt tonne 0.47 Q-1
310(1)c Bituminous Concrete Surface Course, Hot Laid, 50 mm. sq.m 649.26 G-1,EXT.-1, STY-1, C-1
Q-1- for Bituminous Mix
400(6) Structural Steel Sheet Pile, Furnished m. 900.00 Q-1
400(12) Structural Steel Sheet Pile, Driven m. 880.00 P.E Cert-1
404(1)a Reinforcing Steel Bars, Grade 40 kg. 4,738.05 Q-1 per size/10,000 kgs.
405(1)a3 Structural Concrete, Class "A", 28 Days cu.m. 271.56 CCS-4 sets
a.) Portland Cement bags 2,580.00 *
b.) Sand cu.m. 135.78 **
c.) Gravel cu.m. 271.56 ***
d.) Water lit - P.E Cert-1
500(1)a5 Pipe Culverts, Class II, 1220 mm. dia l.m. 68.00 CCS-1 set
501(1) Underdrain l.m. 203.00
505(5) Grouted Riprap, Class "A" cu.m. 8.54
a.) Portland Cement bags 26.00 *
b.) Sand cu.m. 2.14 **
c.) Gravel cu.m. 0.13 ***
d.) Boulders cu.m. 8.97 ****
e.) Water lit - P.E Cert-1
506(1) Stone Masonry cu.m. 16.55
a.) Portland Cement bags 92.00 *
b.) Sand cu.m. 4.97 **
c.) Gravel cu.m. 0.33 ***
d.) Boulders cu.m. 17.38 ****
e.) Water lit - P.E Cert-1
603(3)a1 Metal Guardrail (Metal Beam) Including Post l.m. 52.00 Q-1
603(3)b1 Metal Beam End Piece each 4.00 P.E. Cert-1
612(1) Reflectorized Thermoplastic Pavement Marking, White sq.m 20.00 Q-1
612(2) Reflectorized Thermoplastic Pavement Marking, Yellow sq.m 15.00 Q-1
Construction of Combined Field Office, Laboratory
A.1.1(1) and Living Quarters Building for the Engineer ls. 1 P.E Cert-1
B.4(1) Construction Survey and Staking km. 0.10 P.E Cert-1
B.4(4) Culvert Survey & Staking each 68.00 P.E Cert-1
B.4(10) Mics. Survey & Staking l.s. 1.00 P.E Cert-1
B.5 Project Billboard/Signboard each 4.00 P.E Cert-1
B.7 Occupational Safety and Health Program months 3.90 P.E Cert-1
B.8 Traffic Management months 3.90 P.E Cert-1
B.9 Mobilization/Demobilization ls. 1.00 P.E Cert-1
Summary of item 405(1)a3, 505(5) & 506(1):
a.) Portland Cement * bags 2,726 Q-2
b.) Screened & Washed Fine Aggregate ** cu.m 146.52 Q-1, G-2
c.) Screened & Washed Coarse Aggregate *** cu.m 272.02 Q-1, G-4
d.) Boulders **** cu.m. 26.34 Spec. Grav.-1, IR-1
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 13,220,460.00 0.5000% Q.C Chart--------- P 66,102.30
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 42,966.50 Lab.(66%) (P-L) - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 9,915.35 Reg.l Lab. - - - - - - -- - P
c.) Misc. & Other - (20%) - - - -- P 13,220.46 (34%) (B-1A) - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 66,102.30 TOTAL - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1/ Accred. # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
7.03
1.75
3.25
1.54 1.54 18.51
1.06 12.71
2.24
QUALITY CONTROL PROGRAM
Repair/Maintenance of Road Slip along NRJ Cuevas-Bislig Road (S00464MN)
Name of Project : Road (S00440MN)
Limits : K1388+820 - K1388+870 Location: Trento, Agusan del Sur
Appropriation/Contact Amount: P 7,152,750.00 Source of Funds: NDRRM Fund
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
100(1) Clearing and Grubbing ha. 0.08 P.E Cert.-1
103(1)a Structure Excavation cu.m. 293.45 P.E Cert.-1
104(1)a1 Embankment from Roadway Excavation cu.m. 1.10 GPC-1, D-1
400(6) Structural Steel Sheet Pile, Furnished l.m. 720.00 Q-1
400(12) Structural Steel Sheet Pile, Driven l.m. 696.00 P.E Cert.-1
404(1)1a Reinforcing Steel kgs. 3,267.50 Q-1 per size/10,000 kgs.
405(1)b3 Stuctural Concrete Class "A" cu.m. 114.71
a.) Portland Cement bags 1,089.75 Q-1.
b.) Washed Sand cu.m. 57.36 Q-1, G-1
c.) Washed Gravel cu.m. 114.71 Q-1, G-2
d.) Water lit - P.E Cert.-1
A.1.1(3) Construction of Field Office for the Engineer ls. 1.00 P.E Cert.-1
B.4(1) Construction Survey & Staking km. 0.05 P.E Cert.-1
B.5 Project Billboard/Signboard each 4.00 P.E Cert.-1
B.7 Occupational Safety and Health Program mos. 3.08 P.E Cert.-1
B.8 Traffic Management mos. 3.08 P.E Cert.-1
B.9 Mobilization/Demobilization ls. 1.00 P.E Cert.-1
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 7,152,750.00 0.5000% Q.C Chart--------- P 35,763.75
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 23,246.44 Lab.(66%) (P-L) - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 5,364.56 Reg.l Lab. - - - - - - -- - P
c.) Misc. & Other - (20%) - - - -- P 7,152.75 (34%) (B-1A) - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 35,763.75 TOTAL - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1/ Accred. # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
LLM Concrete Products
QUALITY CONTROL PROGRAM

Repair/Maintenance of Bank Protection of Anagasian Bridge, Along Daang Maharlika (Agusan-


Name of Project: Davao Road), (B00917MN)
Limits : K1317+671 - 1317+705.20 Location: Lapinigan, San Francisco, Agusan del Sur
Appropriation/Contact Amount: P 17,831,880.00 Source of Funds: NDRRM Fund
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
101(6) Removal of Structures & Obstruction cu.m. 263.67 P.E. Cert.-1
103(1)a Structure Excavation cu.m. 204.22 P.E. Cert.-1
104(1)b Embankment(Borrow) cu.m. 187.88 GPC-1, D-6
400(6) Structural Steel Sheet Pile, Furnished l.m. 1,908.00 Q-1
400(12) Structural Steel Sheet Pile, Driven l.m. 1,865.60 P.E. Cert.-1
404(1)a Reinforcing Steel kgs. 5,824.03 Q-1 per size/10,000 kgs.
405(1)a3 Structural Concrete Class "A" cu.m. 205.45 CCS- 3 sets
a.) Portland Cement bags 1,951.78 *
b.) Washed Sand cu.m. 102.73 **
c.) Washed Gravel cu.m. 205.45 ***
d.) Water lit - P.E. Cert.-1
407(8) Lean Concrete cu.m. 51.66
a.) Portland Cement bags 415.86 *
b.) Washed Sand cu.m. 25.83 **
c.) Washed Gravel cu.m. 51.66 ***
d.) Water lit. - P.E. Cert.-1
A.1.1(3) Construction Field Office for the Engineer ls. 1.00 P.E. Cert.-1
B.4(1) Construction Survey & Staking km. 0.103 P.E. Cert.-1
B.5 Project Billboard each 4.00 P.E. Cert.-1
B.7 Occupational Safety & Health Program month 5.00 P.E. Cert.-1
B.8 Traffic Management month 5.00 P.E. Cert.-1
B.9 Mobilization/Demobilization ls. 1.00 P.E. Cert.-1
Summary of item 405(1)a & 407(8) :
a.) Portland Cement * bags 2,368 Q-2
b.) Washed Sand ** cu.m 128.56 Q-1, G-2
c.) Washed Gravel *** cu.m 257.11 Q-1, G-4

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 17,831,880.00 0.5000% Q.C Chart--------- P 89,159.40
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 57,953.61 Lab.(66%) (P-L) - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 13,373.91 Reg.l Lab. - - - - - - -- - P
c.) Misc. & Other - (20%) - - - -- P 17,831.88 (34%) (B-1A) - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 89,159.40 TOTAL - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

RIZALINO G. MORALES LEODEGARIO M. MAZO


ME-1/ Accred. # 1072 Engineer III
LLM Concrete Products Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
5.64

2.74

1.18
1.71
3.43
QUALITY CONTROL PROGRAM

Name of Project: Repair/Maintenance of Road Slip along Asuncion- San Isidro - Laak -Veruela Road (S00447MN)
Limits : K1532+315 - 1532+380 Location: Veruela, Agusan del Sur
Appropriation/Contact Amount: P 13,379,850.00 Source of Funds: NDRRM Fund
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
101(3)a Removal of Actual Structures/Obstruction sq.m. 347.75 P.E. Cert-1
103(1)a Structure Excavation cu.m. 806.89 P.E. Cert-1
103(3) Foundation Fill cu.m. 66.36 GPC-1, D-2
103(6) Pipe Culvert & Drain Excavation cu.m. 3.74 P.E. Cert-1
104(1)b Embankment(Borrow) cu.m. 85.98 GPC-1, D-3
105(1)a Subgrade Preparation sq.m. 347.75 GPC-1, D-2
200(1) Aggregate Subbase Course cu.m. 39.00 GP-1,C-1, CBR-1, D-2
204(1)a Portland Cement Stabilized Road Mix Base Course cu.m. 47.45
a.) Soil Aggregate cu.m 54.57 GP-1, Q-1
b.) Cement bags 142 *
c. Water lit. - P.E. Cert-1
d.) Mix cu.m 54.57 C-1, UC-1, CBR-1
e.) Compacted Base Course cu.m. 54.57 D-3, T-3
311(1)a PCC Pavement (Unreinforced) (0.15 m. thick) sq.m. 130.00 CBS-1 set
a.) Portland Cement bags 186.00 *
b.) Screened and Washed Fine Aggregate cu.m. 10.73 **
c.) Gravel cu.m. 19.50 ***
d.) Water lit - P.E. Cert-1
e.) Curing Chemical Compound lit 37.70 ****
f.) Asphalt Sealant lit 15.60 *****
g.) RSB kgs. 42.90 ******
311(1)e1 PCC Pavement (Unreinforced) (0.28 m. thick) sq.m. 217.75 CBS-1 set
a.) Portland Cement bags 580.00 *
b.) Screened and Washed Fine Aggregate cu.m. 33.53 **
c.) Gravel cu.m. 60.97 ***
d.) Water lit. - P.E. Cert-1
e.) Curing Chemical Compound lit. 63.15 ****
f.) Asphalt Sealant lit. 37.02 *****
g.) RSB kgs. 108.88 ******
400(6) Structural Steel Sheet Pile, Furnished m. 1,062.00 Q-1
400(12) Structural Steel Sheet Pile, Driven m. 1,038.40 P.E. Cert-1
404(1)b Reinforcing Steel kgs. 3,784.14 ******
405(1)a3 Structural Concrete Class "A" cu.m. 128.84 CCS-2 sets
a.) Portland Cement bags 1,224.00 *
b.) Washed Sand cu.m. 64.42 **
c.) Washed Gravel cu.m. 128.84 ***
d.) Water lit. - P.E. Cert-1
407(8) Lean Concrete cu.m. 31.10 CCS-1 set
a.) Portland Cement bags 251.00 *
b.) Washed Sand cu.m. 15.55 **
c.) Washed Gravel cu.m. 31.10 ***
d.) Water lit. - P.E. Cert-1
500(1)a5 Pipe Culverts (1220 mm dia(48" dia) Class II) l.m. 6.00 CCS-1 set
504(3)e Cleaning Culvert Pipe in Placed l.m. 10.00 P.E. Cert-1
505(5) Grouted Riprap Class "A" cu.m. 4.880
a.) Portland Cement bags 15.00 *
b.) Screened and Washed Fine Aggregate cu.m. 1.220 **
c.) Gravel Fill cu.m. 0.073 ***
d.) Water lit. - P.E. Cert-1
e.) Boulders cu.m. 5.124 *******
506(1) Stone Masonry cu.m. 11.92
a.) Portland Cement bags 66.00 *
b.) Screened and Washed Fine Aggregate cu.m. 3.576 **
c.) Gravel Fill cu.m. 0.238 ***
d.) Water lit. - P.E. Cert-1
e.) Boulders cu.m. 12.516 *******
508(1) Hand Laid Rock Embankment cu.m. 319.36 Spec. Grav-1, IR-1
511(1) Gabions cu.m. 124.00 Spec. Grav-1, Q-1
603(3)a Metal Guardrail (Metal Beam) Including Post l.m. 65.00 Q-1
603(3)b Metal Beam End Piece ea 2.00 P.E. Cert-1
612(1) Reflectorized Thermoplastic Pavement Marking, White sq.m. 16.25 Q-1
612(2) Reflectorized Thermoplastic Pavement Marking, Yellow sq.m. 19.50 Q-1
620(1)a Chevron Signs, 450x600 mm each 6.00 P.E. Cert-1
Construction of combined Field Office, Laboratory and
A.1.1(1) Living Quarters Bulding for the Engineer ls. 1.00 P.E. Cert-1
B.4(1) Construction Survey & Staking km 0.065 P.E. Cert-1
B.4(4) Culvert Survey & Staking each 6.00 P.E. Cert-1
B.4(10) Misc. Survey & Staking l.s. 1.00 P.E. Cert-1
B.5 Project Billboard each 4.00 P.E. Cert-1
B.7 Occupational Safety and Health Program month 4 P.E. Cert-1
B.8 Traffic Management month 4.00 P.E. Cert-1
B.9 Mobilization/Demobilization ls. 1.00 P.E. Cert-1
Summary of item 204(1)a, 311(1)a, 311(1)e1, 405(1)a3, 505(5) & 506(1):
a.) Portland Cement * bags 2,464 Q-2
b.) Screened & Washed Fine Aggregate ** cu.m 129.02 Q-1, G-2
c.) Screened & Washed Coarse Aggregate *** cu.m 240.72 Q-1(311), Q-1(405), G-4
d.) Curing Chemical Compound **** kgs. 3,935.92 Q-1
e.) Asphalt Sealant ***** lit. 100.85 Q-1
f.) RSB ****** lit. 52.62 Q-1 per size/ 10,000 kgs.
e.) Boulders ******* cu.m. 17.64 Spec. Grav-1, IR-1

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 13,379,850.00 0.5000% Q.C Chart--------- P 66,899.25
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 43,484.51 Lab.(66%) (P-L) - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 10,034.89 Reg.l Lab. - - - - - - -- - P
c.) Misc. & Other - (20%) - - - -- P 13,379.85 (34%) (B-1A) - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 66,899.25 TOTAL - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1/ Accred. # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
1.99
0.11
2.58
69.55 2.09
1.56

22.50 2.425222
19.50

60.97

1.72
1.23
1.72
3.21
QUALITY CONTROL PROGRAM

: Repair/Maintenance of Bank Protection along NRJ San Francisco-Bahi-Barobo Road


Name of Project
Limits : 1313+168 - 1313+198 Location: San Francisco, Agusan del Sur
Appropriation/Contact Amount:P 1,000,000.00 Source of Funds: 01101101-Regular Agency Fund
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
103(1)a Structure Excavation cu.m. 324.91 P.E. Cert-1
104(1)b Embankmant(Borrow) cu.m. 127.61 GPC-1, D-4
507(1) Rubble Concrete cu.m. 192.06
a.) Portland Cement bags 807.00 Q-1
b.) Sand cu.m. 50.51 Q-1, G-1
c.) Gravel cu.m. 100.83 Q-1, G-2
d.)Boulders cu.m. 121.00 Sp.Gr.-1
e.) Water lit. - P.E. Cert-1
B.4(1) Construction Survey & Staking km. 0.03 P.E. Cert-1
B.5 Project Billboard/Signboard each 4.00 P.E. Cert-1
B.7 Occupational Safety and Health Program months 2.63 P.E. Cert-1
B.8 Traffic Management months 2.63 P.E. Cert-1
B.9 Mobilization/Demobilization ls. 1.00 P.E. Cert-1

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 1,000,000.00 0.5000% Q.C Chart--------- P 5,000.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 3,250.00 Lab.(66%) (P-L) - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 750.00 Reg.l Lab. - - - - - - -- - P
c.) Misc. & Other - (20%) - - - -- P 1,000.00 (34%) (B-1A) - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 5,000.00 TOTAL - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1/ Accred. # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
3.83
5.76

1.34

0.00
0.12
0.53 0.02
0.11
QUALITY CONTROL PROGRAM

: Repair/Maintenance of Bank/Slope Protection along NRJ Cuevas-Sampaguita Road


Name of Project
Limits : K0+000-K0+030 Location: Veruela, Agusan del Sur
Appropriation/Contact Amount: P 1,500,000.00 Source of Funds: 01101101-Regular Agency Fund
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
103(1)a Structure Excavation cu.m. 251.40 P.E. Cert-1
104(1)b Embankment(Borrow) cu.m. 108.80 GPC-1, D-4 3.26
404(1)a Reinforcing Steel kg. 2,600.28 Q-1 per 10,000/size
405(1)a3 Structural Concrete Class "A", 28 days cu.m. 85.00 CCS-2 sets 1.13
a.) Portland Cement bags 807.50 Q-1
b.) Washed Sand cu.m. 42.50 Q-1, G-1
c.) Washed Gravel cu.m. 85.00 Q-1, G-2 1.13
d.)Water lit. - P.E. Cert-1
508(1) Hand Laid Rock Embankment cu.m. 36.00 Spec. Grav-1, IR-1
511(1) Gabions cu.m. 108.00 Q-1, Spec.Grav-1 21.60
B.4(1) Construction Survey & Staking km. 0.03 P.E. Cert-1
B.5 Project Billboard/Signboard each 4.00 P.E. Cert-1
B.7 Occupational Safety and Health Program months 2.77 P.E. Cert-1
B.8 Traffic Management months 2.77 P.E. Cert-1
B.9 Mobilization/Demobilization ls. 1.00 P.E. Cert-1

22.50
-

-
Summary of item 204(1)a, 311(1)a, 311(1)e1, 405(1)a3, 505(5) & 506(1):
a.) Portland Cement * bags 1 Q-2 0.00
b.) Screened & Washed Fine Aggregate ** cu.m - Q-1, G-2 -
c.) Screened & Washed Coarse Aggregate *** cu.m - Q-1(311), Q-1(405), G-4 -
d.) Curing Chemical Compound **** kgs. - Q-1
e.) Asphalt Sealant ***** lit. - Q-1
f.) RSB ****** lit. - Q-1 per size/ 10,000 kgs.
e.) Boulders ******* cu.m. - Spec. Grav-1, IR-1

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 1,500,000.00 0.5000% Q.C Chart--------- P 7,500.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 4,875.00 Lab.(66%) (P-L) - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 1,125.00 Reg.l Lab. - - - - - - -- - P
c.) Misc. & Other - (20%) - - - -- P 1,500.00 (34%) (B-1A) - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 7,500.00 TOTAL - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1/ Accred. # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
78.01
2.55

1.08
0.65
0.00

0
QUALITY CONTROL PROGRAM

: Construction of Materials Recovery Facility Building @ Brgy. Karaos


Name of Project
Limits : Location: San Francisco, Agusan del Sur
Appropriation/Contact Amount: P 152,791.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801(1) Removal of Structures & Obstruction ls 1.00 P.E Cert-1
803(1)a Structure Excavation cu.m. 3.96 P.E Cert-1
803(3) Foundation Fill cu.m. 1.50 P.E Cert-1
804(1)b Embankment cu.m. 1.32 P.E Cert-1
900(1) Reinforcement Concrete cu.m. 3.58 CCS-1 set
a.) Portland Cement bags 34.00 Q-1
b.) Screened Sand cu.m. 1.19 Q-1, G-1
c.) Gravel cu.m. 2.39 Q-1, G-1
d.) RSB kgs. 358.76 Q-1 per size/10,000 kgs.
e.) Water lit. - P.E Cert-1
1043(2)a CHB Non Load Bearing sq.m. 24.98 Q-1
1013(2)b Fabricated Metal Roofing Accesory pcs. 4.00 P.E Cert-1
1014(1)a1 Prepainted Metal Sheets/Roofing sq.mt. 24.00 P.E Cert-1
403(a) Steel Trusses kgs. 216.53 Q-1
1027(1) Cement Plaster Finish sq.mt. 50.90 P.E Cert-1
1032(1) Painting Works sq.mt. 24.98 Q-1
1006(4) Steel Louver Door sq.mtr. 2.00 P.E Cert-1
B.5 Project Billboard/Signboard sets 2.00 P.E Cert-1
B.7 Occupational Safety and Health Program month 1.00 P.E Cert-1
B.9 Mobilization/Demobilization ls. 1.00 P.E Cert-1

22.50
-

-
Summary of item 204(1)a, 311(1)a, 311(1)e1, 405(1)a3, 505(5) & 506(1):
a.) Portland Cement * bags 1 Q-2 0.00
b.) Screened & Washed Fine Aggregate ** cu.m - Q-1, G-2 -
c.) Screened & Washed Coarse Aggregate *** cu.m - Q-1(311), Q-1(405), G-4 -
d.) Curing Chemical Compound **** kgs. - Q-1
e.) Asphalt Sealant ***** lit. - Q-1
f.) RSB ****** lit. - Q-1 per size/ 10,000 kgs.
e.) Boulders ******* cu.m. - Spec. Grav-1, IR-1

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 152,791.00 0.5000% Q.C Chart--------- P 763.96
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 496.57 Lab.(66%) (P-L) - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 114.59 Reg.l Lab. - - - - - - -- - P
c.) Misc. & Other - (20%) - - - -- P 152.79 (34%) (B-1A) - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 763.96 TOTAL - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1/ Accred. # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
0
QUALITY CONTROL PROGRAM
Name of Proje: Construction of Standard Two(2)-Storey Six(6) Classrooms School Building - 9.5m x 36m. under
Basic Educational Facilities Fund (BEFF) - Batch 1 @ Veruela NHS
Limits : Location: Veruela, Agusan del Sur
Appropriation/Contact Amount: P 9,884,888.96 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801 Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803 Excavation of Cfooting, Wall Footing & SW Footing cu.m 737.55 PE Cert.-1
804(a) Backfilling of Excavated Materials cu.m 439.20 GPC-1, D-14
804(b) Gravel Bedding @ SOF, CF, WF, SW & FTB cu.m 52.13 PE Cert.-1
804(c ) Embankment cu.m 68.40 GPC-1, D-2
1000(a) Soil Poisoning sq.m 342.00 PE Cert.-1
900(a) RC Column Footing(fc'=3000 psi @ 28days) cu.m 153.72 *
404(a) Rein. Steel for Column Footing kgs 17,594.21 **
900(b) RC for Tie Beam & WF (fc'=3000psi @ 28days) cu.m 33.83 *
404(b) Rein. Steel for Tie Beam & WF kgs 5,668.20 **
900( c) RC Column,PC & Stiffener (fc'=3000psi @ 28days) cu.m 34.50 *
404(c ) Rein. Steel for Column,PC & Stiffener kgs 12,511.34 **
900(d) RC Beams(fc'=3000psi @ 28days) cu.m 24.96 *
404(d) Rein. Steel for Beams kgs 5,698.47 **
RC for SOF, Slab (2nd flr.), Corridor, Stair, Sun Breaker, ST &
900( e) Ramp (fc=3,000 psi @ 28 days) cu.m 77.40 *
Rein. Steel for SOF, Slab (2nd Flr), Corridor, Stair, Sun
404( e) Breaker, ST & Ramp kgs 4,994.08 **
900( f) RC for Roof Beam (fc'=3000psi @ 28days) cu.m 19.14 *
404( f) Rein. Steel for Roof Beam kgs 3,336.87 **
506(1) Masonry Works (CHB) sq.m 870.93 for CHB, Q-1
1003 Carpentry for Ceiling sq.m 788.64 PE Cert.-1
1004.2.2 Finishing Hardware set 1.00 PE Cert.-1
1005 Jalousie Windows & Jamb sq.m 78.39 PE Cert.-1
1010(b) Panel Door Jamb sq.m 43.50 PE Cert.-1
1014 Prepainted Metal Sheet/Roofing sq.m 435.24 PE Cert.-1
403(a) Steel Trusses kgs. 11,307.85 Q-1
1018 Ceramic Tiles sq.m 120.00 PE Cert.-1
1027(a) Cement Plaster Finish sq.m 1,502.40 PE Cert.-1
1032(a) Painting Works sq.m 1,502.40 Q-1
1016 Water Proofing sq.m 191.40 PE Cert.-1
1002 Plumbing Works lot 1.00 PE Cert.-1
1100 Conduits,Boxes and Fittings lot 1.00 PE Cert.-1
1101 Wires and Wiring Devices lot 1.00 PE Cert.-1
1102(a) Lighting Fixtures lot 1.00 PE Cert.-1
1102 Panel Boards & Cabinets lot 1.00 PE Cert.-1
SPL I Project Billboard sets 2.00 PE Cert.-1
SPL II Blackboard sets 6.00 PE Cert.-1
SPL III Safety & Health Officer hr 30.00 PE Cert.-1
SPL IV Personal Protective Equipment(PPE) md 500.00 PE Cert.-1
Summary:
CCS-4 sets (Footing, Column,
900 Reinforced Concrete * cu.m 343.55 Beam & Slab)
(a,b,c,d,e,f) a.) Portland Cement bags 3,424 Q-2
b.) Screened & Washed Fine Aggregate cu.m 209.62 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 343.55 Q-1,G-5
d.) Water - - PE Cert.-1
404 Reinforcing Steel ** kgs 49,803.17 Q-1/size per 10,000 kgs.
(a,b,c,d,e,f)
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 9,884,888.96 0.5000% Q.C Chart--------- P 49,424.44
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 32,125.89 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 7,413.67 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 9,884.89 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 49,424.44 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
13.18
1.56
2.05

1.71
2.79
4.58
QUALITY CONTROL PROGRAM
Name of Proje: Construction of Standard Two(2)-Storey Six(6) Classrooms School Building - 9.5m x 36m. under
Basic Educational Facilities Fund (BEFF) - Batch 1 @ Trento NHS
Limits : Location: Trento, Agusan del Sur
Appropriation/Contact Amount: P 10,293,606.92 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801 Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803 Excavation of Cfooting, Wall Footing & SW Footing cu.m 974.43 PE Cert.-1
804(a) Backfilling of Excavated Materials cu.m 587.25 GPC-1, D-18
804(b) Gravel Bedding @ SOF, CF, WF, SW & FTB cu.m 66.93 PE Cert.-1
804(c ) Embankment cu.m 121.41 GPC-1, D-4
1000(a) Soil Poisoning sq.m 342.00 PE Cert.-1
900(a) RC Column Footing(fc'=3000 psi @ 28days) cu.m 205.54 *
404(a) Rein. Steel for Column Footing kgs 24,372.86 **
900(b) RC for Tie Beam & WF (fc'=3000psi @ 28days) cu.m 33.83 *
404(b) Rein. Steel for Tie Beam & WF kgs 5,668.20 **
900( c) RC Column,PC & Stiffener (fc'=3000psi @ 28days) cu.m 35.76 *
404(c ) Rein. Steel for Column,PC & Stiffener kgs 12,974.00 **
900(d) RC Beams(fc'=3000psi @ 28days) cu.m 24.96 *
404(d) Rein. Steel for Beams kgs 5,698.47 **
RC for SOF, Slab (2nd flr.), Corridor, Stair, Sun Breaker, ST &
900( e) Ramp (fc=3,000 psi @ 28(2nd
days)Flr), Corridor, Stair, Sun cu.m 77.40 *
Rein. Steel for SOF, Slab
404( e) Breaker, ST & Ramp kgs 4,994.08 **
900( f) RC for Roof Beam (fc'=3000psi @ 28days) cu.m 19.14 *
404( f) Rein. Steel for Roof Beam kgs 3,336.87 **
506(1) Masonry Works (CHB) sq.m 870.93 for CHB, Q-1
1003 Carpentry for Ceiling sq.m 788.64 PE Cert.-1
1004.2.2 Finishing Hardware set 1.00 PE Cert.-1
1005 Jalousie Windows & Jamb sq.m 78.39 PE Cert.-1
1010(b) Panel Door Jamb sq.m 43.50 PE Cert.-1
1014 Prepainted Metal Sheet/Roofing sq.m 435.24 PE Cert.-1
403(a) Steel Trusses kgs. 11,307.85 Q-1
1018 Ceramic Tiles sq.m 120.00 PE Cert.-1
1027(a) Cement Plaster Finish sq.m 1,502.40 PE Cert.-1
1032(a) Painting Works sq.m 1,502.40 Q-1
1016 Water Proofing sq.m 191.40 PE Cert.-1
1002 Plumbing Works lot 1.00 PE Cert.-1
1100 Conduits,Boxes and Fittings lot 1.00 PE Cert.-1
1101 Wires and Wiring Devices lot 1.00 PE Cert.-1
1102(a) Lighting Fixtures lot 1.00 PE Cert.-1
1102 Panel Boards & Cabinets lot 1.00 PE Cert.-1
SPL I Project Billboard sets 2.00 PE Cert.-1
SPL II Blackboard sets 6.00 PE Cert.-1
SPL III Safety & Health Officer hr 30.00 PE Cert.-1
SPL IV Personal Protective Equipment(PPE) md 500.00 PE Cert.-1
Summary:
CCS-4 sets (Footing, Column,
900 Reinforced Concrete * cu.m 396.63 Beam & Slab)
(a,b,c,d,e,f) a.) Portland Cement bags 4,077 Q-2
b.) Screened & Washed Fine Aggregate cu.m 236.16 Q-1,G-4
c.) Screened & Washed Coarse Aggregate cu.m 396.63 Q-1,G-6
d.) Water - - PE Cert.-1
404 Reinforcing Steel ** kgs 57,044.48 Q-1/size per 10,000 kgs.
(a,b,c,d,e,f)
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 10,293,606.92 0.5000% Q.C Chart--------- P 51,468.03
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 33,454.22 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 7,720.21 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 10,293.61 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 51,468.03 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
17.62

3.64
QUALITY CONTROL PROGRAM
Construction of One(1)-Storey TechVoc Workshop/Laboratory Building (Batch 12) @ Bunawan
Name of Project :
National High School, Bunawan, ADS
Limits : Location: Bunawan, Agusan del Sur
Appropriation/Contact Amount: P 2,642,641.45 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801(1) Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803(1)a Structure Excavation cu.m 26.36 PE Cert.-1
803(3) Foundation Fill cu.m 16.33 GPC-1, D-1
804(1)b Embankment cu.m 95.08 GPC-1, D-3
900(1) Reinfroce Concrete * cu.m 57.35 CCS - 1 set
1043(2)a CHB Non-Load bearing sq.m 80.34 Q-1
1043(2)b CHB Non-Load bearing sq.m 256.56 Q-1
1044(1) Forms & Falseworks bd.ft. 1,137.33 PE Cert.-1
1003(1)b Carpentry for Ceiling sq.m 179.55 PE Cert.-1
1003(3) Cabinets sq.m 5.10 PE Cert.-1
1004(2)e Finishing Hardware set 10.00 PE Cert.-1
1004(2)g Finishing Hardware set 21.00 PE Cert.-1
1009(1)a Jalousie Windows & Jamb sq.m 24.53 PE Cert.-1
1010(1) Windows & Door Jamb bd.ft. 508.00 PE Cert.-1
1010(2)a Flush Door sq.m 6.30 PE Cert.-1
1010(2)b Panel Door sq.m 6.30 PE Cert.-1
1013(2)a Fabricated Metal Roofing Accesory sq.m 18.18 PE Cert.-1
1013(2)b Fabricated Metal Roofing Accesory pcs. 24.00 PE Cert.-1
1013(2)c Fabricated Metal Roofing Accesory pcs. 17.73 PE Cert.-1
1014(1)a1 Prepainted Metal Sheets/Roofing sq.m 218.78 PE Cert.-1
403(a) Steel Trusses kgs. 3,123.94 Q-1
1018(1) Ceramic/Granite Tiles sq.m 17.92 PE Cert.-1
1018(2) Ceramic/Granite Tiles sq.m 5.20 PE Cert.-1
1027(1) Cement Plaster Finish sq.m 304.46 PE Cert.-1
1032(1) Painting Works sq.m 442.41 Q-1
1001(1)a5 Pipe mts 72.00 PE Cert.-1
1001(1)a7 Pipe mts 24.00 PE Cert.-1
1001(2)a1 Fittings each 5.00 PE Cert.-1
1001(2)a3 Fittings each 3.00 PE Cert.-1
1001(2)b1 Fittings each 24.00 PE Cert.-1
1001(2)b3 Fittings each 3.00 PE Cert.-1
1001(2)c1 Fittings each 5.00 PE Cert.-1
1001(2)c3 Fittings each 7.00 PE Cert.-1
1001(2)e1 Fittings each 14.00 PE Cert.-1
1001(2)e3 Fittings each 2.00 PE Cert.-1
1001(2)g1 Fittings each 16.00 PE Cert.-1
1001(2)g3 Fittings each 4.00 PE Cert.-1
1001(2)I2 Fittings each 8.00 PE Cert.-1
1002(7)a2 PVC Pipes(Blue) piece 26.00 PE Cert.-1
1002(7)b2 PVC Pipes(Blue) piece 32.00 PE Cert.-1
1002(7)d2 PVC Pipes(Blue) piece 12.00 PE Cert.-1
1002(7)h2 PVC Pipes(Blue) piece 16.00 PE Cert.-1
1002(2) Plumbing Fixtures set 4.00 PE Cert.-1
1001(6)b Catch Basin each 10.00 PE Cert.-1
1100(1)a2 Rigid Steel Conduit(RSC) length 2.00 PE Cert.-1
1100(2)a1 Piece piece 2.00 PE Cert.-1
1100(4)d1 PVC Elbow piece 4.00 PE Cert.-1
1100(6) Conduits Clamp piece 10.00 PE Cert.-1
1100(7)b1 Polyvinyl Chloride Pipes (PVC) piece 6.00 PE Cert.-1
1100(8) G.I. Wire kgs. 1.00 PE Cert.-1
1100(12) PVC Solvent Cement can 1.00 PE Cert.-1
1100(14) Octagonal Junction Boxes piece 10.00 PE Cert.-1
1100(15) Utility Boxes piece 15.00 PE Cert.-1
1100(22) Grounding Rod Copperweld length 1.00 PE Cert.-1
1101(1)a2 Electrical Wire roll 3.00 PE Cert.-1
1101(1)a3 Electrical Wire roll 1.00 PE Cert.-1
1101(1)a4 Electrical Wire roll 0.60 PE Cert.-1
1101(2) Tumbler Switch Single Pole piece 4.00 PE Cert.-1
1101(3) Tumbler Switch Two-Gang piece 6.00 PE Cert.-1
1101(6) Duplex Convenience Receptacles set 6.00 PE Cert.-1
1101(11) Rubber Tape rolls 12.00 PE Cert.-1
1102(1) Panel Board Breaker Type set 1.00 PE Cert.-1
1103(2)a1 Pin Light 6 inch. Dia w/ single CFL Bulb set 7.00 PE Cert.-1
1103(1)b4 Flourescent Lighting Fixture set 12.00 PE Cert.-1
1208(2)b1 G.I. Steel Pipes for Railings meter 91.66 PE Cert.-1
B.5 Project Billboard/Signboard sets 2.00 PE Cert.-1
B.7 Occpational Safety and Health Program month 3.00 PE Cert.-1
B.9 Mobilization/Demobilization ls. 1.00 PE Cert.-1
SPL V Blackboard sets 1.00 PE Cert.-1
Summary:
900 Reinforced Concrete *
(a,b,c,d,e) a.) Portland Cement bags 818.84 Q-1
b.) Screened & Washed Fine Aggregate cu.m 41.26 Q-1,G-1
c.) Screened & Washed Coarse Aggregate cu.m 38.24 Q-1,G-1
d.) Water - - PE Cert.-1
e.) Reinforcing Steel kgs 6,006.69 Q-1/size per 10,000 kgs.

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 2,642,641.45 0.5000% Q.C Chart--------- P 13,213.21
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 8,588.58 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 1,981.98 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 2,642.64 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 13,213.21 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:


LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
0.49
2.85
QUALITY CONTROL PROGRAM
Name of Proje: Construction of Standard Two(2)-Storey Six(6) Classrooms School Building - 9.5m x 36m. under
Basic Educational Facilities Fund (BEFF) - Batch 1 @ San Isidro NHS
Limits : Location: Loreto, Agusan del Sur
Appropriation/Contact Amount: P 10,215,095.31 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801 Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803 Excavation of Cfooting, Wall Footing & SW Footing cu.m 909.63 PE Cert.-1
804(a) Backfilling of Excavated Materials cu.m 546.75 GPC-1, D-17
804(b) Gravel Bedding @ SOF, CF, WF, SW & FTB cu.m 62.88 PE Cert.-1
804(c ) Embankment cu.m 76.95 GPC-1, D-3
1000(a) Soil Poisoning sq.m 342.00 PE Cert.-1
900(a) RC Column Footing(fc'=3000 psi @ 28days) cu.m 191.36 *
404(a) Rein. Steel for Column Footing kgs 23,997.61 **
900(b) RC for Tie Beam & WF (fc'=3000psi @ 28days) cu.m 33.83 *
404(b) Rein. Steel for Tie Beam & WF kgs 5,668.20 **
900( c) RC Column,PC & Stiffener (fc'=3000psi @ 28days) cu.m 35.76 *
404(c ) Rein. Steel for Column,PC & Stiffener kgs 12,974.00 **
900(d) RC Beams(fc'=3000psi @ 28days) cu.m 24.96 *
404(d) Rein. Steel for Beams kgs 5,698.47 **
RC for SOF, Slab (2nd flr.), Corridor, Stair, Sun Breaker, ST &
900( e) Ramp (fc=3,000 psi @ 28 days) cu.m 77.40 *
Rein. Steel for SOF, Slab (2nd Flr), Corridor, Stair, Sun
404( e) Breaker, ST & Ramp kgs 4,994.08 **
900( f) RC for Roof Beam (fc'=3000psi @ 28days) cu.m 19.14 *
404( f) Rein. Steel for Roof Beam kgs 3,336.87 **
506(1) Masonry Works (CHB) sq.m 870.93 for CHB, Q-1
1003 Carpentry for Ceiling sq.m 788.64 PE Cert.-1
1004.2.2 Finishing Hardware set 1.00 PE Cert.-1
1005 Jalousie Windows & Jamb sq.m 78.39 PE Cert.-1
1010(b) Panel Door Jamb sq.m 43.50 PE Cert.-1
1014 Prepainted Metal Sheet/Roofing sq.m 435.24 PE Cert.-1
403(a) Steel Trusses kgs. 11,307.85 Q-1
1018 Ceramic Tiles sq.m 120.00 PE Cert.-1
1027(a) Cement Plaster Finish sq.m 1,502.40 PE Cert.-1
1032(a) Painting Works sq.m 1,502.40 Q-1
1016 Water Proofing sq.m 191.40 PE Cert.-1
1002 Plumbing Works lot 1.00 PE Cert.-1
1100 Conduits,Boxes and Fittings lot 1.00 PE Cert.-1
1101 Wires and Wiring Devices lot 1.00 PE Cert.-1
1102(a) Lighting Fixtures lot 1.00 PE Cert.-1
1102 Panel Boards & Cabinets lot 1.00 PE Cert.-1
SPL I Project Billboard sets 2.00 PE Cert.-1
SPL II Blackboard sets 6.00 PE Cert.-1
SPL III Safety & Health Officer hr 30.00 PE Cert.-1
SPL IV Personal Protective Equipment(PPE) md 500.00 PE Cert.-1
Summary:
CCS-4 sets (Footing, Column,
900 Reinforced Concrete * cu.m 382.45 Beam & Slab)
(a,b,c,d,e,f) a.) Portland Cement bags 3,627 Q-2
b.) Screened & Washed Fine Aggregate cu.m 244.09 Q-1,G-4
c.) Screened & Washed Coarse Aggregate cu.m 382.45 Q-1,G-6
d.) Water - - PE Cert.-1
404 Reinforcing Steel ** kgs 56,669.23 Q-1/size per 10,000 kgs.
(a,b,c,d,e,f)
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 10,215,095.31 0.5000% Q.C Chart--------- P 51,075.48
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 33,199.06 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 7,661.32 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 10,215.10 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 51,075.48 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
16.40

2.31

1.81
3.25
5.10
QUALITY CONTROL PROGRAM
Name of Project :
Construction of Three(3) Storey @ Bunawan NHS
Limits : Location: Bunawan, Agusan del Sur
Appropriation/Contact Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801(1) Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803(1)a Structure Excavation cu.m 1,869.63 PE Cert.-1
803(3) Foundation Fill cu.m 35.82 GPC-1, D-1
804(1)b Embankment cu.m 179.55 GPC-1, D-6
900(1) Reinfroce Concrete (fc=3,000 psi @ 28 days) * cu.m 639.59 CCS - 1 set
1000(1) Soil Poisoning liter 29.93 P.E Cert.-1
1000(2) Wood Preservative liter 5.73 P.E Cert.-1
1043(2)a CHB Non-Load bearing sq.m 439.30 Q-1
1043(2)b CHB Non-Load bearing sq.m 1,419.88 Q-1
403(a) Steel Trusses kgs. 12,205.59 Q-1
1044(1) Forms & Falseworks ls. 1.00 PE Cert.-1
1003(1)a Carpentry for Ceiling sq.m 690.90 PE Cert.-1
1001(1)a5 Pipe meter 96.00 PE Cert.-1
1001(1)a6 Pipe meter 76.80 PE Cert.-1
1001(1)a7 Pipe meter 120.00 PE Cert.-1
1001(1)a8 Pipe meter 73.00 PE Cert.-1
1001(2)a1 Fittings each 30.00 PE Cert.-1
1001(2)a2 Fittings each 36.00 PE Cert.-1
1001(2)a3 Fittings each 18.00 PE Cert.-1
1001(2)a4 Fittings each 8.00 PE Cert.-1
1001(2)b1 Fittings each 18.00 PE Cert.-1
1001(2)b2 Fittings each 32.00 PE Cert.-1
1001(2)c1 Fittings each 12.00 PE Cert.-1
1001(2)c2 Fittings each 18.00 PE Cert.-1
1001(2)c3 Fittings each 12.00 PE Cert.-1
1001(2)c4 Fittings each 6.00 PE Cert.-1
1001(2)d1 Fittings each 24.00 PE Cert.-1
1001(2)d2 Fittings each 16.00 PE Cert.-1
1001(2)d3 Fittings each 12.00 PE Cert.-1
1001(2)d4 Fittings each 4.00 PE Cert.-1
1001(2)e1 Fittings each 18.00 PE Cert.-1
1001(2)e2 Fittings each 9.00 PE Cert.-1
1001(2)e3 Fittings each 18.00 PE Cert.-1
1001(2)f1 Fittings each 12.00 PE Cert.-1
1001(2)f3 Fittings each 6.00 PE Cert.-1
1001(2)g1 Fittings each 24.00 PE Cert.-1
1001(2)g3 Fittings each 18.00 PE Cert.-1
1001(2)g4 Fittings each 4.00 PE Cert.-1
1001(2)i2 Fittings each 18.00 PE Cert.-1
1001(2)l2 Fittings each 6.00 PE Cert.-1
1002(5)b1 PPR-C Pipes piece 18.00 PE Cert.-1
1002(5)c2 PPR-C Pipes piece 24.00 PE Cert.-1
1002(5)d3 PPR-C Pipes piece 24.00 PE Cert.-1
1002(6)b2 PPR-C Pipes piece 18.00 PE Cert.-1
1002(6)b3 PPR-C Pipes piece 12.00 PE Cert.-1
1002(6)b4 PPR-C Pipes piece 36.00 PE Cert.-1
1002(6)c2 PPR-C Pipes piece 12.00 PE Cert.-1
1002(6)c3 PPR-C Pipes piece 13.00 PE Cert.-1
1002(6)c4 PPR-C Pipes piece 10.00 PE Cert.-1
1002(6)g2 PPR-C Pipes piece 30.00 PE Cert.-1
1002(2) Plumbing Fixtures set 17.00 PE Cert.-1
1004(2)a Rough Hardware set 18.00 PE Cert.-1
1004(2)d Finishing Hardwares set 2.00 PE Cert.-1
1004(2)e Finishing Hardwares set 30.00 PE Cert.-1
1004(2)g Finishing Hardwares set 90.00 PE Cert.-1
1009(1)a Jalousie Windows (Jalouplus equiv.) sq.m 157.82 PE Cert.-1
1010(1) Frames set 45.00 PE Cert.-1
1010(2)a Doors sq.mts. 25.62 PE Cert.-1
1010(2)b Doors sq.mts. 45.36 PE Cert.-1
1013(2)a Fabricated Metal Roofing Accesory ln.mt. 45.00 PE Cert.-1
1013(2)b Fabricated Metal Roofing Accesory ln.mt. 7.33 PE Cert.-1
1014(1)a1 Prepainted Metal Sheets sq.mt. 662.29 PE Cert.-1
1018(1) Glazed Tiles and Trims sq.mt. 519.60 PE Cert.-1
1018(2) Unglazed Tiles sq.mt. 193.72 PE Cert.-1
102(1)a Cement Floor Finish sq.mt. 1,710.45 PE Cert.-1
1027(1) Cement Plaster Finish sq.mt. 1,859.18 PE Cert.-1
1032(1) Painting Works sq.mt. 2,110.78 Q-1
1100(1)a2 Rigid Steel Conduit (RSC) length 180.00 PE Cert.-1
1100(1)a3 Rigid Steel Conduit (RSC) length 25.00 PE Cert.-1
1100(1)a5 Rigid Steel Conduit (RSC) length 18.00 PE Cert.-1
1100(1)d2 Conduit Coupling(RSC) pcs. 105.00 PE Cert.-1
1100(1)d3 Conduit Coupling(RSC) pcs. 34.00 PE Cert.-1
1100(2)a2 Conduit Coupling(RSC) pcs. 54.00 PE Cert.-1
1100(2)a3 Conduit Coupling(RSC) pcs. 24.00 PE Cert.-1
1100(2)d4 Conduit Coupling(RSC) pcs. 8.00 PE Cert.-1
1100(4)d1 Conduit Coupling(RSC) pcs. 135.00 PE Cert.-1
1100(4)d2 Conduit Coupling(RSC) pcs. 39.00 PE Cert.-1
1100(4)d4 Conduit Coupling(RSC) pcs. 4.00 PE Cert.-1
1100(6) Conduit Clamp pcs. 440.00 PE Cert.-1
1100(8)b G.I. Wire kls. 10.00 PE Cert.-1
1100(12) PVC Solvent Cement can 6.00 PE Cert.-1
1100(14) Octagonal Junction Box piece 105.00 PE Cert.-1
1100(14) Utility Box piece 135.00 PE Cert.-1
1100(22) Grounding Rod Copperweld length 5.00 PE Cert.-1
1101(1)a2 Electrical Wire rolls 15.00 PE Cert.-1
1101(1)a3 Wires and Wiring Devices rolls 7.50 PE Cert.-1
1101(1)a4 Wires and Wiring Devices rolls 1.80 PE Cert.-1
1101(2) Tumbler Switch Single Pipe pcs. 18.00 PE Cert.-1
1101(3) Tumber Switch pcs. 48.00 PE Cert.-1
1101(4) Tumber Switch pcs. 6.00 PE Cert.-1
1101(5) Tumber Switch pcs. 36.00 PE Cert.-1
1101(6) Duplex Convenience Receptacle set 45.00 PE Cert.-1
1102(1) Panel Boards Safety Switch Type set 1.00 PE Cert.-1
1103(1)a4 Flourescent Lighting Fixture set 168.00 PE Cert.-1
1103(2)a1 Porcelain Keyless Receptacles case with 18w softone bulb set 12.00 PE Cert.-1
1203(2) Stainless Steel Railings mts. 56.10 PE Cert.-1
B.5 Project Billboard each 2.00 PE Cert.-1
B.7 Occupational Safety and Health Program month 5.76 PE Cert.-1
B.9 Mobilization/Demobilization L.S. 1.00 PE Cert.-1
SPL I Blackboard set 12.00 PE Cert.-1
Summary
900 Reinforced Concrete *
(a,b,c,d,e) a.) Portland Cement bags 818.84 Q-1
b.) Screened & Washed Fine Aggregate cu.m 41.26 Q-1,G-1
c.) Screened & Washed Coarse Aggregate cu.m 38.24 Q-1,G-1
d.) Water - - PE Cert.-1
e.) Reinforcing Steel kgs 6,006.69 Q-1/size per 10,000 kgs.

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P 0.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
1.07
5.39
QUALITY CONTROL PROGRAM
Name of Project : IMPROVEMENT OF DPWH QUARTER and FUNCTION ROOM @ Brgy. Karaos
Limits : Location: San Francisco, Agusan del Sur
Appropriation/Contact Amount: P 3,762,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)

A.1 Other General Requirements


B.5 Project Billboard/Signboard sets 2.00 PE Cert.-1
B.7 Occpational Safety and Health Program month 4.00 PE Cert.-1
B.9 Mobilization/Demobilization ls. 1.00 PE Cert.-1
A. Earthworks
803(1)a Structure Excavation cu.m 33.62 PE Cert.-1
803(3) Foundation Fill cu.m 6.71 GPC-1, D-1
804(1)a Embankment cu.m 16.03 GPC-1, D-1
B. Reinforce Concrete Works
CCS - 1 set( Footing Column
900(1) Reinfroce Concrete(fc=3,000 psi @ 28 days) cu.m 10.89 & Beam)
C. Finishing
1043(2)a CHB Non-Load bearing sq.m 134.65 Q-1
1044(1) Forms & Falseworks ls. 1.00 PE Cert.-1
403(a) Steel Trusses kgs. 453.76 Q-1
1003(1)a Carpentry for Ceiling sq.mt. 407.32 PE Cert.-1
1003(3) Cabinets sq.mts. 5.74 PE Cert.-1
1001(1)a5 Pipe meter 35.20 PE Cert.-1
1001(1)a6 Pipe meter 31.00 PE Cert.-1
1001(1)a7 Pipe meter 32.00 PE Cert.-1
1001(2)a1 Fittings each 6.00 PE Cert.-1
1001(2)a2 Fittings each 6.00 PE Cert.-1
1001(2)a3 Fittings each 8.00 PE Cert.-1
1001(2)b1 Fittings each 10.00 PE Cert.-1
1001(2)b2 Fittings each 8.00 PE Cert.-1
1001(2)c1 Fittings each 4.00 PE Cert.-1
1001(2)c2 Fittings each 4.00 PE Cert.-1
1001(2)c3 Fittings each 4.00 PE Cert.-1
1001(2)d1 Fittings each 6.00 PE Cert.-1
1001(2)d2 Fittings each 8.00 PE Cert.-1
1001(2)d3 Fittings each 5.00 PE Cert.-1
1001(2)e1 Fittings each 4.00 PE Cert.-1
1001(2)e2 Fittings each 4.00 PE Cert.-1
1001(2)f1 Fittings each 3.00 PE Cert.-1
1001(2)f3 Fittings each 5.00 PE Cert.-1
1001(2)g1 Fittings each 8.00 PE Cert.-1
1001(2)g3 Fittings each 7.00 PE Cert.-1
1001(2)i2 Fittings each 4.00 PE Cert.-1
1001(2)I2 Fittings each 6.00 PE Cert.-1
1002(5)b1 PPR-C Pipes piece 18.00 PE Cert.-1
1002(6)b2 PPR-C Pipes piece 22.00 PE Cert.-1
1002(6)c2 PPR-C Pipes piece 12.00 PE Cert.-1
1002(6)g2 PPR-C Pipes piece 10.00 PE Cert.-1
1002(2) Plumbing Fixtures set 11.00 PE Cert.-1
1004(2)a Rough Hardwares set 2.00
1004(2)e Finishing Hardware set 7.00 PE Cert.-1
1004(2)g Finishing Hardware sq.mt. 24.00 PE Cert.-1
1007(1)b Aluminum Glass Door sq.mt. 9.45
1008(1)c Aluminum Glass Windows sq.mt. 10.39
1008(1)d Aluminum Glass Windows sq.mt. 68.24
1010(1) Frames sets 4.00 PE Cert.-1
1010(2)a Doors sq.mts. 9.72 PE Cert.-1
1010(2)b Doors sq.mts. 6.93 PE Cert.-1
1013(2)c Fabricated Metal Roofing Accesory ln.m. 35.00 PE Cert.-1
1013(2)d Fabricated Metal Roofing Accesory ln.m. 48.20 PE Cert.-1
1018(3) Granite Tiles sq.mt 122.08 PE Cert.-1
1018(4) Synthetic Granite Tiles sq.mt 285.68 PE Cert.-1
1027(1) Cement Plaster Finish sq.mt 305.65 PE Cert.-1
1032(1) Painting Works sq.mt 558.73 Q-1
1039(1) Aluminum Cladding sq.m 211.20 PE Cert.-1
1042(1) Perforated ceiling panel sq.m 34.00 PE Cert.-1
D. Electrical
1100(1)a2 Rigid Steel Conduit(RSC) length 65.00 PE Cert.-1
1100(1)a3 Rigid Steel Conduit(RSC) length 34.00 PE Cert.-1
1100(1)a5 Rigid Steel Conduit(RSC) length 8.00 PE Cert.-1
1100(1)d2 Conduit Coupling(RSC) pcs 45.00 PE Cert.-1
1100(1)d3 Conduit Coupling(RSC) pcs 34.00 PE Cert.-1
1100(2)a2 Locknut and Bushing(RSC) pcs 56.00 PE Cert.-1
1100(2)a3 Locknut and Bushing(RSC) pcs 36.00 PE Cert.-1
1100(1)d4 Conduit Coupling(RSC) pcs 10.00 PE Cert.-1
1100(4)a2 Conduit Elbow(RSC) pcs 130.00 PE Cert.-1
1100(4)a3 Conduit Coupling(RSC) pcs 72.00 PE Cert.-1
1100(4)a5 Conduit Coupling(RSC) pcs 6.00 PE Cert.-1
1100(6) Conduits Clamp pcs 440.00 PE Cert.-1
1100(8)b G.I. Wire kls 4.00 PE Cert.-1
1100(12) PVC Solvent Cement can 7.00 PE Cert.-1
1100(14) Octagonal Junction Boxes piece 22.00 PE Cert.-1
1100(15) Utility Boxes piece 15.00 PE Cert.-1
1100(22) Grounding Rod Copperweld length 5.00 PE Cert.-1
1101(1)a1 Wires & Wiring Devices rolls 7.00 PE Cert.-1
1101(1)a2 Wires & Wiring Devices rolls 4.00 PE Cert.-1
1101(1)a3 Wires & Wiring Devices rolls 2.00 PE Cert.-1
1101(1)a4 Wires & Wiring Devices rolls 0.50 PE Cert.-1
1101(2) Tumbler Switch pcs 5.00 PE Cert.-1
1101(3) Tumbler Switch pcs 2.00 PE Cert.-1
1101(4) Tumbler Switch pcs 10.00 PE Cert.-1
1101(6) Duplex Convenience Receptacle set 25.00 PE Cert.-1
1101(9) Air Conditioning Outlet 3-prong set 7.00 PE Cert.-1
1102(1) Panel Boards Safety Switch Type set 1.00 PE Cert.-1
1103(1)a3 Flourescent Lighting Fixture set 67.00 PE Cert.-1
1103(2)a1 Pin Light 6 inch. Dia w/ single CFL Bulb set 94.00 PE Cert.-1
1103(3) Emergency Light Duration 2 hrs. set 3.00 PE Cert.-1
1200(1) Compressor, Condenser and Evaporator set 7.00 PE Cert.-1
1208(2) Steel Tubular kgs. 674.99 PE Cert.-1
SPL-1a Sounds System & Accessories ls. 1.00 PE Cert.-1
Summary:
900 Reinforced Concrete *
(a,b,c,d,e) a.) Portland Cement bags 345.84 Q-1
b.) Screened & Washed Fine Aggregate cu.m 105.64 Q-1,G-2
c.) Screened & Washed Coarse Aggregate cu.m 10.90 Q-1,G-1
d.) Water - - PE Cert.-1
e.) Reinforcing Steel kgs 1,244.50 Q-1/size per 10,000 kgs.

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 3,762,000.00 0.5000% Q.C Chart--------- P 18,810.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 12,226.50 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 2,821.50 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 3,762.00 (34%) (B-1A) - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 18,810.00 TOTAL - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
0.20
0.48
1.41
QUALITY CONTROL PROGRAM
Name of Proje: Construction of Bunawan Municipal Water System @ Bunawan, Agusan del Sur
Limits : Location: Bunawan, Agusan del Sur
Appropriation/Contact Amount: P 13,592,309.37 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
803(1)a Removal of Obstruction & Structures cu.m 154.67 PE Cert.-1
803(3) Excavation of Cfooting, Wall Footing & SW Footing cu.m 6.00 PE Cert.-1
804(1)a Backfilling of Excavated Materials cu.m 52.00 GPC-1, D-2
900(1) Reinforce Concrete (fc = 3,000 psi @ 28 days) cu.m 138.00 *
1002(2) Plumbing Fixtures set 1.00 PE Cert.-1
1008(1)b Aluminum Glass Window sq.m. 2.88 PE Cert.-1
1010(2)a Doors sq.m. 1.26 PE Cert.-1
1011(1)b Rool-up Door set 1.00 PE Cert.-1
1018(1) Glazed Tiles and Trims sq.m. 4.84 PE Cert.-1
1032(1) Painting Works sq.m. 305.00 Q-1
1044(1) Forms & Falseworks ls 1.00 PE Cert.-1
1101(1)a1 Electrical Wire roll 120.00 PE Cert.-1
1101(1)a2 Electrical Wire roll 60.00 PE Cert.-1
1101(3) Tumbler Switch Two Gang pc 4.00 PE Cert.-1
1101(6) Duplex Convenience Receptacles set 2.00 PE Cert.-1
1103(2)a1 Pin Light 6 inch Dia w/ Single CFL Bulb set 8.00 PE Cert.-1
B.5 Project Billboard/Signboard sets 2.00 PE Cert.-1
B.7 Occupational Safety & Health Program months 7.00 PE Cert.-1
B.9 Mobilization/Demobilization ls 1.00 PE Cert.-1
SPL 1 Pipes and Fittings ls 1.00 PE Cert.-1
Cast Iron and Butterfly Gate Valves and Fitting
SPL 2 Assembly ls 1.00 PE Cert.-1
SPL 3 Manhole Frame & Cover sets 3.00 PE Cert.-1
SPL 4 Slow-Sand Filtration Plant, Capacity = 50 Lps ls 1.00 PE Cert.-1
SPL 5 Metal Works ls 1.00 PE Cert.-1
Summary:
CCS-4 sets (Footing, Column,
900 Reinforced Concrete * cu.m 138.00 Beam & Slab)
(a,b,c,d,e,f) a.) Portland Cement bags Q-2
b.) Screened & Washed Fine Aggregate cu.m Q-1,G-4
c.) Screened & Washed Coarse Aggregate cu.m Q-1,G-6
d.) Water - - PE Cert.-1
404 Reinforcing Steel ** kgs Q-1/size per 10,000 kgs.
(a,b,c,d,e,f)
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 13,592,309.37 0.5000% Q.C Chart--------- P 67,961.55
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 44,175.01 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 10,194.23 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 13,592.31 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 67,961.55 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
Sur

1.56

-
-
-
QUALITY CONTROL PROGRAM
Name of Project : Completion of Dietary Building @ Loreto District Hospital
Limits : Location: Loreto, Agusan del Sur
Appropriation/Contact Amount: P 2,475,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801(1) Removal of Obstruction & Structures ls 11.04 P.E. Cert-1
803(3)a Structure Excavation-common soil cu.m. 16.45 GPC-1, D-1
804(1)b Gravel Bedding @ CF, WF, SW, FTB & SOF cu.m. 6.05 GPC-1, D-1
804(4) Gravel Fill cu.m. 25.97 GPC-1, D-1
B.7 Occupational Safety & Health month 2.16 P.E. Cert-1
900(1)c2 Structural Concrete-Footing and Slab on Fill ( fc=3,000 psi @ 28 days) cu.m. 160.83 *
900(1)c4 Structural Concrete-Columns ( fc=3,000 psi @ 28 days) cu.m. 3.20 *
900(1)c5 Rein. Steel for Tie Beam cu.m. 516.87 *
900(1)c6 Structural Concrete-Beams/Girder ( fc=3,000 psi @ 28 days) cu.m. 4.68 *
902(1)a2 Reinforcing Steel (Deformed) grade 60 kgs 1,284.39 Q-1/ size per 10,000 kgs.
903(1) RC for Beams(fc'=3000psi @ 28days) ls 4.55 P.E. Cert-1
1001(1)a5 Pipe-50mm dia x pvc - series 1000 meter 861.28 P.E. Cert-1
1001(1)a7 RC for SOF, Corridor & Ramp (fc=3,000 psi @ 28 days) meter 7.65 P.E. Cert-1
1001(2)a1 Reinforcing Steel for SOF, Corridor & Ramp each 238.33 P.E. Cert-1
1001(2)b3 Fittings-100mm dia X pvc - elbow, 1/4 bend each 114.10 P.E. Cert-1
1001(2)c3 Fittings-100mm dia X pvc - clean-out with plug each 99.75 P.E. Cert-1
1001(2)f1 Fittings-50mm dia X pvc - sanitary fee each 2.00 P.E. Cert-1
1001(2)f3 Fittings-100mm dia X pvc - sanitary fee each 12.37 P.E. Cert-1
1001(2)e3 Fittings-100mm dia X pvc p trap each 4.32 P.E. Cert-1
1001(2)g1 Prepainted Metal Sheets/Roofing each 104.76 P.E. Cert-1
1001(2)g3 Fittings-100mm dia X pvc - sanitary wye each 1,512.20 P.E. Cert-1
1001(2)k3 Fittings-100mm dia X 75mm dia X pvc -reducer sanitary tee sq.m 192.00 P.E. Cert-1
1001(2)I2 Fittings-100mm dia X 50mm dia X pvc -reducer sanitary wye each 307.80 P.E. Cert-1
1002(4)b1 PVC Pipes (blue)-13mm dia x elbow, 1/4 bend 90 degrees piece 15.00 P.E. Cert-1
1002(4)b2 PVC Pipes (blue)-20mm dia x elbow, 1/4 bend 90 degrees piece 12.00 P.E. Cert-1
1002(4)d1 PVC Pipes (blue)-13mm dia x tee equal piece 9.00 P.E. Cert-1
1002(4)d2 PVC Pipes(blue)-20mm dia X tee equal piece 9.00 P.E. Cert-1
1002(4)h1 PVC Pipes(blue)-13mm dia X socket/coupling piece 9.00 P.E. Cert-1
1002(4)j1 PVC Pipes(blue)-13mm dia X male threaded adaptor piece 10.00 P.E. Cert-1
1002(4)j2 PVC Pipes(blue)-20mm dia X male threaded adaptor
4.10 Safety Helmet man-days 150.00 PE Cert.-1
4.20 Safety Gloves man-days 150.00 PE Cert.-1
4.30 Safety Shoes man-days 150.00 PE Cert.-1
4.40 Rain Coat man-days 150.00 PE Cert.-1
1002(4)k1 4.50 Safety Dusk Masks man-days 150.00 PE Cert.-1
1002(4)k2 PVC Pipes(blue)-20mm dia X female threaded adaptor piece 9.00 P.E. Cert-1
CCS-2 sets
(Footing &
Column,
1002(4)l1 PVC Pipes (blue) -13mm dia x cap piece 22.24 Beam)
1002(4)l2 PVC Pipes (blue) -20mm dia x cap piece 309.59 Q-1
1002(5)a2 Water Closet, Elongated, Complete-flush type set 19.64 Q-1,G-1
1002(5)c1 Kitchen Sink, Complete set 22.24 Q-1,G-1
1002(5)f1 Lavatory, Wall Hung, Complete-manually operated set 2.00 P.E. Cert-1
1002(5) i Toilet Soap Holder set 3,061.70 Q-1/size per 10,000 kgs.
1002(5) k Toilet Tissue Holder set 2.00 P.E. Cert-1
1002(5)r Hose Bibb pcs 7.00 P.E. Cert-1
1003(1)a2 Ceiling-4.5mm fiber cement board on wood frame sq.mt. 160.00 P.E. Cert-1
1003(5)a1 Fascia Board-19mm fiber cement board kilo 16.77 P.E. Cert-1
1004(1) a Rough Hardwares-nails kilo 130.00 P.E. Cert-1
1004(1)c Rough Hardwares-bolts sq.mt. 16.77 P.E. Cert-1
1007(1)b Aluminum Glass Door Swing Type sq.mt. 8.82 P.E. Cert-1
1008(1)a Aluminum Glass Door Swing Type ln mt 124.81 P.E. Cert-1
1013(2)a Fabricated Metal Roofing Accesory-ridge/hip rolls x gauge 26 ln mt 7.50 P.E. Cert-1
1013(2)e Fabricated Metal Roofing Accesory-valley rolls/gutter x gauge 26 sq mt 44.29 P.E. Cert-1
1014(1)b2 Prepainted Metal Sheets-above 0.427 mm rib type long span sq mt 35.00 P.E. Cert-1
1018(3) Granite Tiles sq mt 245.60 P.E. Cert-1
1026(1) Pebble Washout ln mt 12.50 P.E. Cert-1
1027(1) Cement Plaster Finish sq mt 225.00 P.E. Cert-1
1032(1) Painting Works sq mt 600.00 Q-1
1035(1) Furring Channel ln.mt 788.64 P.E. Cert-1
1039(1) Aluminum Cladding Panel (ACP) sq mt 10.13 P.E. Cert-1
1043(2) PVC Doors and Frames sets 1.26 P.E. Cert-1
1046(1)a CHB Non load Bearing-including reinforced steel-100 mm sq m 55.00 Q-1
1047(2)a Structural Steel-roof framing kgs. OPERARIO P.E. Cert-1
1047(2)c Structural Steel-purlins kgs. 304.50 P.E. Cert-1
1047(3)a Metal Structural Accessories-bolts pcs 15.00 P.E. Cert-1
1047(3)b Metal Structural Accessories-sagrods pcs 8.00 P.E. Cert-1
1100(1)a2 Rigid Steel Conduit (RSC)-20 mm dia length 6.67 P.E. Cert-1
1100(1)a3 Rigid Steel Conduit (RSC)-25 mm dia length 3.00 P.E. Cert-1
1100(11)a2 Octagonal Junction Boxes-pvc/upvc piece 10.00 P.E. Cert-1
1100(11)b2 Utility Boxes piece 20.00 P.E. Cert-1
1101(1)a6 Electrical Wire-3.5mm2 tw/thhn/thwn2 rolls 13.00 P.E. Cert-1
1101(1)a7 Electrical Wire-5.5mm2 tw/thhn/thwn3 rolls 4.00 P.E. Cert-1
1101(7)a1 Single Pole Wall Switch on one switch plate set 10.00 P.E. Cert-1
1101(7)a2 Duplex(2 single pole wall swithes on one switch plate) set 6.00 P.E. Cert-1
1101(8)a2 Duplex Convenience Outlet/Receptaclem Grounding Type(GT) set 10.00 P.E. Cert-1
1102(2)a1 Panelboard main and Branch Breakers-plug in type NEMA 1 set 1.00 P.E. Cert-1
1103(3)a12 Compact Flourescent Lighting Fixture-21w louvre/pismatic diffuser-reccesed set 13.00 P.E. Cert-1
Down Light/Pinlight Fixture with CFL (203mm dia- (8"))-18w
1103(5) b4 with glass cover recessed
set 20.00 P.E. Cert-1
1200(14)b2 Oscillating Wall Fan set 4.00 P.E. Cert-1
1208(2)a1 Stainless Steel Railing-38 mm dia mts. 50.00 P.E. Cert-1
1208(2)a2 Stainless Steel Railing-50 mm dia mts. 16.67 P.E. Cert-1
Summary:
CCS- 2 sets (Footing
900 Reinforced Concrete * cu.m 685.58 Column & Beam)
a.) Portland Cement bags 243 Q-1
b.) Screened & Washed Fine Aggregate cu.m 111.30 Q-1,G-2
c.) Screened & Washed Coarse Aggregate cu.m 5.08 Q-1,G-1
d.) Water - - PE Cert.-1

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 2,475,000.00 0.5000% Q.C Chart--------- P 12,375.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 8,043.75 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 1,856.25 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 2,475.00 (34%) (B-1A) - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 12,375.00 TOTAL - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
0.4935
0.18 0.1815
0.7791

0.261867
0.296533

kgs.
0.12
1.48
0.07
QUALITY CONTROL PROGRAM
Name of Project : Completion of Hospital (Phase III) @ LA PAZ Municipal Hospital
Limits : Location: La Paz, Agusan del Sur
Appropriation/Contact Amount: P 4,950,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801(1) Removal of Obstruction & Structures ls 11.04 P.E. Cert-1
803(3)a Structure Excavation-common soil cu.m. 16.45 GPC-1, D-1
804(1)b Gravel Bedding @ CF, WF, SW, FTB & SOF cu.m. 6.05 GPC-1, D-1
804(4) Gravel Fill cu.m. 25.97 GPC-1, D-1
B.7 Occupational Safety & Health month 2.16 P.E. Cert-1
900(1)c2 Structural Concrete-Footing and Slab on Fill ( fc=3,000 psi @ 28 days) cu.m. 160.83 *
900(1)c3 Structural Concrete-Footing Tie Beam ( fc=3,000 psi @ 28 days) cu.m. 3.20 *
900(1)c4 Rein. Steel for Tie Beam cu.m. 516.87 *
900(1)c6 Structural Concrete-Beams/Girder ( fc=3,000 psi @ 28 days) cu.m. 4.68 *
902(1)a2 Reinforcing Steel (Deformed) grade 60 kgs 1,284.39 Q-1/ size per 10,000 kgs.
903(1) RC for Beams(fc'=3000psi @ 28days) ls 4.55 P.E. Cert-1
1001(1)a5 Pipe-50mm dia x pvc - series 1000 meter 861.28 P.E. Cert-1
1001(1)a6 RC for SOF, Corridor & Ramp (fc=3,000 psi @ 28 days) meter 7.65 P.E. Cert-1
1001(1)a7 Reinforcing Steel for SOF, Corridor & Ramp meter 238.33 P.E. Cert-1
1001(2)a3 Fittings-100mm dia X pvc - elbow, 1/8 bend each 114.10 P.E. Cert-1
1001(2)b1 Fittings-50mm dia X pvc - elbow, 1/4 bend each 99.75 P.E. Cert-1
1001(2)b2 Fittings-75mm dia X pvc - elbow, 1/4 bend each 2.00 P.E. Cert-1
1001(2)b3 Fittings-100mm dia X pvc - elbow, 1/4 bend each 12.37 P.E. Cert-1
1001(2)c2 Fittings-75mm dia X pvc - clean-out with plug each 4.32 P.E. Cert-1
1001(2)c3 Prepainted Metal Sheets/Roofing each 104.76 P.E. Cert-1
1001(2)f1 Fittings-50mm dia X pvc - sanitary fee each 1,512.20 P.E. Cert-1
1001(2)f3 Fittings-100mm dia X pvc - sanitary fee sq.m 192.00 P.E. Cert-1
1001(2)e2 Fittings-100mm dia X pvc p trap each 307.80 P.E. Cert-1
1001(2)g3 Fittings-100mm dia X pvc - sanitary wye each 4.00 P.E. Cert-1
1001(2)k1 Fittings-75mm dia X 50mm dia X pvc -reducer sanitary tee each 8.00 P.E. Cert-1
1001(2)k2 Fittings-100mm dia X 50mm dia X pvc -reducer sanitary tee each 6.00 P.E. Cert-1
1001(2)k3 Fittings-100mm dia X 75mm dia X pvc -reducer sanitary tee each 8.00 P.E. Cert-1
1001(2)I1 Fittings-75mm dia X 75mm dia X pvc -reducer sanitary tee each 8.00 P.E. Cert-1
1001(2)I3 Fittings-100mm dia X 75mm dia X pvc -reducer sanitary wye each 10.00 P.E. Cert-1
1002(4)a1 PVC Pipes (blue)-13mm dia
4.10 Safety Helmet man-days 150.00 PE Cert.-1
4.20 Safety Gloves man-days 150.00 PE Cert.-1
4.30 Safety Shoes man-days 150.00 PE Cert.-1
4.40 Rain Coat man-days 150.00 PE Cert.-1
1002(4)a4 4.50 Safety Dusk Masks man-days 150.00 PE Cert.-1
1002(4)b1 PVC Pipes (blue)-13mm dia x elbow, 1/4 bend 90 degrees pcs 15.00 P.E. Cert-1
CCS-2 sets
(Footing &
Column,
1002(4)b2 PVC Pipes (blue)-20mm dia x elbow, 1/4 bend 90 degrees pcs 22.24 Beam)
1002(4)b4 PVC Pipes (blue)-32mm dia x elbow, 1/4 bend 90 degrees pcs 309.59 Q-1
1002(4)d1 PVC Pipes (blue)-13mm dia x tee equal pcs 19.64 Q-1,G-1
1002(4)d2 PVC Pipes(blue)-20mm dia X tee equal pcs 22.24 Q-1,G-1
1002(4)d4 PVC Pipes(blue)-32mm dia X tee equal pcs 9.00 P.E. Cert-1
1002(4)h1 PVC Pipes(blue)-13mm dia X socket/coupling pcs 3,061.70 Q-1/size per 10,000 kgs.
1002(4)h2 PVC Pipes(blue)-20mm dia X socket/coupling pcs 9.00 P.E. Cert-1
1002(4)j1 PVC Pipes(blue)-13mm dia X male threaded adaptor pcs 9.00 P.E. Cert-1
1002(4)j2 PVC Pipes(blue)-20mm dia X male threaded adaptor pcs 9.00 P.E. Cert-1
1002(4)k1 PVC Pipes(blue)-13mm dia X female threaded adaptor pcs 9.00 P.E. Cert-1
1002(4)k2 PVC Pipes(blue)-20mm dia X female threaded adaptor pcs 9.00 P.E. Cert-1
1002(4)l1 PVC Pipes (blue) -13mm dia x cap pcs 9.00 P.E. Cert-1
1002(4)l2 PVC Pipes (blue) -20mm dia x cap pcs 9.00 P.E. Cert-1
1002(5)a2 Water Closet, Elongated, Complete-flush type set 7.00 P.E. Cert-1
1002(5)c1 Kitchen Sink, Complete set 1.00 P.E. Cert-1
1002(5)f1 Lavatory, Wall Hung, Complete-manually operated set 2.00 P.E. Cert-1
1002(5) i Toilet Soap Holder set 2.00 P.E. Cert-1
1002(5) k Toilet Tissue Holder set 2.00 P.E. Cert-1
1002(5)r Hose Bibb pcs 7.00 P.E. Cert-1
1003(1)a2 Ceiling-4.5mm fiber cement board on wood frame sq.mt. 1,050.00 P.E. Cert-1
1004(1) a Rough Hardwares-nails kilo 280.00 P.E. Cert-1
1004(1)c Rough Hardwares-bolts kilo 16.77 P.E. Cert-1
1004(2)a Finishing Hardware-lockset set 15.00 P.E. Cert-1
1004(2)e Finishing Hardware-knob set 12.00 P.E. Cert-1
1004(2)g Finishing Hardware-hinges set 26.00 P.E. Cert-1
1007(1)b Aluminum Glass Door Swing Type sq.mt. OPERARIO P.E. Cert-1
1008(1)a Aluminum Glass Window sq.mt. 7.30 P.E. Cert-1
1010(1) Frames-jambs, sills, head set 4.00 P.E. Cert-1
1010(2)a Doors-flush sq.mts. 9.66 P.E. Cert-1
1013(2)a Fabricated Metal Roofing Accesory-ridge/hip rolls x gauge 26 ln mt 7.50 P.E. Cert-1
1013(2)e Fabricated Metal Roofing Accesory-valley rolls/gutter x gauge 26 sq mt 77.00 P.E. Cert-1
1014(1)b2 Prepainted Metal Sheets-above 0.427 mm rib type long span sq mt 108.00 P.E. Cert-1
1014(2) Perforated Aluminum Ceiling Panel sq mt 150.00 P.E. Cert-1
1018(3) Granite Tiles sq mt 587.13 P.E. Cert-1
1027(1) Cement Plaster Finish sq mt 407.00 P.E. Cert-1
1032(1) Painting Works sq mt 2,512.50 Q-1
1035(1) Furring Channel ln.mt 150.00 P.E. Cert-1
1039(1) Aluminum Cladding Panel (ACP) sq mt 70.55 P.E. Cert-1
1043(2) PVC Doors and Frames sets 5.00 P.E. Cert-1
1046(1)a CHB Non load Bearing-including reinforced steel-100 mm sq m 196.00 Q-1
1047(2)a Structural Steel-roof framing kgs. 4,677.67 P.E. Cert-1
1047(2)c Structural Steel-purlins kgs. 1,098.24 P.E. Cert-1
1047(3)a Metal Structural Accessories-bolts pcs 15.00 P.E. Cert-1
1047(3)b Metal Structural Accessories-sagrods pcs 34.29 P.E. Cert-1
1047(3)c Metal Structural Accessories-tumbuckle pcs 4.00 P.E. Cert-1
1047(5)b Metal Structural Accessories-steelplates kgs 361.73 P.E. Cert-1
1100(1)a2 Rigid Steel Conduit (RSC)-20 mm dia length 26.67 P.E. Cert-1
1100(1)a3 Rigid Steel Conduit (RSC)-25 mm dia length 3.00 P.E. Cert-1
1100(11)a2 Octagonal Junction Boxes-pvc/upvc piece 1.00 P.E. Cert-1
1100(11)b2 Utility Boxes piece 1.00 P.E. Cert-1
1101(1)a6 Electrical Wire-3.5mm2 tw/thhn/thwn2 rolls 1.00 P.E. Cert-1
1101(1)a7 Electrical Wire-5.5mm2 tw/thhn/thwn3 rolls 1.00 P.E. Cert-1
1101(7)a1 Single Pole Wall Switch on one switch plate set 20.00 P.E. Cert-1
1101(7)a2 Duplex(2 single pole wall swithes on one switch plate) set 20.00 P.E. Cert-1
1101(7)a3 Triplex(3 single pole wall swithes on one switch plate) set 12.00 P.E. Cert-1
1101(8)a2 Duplex Convenience Outlet/Receptaclem Grounding Type(GT) set 20.00 P.E. Cert-1
1101(8)a4 Weatherproof Duplex Convenience Outlet/Receptacle, Grounding Type set 2.00 P.E. Cert-1
1101(8)a6 Special Purpose Outlet/Receptacle, (GT) for ACU set 4.00 P.E. Cert-1
1102(2)a1 Panelboard main and Branch Breakers-plug in type NEMA 1 set 1.00 P.E. Cert-1
1103(3)a12 Compact Flourescent Lighting Fixture-21w louvre/pismatic diffuser-reccesed set 67.00 P.E. Cert-1
Down Light/Pinlight Fixture with CFL (203mm dia- (8"))-18w
1103(5) b4 with glass cover recessed set 20.00 P.E. Cert-1
1200(4)a2 Package type Airconditioning unit PACU-wall mounted set 2.00 P.E. Cert-1
1200(5)a1 Window type airconditioning unit set 2.00 P.E. Cert-1
1200(14)b2 Oscillating Wall Fan set 4.00 P.E. Cert-1
1200(14)e1 Exhaust fan, ceiling cassette set 8.00 P.E. Cert-1
1200(16)a5 Pipes Copper Tube-15.88mm dia type)hard drawn ln mts. 10.00 P.E. Cert-1
1200(19)a5 Refrigrant Copper Pipes Insulation-15.88mm dia X 3/4 thk length 2.00 P.E. Cert-1
Summary:
900 Reinforced Concrete * cu.m 685.58
a.) Portland Cement bags 706 Q-1
b.) Screened & Washed Fine Aggregate cu.m 361.28 Q-1,G-2
c.) Screened & Washed Coarse Aggregate cu.m 5.08 Q-1,G-1
d.) Water - - PE Cert.-1

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 4,950,000.00 0.5000% Q.C Chart--------- P 24,750.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 16,087.50 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 3,712.50 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 4,950.00 (34%) (B-1A) - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 24,750.00 TOTAL - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
0.4935
0.18 0.1815
0.7791

0.261867
0.296533

kgs.
0.35
4.82
0.07
QUALITY CONTROL PROGRAM
Name of Project : Construction of Multi-Purpose Building ( Barangay Hall) @ Brgy. Concepcion
Limits : Location: Sta. Josefa, Agusan del Sur
Appropriation/Contact Amount: P 997,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801 Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803 Excavation of Cfooting, Wall Footing & SW Footing cu.m 11.04 PE Cert.-1
804(a) Backfilling of Excavated Materials cu.m 16.45 GPC-1, D-1
804(b) Gravel Bedding @ CF, WF, SW, FTB & SOF cu.m 6.05 PE Cert.-1
804(c ) Embankment cu.m 25.97 GPC-1, D-1
900(a) RC Column Footing(fc'=3000 psi @ 28days) cu.m 2.16 *
404(a) Rein. Steel for Column Footing kgs 160.83 **
900(b) RC for Tie Beam & WF (fc'=3000psi @ 28days) cu.m 3.20 *
404(b) Rein. Steel for Tie Beam kgs 516.87 **
900( c) RC Column,PC & Stiffener (fc'=3000psi @ 28days) cu.m 4.68 *
404(c ) Rein. Steel for Column,PC & Stiffener kgs 1,284.39 **
900(d) RC for Beams(fc'=3000psi @ 28days) cu.m 4.55 *
404(d) Rein. Steel for Beams kgs 861.28 **
900( e) RC for SOF, Corridor & Ramp (fc=3,000 psi @ 28 days) cu.m 7.65 *
404( e) Reinforcing Steel for SOF, Corridor & Ramp kgs 238.33 **
506(1) Masonry Works (CHB) sq.m 114.10 for CHB, Q-1
1003 Carpentry for Ceiling sq.m 99.75 PE Cert.-1
1004.2.2 Finishing Hardware set 2.00 PE Cert.-1
1005 Jalousie Windows & Jamb sq.m 12.37 PE Cert.-1
1010(b) Panel Door Jamb sq.m 4.32 PE Cert.-1
1014 Prepainted Metal Sheets/Roofing sq.m 104.76 PE Cert.-1
403(a) Steel Trusses kgs. 1,512.20 Q-1
1027(a) Cement Plaster Finish sq.m 192.00 PE Cert.-1
1032(a) Painting Works sq.m 307.80 Q-1
1100 Conduits,Boxes and Fittings lot 1.00 PE Cert.-1
1101 Wires and Wiring Devices lot 1.00 PE Cert.-1
1102(a) Lighting Fixtures lot 1.00 PE Cert.-1
1102 Panel Boards & Cabinets lot 1.00 PE Cert.-1
SPL I Project Billboard sets 2.00 PE Cert.-1
SPL III Safety & Health Officer hr 10.00 PE Cert.-1
SPL IV Personal Protective Equipment
4.10 Safety Helmet man-days 150.00 PE Cert.-1
4.20 Safety Gloves man-days 150.00 PE Cert.-1
4.30 Safety Shoes man-days 150.00 PE Cert.-1
4.40 Rain Coat man-days 150.00 PE Cert.-1
4.50 Safety Dusk Masks man-days 150.00 PE Cert.-1
Summary:
CCS-2 sets (Footing & Column,
900 Reinforced Concrete * cu.m 22.24 Beam)
(a,b,c,d,e) a.) Portland Cement bags 310 Q-1
b.) Screened & Washed Fine Aggregate cu.m 19.64 Q-1,G-1
c.) Screened & Washed Coarse Aggregate cu.m 22.24 Q-1,G-1
d.) Water - - PE Cert.-1
404 Reinforcing Steel ** kgs 3,061.70 Q-1/size per 10,000 kgs.
(a,b,c,d,e)
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 997,000.00 0.5000% Q.C Chart--------- P 4,985.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 3,240.25 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 747.75 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 997.00 (34%) (B-1A) - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 4,985.00 TOTAL - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:


LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
0.49
0.18
0.78

[p;kl;l'

0.26
0.30
QUALITY CONTROL PROGRAM
: Construction of Power House and Records Building @ Bunawan District Hospital
Name of Project
Limits : Location: Bunawan, Agusan del Sur
Appropriation/Contact Amount:P 2,970,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert-1
803(3)a Structure Excavation-common soil cu.m. 74.00 P.E. Cert-1
804(1)b Embankment from Borrow cu.m. 74.00 GPC-1, D-3
804(4) Gravel Fill cu.m. 45.11 P.E. Cert-1
B.5 Project Billboard/Signboard each 2.00 P.E. Cert-1
B.7 Occupational Safety & Health month 3.00 P.E. Cert-1
900(1)c2 Structural Concrete-Footing and Slab on Fill ( fc=3,000 psi @ 28 days) cu.m. 19.51 *
900(1)c3 Structural Concrete-Footing Tie Beam ( fc=3,000 psi @ 28 days) cu.m. 5.82 *
900(1)c4 Structural Concrete-Columns ( fc=3,000 psi @ 28 days) cu.m. 9.31 *
900(1)c5 Structural Concrete-Suspended Slab ( fc=3,000 psi @ 28 days) cu.m. 3.24 *
900(1)c6 Structural Concrete-Beams/Girder ( fc=3,000 psi @ 28 days) cu.m. 13.14 *
902(1)a2 Reinforcing Steel (Deformed) grade 60 kgs 5,296.68 Q-1/ size per 10,000 kgs.
903(1) Forms and Falseworks ls 1.00 P.E. Cert-1
1001(1)a5 Pipe-50mm dia x pvc - series 1000 meter 6.00 P.E. Cert-1
1001(1)a7 Pipe-100mm dia x pvc - series 1000 meter 9.00 P.E. Cert-1
1001(2)a1 Fittings-50mm dia X pvc - elbow, 1/8 bend each 12.00 P.E. Cert-1
1001(2)a3 Fittings-100mm dia X pvc - elbow, 1/8 bend each 9.00 P.E. Cert-1
1001(2)b1 Fittings-50mm dia X pvc - elbow, 1/4 bend each 8.00 P.E. Cert-1
1001(2)b3 Fittings-100mm dia X pvc - elbow, 1/4 bend each 4.00 P.E. Cert-1
1001(2)c3 Prepainted Metal Sheets/Roofing each 6.00 P.E. Cert-1
1001(2)f1 Fittings-50mm dia X pvc - sanitary fee each 6.00 P.E. Cert-1
1001(2)f3 Fittings-100mm dia X pvc - sanitary fee sq.m 6.00 P.E. Cert-1
1001(2)e3 Fittings-100mm dia X pvc p trap each 4.00 P.E. Cert-1
1001(2)g1 Fittings-50mm dia X pvc - sanitary wye each 9.00 P.E. Cert-1
1001(2)g3 Fittings-100mm dia X pvc - sanitary wye each 4.00 P.E. Cert-1
1001(2)k2 Fittings-100mm dia X 50mm dia X pvc -reducer sanitary tee each 6.00 P.E. Cert-1
1001(2)k3 Fittings-100mm dia X 75mm dia X pvc -reducer sanitary tee each 8.00 P.E. Cert-1
1001(2)I3 Fittings-100mm dia X 75mm dia X pvc -reducer sanitary wye each 8.00 P.E. Cert-1
1002(4)a1 PVC Pipes (blue)-13mm dia pcs 9.00 P.E. Cert-1
1002(4)b1 PVC Pipes (blue)-13mm dia x elbow, 1/4 bend 90 degrees pcs 15.00 P.E. Cert-1
1002(4)b2 PVC Pipes (blue)-20mm dia x elbow, 1/4 bend 90 degrees pcs 12.00 P.E. Cert-1
1002(4)d1 PVC Pipes (blue)-13mm dia x tee equal pcs 9.00 P.E. Cert-1
1002(4)d2 PVC Pipes(blue)-20mm dia X tee equal pcs 9.00 P.E. Cert-1
1002(4)h1 PVC Pipes(blue)-13mm dia X socket/coupling pcs 9.00 P.E. Cert-1
1002(4)j1 PVC Pipes(blue)-13mm dia X male threaded adaptor pcs 9.00 P.E. Cert-1
1002(4)j2 PVC Pipes(blue)-20mm dia X male threaded adaptor pcs 9.00 P.E. Cert-1
1002(4)k1 PVC Pipes(blue)-13mm dia X female threaded adaptor pcs 9.00 P.E. Cert-1
1002(4)k2 PVC Pipes(blue)-20mm dia X female threaded adaptor pcs 9.00 P.E. Cert-1
1002(4)l1 PVC Pipes (blue) -13mm dia x cap pcs 9.00 P.E. Cert-1
1002(4)l2 PVC Pipes (blue) -20mm dia x cap pcs 9.00 P.E. Cert-1
1002(5)a2 Water Closet, Elongated, Complete-flush type set 2.00 P.E. Cert-1
1002(5)f1 Lavatory, Wall Hung, Complete-manually operated set 2.00 P.E. Cert-1
1002(5)h6 Floor Drain Plates - 100mm dia x brass set 2.00 P.E. Cert-1
1002(5) i Toilet Soap Holder pcs 2.00 P.E. Cert-1
1002(5) k Toilet Tissue Holder pcs 2.00 P.E. Cert-1
1002(5)r Hose Bibb pcs 2.00 P.E. Cert-1
1002(7)h2 PVC Pipes(blue)-20mm dia x socket/coupling pcs 9.00 P.E. Cert-1
1002(7)j1 PVC Pipes(blue)-13mm dia X male threaded adaptor pcs 6.00 P.E. Cert-1
1003(1)a1 Ceiling-4.5mm fiber cement board on metal frame sq.mt. 148.25 P.E. Cert-1
1004(1) a Rough Hardwares-nails kilo 60.00 P.E. Cert-1
1004(1)c Rough Hardwares-bolts kilo 18.95 P.E. Cert-1
1008(1)a Aluminum Glass Window-Sliding Type sq.mt. 20.20 P.E. Cert-1
1008(1)c Aluminum Glass Window-Awning Type sq.mt. 2.10 P.E. Cert-1
1008(1)d Aluminu Glass Window-fixed type sq.mt. 0.72 P.E. Cert-1
1010(2)b Doors wood panel sq.mt. 4.05 P.E. Cert-1
1013(2)b Fabricated Metal Roofing Accesory-ridge/hip rolls x gauge 26 ln mt 27.50 P.E. Cert-1
1013(2)c Fabricated Metal Roofing Accesory-valley rolls/gutter x gauge 26 sq mt 9.50 P.E. Cert-1
1014(1)b2 Prepainted Metal Sheets-above 0.427 mm rib type long span sq mt 96.00 P.E. Cert-1
1014(2) Perforated Aluminum Ceiling Panel sq mt 108.25 P.E. Cert-1
1018(3) Granite Tiles sq mt 130.40 P.E. Cert-1
1027(1) Cement Plaster Finish sq mt 260.67 P.E. Cert-1
1035(1) Furring Channel ln.mt 148.25 P.E. Cert-1
1039(1) Aluminum Cladding Panel (ACP) sq mt 25.66 P.E. Cert-1
1043(2) PVC Doors and Frames sets 1.68 P.E. Cert-1
1046(1)a CHB Non load Bearing-including reinforced steel-100 mm sq m 255.67 Q-1
1100(1)a2 Rigid Steel Conduit (RSC)-20 mm dia length 6.67 P.E. Cert-1
1100(1)a3 Rigid Steel Conduit (RSC)-25 mm dia length 3.00 P.E. Cert-1
1100(11)a2 Octagonal Junction Boxes-pvc/upvc piece 1.00 P.E. Cert-1
1100(11)b2 Utility Boxes piece 1.00 P.E. Cert-1
1101(1)a6 Electrical Wire-3.5mm2 tw/thhn/thwn2 rolls 7.00 P.E. Cert-1
1101(1)a7 Electrical Wire-5.5mm2 tw/thhn/thwn3 rolls 4.00 P.E. Cert-1
1101(7)a1 Single Pole Wall Switch on one switch plate set 10.00 P.E. Cert-1
1101(7)a2 Duplex(2 single pole wall swithes on one switch plate) set 6.00 P.E. Cert-1
1101(7)a3 Triplex(3 single pole wall swithes on one switch plate) set 5.00 P.E. Cert-1
1101(8)a2 Duplex Convenience Outlet/Receptaclem Grounding Type(GT) set 8.00 P.E. Cert-1
1101(8)a5 Weatherproof Duplex Convenience Outlet/Receptacle, Grounding Type set 2.00 P.E. Cert-1
1102(2)a1 Panelboard main and Branch Breakers-plug in type NEMA 1 set 1.00 P.E. Cert-1
1103(3)a12 Compact Flourescent Lighting Fixture-21w louvre/pismatic diffuser-reccesed set 13.00 P.E. Cert-1
Down Light/Pinlight Fixture with CFL (203mm dia- (8"))-
1103(5) b4 18w with glass cover recessed set 12.00
P.E. Cert-1
1208(2)a1 Stainless Steel Railing-38mm dia mts. 8.33 P.E. Cert-1
1208(2)a2 Stainless Steel Railing-50mm dia mts. 10.00 P.E. Cert-1
1208(2)b2 GI Pipe Railings and Others mts. 10.00 P.E. Cert-1
1047(2)a Structural Steel-roof framing kgs. 700.00 P.E. Cert-1
1047(2)c Structural Steel-Purlins kgs. 1,190.40 P.E. Cert-1
1047(3)a Metal Structure Accessories-bolts pcs 80.00 P.E. Cert-1
1047(3)b Metal Structure Accessories-sagrods pcs 54.00 P.E. Cert-1
1047(3)c Metal Structure Accessories-tumbuckle pcs 8.00 P.E. Cert-1
1047(5)b Metal Structure Accessories-steel plates kgs. 70.65 P.E. Cert-1
SPL I Attachment, Guy, Malleable Type w/ 11/16" hole dia pcs 1,961.05 P.E. Cert-1
SPL II Bolt(Carriage, Double Arming, Oval Eye, Machine and Single Upset) pcs 40.00 P.E. Cert-1
SPL III Brace, CrossArm, 28", Steel or Wood pcs 18.00 P.E. Cert-1
SPL IV Clamp pcs 41.00 P.E. Cert-1
SPL V Clevis, Secondary Swinging Without Spool pcs 4.00 P.E. Cert-1
SPL VI Conductor (Bare-ACSR #2-1/0 and Insulated-ACSR #2) mts. 424.00 P.E. Cert-1
SPL VII Connector (Compression, #6-#1/0 ACSR Run) pcs 37.00 P.E. Cert-1
Summary:
CCS - 3 Sets ( Footing Column,
900 Reinforced Concrete * cu.m 51.02 Beam & Slab )
a.) Portland Cement bags 734 Q-1
b.) Screened & Washed Fine Aggregate cu.m 84.03 Q-1,G-2
c.) Screened & Washed Coarse Aggregate cu.m 51.02 Q-1,G-1
d.) Water - - PE Cert.-1

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 2,970,000.00 0.5000% Q.C Chart--------- P 14,850.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 9,652.50 Lab.(66%) (P-L) - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 2,227.50 Reg.l Lab. - - - - - - -- - - P
c.) Misc. & Other - (20%) - - - -- P 2,970.00 (34%) (B-1A) - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 14,850.00 TOTAL - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
2.22
2.22 2.22
1.3533

0.12
0.12
0.37
1.12
0.68
QUALITY CONTROL PROGRAM
Name of Project : Construction of Multi-Purpose Building (Covered Court - Elevated) @ Bgy. Borbon
Limits : Location: San Francisco, Agusan del Sur
Appropriation/Contact Amount: P 4,950,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert.-1
803(1)a Structure of Excavation cu.m. 146.70 P.E. Cert.-1
804(1)b Embankment from borrow cu.m. 435.33 GPC-1, D-13
804(4) Gravel Fill cu.m. 133.06 P.E. Cert.-1
B. Other General Requirements
B.5 Project Billboard/Signboard each 2.00 P.E. Cert.-1
B.7 Occupational Safety and Health Program month 4.00 P.E. Cert.-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert.-1
Plain and Reinforced Concrete Works
900(1)c2 Structural Concrete (Footings and Slab on Fill) cu.m. 97.95 *
900(1)c3 Structural Concrete (Footing Tie Beam) cu.m. 9.66 *
900(1)c4 Structural Concrete (Columns) cu.m. 18.20 *
Reinforcing Steel
902(1)a2 Reinforcing Steel (Deformed) kls. 6,342.08 Q-1/size per 10,000 kgs.
Forms and Falsework
903(1) Forms/Falseworks ls 1.00 P.E. Cert.-1
Corrugated Metal Roofing
1013(2)b Fabricated Metal Roofing Accesory (Flashing)-gauge 27 ln.m. 17.00 P.E. Cert.-1
1013(2)c Fabricated Metal Roofing Accesory (Gutter)-gauge 28 ln.m. 68.40 P.E. Cert.-1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets (Long Span)-above 0.427m sq.mt. 1,166.84 P.E. Cert.-1
Cement Floor Finish
1021(1)a Cement Floor Finish (Plain) sq.mt 544.16 P.E. Cert-1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq.mt. 126.29 P.E. Cert.-1
Painting, Varnishing and Other related works
1032(1)a1 Painting Works(Masonry/Concrete) sq.mt. 115.92 Q-1
1032(1)a3 Painting Works(Steel) sq.mt. 250.00 Q-1
Masonry Works
1043(2)b CHB Non Load Bearing-including reinforced steel-100 mm sq.m. 115.92 Q-1
Metal Structures
1047(1) Structural Steel(Roof Framing) ls 1.00 P.E. Cert.-1
1047(2)a Structural Steel(Roof Framing) kls. 214.91 P.E. Cert.-1
1047(2)c Structural Steel(Purlins) kls. 5,206.95 P.E. Cert.-1
1047(3)a Metal Structure Accessories(bolts) pcs. 254.87 P.E. Cert.-1
1047(3)b Metal Structure Accessories(sagrods) pcs. 60.71 P.E. Cert.-1
1047(3)c Metal Structure Accessories(Tumbuckle) pcs. 20.00 P.E. Cert.-1
1047(5)b Metal Structure Accessories(Steel Plate) kls. 589.19 P.E. Cert.-1
Conduits, Boxes and Fittings
1100(1)f1 Polyvinyl Chloride Pipes (PVC/uPVC)-20mm dia length 16.00 P.E. Cert.-1
1100(2)d1 PVC/uPVC Coupling-20mm dia pcs. 8.00 P.E. Cert.-1
1100(3)c1 PVC/uPVC Adapter-20mm dia pcs. 12.00 P.E. Cert.-1
1100(4)d1 PVC/uPVC Elbow-20mm dia pcs. 18.00 P.E. Cert.-1
1100(8)a2 Conduit Clamp-20 mm. dia pcs. 150.00 P.E. Cert.-1
1100(9)a2 G.I. Wire-#16 kilo 3.00 P.E. Cert.-1
1100(10) PVC Solvent Cement can 2.00 P.E. Cert.-1
1100(11)a2 Octagonal Junction Box (PVC/uPVC) pcs. 8.00 P.E. Cert.-1
1100(11)b2 Utility Boxes(PVC/uPVC) pcs. 4.00 P.E. Cert.-1
1100(14)b Grounding Rod Copper clad (20mm dia x 3m) length 2.00 P.E. Cert.-1
Wires and Wiring Devices
1101(1)a6 Electric Wire (3.5mm2 TW/THHN/THWN) roll 2.50 P.E. Cert.-1
1101(1)a7 Electric Wire (5.5mm2 TW/THHN/THWN) roll 2.00 P.E. Cert.-1
1101(7)a2 Duplex (2 Single Pole Wall Switches on one switch plate) set 2.00 P.E. Cert.-1
1101(8)a2 Duplex Convenience Outlet/Receptacles(GT) set 4.00 P.E. Cert.-1
Power load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board with Main & Branch Breakers set 1.00 P.E. Cert.-1
Lighting Fixture
1103(12)a3 Die-Cast Aluminum Spot - Floodlight with electrocoat gray set 4.00 P.E. Cert.-1
Miscellaneous Hardwares
1208(2)a2 Stainless Steel Railings-50mm dia meter 31.00 P.E. Cert.-1
Summary:
CCS - 3 Sets ( Footing Column,
900 Reinforced Concrete * cu.m 125.81 Beam & Slab )
a.) Portland Cement bags 1,444 Q-1
b.) Screened & Washed Fine Aggregate cu.m 201.66 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 125.81 Q-1,G-2
d.) Water - - PE Cert.-1

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
n del Sur

13.06 13.06
3.99

0.06

[p;kl;l'
0.03
0.03

2.69
1.68
QUALITY CONTROL PROGRAM
Name of Proje: Repair/Maintenance of River Bank Protection along Daang Maharlika (Agusan-Davao Road)
Adlayan Bridge
App. "A" Downstream 0+000-0+010; App. "A"
Limits : Upstream 0+000-0+015; App. "B" Downstream Location: San Francisco, Agusan del Sur
0+000-0+009; App. "B" Upstream 0+000-0+012
Appropriation/Contact Amount: P 2,000,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
103(1)a Structure Excavation Common Soil cu.m. 74.41 P.E. Cert-1
104(1)b Embankment(Borrow) cu.m. 352.69 GPC-1, D-11
200(1) Aggregare Subbase Course cu.m. 10.00 GP-1, C-1, D-1, CBR-1
404(1)a Reinforcing Steel Bar, Grade 40 kg 3,317.28 Q-1/size per 10,000 kgs.
405(1)a3 Structural Concrete Class A, 28 days cu.m. 83.55 CCS-2 sets
a.) Portland Cement bags 794 Q-1
b.) Screened & Washed Fine Aggregate cu.m 41.78 Q-1,G-1
c.) Screened & Washed Coarse Aggregate cu.m 83.55 Q-1,G-2
d.) Water - - PE Cert.-1
508(1) Hand Laid Rock Embankment cu.m. 51.00 P.E. Cert-1
511(1) Gabions cu.m. 142.00 Sp.Gr.-1, Q-1
A.1.1(3) Facilities for the Engineer ls. 1.00 P.E. Cert-1
B.4(1) Construction Survey & Staking km 0.046 P.E. Cert-1
B.5 Project Billboard unit 4.00 P.E. Cert-1
B.7 Occupational Safety & Health months 2.73 P.E. Cert-1
B.8 Traffic Management months 2.73 P.E. Cert-1
B.9 Mobilization/Demobilization ls. 1.00 P.E. Cert-1

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 2,000,000.00 0.5000% Q.C Chart--------- P 10,000.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 6,500.00 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 1,500.00 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 2,000.00 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 10,000.00 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
del Sur

10.58
0.40

1.11

0.56
1.11
QUALITY CONTROL PROGRAM
: Construction of Multi-Purpose Building (Covered Court with Stage) @ Brgy. Tapaz
Name of Project
Limits : Location: Sta. Josefa, Agusan del Sur
Appropriation/Contact Amount:P 4,950,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert.-1
803(1)a Structure of Excavation cu.m. 155.40 P.E. Cert.-1
804(1)b Embankment from borrow cu.m. 55.00 GPC-1, D-2
804(4) Gravel Fill cu.m. 136.33 P.E. Cert.-1
B.5 Project Billboard/Signboard each 2.00 P.E. Cert.-1
B.7 Occupational Safety and Health Program month 4.00 P.E. Cert.-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert.-1
900(1)c2 Structural Concrete (Footings and Slab on Fill) cu.m. 28.06 *
900(1)c3 Structural Concrete (Footing Tie Beam) cu.m. 9.66 *
900(1)c4 Structural Concrete (Columns) cu.m. 19.01 *
900(1)c6 Structural Concrete (Beam/Girder) cu.m. 0.56 *
902(1)a2 Reinforcing Steel (Deformed) kls. 6,127.22 Q-1/size per 10,000 kgs.
903(1) Forms/Falseworks ls 1.00 P.E. Cert.-1
1013(2)a Fabricated Metal Roofing Accesory (Hip/ridge roll)-gauge 26 ln.m. 7.50 P.E. Cert.-1
1013(2)b Fabricated Metal Roofing Accesory (Flashing)-gauge 27 ln.m. 24.33 P.E. Cert.-1
1013(2)c Fabricated Metal Roofing Accesory (Gutter)-gauge 28 ln.m. 83.40 P.E. Cert.-1
1014(1)b1 Prepainted Metal Sheets (Long Span)-above 0.427m sq.m. 1,297.96 P.E. Cert.-1
1018(3) Granite Tiles sq.m. 50.00 P.E. Cert.-1
1027(1) Cement Plaster Finish sq.m. 108.71 P.E. Cert.-1
1032(1)a1 Painting Works(Masonry/Concrete) sq.m. 115.92 Q-1
1032(1)a3 Painting Works(Steel) sq.m. 250.00 Q-1
1046(2)a CHB Non Load Bearing-including reinforced steel-100 mm sq.m. 108.71 Q-1
1047(1) Structural Steel(Roof Framing) ls 1.00 P.E. Cert.-1
1047(2)a Structural Steel(Roof Framing) kls. 1,268.07 P.E. Cert.-1
1047(2)c Structural Steel(Purlins) kls. 6,046.95 P.E. Cert.-1
1047(3)a Metal Structure Accessories(bolts) pcs. 278.37 P.E. Cert.-1
1047(3)b Metal Structure Accessories(sagrods) pcs. 64.60 P.E. Cert.-1
1047(3)c Metal Structure Accessories(Tumbuckle) pcs. 68.00 P.E. Cert.-1
1047(5)b Metal Structure Accessories(Steel Plate) kls. 620.98 P.E. Cert.-1
1100(1)f1 Polyvinyl Chloride Pipes (PVC/uPVC)-20mm dia length 24.00 P.E. Cert.-1
1100(2)d1 PVC/uPVC Coupling-20mm dia pcs. 12.00 P.E. Cert.-1
1100(3)c1 PVC/uPVC Adapter-20mm dia pcs. 20.00 P.E. Cert.-1
1100(4)d1 PVC/uPVC Elbow-20mm dia pcs. 26.00 P.E. Cert.-1
1100(8)a2 G.I. Wire-#16 pcs. 225.00 P.E. Cert.-1
1100(10) PVC Solvent Cement pcs. 3.00 P.E. Cert.-1
1100(11)a2 Octagonal Junction Box (PVC/uPVC) pcs. 2.00 P.E. Cert.-1
1100(11)b2 Utility Boxes(PVC/uPVC) pcs. 13.00 P.E. Cert.-1
1100(14)b Grounding Rod Copper clad (20mm dia x 3m) length 72.00 P.E. Cert.-1
1101(1)a6 Electric Wire (3.5mm2 TW/THHN/THWN) roll 3.50 P.E. Cert.-1
1101(1)a7 Electric Wire (5.5mm2 TW/THHN/THWN) roll 3.00 P.E. Cert.-1
1101(7)a2 Duplex (2 Single Pole Wall Switches on one switch plate) set 4.00 P.E. Cert.-1
1101(8)a2 Duplex Convenience Outlet/Receptacles(GT) set 6.00 P.E. Cert.-1
1102(1)a1 Panel Board with Main & Branch Breakers set 1.00 P.E. Cert.-1
1103(12)a3 Die-Cast Aluminum Spot - Floodlight with electrocoat gray paint set 3.00 P.E. Cert.-1
1208(2)a2 Stainless Steel Railings-50mm dia meter 63.50 P.E. Cert.-1
1208(5) Steel Brass Metal Nosing meter 12.00 P.E. Cert.-1
Summary:
CCS - 3 Sets ( Footing Column,
900 Reinforced Concrete * cu.m 57.29 Beam & Slab )
a.) Portland Cement bags 733 Q-1
b.) Screened & Washed Fine Aggregate cu.m 146.36 Q-1,G-2
c.) Screened & Washed Coarse Aggregate cu.m 57.29 Q-1,G-1
d.) Water - - PE Cert.-1
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 4,950,000.00 0.5000% Q.C Chart--------- P 24,750.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 16,087.50 Lab.(66%) (P-L) - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 3,712.50 Reg.l Lab. - - - - - - -- - - P
c.) Misc. & Other - (20%) - - - -- P 4,950.00 (34%) (B-1A) - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 24,750.00 TOTAL - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
4.662
1.65 1.65
4.0899

3
0.04

0.37
1.95
0.76
QUALITY CONTROL PROGRAM
: Construction of Multi-Purpose Building (Covered Court with Stage) @ Brgy. Comota
Name of Project
Limits : Location: La Paz, Agusan del Sur
Appropriation/Contact Amount:P 4,950,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert.-1
803(1)a Structure of Excavation cu.m. 159.40 P.E. Cert.-1
804(1)b Embankment from borrow cu.m. 84.42 GPC-1, D-3
804(4) Gravel Fill cu.m. 194.74 P.E. Cert.-1
B.5 Project Billboard/Signboard each 2.00 P.E. Cert.-1
B.7 Occupational Safety and Health Program month 4.00 P.E. Cert.-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert.-1
900(1)c2 Structural Concrete (Footings and Slab on Fill) cu.m. 76.67 *
900(1)c3 Structural Concrete (Footing Tie Beam) cu.m. 9.66 *
900(1)c4 Structural Concrete (Columns) cu.m. 19.01 *
900(1)c6 Structural Concrete (Beam/Girder) cu.m. 0.56 *
902(1)a2 Reinforcing Steel (Deformed) kls. 6,716.46 Q-1/size per 10,000 kgs.
903(1) Forms/Falseworks ls 1.00 P.E. Cert.-1
1013(2)a Fabricated Metal Roofing Accesory (Hip/ridge roll)-gauge 26 ln.m. 7.50 P.E. Cert.-1
1013(2)b Fabricated Metal Roofing Accesory (Flashing)-gauge 27 ln.m. 24.33 P.E. Cert.-1
1013(2)c Fabricated Metal Roofing Accesory (Gutter)-gauge 28 ln.m. 15.00 P.E. Cert.-1
1014(1)b1 Prepainted Metal Sheets (Long Span)-above 0.427m sq.m. 1,297.96 P.E. Cert.-1
1027(1) Cement Plaster Finish sq.m. 98.67 P.E. Cert.-1
1032(1)a1 Painting Works(Masonry/Concrete) sq.m. 115.92 Q-1
1032(1)a3 Painting Works(Steel) sq.m. 250.00 Q-1
1046(2)a CHB Non Load Bearing-including reinforced steel-100 mm sq.m. 98.67 Q-1
1047(1) Structural Steel(Roof Framing) ls 1.00 P.E. Cert.-1
1047(2)a Structural Steel(Roof Framing) kls. 510.68 P.E. Cert.-1
1047(2)c Structural Steel(Purlins) kls. 6,046.95 P.E. Cert.-1
1047(3)a Metal Structure Accessories(bolts) pcs. 278.37 P.E. Cert.-1
1047(3)b Metal Structure Accessories(sagrods) pcs. 64.60 P.E. Cert.-1
1047(3)c Metal Structure Accessories(Tumbuckle) pcs. 68.00 P.E. Cert.-1
1047(5)b Metal Structure Accessories(Steel Plate) kls. 589.19 P.E. Cert.-1
1100(1)f1 Polyvinyl Chloride Pipes (PVC/uPVC)-20mm dia length 24.00 P.E. Cert.-1
1100(2)d1 PVC/uPVC Coupling-20mm dia pcs. 12.00 P.E. Cert.-1
1100(3)c1 PVC/uPVC Adapter-20mm dia pcs. 20.00 P.E. Cert.-1
1100(4)d1 PVC/uPVC Elbow-20mm dia pcs. 26.00 P.E. Cert.-1
1100(8)a2 G.I. Wire-#16 pcs. 225.00 P.E. Cert.-1
1100(10) PVC Solvent Cement kilo 3.00 P.E. Cert.-1
1100(11)a2 Octagonal Junction Box (PVC/uPVC) can 2.00 P.E. Cert.-1
1100(11)b2 Utility Boxes(PVC/uPVC) pcs. 13.00 P.E. Cert.-1
1100(14)b Grounding Rod Copper clad (20mm dia x 3m) length 7.00 P.E. Cert.-1
1101(1)a6 Electric Wire (3.5mm2 TW/THHN/THWN) roll 3.50 P.E. Cert.-1
1101(1)a7 Electric Wire (5.5mm2 TW/THHN/THWN) roll 3.00 P.E. Cert.-1
1101(7)a2 Duplex (2 Single Pole Wall Switches on one switch plate) set 4.00 P.E. Cert.-1
1101(8)a2 Duplex Convenience Outlet/Receptacles(GT) set 6.00 P.E. Cert.-1
1102(1)a1 Panel Board with Main & Branch Breakers set 1.00 P.E. Cert.-1
1103(12)a3 Die-Cast Aluminum Spot - Floodlight with electrocoat gray paint set 4.00 P.E. Cert.-1
Summary:
CCS - 3 Sets ( Footing Column,
900 Reinforced Concrete * cu.m 105.90 Beam & Slab )
a.) Portland Cement bags 1,153 Q-1
b.) Screened & Washed Fine Aggregate cu.m 158.65 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 105.90 Q-1,G-2
d.) Water - - PE Cert.-1

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 4,950,000.00 0.5000% Q.C Chart--------- P 24,750.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 16,087.50 Lab.(66%) (P-L) - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 3,712.50 Reg.l Lab. - - - - - - -- - - P
c.) Misc. & Other - (20%) - - - -- P 4,950.00 (34%) (B-1A) - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 24,750.00 TOTAL - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
4.782
2.53 2.5326
5.8422

3
0.04

0.58
2.12
1.41
QUALITY CONTROL PROGRAM
Name of Project : Construction of Multi-Purpose Building (Covered Court - Elevated) @ Bgry. Cabawan
Limits : Location: Rosario, Agusan del Sur
Appropriation/Contact Amount: P 4,950,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert.-1
803(1)a Structure of Excavation cu.m. 146.70 P.E. Cert.-1
804(1)b Embankment from borrow cu.m. 435.33 GPC-1, D-13
804(4) Gravel Fill cu.m. 133.06 P.E. Cert.-1
B. Other General Requirements
B.5 Project Billboard/Signboard each 2.00 P.E. Cert.-1
B.7 Occupational Safety and Health Program month 4.00 P.E. Cert.-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert.-1
Plain and Reinforced Concrete Works
900(1)c2 Structural Concrete (Footings and Slab on Fill) cu.m. 97.95 *
900(1)c3 Structural Concrete (Footing Tie Beam) cu.m. 9.66 *
900(1)c4 Structural Concrete (Columns) cu.m. 18.20 *
Reinforcing Steel
902(1)a2 Reinforcing Steel (Deformed) kls. 6,342.08 Q-1/size per 10,000 kgs.
Forms and Falsework
903(1) Forms/Falseworks ls 1.00 P.E. Cert.-1
Corrugated Metal Roofing
1013(2)b Fabricated Metal Roofing Accesory (Flashing)-gauge 26 ln.m. 17.00 P.E. Cert.-1
1013(2)c Fabricated Metal Roofing Accesory (Gutter)-gauge 24 ln.m. 68.40 P.E. Cert.-1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets (Long Span)-above 0.427m sq.mt. 1,166.84 P.E. Cert.-1
Cement Floor Finish
1021(1)a Cement Floor Finish (Plain) sq.mt 544.16 P.E. Cert-1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq.mt. 126.29 P.E. Cert.-1
Painting, Varnishing and Other related works
1032(1)a1 Painting Works(Masonry/Concrete) sq.mt. 115.92 Q-1
1032(1)a3 Painting Works(Steel) sq.mt. 250.00 Q-1
Masonry Works
1043(2)b CHB Non Load Bearing-including reinforced steel-100 mm sq.m. 115.92 Q-1
Metal Structures
1047(1) Structural Steel(Roof Framing) ls 1.00 P.E. Cert.-1
1047(2)a Structural Steel(Roof Framing) kls. 214.91 P.E. Cert.-1
1047(2)c Structural Steel(Purlins) kls. 5,206.95 P.E. Cert.-1
1047(3)a Metal Structure Accessories(bolts) pcs. 254.87 P.E. Cert.-1
1047(3)b Metal Structure Accessories(sagrods) pcs. 60.71 P.E. Cert.-1
1047(3)c Metal Structure Accessories(Tumbuckle) pcs. 20.00 P.E. Cert.-1
1047(5)b Metal Structure Accessories(Steel Plate) kls. 589.19 P.E. Cert.-1
Conduits, Boxes and Fittings
1100(1)f1 Polyvinyl Chloride Pipes (PVC/uPVC)-20mm dia length 16.00 P.E. Cert.-1
1100(2)d1 PVC/uPVC Coupling-20mm dia pcs. 8.00 P.E. Cert.-1
1100(3)c1 PVC/uPVC Adapter-20mm dia pcs. 12.00 P.E. Cert.-1
1100(4)d1 PVC/uPVC Elbow-20mm dia pcs. 18.00 P.E. Cert.-1
1100(8)a2 Conduit Clamp-20 mm. dia pcs. 150.00 P.E. Cert.-1
1100(9)a2 G.I. Wire-#16 kilo 3.00 P.E. Cert.-1
1100(10) PVC Solvent Cement can 2.00 P.E. Cert.-1
1100(11)a2 Octagonal Junction Box (PVC/uPVC) pcs. 8.00 P.E. Cert.-1
1100(11)b2 Utility Boxes(PVC/uPVC) pcs. 4.00 P.E. Cert.-1
1100(14)b Grounding Rod Copper clad (20mm dia x 3m) length 2.00 P.E. Cert.-1
Wires and Wiring Devices
1101(1)a6 Electric Wire (3.5mm2 TW/THHN/THWN) roll 2.50 P.E. Cert.-1
1101(1)a7 Electric Wire (5.5mm2 TW/THHN/THWN) roll 2.00 P.E. Cert.-1
1101(7)a2 Duplex (2 Single Pole Wall Switches on one switch plate) set 2.00 P.E. Cert.-1
1101(8)a2 Duplex Convenience Outlet/Receptacles(GT) set 4.00 P.E. Cert.-1
Power load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board with Main & Branch Breakers set 1.00 P.E. Cert.-1
Lighting Fixture
1103(12)a3 Die-Cast Aluminum Spot - Floodlight with electrocoat gray p set 4.00 P.E. Cert.-1
Miscellaneous Hardwares
1208(2)a2 Stainless Steel Railings-50mm dia meter 31.00 P.E. Cert.-1
Summary:
CCS - 3 Sets ( Footing Column,
900 Reinforced Concrete * cu.m 125.81 Beam & Slab )
a.) Portland Cement bags 1,444 Q-1
b.) Screened & Washed Fine Aggregate cu.m 201.66 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 125.81 Q-1,G-2
d.) Water - - PE Cert.-1

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
0.03
0.03

2.69
1.68
QUALITY CONTROL PROGRAM
Name of Project : Construction of Multi-Purpose Building (Covered Court - Elevated) @ Bgry. Sampaguita
Limits : Location: Veruela, Agusan del Sur
Appropriation/Contact Amount: P 4,950,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert.-1
803(1)a Structure of Excavation cu.m. 146.70 P.E. Cert.-1
804(1)b Embankment from borrow cu.m. 435.33 GPC-1, D-13
804(4) Gravel Fill cu.m. 133.06 P.E. Cert.-1
B. Other General Requirements
B.5 Project Billboard/Signboard each 2.00 P.E. Cert.-1
B.7 Occupational Safety and Health Program month 4.00 P.E. Cert.-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert.-1
Plain and Reinforced Concrete Works
900(1)c2 Structural Concrete (Footings and Slab on Fill) cu.m. 97.95 *
900(1)c3 Structural Concrete (Footing Tie Beam) cu.m. 9.66 *
900(1)c4 Structural Concrete (Columns) cu.m. 18.20 *
Reinforcing Steel
902(1)a2 Reinforcing Steel (Deformed) kls. 6,342.08 Q-1/size per 10,000 kgs.
Forms and Falsework
903(1) Forms/Falseworks ls 1.00 P.E. Cert.-1
Corrugated Metal Roofing
1013(2)b Fabricated Metal Roofing Accesory (Flashing)-gauge 26 ln.m. 17.00 P.E. Cert.-1
1013(2)c Fabricated Metal Roofing Accesory (Gutter)-gauge 24 ln.m. 68.40 P.E. Cert.-1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets (Long Span)-above 0.427m sq.mt. 1,166.84 P.E. Cert.-1
Cement Floor Finish
1021(1)a Cement Floor Finish (Plain) sq.mt 544.16 P.E. Cert-1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq.mt. 126.29 P.E. Cert.-1
Painting, Varnishing and Other related works
1032(1)a1 Painting Works(Masonry/Concrete) sq.mt. 115.92 Q-1
1032(1)a3 Painting Works(Steel) sq.mt. 250.00 Q-1
Masonry Works
1046(2)b CHB Non Load Bearing-including reinforced steel-100 mm sq.m. 115.92 Q-1
Metal Structures
1047(1) Structural Steel(Roof Framing) ls 1.00 P.E. Cert.-1
1047(2)a Structural Steel(Roof Framing) kls. 214.91 P.E. Cert.-1
1047(2)c Structural Steel(Purlins) kls. 5,206.95 P.E. Cert.-1
1047(3)a Metal Structure Accessories(bolts) pcs. 254.87 P.E. Cert.-1
1047(3)b Metal Structure Accessories(sagrods) pcs. 60.71 P.E. Cert.-1
1047(3)c Metal Structure Accessories(Tumbuckle) pcs. 20.00 P.E. Cert.-1
1047(5)b Metal Structure Accessories(Steel Plate) kls. 589.19 P.E. Cert.-1
Conduits, Boxes and Fittings
1100(1)f1 Polyvinyl Chloride Pipes (PVC/uPVC)-20mm dia length 16.00 P.E. Cert.-1
1100(2)d1 PVC/uPVC Coupling-20mm dia pcs. 8.00 P.E. Cert.-1
1100(3)c1 PVC/uPVC Adapter-20mm dia pcs. 12.00 P.E. Cert.-1
1100(4)d1 PVC/uPVC Elbow-20mm dia pcs. 18.00 P.E. Cert.-1
1100(8)a2 Conduit Clamp-20 mm. dia pcs. 150.00 P.E. Cert.-1
1100(9)a2 G.I. Wire-#16 kilo 3.00 P.E. Cert.-1
1100(10) PVC Solvent Cement can 2.00 P.E. Cert.-1
1100(11)a2 Octagonal Junction Box (PVC/uPVC) pcs. 8.00 P.E. Cert.-1
1100(11)b2 Utility Boxes(PVC/uPVC) pcs. 4.00 P.E. Cert.-1
1100(14)b Grounding Rod Copper clad (20mm dia x 3m) length 2.00 P.E. Cert.-1
Wires and Wiring Devices
1101(1)a6 Electric Wire (3.5mm2 TW/THHN/THWN) roll 2.50 P.E. Cert.-1
1101(1)a7 Electric Wire (5.5mm2 TW/THHN/THWN) roll 2.00 P.E. Cert.-1
1101(7)a2 Duplex (2 Single Pole Wall Switches on one switch plate) set 2.00 P.E. Cert.-1
1101(8)a2 Duplex Convenience Outlet/Receptacles(GT) set 4.00 P.E. Cert.-1
Power load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board with Main & Branch Breakers set 1.00 P.E. Cert.-1
Lighting Fixture
1103(12)a3 Die-Cast Aluminum Spot - Floodlight with electrocoat gray paint set 4.00 P.E. Cert.-1
Miscellaneous Hardwares
1208(2)a2 Stainless Steel Railings-50mm dia meter 31.00 P.E. Cert.-1
Summary:
CCS - 3 Sets ( Footing
900 Reinforced Concrete * cu.m 125.81 Column, Beam & Slab )
a.) Portland Cement bags 1,444 Q-1
b.) Screened & Washed Fine Aggregate cu.m 201.66 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 125.81 Q-1,G-2
d.) Water - - PE Cert.-1

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
0.03
0.03
2.69
1.68

RARIO
QUALITY CONTROL PROGRAM
Name of Project : Construction of Multi-Purpose Building (Covered Court - Elevated) @ Bgry. Mambalili
Limits : Location: Bunawan, Agusan del Sur
Appropriation/Contact Amount: P 4,950,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert.-1
803(1)a Structure of Excavation cu.m. 146.70 P.E. Cert.-1
804(1)b Embankment from borrow cu.m. 435.33 GPC-1, D-13
804(4) Gravel Fill cu.m. 133.06 P.E. Cert.-1
B. Other General Requirements
B.5 Project Billboard/Signboard each 2.00 P.E. Cert.-1
B.7 Occupational Safety and Health Program month 4.00 P.E. Cert.-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert.-1
Plain and Reinforced Concrete Works
900(1)c2 Structural Concrete (Footings and Slab on Fill) cu.m. 97.95 *
900(1)c3 Structural Concrete (Footing Tie Beam) cu.m. 9.66 *
900(1)c4 Structural Concrete (Columns) cu.m. 18.20 *
Reinforcing Steel
902(1)a2 Reinforcing Steel (Deformed) kls. 6,342.08 Q-1/size per 10,000 kgs.
Forms and Falsework
903(1) Forms/Falseworks ls 1.00 P.E. Cert.-1
Corrugated Metal Roofing
1013(2)b Fabricated Metal Roofing Accesory (Flashing)-gauge 26 ln.m. 17.00 P.E. Cert.-1
1013(2)c Fabricated Metal Roofing Accesory (Gutter)-gauge 24 ln.m. 68.40 P.E. Cert.-1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets (Long Span)-above 0.427m sq.mt. 1,166.84 P.E. Cert.-1
Cement Floor Finish
1021(1)a Cement Floor Finish (Plain) sq.mt 544.16 P.E. Cert-1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq.mt. 126.29 P.E. Cert.-1
Painting, Varnishing and Other related works
1032(1)a1 Painting Works(Masonry/Concrete) sq.mt. 115.92 Q-1
1032(1)a3 Painting Works(Steel) sq.mt. 250.00 Q-1
Masonry Works
1043(2)b CHB Non Load Bearing-including reinforced steel-100 mm sq.m. 115.92 Q-1
Metal Structures
1047(1) Structural Steel(Roof Framing) ls 1.00 P.E. Cert.-1
1047(2)a Structural Steel(Roof Framing) kls. 214.91 P.E. Cert.-1
1047(2)c Structural Steel(Purlins) kls. 5,206.95 P.E. Cert.-1
1047(3)a Metal Structure Accessories(bolts) pcs. 254.87 P.E. Cert.-1
1047(3)b Metal Structure Accessories(sagrods) pcs. 60.71 P.E. Cert.-1
1047(3)c Metal Structure Accessories(Tumbuckle) pcs. 20.00 P.E. Cert.-1
1047(5)b Metal Structure Accessories(Steel Plate) kls. 589.19 P.E. Cert.-1
Conduits, Boxes and Fittings
1100(1)f1 Polyvinyl Chloride Pipes (PVC/uPVC)-20mm dia length 16.00 P.E. Cert.-1
1100(2)d1 PVC/uPVC Coupling-20mm dia pcs. 8.00 P.E. Cert.-1
1100(3)c1 PVC/uPVC Adapter-20mm dia pcs. 12.00 P.E. Cert.-1
1100(4)d1 PVC/uPVC Elbow-20mm dia pcs. 18.00 P.E. Cert.-1
1100(8)a2 Conduit Clamp-20 mm. dia pcs. 150.00 P.E. Cert.-1
1100(9)a2 G.I. Wire-#16 kilo 3.00 P.E. Cert.-1
1100(10) PVC Solvent Cement can 2.00 P.E. Cert.-1
1100(11)a2 Octagonal Junction Box (PVC/uPVC) pcs. 8.00 P.E. Cert.-1
1100(11)b2 Utility Boxes(PVC/uPVC) pcs. 4.00 P.E. Cert.-1
1100(14)b Grounding Rod Copper clad (20mm dia x 3m) length 2.00 P.E. Cert.-1
Wires and Wiring Devices
1101(1)a6 Electric Wire (3.5mm2 TW/THHN/THWN) roll 2.50 P.E. Cert.-1
1101(1)a7 Electric Wire (5.5mm2 TW/THHN/THWN) roll 2.00 P.E. Cert.-1
1101(7)a2 Duplex (2 Single Pole Wall Switches on one switch plate) set 2.00 P.E. Cert.-1
1101(8)a2 Duplex Convenience Outlet/Receptacles(GT) set 4.00 P.E. Cert.-1
Power load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board with Main & Branch Breakers set 1.00 P.E. Cert.-1
Lighting Fixture
1103(12)a3 Die-Cast Aluminum Spot - Floodlight with electrocoat gray paint set 4.00 P.E. Cert.-1
Miscellaneous Hardwares
1208(2)a2 Stainless Steel Railings-50mm dia meter 31.00 P.E. Cert.-1
Summary:
CCS - 3 Sets ( Footing
900 Reinforced Concrete * cu.m 125.81 Column, Beam & Slab )
a.) Portland Cement bags 1,444 Q-1
b.) Screened & Washed Fine Aggregate cu.m 201.66 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 125.81 Q-1,G-2
d.) Water - - PE Cert.-1

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
n del Sur

0.03
0.03
2.69
1.68

RARIO
QUALITY CONTROL PROGRAM
Name of Project : Construction of Multi-Purpose Building (Covered Court With Stage) @ Bgry. Langkilaan
Limits : Location: Trento, Agusan del Sur
Appropriation/Contact Amount: P 4,950,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert.-1
803(1)a Structure of Excavation cu.m. 155.40 P.E. Cert.-1
804(1)b Embankment from borrow cu.m. 55.00 GPC-1, D-2
804(4) Gravel Fill cu.m. 136.33 P.E. Cert.-1
B. Other General Requirements
B.5 Project Billboard/Signboard each 2.00 P.E. Cert.-1
B.7 Occupational Safety and Health Program month 4.00 P.E. Cert.-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert.-1
Plain and Reinforced Concrete Works
900(1)c2 Structural Concrete (Footings and Slab on Fill) cu.m. 28.06 *
900(1)c3 Structural Concrete (Footing Tie Beam) cu.m. 9.66 *
900(1)c4 Structural Concrete (Columns) cu.m. 19.01 *
900(1)c6 Structural Concrete (Beam/Girder) cu.m. 0.56 *
Reinforcing Steel
902(1)a2 Reinforcing Steel (Deformed) kls. 6,127.22 Q-1/size per 10,000 kgs.
Forms and Falsework
903(1) Forms/Falseworks ls 1.00 P.E. Cert.-1
Corrugated Metal Roofing
1013(2)a Fabricated Metal Roofing Accesory (Hip/Ridgeroll)-gauge 26 ln.m. 7.50 P.E. Cert.-1
1013(2)b Fabricated Metal Roofing Accesory (Flashing)-gauge 26 ln.m. 24.33 P.E. Cert.-1
1013(2)c Fabricated Metal Roofing Accesory (Gutter)-gauge 24 ln.m. 83.40 P.E. Cert.-1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets (Long Span)-above 0.427m sq.mt. 1,297.96 P.E. Cert.-1
Ceramic/Granite Tiles
1018(3) Granite Tiles sq.m. 50.00 P.E. Cert.-1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq.mt. 108.71 P.E. Cert.-1
Painting, Varnishing and Other related works
1032(1)a1 Painting Works(Masonry/Concrete) sq.mt. 115.92 Q-1
1032(1)a3 Painting Works(Steel) sq.mt. 250.00 Q-1
Masonry Works
1046(2)a CHB Non Load Bearing-including reinforced steel-100 mm sq.m. 108.71 Q-1
Metal Structures
1047(1) Structural Steel(Roof Framing) ls 1.00 P.E. Cert.-1
1047(2)a Structural Steel(Roof Framing) kls. 1,268.07 P.E. Cert.-1
1047(2)c Structural Steel(Purlins) kls. 6,046.95 P.E. Cert.-1
1047(3)a Metal Structure Accessories(bolts) pcs. 278.37 P.E. Cert.-1
1047(3)b Metal Structure Accessories(sagrods) pcs. 64.60 P.E. Cert.-1
1047(3)c Metal Structure Accessories(Tumbuckle) pcs. 68.00 P.E. Cert.-1
1047(5)b Metal Structure Accessories(Steel Plate) kls. 620.98 P.E. Cert.-1
Conduits, Boxes and Fittings
1100(1)f1 Polyvinyl Chloride Pipes (PVC/uPVC)-20mm dia length 24.00 P.E. Cert.-1
1100(2)d1 PVC/uPVC Coupling-20mm dia pcs. 12.00 P.E. Cert.-1
1100(3)c1 PVC/uPVC Adapter-20mm dia pcs. 20.00 P.E. Cert.-1
1100(4)d1 PVC/uPVC Elbow-20mm dia pcs. 26.00 P.E. Cert.-1
1100(8)a2 Conduit Clamp-20 mm. dia pcs. 225.00 P.E. Cert.-1
1100(9)a2 G.I. Wire-#16 kilo 3.00 P.E. Cert.-1
1100(10) PVC Solvent Cement can 2.00 P.E. Cert.-1
1100(11)a2 Octagonal Junction Box (PVC/uPVC) pcs. 13.00 P.E. Cert.-1
1100(11)b2 Utility Boxes(PVC/uPVC) pcs. 7.00 P.E. Cert.-1
1100(14)b Grounding Rod Copper clad (20mm dia x 3m) length 2.00 P.E. Cert.-1
Wires and Wiring Devices
1101(1)a6 Electric Wire (3.5mm2 TW/THHN/THWN) roll 3.50 P.E. Cert.-1
1101(1)a7 Electric Wire (5.5mm2 TW/THHN/THWN) roll 3.00 P.E. Cert.-1
1101(7)a2 Duplex (2 Single Pole Wall Switches on one switch plate) set 4.00 P.E. Cert.-1
1101(8)a2 Duplex Convenience Outlet/Receptacles(GT) set 6.00 P.E. Cert.-1
Power load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board with Main & Branch Breakers set 1.00 P.E. Cert.-1
Lighting Fixture
1103(12)a3 Die-Cast Aluminum Spot - Floodlight with electrocoat gray paint set 3.00 P.E. Cert.-1
Miscellaneous Hardwares
1208(2)a2 Stainless Steel Railings-50mm dia meter 63.50 P.E. Cert.-1
1208(5) Steel Brass Metal Nosing meter 12.00 P.E. Cert.-1
Summary:
CCS - 3 Sets ( Footing Column,
900 Reinforced Concrete * cu.m 57.29 Beam & Slab )
a.) Portland Cement bags 733 Q-1
b.) Screened & Washed Fine Aggregate cu.m 146.36 Q-1,G-2
c.) Screened & Washed Coarse Aggregate cu.m 57.29 Q-1,G-1
d.) Water - - PE Cert.-1

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
0.04
0.05

1.95
0.76

RIO
QUALITY CONTROL PROGRAM
Name of Project : Construction of Multi-Purpose Building (Covered Court With Stage) @ Bgry. Magaud
Limits : Location: Loreto, Agusan del Sur
Appropriation/Contact Amount: P 4,950,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert.-1
803(1)a Structure of Excavation cu.m. 155.40 P.E. Cert.-1
804(1)b Embankment from borrow cu.m. 55.00 GPC-1, D-2
804(4) Gravel Fill cu.m. 136.33 P.E. Cert.-1
B. Other General Requirements
B.5 Project Billboard/Signboard each 2.00 P.E. Cert.-1
B.7 Occupational Safety and Health Program month 4.00 P.E. Cert.-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert.-1
Plain and Reinforced Concrete Works
900(1)c2 Structural Concrete (Footings and Slab on Fill) cu.m. 28.06 *
900(1)c3 Structural Concrete (Footing Tie Beam) cu.m. 9.66 *
900(1)c4 Structural Concrete (Columns) cu.m. 19.01 *
900(1)c6 Structural Concrete (Beam/Girder) cu.m. 0.56 *
Reinforcing Steel
902(1)a2 Reinforcing Steel (Deformed) kls. 6,127.22 Q-1/size per 10,000 kgs.
Forms and Falsework
903(1) Forms/Falseworks ls 1.00 P.E. Cert.-1
Corrugated Metal Roofing
1013(2)a Fabricated Metal Roofing Accesory (Hip/Ridgeroll)-gauge 26 ln.m. 7.50 P.E. Cert.-1
1013(2)b Fabricated Metal Roofing Accesory (Flashing)-gauge 26 ln.m. 24.33 P.E. Cert.-1
1013(2)c Fabricated Metal Roofing Accesory (Gutter)-gauge 24 ln.m. 83.40 P.E. Cert.-1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets (Long Span)-above 0.427m sq.mt. 1,297.96 P.E. Cert.-1
Ceramic/Granite Tiles
1018(3) Granite Tiles sq.m. 50.00 P.E. Cert.-1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq.mt. 108.71 P.E. Cert.-1
Painting, Varnishing and Other related works
1032(1)a1 Painting Works(Masonry/Concrete) sq.mt. 115.92 Q-1
1032(1)a3 Painting Works(Steel) sq.mt. 250.00 Q-1
Masonry Works
1046(2)a CHB Non Load Bearing-including reinforced steel-100 mm sq.m. 108.71 Q-1
Metal Structures
1047(1) Structural Steel(Roof Framing) ls 1.00 P.E. Cert.-1
1047(2)a Structural Steel(Roof Framing) kls. 1,268.07 P.E. Cert.-1
1047(2)c Structural Steel(Purlins) kls. 6,046.95 P.E. Cert.-1
1047(3)a Metal Structure Accessories(bolts) pcs. 278.37 P.E. Cert.-1
1047(3)b Metal Structure Accessories(sagrods) pcs. 64.60 P.E. Cert.-1
1047(3)c Metal Structure Accessories(Tumbuckle) pcs. 68.00 P.E. Cert.-1
1047(5)b Metal Structure Accessories(Steel Plate) kls. 620.98 P.E. Cert.-1
Conduits, Boxes and Fittings
1100(1)f1 Polyvinyl Chloride Pipes (PVC/uPVC)-20mm dia length 24.00 P.E. Cert.-1
1100(2)d1 PVC/uPVC Coupling-20mm dia pcs. 12.00 P.E. Cert.-1
1100(3)c1 PVC/uPVC Adapter-20mm dia pcs. 20.00 P.E. Cert.-1
1100(4)d1 PVC/uPVC Elbow-20mm dia pcs. 26.00 P.E. Cert.-1
1100(8)a2 Conduit Clamp-20 mm. dia pcs. 225.00 P.E. Cert.-1
1100(9)a2 G.I. Wire-#16 kilo 3.00 P.E. Cert.-1
1100(10) PVC Solvent Cement can 2.00 P.E. Cert.-1
1100(11)a2 Octagonal Junction Box (PVC/uPVC) pcs. 13.00 P.E. Cert.-1
1100(11)b2 Utility Boxes(PVC/uPVC) pcs. 7.00 P.E. Cert.-1
1100(14)b Grounding Rod Copper clad (20mm dia x 3m) length 2.00 P.E. Cert.-1
Wires and Wiring Devices
1101(1)a6 Electric Wire (3.5mm2 TW/THHN/THWN) roll 3.50 P.E. Cert.-1
1101(1)a7 Electric Wire (5.5mm2 TW/THHN/THWN) roll 3.00 P.E. Cert.-1
1101(7)a2 Duplex (2 Single Pole Wall Switches on one switch plate) set 4.00 P.E. Cert.-1
1101(8)a2 Duplex Convenience Outlet/Receptacles(GT) set 6.00 P.E. Cert.-1
Power load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board with Main & Branch Breakers set 1.00 P.E. Cert.-1
Lighting Fixture
1103(12)a3 Die-Cast Aluminum Spot - Floodlight with electrocoat gray paint set 3.00 P.E. Cert.-1
Miscellaneous Hardwares
1208(2)a2 Stainless Steel Railings-50mm dia meter 63.50 P.E. Cert.-1
1208(5) Steel Brass Metal Nosing meter 12.00 P.E. Cert.-1
Summary:
CCS - 3 Sets ( Footing Column,
900 Reinforced Concrete * cu.m 57.29 Beam & Slab )
a.) Portland Cement bags 733 Q-1
b.) Screened & Washed Fine Aggregate cu.m 146.36 Q-1,G-2
c.) Screened & Washed Coarse Aggregate cu.m 57.29 Q-1,G-1
d.) Water - - PE Cert.-1

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
0.04
0.05

1.95
0.76

RIO
QUALITY CONTROL PROGRAM
Name of Project : Construction of Multi-Purpose Building (Covered Court With Stage) @ Bgry. Angas
Limits : Location: Sta. Josefa, Agusan del Sur
Appropriation/Contact Amount: P 4,950,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert.-1
803(1)a Structure of Excavation cu.m. 155.40 P.E. Cert.-1
804(1)b Embankment from borrow cu.m. 55.00 GPC-1, D-2
804(4) Gravel Fill cu.m. 136.33 P.E. Cert.-1
B. Other General Requirements
B.5 Project Billboard/Signboard each 2.00 P.E. Cert.-1
B.7 Occupational Safety and Health Program month 4.00 P.E. Cert.-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert.-1
Plain and Reinforced Concrete Works
900(1)c2 Structural Concrete (Footings and Slab on Fill) cu.m. 28.06 *
900(1)c3 Structural Concrete (Footing Tie Beam) cu.m. 9.66 *
900(1)c4 Structural Concrete (Columns) cu.m. 19.01 *
900(1)c6 Structural Concrete (Beam/Girder) cu.m. 0.56 *
Reinforcing Steel
902(1)a2 Reinforcing Steel (Deformed) kls. 6,127.22 Q-1/size per 10,000 kgs.
Forms and Falsework
903(1) Forms/Falseworks ls 1.00 P.E. Cert.-1
Corrugated Metal Roofing
1013(2)a Fabricated Metal Roofing Accesory (Hip/Ridgeroll)-gauge 26 ln.m. 7.50 P.E. Cert.-1
1013(2)b Fabricated Metal Roofing Accesory (Flashing)-gauge 26 ln.m. 24.33 P.E. Cert.-1
1013(2)c Fabricated Metal Roofing Accesory (Gutter)-gauge 24 ln.m. 83.40 P.E. Cert.-1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets (Long Span)-above 0.427m sq.mt. 1,297.96 P.E. Cert.-1
Ceramic/Granite Tiles
1018(3) Granite Tiles sq.m. 50.00 P.E. Cert.-1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq.mt. 108.71 P.E. Cert.-1
Painting, Varnishing and Other related works
1032(1)a1 Painting Works(Masonry/Concrete) sq.mt. 115.92 Q-1
1032(1)a3 Painting Works(Steel) sq.mt. 250.00 Q-1
Masonry Works
1046(2)a CHB Non Load Bearing-including reinforced steel-100 mm sq.m. 108.71 Q-1
Metal Structures
1047(1) Structural Steel(Roof Framing) ls 1.00 P.E. Cert.-1
1047(2)a Structural Steel(Roof Framing) kls. 1,268.07 P.E. Cert.-1
1047(2)c Structural Steel(Purlins) kls. 6,046.95 P.E. Cert.-1
1047(3)a Metal Structure Accessories(bolts) pcs. 278.37 P.E. Cert.-1
1047(3)b Metal Structure Accessories(sagrods) pcs. 64.60 P.E. Cert.-1
1047(3)c Metal Structure Accessories(Tumbuckle) pcs. 68.00 P.E. Cert.-1
1047(5)b Metal Structure Accessories(Steel Plate) kls. 620.98 P.E. Cert.-1
Conduits, Boxes and Fittings
1100(1)f1 Polyvinyl Chloride Pipes (PVC/uPVC)-20mm dia length 24.00 P.E. Cert.-1
1100(2)d1 PVC/uPVC Coupling-20mm dia pcs. 12.00 P.E. Cert.-1
1100(3)c1 PVC/uPVC Adapter-20mm dia pcs. 20.00 P.E. Cert.-1
1100(4)d1 PVC/uPVC Elbow-20mm dia pcs. 26.00 P.E. Cert.-1
1100(8)a2 Conduit Clamp-20 mm. dia pcs. 225.00 P.E. Cert.-1
1100(9)a2 G.I. Wire-#16 kilo 3.00 P.E. Cert.-1
1100(10) PVC Solvent Cement can 2.00 P.E. Cert.-1
1100(11)a2 Octagonal Junction Box (PVC/uPVC) pcs. 13.00 P.E. Cert.-1
1100(11)b2 Utility Boxes(PVC/uPVC) pcs. 7.00 P.E. Cert.-1
1100(14)b Grounding Rod Copper clad (20mm dia x 3m) length 2.00 P.E. Cert.-1
Wires and Wiring Devices
1101(1)a6 Electric Wire (3.5mm2 TW/THHN/THWN) roll 3.50 P.E. Cert.-1
1101(1)a7 Electric Wire (5.5mm2 TW/THHN/THWN) roll 3.00 P.E. Cert.-1
1101(7)a2 Duplex (2 Single Pole Wall Switches on one switch plate) set 4.00 P.E. Cert.-1
1101(8)a2 Duplex Convenience Outlet/Receptacles(GT) set 6.00 P.E. Cert.-1
Power load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board with Main & Branch Breakers set 1.00 P.E. Cert.-1
Lighting Fixture
1103(12)a3 Die-Cast Aluminum Spot - Floodlight with electrocoat gray paint set 3.00 P.E. Cert.-1
Miscellaneous Hardwares
1208(2)a2 Stainless Steel Railings-50mm dia meter 63.50 P.E. Cert.-1
1208(5) Steel Brass Metal Nosing meter 12.00 P.E. Cert.-1
Summary:
CCS - 3 Sets ( Footing Column,
900 Reinforced Concrete * cu.m 57.29 Beam & Slab )
a.) Portland Cement bags 733 Q-1
b.) Screened & Washed Fine Aggregate cu.m 146.36 Q-1,G-2
c.) Screened & Washed Coarse Aggregate cu.m 57.29 Q-1,G-1
d.) Water - - PE Cert.-1

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
0.04
0.05

1.95
0.76
QUALITY CONTROL PROGRAM
Name of Project : Construction of Multi-Purpose Building (Covered Court With Stage) @ Bgry. Johnson
Limits : Location: Loreto, Agusan del Sur
Appropriation/Contact Amount: P 4,950,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert.-1
803(1)a Structure of Excavation cu.m. 159.40 P.E. Cert.-1
804(1)b Embankment from borrow cu.m. 99.42 GPC-1, D-3
804(4) Gravel Fill cu.m. 194.74 P.E. Cert.-1
B. Other General Requirements
B.5 Project Billboard/Signboard each 2.00 P.E. Cert.-1
B.7 Occupational Safety and Health Program month 4.00 P.E. Cert.-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert.-1
Plain and Reinforced Concrete Works
900(1)c2 Structural Concrete (Footings and Slab on Fill) cu.m. 76.67 *
900(1)c3 Structural Concrete (Footing Tie Beam) cu.m. 9.66 *
900(1)c4 Structural Concrete (Columns) cu.m. 19.01 *
900(1)c6 Structural Concrete (Beam/Girder) cu.m. 0.56 *
Reinforcing Steel
902(1)a2 Reinforcing Steel (Deformed) kls. 6,716.46 Q-1/size per 10,000 kgs.
Forms and Falsework
903(1) Forms/Falseworks ls 1.00 P.E. Cert.-1
Corrugated Metal Roofing
1013(2)a Fabricated Metal Roofing Accesory (Hip/Ridgeroll)-gauge 26 ln.m. 7.50 P.E. Cert.-1
1013(2)b Fabricated Metal Roofing Accesory (Flashing)-gauge 26 ln.m. 24.33 P.E. Cert.-1
1013(2)c Fabricated Metal Roofing Accesory (Gutter)-gauge 24 ln.m. 15.00 P.E. Cert.-1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets (Long Span)-above 0.427m sq.mt. 1,297.96 P.E. Cert.-1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq.mt. 98.67 P.E. Cert.-1
Painting, Varnishing and Other related works
1032(1)a1 Painting Works(Masonry/Concrete) sq.mt. 115.92 Q-1
1032(1)a3 Painting Works(Steel) sq.mt. 250.00 Q-1
Masonry Works
1046(2)a CHB Non Load Bearing-including reinforced steel-100 mm sq.m. 98.67 Q-1
Metal Structures
1047(1) Structural Steel(Roof Framing) ls 1.00 P.E. Cert.-1
1047(2)a Structural Steel(Roof Framing) kls. 510.68 P.E. Cert.-1
1047(2)c Structural Steel(Purlins) kls. 6,046.95 P.E. Cert.-1
1047(3)a Metal Structure Accessories(bolts) pcs. 278.37 P.E. Cert.-1
1047(3)b Metal Structure Accessories(sagrods) pcs. 64.60 P.E. Cert.-1
1047(3)c Metal Structure Accessories(Tumbuckle) pcs. 68.00 P.E. Cert.-1
1047(5)b Metal Structure Accessories(Steel Plate) kls. 589.19 P.E. Cert.-1
Conduits, Boxes and Fittings
1100(1)f1 Polyvinyl Chloride Pipes (PVC/uPVC)-20mm dia length 24.00 P.E. Cert.-1
1100(2)d1 PVC/uPVC Coupling-20mm dia pcs. 12.00 P.E. Cert.-1
1100(3)c1 PVC/uPVC Adapter-20mm dia pcs. 20.00 P.E. Cert.-1
1100(4)d1 PVC/uPVC Elbow-20mm dia pcs. 26.00 P.E. Cert.-1
1100(8)a2 Conduit Clamp-20 mm. dia pcs. 225.00 P.E. Cert.-1
1100(9)a2 G.I. Wire-#16 kilo 3.00 P.E. Cert.-1
1100(10) PVC Solvent Cement can 2.00 P.E. Cert.-1
1100(11)a2 Octagonal Junction Box (PVC/uPVC) pcs. 13.00 P.E. Cert.-1
1100(11)b2 Utility Boxes(PVC/uPVC) pcs. 7.00 P.E. Cert.-1
1100(14)b Grounding Rod Copper clad (20mm dia x 3m) length 2.00 P.E. Cert.-1
Wires and Wiring Devices
1101(1)a6 Electric Wire (3.5mm2 TW/THHN/THWN) roll 3.50 P.E. Cert.-1
1101(1)a7 Electric Wire (5.5mm2 TW/THHN/THWN) roll 3.00 P.E. Cert.-1
1101(7)a2 Duplex (2 Single Pole Wall Switches on one switch plate) set 4.00 P.E. Cert.-1
1101(8)a2 Duplex Convenience Outlet/Receptacles(GT) set 6.00 P.E. Cert.-1
Power load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board with Main & Branch Breakers set 1.00 P.E. Cert.-1
Lighting Fixture
1103(12)a3 Die-Cast Aluminum Spot - Floodlight with electrocoat gray paint set 4.00 P.E. Cert.-1
Summary:
CCS - 3 Sets ( Footing Column,
900 Reinforced Concrete * cu.m 105.90 Beam & Slab )
a.) Portland Cement bags 1,153 Q-1
b.) Screened & Washed Fine Aggregate cu.m 131.44 Q-1,G-2
c.) Screened & Washed Coarse Aggregate cu.m 105.90 Q-1,G-2
d.) Water - - PE Cert.-1

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
0.04
0.05
1.75
1.41
QUALITY CONTROL PROGRAM
Name of Project : Improvement of Multi-Purpose Building (Covered Court) @ Brgy. Karaos
Limits : Location: San Francisco, Agusan del Sur
Appropriation/Contact Amount: P 990,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. Earthworks
803(1)a Structure of Excavation cu.m. 38.88 P.E. Cert.-1
804(4) Gravel Fill cu.m. 3.49 P.E. Cert.-1
B. Other General Requirements
B.5 Project Billboard/Signboard each 2.00 P.E. Cert.-1
B.7 Occupational Safety and Health Program month 1.00 P.E. Cert.-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert.-1
Plain and Reinforced Concrete Works
900(1)c2 Structural Concrete (Footings) cu.m. 7.39 *
900(1)c3 Structural Concrete (Footing Tie Beam) cu.m. 2.40 *
900(1)c4 Structural Concrete (Columns) cu.m. 6.35 *
900(1)c6 Structural Concrete (Beam/Girder) cu.m. 2.52 *
Reinforcing Steel
902(1)a1 Reinforcing Steel (Deformed) kls. 1,764.82 Q-1/size per 10,000 kgs.
Forms and Falsework
903(1) Forms and Falseworks ls 1.00 P.E. Cert.-1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets (Long Span) sq.mt. 369.60 P.E. Cert.-1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq.mt. 10.37 P.E. Cert.-1
Painting, Varnishing and Other related works
1032(1)a3 Painting Works(Steel) sq.mt. 128.00 Q-1
Metal Structures
1047(2)b Structural Steel(Trusses) kilo 2,073.96 P.E Cert-1
1047(2)c Structural Steel(Purlins) kilo 1,968.18 P.E Cert-1
1047(3)a Metal Structure Accessories(bolts) piece 137.73 P.E Cert-1
1047(3)b Metal Structure Accessories(sagrods) piece 50.00 P.E Cert-1
1047(3)c Metal Structure Accessories(Tumbuckle) piece 13.33 P.E Cert-1
1047(5)b Metal Structure Accessories(Steel Plate) kilo 419.48 P.E Cert-1
Summary:
CCS - 2 Sets ( Footing Column,
900 Reinforced Concrete * cu.m 18.66 Beam)
a.) Portland Cement bags 175 Q-1
b.) Screened & Washed Fine Aggregate cu.m 31.07 Q-1,G-1
c.) Screened & Washed Coarse Aggregate cu.m 18.66 Q-1,G-1
d.) Water - - PE Cert.-1

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
del Sur

0.41
0.25
QUALITY CONTROL PROGRAM
Name of Project : Improvement of Multi-Purposed Building @ Brgy. Poblacion
Limits : Location: Sta. Josefa, Agusan del Sur
Appropriation/Contact Amount: P 990,000.00 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. Earthworks
804(4) Gravel Fill cu.m. 3.98 P.E. Cert.-1
B. Other General Requirements
B.5 Project Billboard/Signboard each 2.00 P.E. Cert.-1
B.7 Occupational Safety and Health Program month 1.00 P.E. Cert.-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert.-1
Plain and Reinforced Concrete Works
900(1)c2 Structural Concrete (Slab on Fill) cu.m. 4.19 *
Reinforcing Steel
902(1)a1 Reinforcing Steel (Deformed) kls. 88.92 Q-1/size per 10,000 kgs.
Forms and Falsework
903(1) Forms and Falseworks ls 1.00 P.E. Cert.-1
C. Finishing
Storm Drainage and Sewerage System
1001(1)a5 Pipe-50mm dia x pvc - series 1000 meter 13.00 P.E. Cert-1
1001(1)a6 Pipe-75mm dia x pvc - series 1001 meter 14.00 P.E. Cert-1
1001(1)a7 Pipe-100mm dia x pvc - series 1000 meter 14.10 P.E. Cert-1
1001(2)a1 Fittings-50mm dia X pvc - elbow, 1/8 bend each 8.00 P.E. Cert-1
1001(2)a2 Fittings-75mm dia X pvc - elbow, 1/8 bend each 6.00 P.E. Cert-1
1001(2)a3 Fittings-100mm dia X pvc - elbow, 1/8 bend each 2.00 P.E. Cert-1
1001(2)b1 Fittings-50mm dia X pvc - elbow, 1/4 bend each 4.00 P.E. Cert-1
1001(2)b2 Fittings-100mm dia X pvc - elbow, 1/4 bend each 3.00 P.E. Cert-1
1001(2)c1 Fittings(50mm dia, PVC Clean out with Frog) each 2.00 P.E. Cert-1
1001(2)c2 Fittings(75mm dia, PVC Clean out with Frog) each 2.00 P.E. Cert-1
1001(2)c3 Fittings(100mm dia, PVC Clean out with Frog) each 2.00 P.E. Cert-1
1001(2)d1 Fittings(50mm dia, PVC Coupling) each 5.00 P.E. Cert-1
1001(2)d2 Fittings(75mm dia, PVC Coupling) each 2.00 P.E. Cert-1
1001(2)d3 Fittings(100mm dia, PVC Coupling) each 3.00 P.E. Cert-1
1001(2)e1 Fittings(50mm dia, PVC P-Trap) each 2.00 P.E. Cert-1
1001(2)e2 Fittings(75mm dia, PVC P-Trap) each 2.00 P.E. Cert-1
1001(2)e3 Fittings-100mm dia X pvc p trap each 2.00 P.E. Cert-1
1001(2)f1 Fittings-50mm dia X pvc - sanitary fee each 3.00 P.E. Cert-1
1001(2)f3 Fittings-5100mm dia X pvc - sanitary fee each 2.00 P.E. Cert-1
1001(2)g1 Fittings-50mm dia X pvc - sanitary wye each 2.00 P.E. Cert-1
1001(2)g3 Fittings-100mm dia X pvc - sanitary wye each 3.00 P.E. Cert-1
1001(2)i2 Fittings(100mm x 50mm dia. PVC Reducer-Bushing) each 2.00 P.E. Cert-1
1001(2)I2 Fittings(100mm dia. PVC Reducer-Sanitary Wye) 1.00 P.E. Cert-1
Plumbing
1002(4)a2 PVC Pipes (blue)-20mm dia piece 9.00 P.E. Cert-1
1002(4)b2 PVC Pipes (blue)-20mm dia x elbow, 1/4 bend 90 degrees piece 12.00 P.E. Cert-1
1002(4)c2 PVC Pipes (blue)-20mm dia. Female Threaded (Elbow, 1/4 bend piece 6.00 P.E. Cert-1
1002(4)d2 PVC Pipes(blue)-20mm dia X tee equal piece 6.00 P.E. Cert-1
1002(4)h2 PVC Pipes(blue)-20mm dia X socket/coupling piece 8.00 P.E. Cert-1
1002(4)k2 PVC Pipes(blue)-20mm dia X female threaded adaptor piece 6.00 P.E. Cert-1
1002(5)a2 Water Closet, Elongated, Complete-flush type set 2.00 P.E. Cert-1
1002(5)c1 Kitchen Sink, Complete(Stainless) piece 1.00 P.E. Cert-1
1002(5)f1 Lavatory, Wall Hung, Complete-manually operated set 2.00 P.E. Cert-1
1002(5) i Toilet Soap Holder set 2.00 P.E. Cert-1
1002(5) k Toilet Tissue Holder set 2.00 P.E. Cert-1
1002(5)p Facial Mirror Sq.mtr 1.00 P.E. Cert-1
1002(5)q Faucet set 3.00 P.E. Cert-1
1002(7)h2 Floor Drain Plates set 3.00 P.E. Cert-1
1002(5)s4 Water Meter piece 1.00 P.E. Cert-1
Carpentry and Joinery Works
1003(3)a1 Cabinets sq.mtr. 2.50 P.E. Cert -1
1003(1)b2 Ceiling (4.5mm. Wood frame, Marine Plywood) sq.mt. 95.65 P.E. Cert -1
1003(4)a1 Roof Frame (Wood) bdft. 102.67 P.E. Cert -1
1003(5)a2 Fascia Board(25mm, lumber) bdft. 42.67 P.E. Cert -1
Hardware
1004(2)a Rough Hardwares set 2.00 P.E. Cert-1
1004(2)e Finishing Hardwares set 4.00 P.E. Cert-1
1004(2)g Finishing Hardwares set 12.00 P.E. Cert-1
Wooden Doors and Windows
1007(1)b Aluminum Glass Door (Swing Type) sq.mts. 4.20 P.E. Cert-1
1010(1) Frames(Jambs, Sills, Head, Transoms, and Mullions) set 2.00 P.E. Cert-1
1010(2)b Doors sq.mts. 3.36 P.E. Cert-1
Corrugated Metal Roofing
1013(2)b Fabricated Metal Roofing Accesory ln.mt 23.90 P.E. Cert-1
1013(2)c Fabricated Metal Roofing Accesory ln.mt 37.05 P.E. Cert-1
Prepainted Metal Sheets
1014(1)a2 Prepainted Metal Sheets (Rib Type, Short Span) sq.mt. 10.17 P.E. Cert-1
Ceramic/Granite Tiles
1018(1) Glazed Tiles and Trims sq.mt. 19.84 P.E. Cert-1
1018(2) Unglazed Tiles sq.mt. 9.36 P.E. Cert-1
1018(3) Granite Tiles sq.mt. 161.68 P.E. Cert-1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq.mt. 158.18 P.E. Cert-1
Painting, Varnishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 405.45 Q-1
PVC Doors and Frames
1043(1) PVC Doors and Frames sq.mt. 2.52 P.E. Cert-1
Masonry Works
1046(2)a CHB Non Load Bearing-including reinforced steel-100 mm sq.m. 19.68 Q-1
Conduits, Boxes and Fittings
1100(1)f1 Polyvinyl Chloride Pipes (PVC/uPVC)-20mm dia length 11.00 P.E. Cert-1
1100(2)d1 PVC/uPVC Coupling-20mm dia pcs. 12.00 P.E. Cert-1
1100(3)c1 PVC/uPVC Adapter-20mm dia pcs. 7.00 P.E. Cert-1
1100(4)d1 PVC/uPVC Elbow-20mm dia pcs. 10.00 P.E. Cert-1
1100(8)a2 Conduit Clamp-20 mm. dia pcs. 150.00 P.E. Cert-1
1100(9)a2 G.I. Wire-#16 kilo 4.00 P.E. Cert-1
1100(10) PVC Solvent Cement can 2.00 P.E. Cert-1
1100(11)a2 Octagonal Junction Box (PVC/uPVC) pcs. 8.00 P.E. Cert-1
1100(11)b2 Utility Boxes(PVC/uPVC) pcs. 12.00 P.E. Cert-1
1100(14)b Grounding Rod Copper clad (20mm dia x 3m) length 5.00 P.E. Cert-1
Wires and Wiring Devices
1101(1)a6 Electric Wire (3.5mm2 TW/THHN/THWN) roll 1.50 P.E. Cert.-1
1101(1)a7 Electric Wire (5.5mm2 TW/THHN/THWN) meter 300.00 P.E. Cert.-1
1101(1)a8 Electric Wire (8.0 mm2 TW/THHN/THWN) meter 40.00 P.E. Cert.-1
1101(7)a2 Duplex (2 Single Pole Wall Switches on one switch plate) sets 1.00 P.E. Cert.-1
1101(7)a3 Triplex (3 Single Pole Wall Switches on one switch plate) sets 2.00 P.E. Cert.-1
1101(8)a2 Duplex Convenience Outlet/Receptacles(GT) set 4.00 P.E. Cert.-1
1101(8)a6 Special Purpose Outlet/Receptacle, (GT) for ACU, WH, etc. set 4.00 P.E. Cert.-1
Power Load Center, Switchgear and Panelboards
1102(1)a1 Panel Board with Main & Branch Breakers (Flushed Type) set 1.00 P.E Cert-1
Lighting Fixture
1103(6) c27 LED Tube Lighting Fixture(2-16 watts Troffer Type) set 6.00 P.E Cert-1
1103(8) a2 Down Light/Pin Light Fixture w/ LED(100mm dia. (4")) set 7.00 P.E Cert-1
Air Conditioning and Refregeration System
1200(4)a2 Package Type Airconditioning Unit (PACU) set 4.00 P.E Cert-1
Miscellaneous Hardwares
1208(2)a2 Stainless Steel Railings(50mm dia.) meter 58.80 P.E Cert-1
Auxillary System
1209(1) Auxillary System ls 1.00 P.E Cert-1
Summary:
900 Reinforced Concrete * cu.m 4.19 CCS-1 set (Slab)
a.) Portland Cement bags 77.00 Q-1
b.) Screened & Washed Fine Aggregate cu.m 21.05 Q-1, G-1
c.) Screened & Washed Coarse Aggregate cu.m 4.18 Q-1, G-1
d.) Water - - P.E. Cert-1

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
4.00

0.01
RIO
QUALITY CONTROL PROGRAM
Name of Project : Construction of Three(3) Storey Six(6) Classrooms School Building under Basic Educational
Facilities Fund (BEFF)-Batch 11 Bunawan NHS
Limits : Location: Bunawan, Agusan del Sur
Appropriation/Contact Amount: P 12,094,825.81 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert.-1
803(1)a Structure Excavation cu.m. 526.72 P.E. Cert.-1
803(3) Foundation Fill cu.m. 9.77 GPC-1, D-1
804(1)a Embankment cu.m. 115.43 GPC-1, D-4
B. Other General Requirements
B.5 Project Billboard/Signboard each 2.00 P.E. Cert.-1
B.7 Occupational Safety and Health Program month 1.00 P.E. Cert.-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert.-1
SPL I Blackboard set 6.00 P.E. Cert.-1
B.1 Concrete Structrures
407-4 Piling ln. mts. 780.00 CCS-1 set
Plain and Reinforced Concrete Works
B. Reinforce Concrete Works
900(1)c2 Structural Concrete-Footing and Slab on Fill (fc=3,000 psi @ 28 days) cu.m. 128.82 *
900(1)c3 Structural Concrete-Footing Tie Beams (fc=3,000 psi @ 28 days) cu.m. 20.72 *
900(1)c4 Structural Concrete-Columns (fc=3,000 psi @ 28 days) cu.m. 63.96 *
900(1)c5 Structural Concrete-Suspended Slab(fc=3,000 psi @ 28 days) cu.m. 73.80 *
900(1)c6 Structural Concrete-Beams/Girder (fc=3,000 psi @ 28 days) cu.m. 68.40 *
Reinforcing Steel
902(1)a2 Reinforcing Steel (Deformed) grade 60 kgs. 55,206.83 Q-1/size per 10,000 kgs.
Forms and Falsework
903(1) Forms and Falseworks ls 1.00 P.E. Cert.-1
Termite Control Works
1000(1) Soil Poisoning liter 10.69 P.E Cert.-1
C. Finishing
Storm Drainage and Sewerage System
1001(1)a5 Pipe-50mm dia x pvc - series 1000 meter 48.00 P.E. Cert-1
1001(1)a7 Pipe-75mm dia x pvc - series 1000 meter 60.00 P.E. Cert-1
1001(1)a8 Pipe-100mm dia x pvc - series 1000 meter 20.00 P.E. Cert-1
1001(2)a1 Fittings each 15.00 P.E. Cert-1
1001(2)a3 Fittings-100m dia X pvc - elbow, 1/8 bend each 9.00 P.E. Cert-1
1001(2)a4 Fittings-150mm dia X pvc - elbow, 1/8 bend each 8.00 P.E. Cert-1
1001(2)b1 Fittings-50mm dia X pvc - elbow, 1/4 bend each 18.00 P.E. Cert-1
1001(2)c1 Fittings(50mm dia, PVC Clean out with Frog) each 6.00 P.E. Cert-1
1001(2)c3 Fittings(100mm dia, PVC Clean out with Frog) each 6.00 P.E. Cert-1
1001(2)c4 Fittings(150mm dia, PVC Clean out with Frog) each 4.00 P.E. Cert-1
1001(2)d1 Fittings(50mm dia, PVC Coupling) each 24.00 P.E. Cert-1
1001(2)d3 Fittings(100mm dia, PVC Coupling) each 12.00 P.E. Cert-1
1001(2)d4 Fittings(150mm dia, PVC Coupling) each 4.00 P.E. Cert-1
1001(2)e1 Fittings(50mm dia, PVC P-Trap) each 12.00 P.E. Cert-1
1001(2)e3 Fittings-100mm dia X pvc p trap each 12.00 P.E. Cert-1
1001(2)f1 Fittings-50mm dia X pvc - sanitary fee each 8.00 P.E. Cert-1
1001(2)f3 Fittings-5100mm dia X pvc - sanitary fee each 6.00 P.E. Cert-1
1001(2)g1 Fittings-50mm dia X pvc - sanitary wye each 12.00 P.E. Cert-1
1001(2)g3 Fittings-100mm dia X pvc - sanitary wye each 4.00 P.E. Cert-1
1001(2)g4 Fittings-150mm dia X pvc - sanitary wye each 9.00 P.E. Cert-1
1001(2)i2 Fittings(100mm x 50mm dia. PVC Reducer-Bushing) each 6.00 P.E. Cert-1
1001(2)I2 Fittings(100mm dia. PVC Reducer-Sanitary Wye) each 1.00 P.E. Cert-1
Plumbing
1002(3)a6 PPR-C Pipes-20mm dia-pn20 piece 12.00 P.E. Cert-1
1002(3)a9 PPR-C Pipes-25mm dia-pn20 piece 16.00 P.E. Cert-1
1002(3)a12 PPR-C Pipes-32mm dia-pn20 piece 16.00 P.E. Cert-1
1002(3)c2 PPR-C Pipes-20mm dia-elbow-1/4 bend-90 deg piece 18.00 P.E. Cert-1
1002(3)c3 PPR-C Pipes-25mm dia-elbow-1/4 bend-90 deg piece 12.00 P.E. Cert-1
1002(3)c4 PPR-C Pipes-32mm dia-elbow-1/4 bend-90 deg piece 24.00 P.E. Cert-1
1002(3)d2 PPR-C Pipes-20mm dia-tee piece 12.00 P.E. Cert-1
1002(3)d3 PPR-C Pipes-25mm dia-tee piece 13.00 P.E. Cert-1
1002(3)d4 PPR-C Pipes-32mm dia-tee piece 10.00 P.E. Cert-1
1002(3)h2 PPR-C Pipes-20mm dia-female threaded adaptor piece 30.00 P.E. Cert-1
1002(5)a2 Water Closet, Elongated, Complete-manually operated set 9.00 P.E. Cert-1
1002(5)f1 Lavatory Wall Hung, Complete-manually operated set 1.00 P.E. Cert-1
1002(5)h3 Floor Drain-Stainless 100mm dia set 9.00 P.E. Cert-1
1002(5)i Toilet Soap Holder pcs 4.00 P.E. Cert-1
1002(5)k Toilet Tissue Holder pcs 5.00 P.E. Cert-1
1002(5)q Faucet piece 9.00 P.E. Cert-1
Carpentry and Joinery Works
1003(1)a1 Ceiling-4.5mm fiber cement board on metal frame sq.mt. 736.63 P.E. Cert -1
1003(5)a2 Fascia Board-19mm fiber cement board mts. 11.31 P.E. Cert -1
Hardware
1004(2)a Finishing Hardwares-lockset set 6.00 P.E. Cert-1
1004(2)d Finishing Hardwares-door closer set 2.00 P.E. Cert-1
1004(2)e Finishing Hardwares-knobs set 20.00 P.E. Cert-1
1004(2)g Finishing Hardwares-hinges set 40.00 P.E. Cert-1
1004(2)h Ladder set 1.00 P.E. Cert-1
Jalousie Windows
1009(1)a Jalousie Windows-glass sq.mt. 56.38 P.E. Cert-1
Wooden Doors and Windows
1010(1) Frames set 33.00 P.E. Cert-1
1010(2)a Doors-Flush sq.mts. 14.85 P.E. Cert-1
1010(2)b Doors-Wood Panel sq.mts. 22.68 P.E. Cert-1
Corrugated Metal Roofing
1013(2)a Fabricated Metal Roofing Accesory ln.mt 23.50 P.E. Cert-1
1013(2)b Fabricated Metal Roofing Accesory ln.mt 22.00 P.E. Cert-1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets (Rib Type, Short Span) sq.mt. 345.86 P.E. Cert-1
Ceramic/Granite Tiles
1018(1) Glazed Tiles and Trims sq.mt. 70.64 P.E. Cert-1
1018(2) Unglazed Tiles sq.mt. 32.87 P.E. Cert-1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq.mt. 700.52 P.E. Cert-1
Painting, Varnishing and Other Related Works
1032(1)a1 Painting Works-masonry/concrete sq.mt. 530.27 Q-1
Masonry Works
1046(2)a CHB Non Load Bearing-including reinforced steel-100 mm sq.m. 170.25 Q-1
1046(2)b CHB Non Load Bearing-including reinforced steel-150 mm sq.m. 530.27 Q-1
Roof Framing
1047(2)a Structural Steel kgs. 6441.72 P.E. Cert-1
Electrical
1100(1)a2 Rigid Steel Conduit(RSC)-20mm dia length 90.00 P.E. Cert-1
1100(1)a3 Rigid Steel Conduit(RSC)-25mm dia pcs. 25.00 P.E. Cert-1
1100(1)a5 Rigid Steel Conduit(RSC)-40mm dia pcs. 18.00 P.E. Cert-1
1100(2)a2 Conduit Coupling-(RSC)-20mm dia conduit coupling pcs. 75.00 P.E. Cert-1
1100(2)a3 Conduit Coupling-(RSC)-25mm dia conduit coupling pcs. 24.00 P.E. Cert-1
1100(3)a2 Locknut & Bushing-(RSC)-20mm dia conduit coupling pcs. 39.00 P.E. Cert-1
1100(3)a3 Locknut & Bushing-(RSC)-25mm dia conduit coupling pcs. 24.00 P.E. Cert-1
1100(2)b5 Conduit Coupling (RSC)-40mm dia conduit coupling pcs. 8.00 P.E. Cert-1
1100(4)d1 PVC/uPVC Elbow-20mm dia-90 deg elbow pcs. 105.00 P.E. Cert-1
1100(4)d2 PVC/uPVC Elbow-25mm dia-90 deg elbow pcs. 27.00 P.E. Cert-1
1100(4)d4 PVC/uPVC Elbow-40mm dia-90 deg elbow pcs. 4.00 P.E. Cert-1
1100(8)a2 Conduit Clamp-20mm. Dia pcs. 290.00 P.E. Cert-1
1100(9)a2 G.I. Wire-#16 gauge kls 6.00 P.E. Cert-1
110010) PVC Solvent Cement-400cc can 4.00 P.E. Cert-1
1100(11)a2 Octagonal Junction Box-pvc/upvc Piece 45.00 P.E. Cert-1
1100(11)b2 Utility Box-pvc/upvc Piece 75.00 P.E. Cert-1
1100(14)b Grounding Rod Copperweld-20mm x 3m length 5.00 P.E. Cert-1
Wires and Wiring Devices
1101(1)a6 Electric Wire (3.5mm2 TW/THHN/THWN) rolls 8.00 P.E. Cert.-1
1101(1)a7 Electric Wire (5.5mm2 TW/THHN/THWN) rolls 2.50 P.E. Cert.-1
1101(1)a8 Electric Wire (8.0 mm2 TW/THHN/THWN) rolls 1.80 P.E. Cert.-1
1101(7)a1 Sungle Pole Wall on one Switch Plate set 9.00 P.E. Cert.-1
1101(7)a2 Duplex (2 Single Pole Wall Switches on one switch plate) set 12.00 P.E. Cert.-1
1101(7)a4 Triplex (3 Single Pole Wall Switches on one switch plate) set 2.00 P.E. Cert.-1
1101(8)a2 Duplex Convenience Outlet/Receptacles(GT) set 12.00 P.E. Cert.-1
1101(8)a5 Special Purpose Outlet/Receptacle, (GT) for ACU, WH, etc. set 3.00 P.E. Cert.-1
Power Load Center, Switchgear and Panelboards
1102(1)a1 Panel Board with Main & Branch Breakers (Flushed Type) set 1.00 P.E Cert-1
Lighting Fixture
1103(2)a33 Flourescent Light Fixture w/ HPF-NCPF Ballast-1 set 18.00 P.E Cert-1
1103(2)a34 Flourescent Light Fixture w/ HPF-NCPF Ballast-2 set 36.00 P.E Cert-1
Compact Flourescent Lamp (CFL) with Medium Base,
KeylessType, Porcelain Receptacle Outlet-18w-surface 12.00
1103(4)a7 mounted set P.E Cert-1
Air Conditioning and Refregeration System
1200(14)b2 Oscillating Wall Fan set 12.00 P.E Cert-1
Miscellaneous Hardwares
1208(2)a1 Stainless Steel Railings(38mm dia.) mts. 445.01 P.E Cert-1
1208(4) Square Bar Railings (Solid)-19mm kgs. 143.99 P.E Cert-1

Summary: CCS-4 sets (Footing,


Column, Beam &
900 Reinforced Concrete * cu.m 355.70 Slab)
a.) Portland Cement bags 4,896.00 Q-3
b.) Screened & Washed Fine Aggregate cu.m 160.27 Q-1, G-3
c.) Screened & Washed Coarse Aggregate cu.m 319.805 Q-1, G-5
d.) Water - - P.E. Cert-1

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
el Sur

0.2931
3.4629

0 kgs.
0.03

0.16

2.45
2.14
4.26

RIO
QUALITY CONTROL PROGRAM
Name of Proje: Construction of Standard Two(2)-Storey Six(6) Classrooms School Building - 9.5m x 36m. under
Basic Educational Facilities Fund (BEFF) - Batch 1 @ Panagangan NHS
Limits : Location: La Paz, Agusan del Sur
Appropriation/Contact Amount: P 9,327,591.56 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. OTHER REQUIRED FACILITIES
SPL I Project Billboard sets 2.00
B. Earthworks
801 Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803 Excavation of Cfooting, Wall Footing & SW Footing cu.m 865.89 PE Cert.-1
804(a) Backfilling of Excavated Materials cu.m 522.00 GPC-1, D-17
804(b) Gravel Bedding @ SOF, CF, WF, SW & FTB cu.m 59.32 PE Cert.-1
804(c ) Embankment cu.m 90.35 GPC-1, D-3
C. TERMITE CONTROL WORKS
1000(a) Soil Poisoning sq.m 301.15 PE Cert.-1
F. CONCRETE WORKS
900(a) RC Column Footing(fc'=3000 psi @ 28days) cu.m 182.70 *
404(a) Rein. Steel for Column Footing kgs 21,665.38 **
900(b) RC for Tie Beam & WF (fc'=3000psi @ 28days) cu.m 29.58 *
404(b) Rein. Steel for Tie Beam & WF kgs 4,979.94 **
900( c) RC Column,PC & Stiffener (fc'=3000psi @ 28days) cu.m 30.42 *
404(c ) Rein. Steel for Column,PC & Stiffener kgs 11,432.22 **
900(d) RC Beams(fc'=3000psi @ 28days) cu.m 22.30 *
404(d) Rein. Steel for Beams kgs 5,117.74 **
RC for SOF, Slab (2nd flr.), Corridor, Stair, Sun Breaker, ST &
900( e) Ramp (fc=3,000 psi @ 28 days) cu.m 66.71 *
Rein. Steel for SOF, Slab (2nd Flr), Corridor, Stair, Sun
404( e) Breaker, ST & Ramp kgs 4,212.43 **
900( f) RC for Roof Beam (fc'=3000psi @ 28days) cu.m 17.16 *
404( f) Rein. Steel for Roof Beam kgs 2,837.25 **
G. MASONRY WORKS
506(1) Masonry Works (CHB) sq.m 761.59 for CHB, Q-1
H. CARPENTRY WORKS
1003 Carpentry for Ceiling sq.m 697.48 PE Cert.-1
I. FABRICATED MATERIALS AND HARDWARES
1004.2.2 Finishing Hardware set 1.00 PE Cert.-1
1004.2.3 G.I. Pipe Railings & Baluster meter 15.24
1005 Jalousie Windows & Jamb sq.m 78.39 PE Cert.-1
1010(b) Panel Door & Jamb sq.m 39.72 PE Cert.-1
SPL 2 Blackboard set 6.00
J. ROOF AND FRAMING WORKS
1014 Prepainted Metal Sheet/Roofing sq.m 384.93 PE Cert.-1
403(a) Steel Trusses kgs. 9,911.08 Q-1
L. FINISHING WORKS
1018 Ceramic Tiles sq.m 120.00 PE Cert.-1
1027(a) Cement Plaster Finish sq.m 1,252.80 PE Cert.-1
M. PAINTING WORKS
1032(a) Painting Works sq.m 2,017.99 Q-1
N. WATER PROOFING WORKS
1016 Water Proofing sq.m 191.40 PE Cert.-1
O. SANITARY WORKS
1002 Plumbing Works lot 1.00 PE Cert.-1
P. ELECTRICAL WORKS
1100 Conduits,Boxes and Fittings lot 1.00 PE Cert.-1
1101 Wires and Wiring Devices lot 1.00 PE Cert.-1
1102(a) Lighting Fixtures lot 1.00 PE Cert.-1
1102 Panel Boards & Cabinets lot 1.00 PE Cert.-1
R. SAFETY AND HEALTH
SPL 3 Safety & Health Officer hr 30.00 PE Cert.-1
SPL 4 Personal Protective Equipment(PPE) md 500.00 PE Cert.-1
Summary:
CCS-4 sets (Footing, Column,
900 Reinforced Concrete * cu.m 348.87 Beam & Slab)
(a,b,c,d,e,f) a.) Portland Cement bags 3,315 Q-2
b.) Screened & Washed Fine Aggregate cu.m 206.36 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 306.99 Q-1,G-4
d.) Water - - PE Cert.-1
404 Reinforcing Steel ** kgs 50,244.96 Q-1/size per 10,000 kgs.
(a,b,c,d,e,f)
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 9,327,591.56 0.5000% Q.C Chart--------- P 46,637.96
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 30,314.67 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 6,995.69 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 9,327.59 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 46,637.96 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
15.66

2.71
1.66
2.75
4.09
QUALITY CONTROL PROGRAM
Name of Proje: Construction of Standard Two(2)-Storey Six(6) Classrooms School Building - 9.5m x 36m. under
Basic Educational Facilities Fund (BEFF) - Batch 1 @ Sampaguita NHS
Limits : Location: Veruela, Agusan del Sur
Appropriation/Contact Amount: P 9,348,888.29 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. OTHER REQUIRED FACILITIES
SPL I Project Billboard sets 2.00 P.E. Cert.1
B. Earthworks
801 Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803 Excavation of Cfooting, Wall Footing & SW Footing cu.m 923.49 PE Cert.-1
804(a) Backfilling of Excavated Materials cu.m 558.00 GPC-1, D-17
804(b) Gravel Bedding @ SOF, CF, WF, SW & FTB cu.m 62.92 PE Cert.-1
804(c ) Embankment cu.m 90.35 GPC-1, D-3
C. TERMITE CONTROL WORKS
1000(a) Soil Poisoning sq.m 301.15 PE Cert.-1
F. CONCRETE WORKS
900(a) RC Column Footing(fc'=3000 psi @ 28days) cu.m 195.30 *
404(a) Rein. Steel for Column Footing kgs 23,506.84 **
900(b) RC for Tie Beam & WF (fc'=3000psi @ 28days) cu.m 29.58 *
404(b) Rein. Steel for Tie Beam & WF kgs 4,979.94 **
900( c) RC Column,PC & Stiffener (fc'=3000psi @ 28days) cu.m 30.14 *
404(c ) Rein. Steel for Column,PC & Stiffener kgs 11,325.15 **
900(d) RC Beams(fc'=3000psi @ 28days) cu.m 22.30 *
404(d) Rein. Steel for Beams kgs 5,117.74 **
RC for SOF, Slab (2nd flr.), Corridor, Stair, Sun Breaker, ST &
900( e) Ramp (fc=3,000 psi @ 28 days) cu.m 66.71 *
Rein. Steel for SOF, Slab (2nd Flr), Corridor, Stair, Sun
404( e) Breaker, ST & Ramp kgs 4,212.43 **
900( f) RC for Roof Beam (fc'=3000psi @ 28days) cu.m 17.16 *
404( f) Rein. Steel for Roof Beam kgs 2,837.25 **
G. MASONRY WORKS
506(1) Masonry Works (CHB) sq.m 761.59 for CHB, Q-1
H. CARPENTRY WORKS
1003 Carpentry for Ceiling sq.m 697.48 PE Cert.-1
I. FABRICATED MATERIALS AND HARDWARES
1004.2.2 Finishing Hardware set 1.00 PE Cert.-1
1004.2.3 G.I. Pipe Railings & Baluster meter 15.24
1005 Jalousie Windows & Jamb sq.m 78.39 PE Cert.-1
1010(b) Panel Door & Jamb sq.m 39.72 PE Cert.-1
SPL 2 Blackboard set 6.00
J. ROOF AND FRAMING WORKS
1014 Prepainted Metal Sheet/Roofing sq.m 384.93 PE Cert.-1
403(a) Steel Trusses kgs. 9,911.08 Q-1
L. FINISHING WORKS
1018 Ceramic Tiles sq.m 120.00 PE Cert.-1
1027(a) Cement Plaster Finish sq.m 1,252.80 PE Cert.-1
M. PAINTING WORKS
1032(a) Painting Works sq.m 2,017.99 Q-1
N. WATER PROOFING WORKS
1016 Water Proofing sq.m 191.40 PE Cert.-1
O. SANITARY WORKS
1002 Plumbing Works lot 1.00 PE Cert.-1
P. ELECTRICAL WORKS
1100 Conduits,Boxes and Fittings lot 1.00 PE Cert.-1
1101 Wires and Wiring Devices lot 1.00 PE Cert.-1
1102(a) Lighting Fixtures lot 1.00 PE Cert.-1
1102 Panel Boards & Cabinets lot 1.00 PE Cert.-1
R. SAFETY AND HEALTH
SPL 3 Safety & Health Officer hr 30.00 PE Cert.-1
SPL 4 Personal Protective Equipment(PPE) md 500.00 PE Cert.-1
Summary:
CCS-4 sets (Footing, Column,
900 Reinforced Concrete * cu.m 361.19 Beam & Slab)
(a,b,c,d,e,f) a.) Portland Cement bags 3,315 Q-2
b.) Screened & Washed Fine Aggregate cu.m 206.36 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 306.99 Q-1,G-4
d.) Water - - PE Cert.-1
404 Reinforcing Steel ** kgs 51,979.35 Q-1/size per 10,000 kgs.
(a,b,c,d,e,f)
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 9,348,888.29 0.5000% Q.C Chart--------- P 46,744.44
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 30,383.89 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 7,011.67 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 9,348.89 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 46,744.44 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
16.74

2.71
1.66
2.75
4.09
QUALITY CONTROL PROGRAM
Name of Proje: Construction of Standard Two(2)-Storey Six(6) Classrooms School Building - 9.5m x 36m. under
Basic Educational Facilities Fund (BEFF) - Batch 1 @Sinobong NHS
Limits : Location: Veruela, Agusan del Sur
Appropriation/Contact Amount: P 8,618,858.34 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. OTHER REQUIRED FACILITIES
SPL I Project Billboard sets 2.00 P.E. Cert.1
B. Earthworks
801 Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803 Excavation of Cfooting, Wall Footing & SW Footing cu.m 551.14 PE Cert.-1
804(a) Backfilling of Excavated Materials cu.m 325.28 GPC-1, D-17
804(b) Gravel Bedding @ SOF, CF, WF, SW & FTB cu.m 39.64 PE Cert.-1
804(c ) Embankment cu.m 90.35 GPC-1, D-3
C. TERMITE CONTROL WORKS
1000(a) Soil Poisoning sq.m 301.15 PE Cert.-1
F. CONCRETE WORKS
900(a) RC Column Footing(fc'=3000 psi @ 28days) cu.m 113.85 *
404(a) Rein. Steel for Column Footing kgs 13,156.23 **
900(b) RC for Tie Beam & WF (fc'=3000psi @ 28days) cu.m 29.58 *
404(b) Rein. Steel for Tie Beam & WF kgs 4,979.94 **
900( c) RC Column,PC & Stiffener (fc'=3000psi @ 28days) cu.m 30.42 *
404(c ) Rein. Steel for Column,PC & Stiffener kgs 11,432.22 **
900(d) RC Beams(fc'=3000psi @ 28days) cu.m 22.30 *
404(d) Rein. Steel for Beams kgs 5,117.74 **
RC for SOF, Slab (2nd flr.), Corridor, Stair, Sun Breaker, ST &
900( e) Ramp (fc=3,000 psi @ 28 days) cu.m 66.71 *
Rein. Steel for SOF, Slab (2nd Flr), Corridor, Stair, Sun
404( e) Breaker, ST & Ramp kgs 4,212.43 **
900( f) RC for Roof Beam (fc'=3000psi @ 28days) cu.m 17.16 *
404( f) Rein. Steel for Roof Beam kgs 2,837.25 **
G. MASONRY WORKS
506(1) Masonry Works (CHB) sq.m 761.59 for CHB, Q-1
H. CARPENTRY WORKS
1003 Carpentry for Ceiling sq.m 697.48 PE Cert.-1
I. FABRICATED MATERIALS AND HARDWARES
1004.2.2 Finishing Hardware set 1.00 PE Cert.-1
1004.2.3 G.I. Pipe Railings & Baluster meter 15.24
1005 Jalousie Windows & Jamb sq.m 78.39 PE Cert.-1
1010(b) Panel Door & Jamb sq.m 39.72 PE Cert.-1
SPL 2 Blackboard set 6.00
J. ROOF AND FRAMING WORKS
1014 Prepainted Metal Sheet/Roofing sq.m 384.93 PE Cert.-1
403(a) Steel Trusses kgs. 9,911.08 Q-1
L. FINISHING WORKS
1018 Ceramic Tiles sq.m 120.00 PE Cert.-1
1027(a) Cement Plaster Finish sq.m 1,252.80 PE Cert.-1
M. PAINTING WORKS
1032(a) Painting Works sq.m 2,017.99 Q-1
N. WATER PROOFING WORKS
1016 Water Proofing sq.m 191.40 PE Cert.-1
O. SANITARY WORKS
1002 Plumbing Works lot 1.00 PE Cert.-1
P. ELECTRICAL WORKS
1100 Conduits,Boxes and Fittings lot 1.00 PE Cert.-1
1101 Wires and Wiring Devices lot 1.00 PE Cert.-1
1102(a) Lighting Fixtures lot 1.00 PE Cert.-1
1102 Panel Boards & Cabinets lot 1.00 PE Cert.-1
R. SAFETY AND HEALTH
SPL 3 Safety & Health Officer hr 30.00 PE Cert.-1
SPL 4 Personal Protective Equipment(PPE) md 500.00 PE Cert.-1
Summary:
CCS-3 sets (Footing &
900 Reinforced Concrete * cu.m 280.02 Column, Beam & Slab)
(a,b,c,d,e,f) a.) Portland Cement bags 3,315 Q-2
b.) Screened & Washed Fine Aggregate cu.m 206.36 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 306.99 Q-1,G-4
d.) Water - - PE Cert.-1
404 Reinforcing Steel ** kgs 41,735.81 Q-1/size per 10,000 kgs.
(a,b,c,d,e,f)
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 8,618,858.34 0.5000% Q.C Chart--------- P 43,094.29
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 28,011.29 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 6,464.14 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 8,618.86 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 43,094.29 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
9.76

2.71
1.66
2.75
4.09
QUALITY CONTROL PROGRAM
Name of Project : Construction of Standard Two(2)-Storey Six(6) Classrooms School Building - 9.5m x 36m. under
Basic Educational Facilities Fund (BEFF) - Batch 1 @ Nueva Era Elementary School
Limits : Location: Bunawan, Agusan del Sur
Appropriation/Contact Amount: P 10,901,185.46 Source of Funds: CY 2016 BEFF Batch 11
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A.1 OTHER REQUIRED FACILITIES
B.5 Project Billboard/Signboard units 2.00 P.E. Cert.1
B.7 Occupational Safety and Health Program month 4.60 P.E. Cert.1
B.9 Mobilization/Demobilization ls. 1.00 P.E. Cert.1
SPL I Project Billboard set 6.00 P.E. Cert.1
A. Earthworks
801(1) Removal of Obstruction & Structures L.S 1.00 PE Cert.-1
803(1)a Structure Excavation cu.m 335.96 PE Cert.-1
803(3) Foundation Fill cu.m 22.74 GPC-1, D-17
804(1 a) Embankment cu.m 102.60 GPC-1, D-3
B.1 Concrete Structrures
407(4) Piling ln mts. 720.00 CCS-1 set
Plain and Reinforced Concrete Works
B.Reinforce Concrete
900(1)c2 Structural Concrete-Footing and Slab on Fill (fc=3,000 psi @ 28 days) cu.m. 67.50 *
900(1)c3 Structural Concrete-Footing Tie Beams (fc=3,000 psi @ 28 days) cu.m. 27.50 *
900(1)c4 Structural Concrete-Columns (fc=3,000 psi @ 28 days) cu.m. 31.87 *
900(1)c5 Structural Concrete-Suspended Slab(fc=3,000 psi @ 28 days) cu.m. 49.88 *
900(1)c6 Structural Concrete-Beams/Girder (fc=3,000 psi @ 28 days) cu.m. 34.21 *
Reinforcing Steel
902(1)a2 Reinforcing Steel (Deformed) grade 60 kgs. 44,925.24 Q-1/size per 10,000 kgs.
Forms and Falsework
903(1) Forms and Falseworks ls 1.00 P.E. Cert.-1
Termite Control Works
1000(1) Soil Poisoning liter 29.93 P.E Cert.-1
C. Finishing
Storm Drainage and Sewerage System
1001(1)a5 Pipe-50mm dia x pvc - series 1000 meter 44.80 P.E. Cert-1
1001(1)a7 Pipe-100mm dia x pvc - series 1000 meter 52.80 P.E. Cert-1
1001(2)a1 Fittings-50mm dia x pvc - elbow 1/8 bend each 30.00 P.E. Cert-1
1001(2)a3 Fittings-100m dia X pvc - elbow, 1/8 bend each 18.00 P.E. Cert-1
1001(2)b1 Fittings-50mm dia X pvc - elbow, 1/4 bend each 12.00 P.E. Cert-1
1001(2)c1 Fittings(50mm dia, PVC Clean out with Plug) each 8.00 P.E. Cert-1
1001(2)c3 Fittings(100mm dia, PVC Clean out with Plug) each 8.00 P.E. Cert-1
1001(2)d1 Fittings(50mm dia, PVC Coupling) each 14.00 P.E. Cert-1
1001(2)d3 Fittings(100mm dia, PVC Coupling) each 8.00 P.E. Cert-1
1001(2)e1 Fittings(50mm dia, PVC P-Trap) each 14.00 P.E. Cert-1
1001(2)e3 Fittings-100mm dia X pvc p trap each 14.00 P.E. Cert-1
1001(2)f1 Fittings-50mm dia X pvc - sanitary fee each 12.00 P.E. Cert-1
1001(2)g1 Fittings-50mm dia X pvc - sanitary wye each 22.00 P.E. Cert-1
1001(2)g3 Fittings-100mm dia X pvc - sanitary wye each 18.00 P.E. Cert-1
1001(2)g4 Fittings-150mm dia X pvc - sanitary wye each 4.00 P.E. Cert-1
1001(2)i2 Fittings(100mm x 50mm dia. PVC Reducer-Bushing) each 18.00 P.E. Cert-1
1001(2)I2 Fittings(100mm dia. PVC Reducer-Sanitary Wye) each 6.00 P.E. Cert-1
Plumbing
1002(3)a6 PPR-C Pipes-20mm dia-pn20 piece 16.00 P.E. Cert-1
1002(3)c2 PPR-C Pipes-20mm dia-elbow-1/4 bend-90 deg piece 16.00 P.E. Cert-1
1002(3)d2 PPR-C Pipes-20mm dia-tee piece 12.00 P.E. Cert-1
1002(3)d3 PPR-C Pipes-25mm dia-tee piece 13.00 P.E. Cert-1
1002(3)h2 PPR-C Pipes-20mm dia-female threaded adaptor piece 30.00 P.E. Cert-1
1002(5)a2 Water Closet, Elongated, Complete-manually operated set 10.00 P.E. Cert-1
1002(5)h3 Floor Drain-Stainless 100mm dia set 8.00 P.E. Cert-1
1002(5)i Toilet Soap Holder piece 5.00 P.E. Cert-1
1002(5)k Toilet Tissue Holder piece 5.00 P.E. Cert-1
1002(5)q Faucet piece 12.00 P.E. Cert-1
Carpentry and Joinery Works
1003(1)a1 Ceiling-4.5mm fiber cement board on metal frame sq.mt. 807.00 P.E. Cert -1
1003(5)a1 Fascia Board-19mm fiber cement board mts. 51.20 P.E. Cert -1
Hardware
1004(2)e Finishing Hardwares-knobs set 12.00 P.E. Cert-1
1004(2)g Finishing Hardwares-hinges set 48.00 P.E. Cert-1
Jalousie Windows
1009(1)a Jalousie Windows-glass sq.mt. 80.51 P.E. Cert-1
Wooden Doors and Windows
1010(1) Frames set 33.00 P.E. Cert-1
1010(2)a Doors-Flush sq.mts. 18.66 P.E. Cert-1
1010(2)b Doors-Wood Panel sq.mts. 22.68 P.E. Cert-1
Corrugated Metal Roofing
1013(2)a Fabricated Metal Roofing Accesory ln.mt 36.00 P.E. Cert-1
1013(2)b Fabricated Metal Roofing Accesory ln.mt 7.33 P.E. Cert-1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets (Rib Type, Short Span) sq.mt. 529.83 P.E. Cert-1
Ceramic/Granite Tiles
1018(1) Glazed Tiles and Trims sq.mt. 207.10 P.E. Cert-1
1018(2) Unglazed Tiles sq.mt. 99.44 P.E. Cert-1
Cement Plaster Finish
1021(1)a Cement Plaster Finish Plain sq.mt. 627.30 P.E. Cert-1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq.mt. 727.99 P.E. Cert-1
Painting, Varnishing and Other Related Works
1032(1)a1 Painting Works-masonry/concrete sq.mt. 1342.59 Q-1
Masonry Works
1046(2)b CHB Non Load Bearing-including reinforced steel-150 m sq.m. 535.59 Q-1
Roof Framing
1047(2)a Structural Steel kgs. 9077.80 P.E. Cert-1
Electrical
1100(1)a2 Rigid Steel Conduit(RSC)-20mm dia length 86.00 P.E. Cert-1
1100(1)a3 Rigid Steel Conduit(RSC)-25mm dia length 21.00 P.E. Cert-1
1100(2)a2 Conduit Coupling-(RSC)-20mm dia conduit coupling pcs. 45.00 P.E. Cert-1
1100(2)a3 Conduit Coupling-(RSC)-25mm dia conduit coupling pcs. 34.00 P.E. Cert-1
1100(3)a2 Locknut & Bushing-(RSC)-20mm dia conduit coupling pcs. 34.00 P.E. Cert-1
1100(3)a3 Locknut & Bushing-(RSC)-25mm dia conduit coupling pcs. 17.00 P.E. Cert-1
1100(4)d1 PVC/uPVC Elbow-20mm dia-90 deg elbow pcs. 98.00 P.E. Cert-1
1100(4)d2 PVC/uPVC Elbow-25mm dia-90 deg elbow pcs. 26.00 P.E. Cert-1
1100(8)a2 Conduit Clamp-20mm. Dia pcs. 330.00 P.E. Cert-1
1100(9)a2 G.I. Wire-#16 gauge kls 7.00 P.E. Cert-1
110010) PVC Solvent Cement-400cc can 4.00 P.E. Cert-1
1100(11)a2 Octagonal Junction Box-pvc/upvc Piece 75.00 P.E. Cert-1
1100(11)b2 Utility Box-pvc/upvc Piece 70.00 P.E. Cert-1
1100(14)b Grounding Rod Copperweld-20mm x 3m length 5.00 P.E. Cert-1
Wires and Wiring Devices
1101(1)a6 Electric Wire (3.5mm2 TW/THHN/THWN) rolls 8.00 P.E. Cert.-1
1101(1)a7 Electric Wire (5.5mm2 TW/THHN/THWN) rolls 5.00 P.E. Cert.-1
1101(1)a8 Electric Wire (8.0 mm2 TW/THHN/THWN) rolls 1.20 P.E. Cert.-1
1101(7)a1 Sungle Pole Wall on one Switch Plate set 12.00 P.E. Cert.-1
1101(7)a2 Duplex (2 Single Pole Wall Switches on one switch plate) set 32.00 P.E. Cert.-1
1101(8)a2 Duplex Convenience Outlet/Receptacles(GT) set 24.00 P.E. Cert.-1
Power Load Center, Switchgear and Panelboards
1102(1)a1 Panel Board with Main & Branch Breakers (Flushed Type) set 1.00 P.E Cert-1
Lighting Fixture
KeylessType, Porcelain Receptacle Outlet-18w-surface
1103(4)a7 mounted set 6.00 P.E Cert-1
Air Conditioning and Refregeration System
1200(14)b2 Oscillating Wall Fan set 12.00 P.E Cert-1
Summary:
cu.m CCS-3 sets (Footing &
900 Reinforced Concrete * 210.96 Column, Beam & Slab)
(a,b,c,d,e,f) a.) Portland Cement bags 3,315 Q-2
b.) Screened & Washed Fine Aggregate cu.m 206.36 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 306.99 Q-1,G-4
d.) Water - - PE Cert.-1
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 10,901,185.46 0.5000% Q.C Chart--------- P 54,505.93
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 35,428.85 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 8,175.89 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 10,901.19 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 54,505.93 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
ur

0.68
3.08

28.8

4.09
3
4
QUALITY CONTROL PROGRAM
Name of Project : Construction of Slope/River Bank Protection of Bahayan River Protecting Daang Maharlika
(Agusan-Davao Section), (Back of Trento Bus Terminal), 0+410.00-0+560.00
Limits : Location: Trento, Agusan del Sur
Appropriation/Contact Amount: P 46,543,684.36 Source of Funds: CY 2017 GAA
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. Facilities for the Engineer
A.1.1(3) Construction of Field Office for the Engineer
A.1 Filed Office/Quarters/View Deck 1 unit(Area=5mx ls 1.00 P.E. Cert-1
5m)=25 sq.m.)
B. Other General Requirements
B.4(1) Construction Survey & Staking km 0.15 P.E. Cert-1
B.4(10) Misc. Survey & Staking ls 1.00 P.E. Cert-1
B.5 Project Billboard each 4.00 P.E. Cert-1
B.7 Construction Safety and Health mo. 7.13 P.E. Cert-1
B.8 Traffice Management mo. 7.13 P.E. Cert-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert-1
I.A. Earthworks
1700(1) Clearing and Grubbing ha 0.25 P.E. Cert-1
1702(1)a Structure Excavation cu.m. 825.22 P.E. Cert-1
1704(1) Embankment cu.m. 2,119.50 GPC-2, D-64
I.B. Slope Protection Structures
404(1)A Reinforcing Steel Bars kgs. 19,450.42 Q-1/size per 10,000 kgs.
405(1)A3 Structural Concrete Class "A" cu.m. 683.09 CCS-10 sets
a.) Portland Cement bags
b.) Screened and Washed Fine Aggregates cu.m.
b.) Screened and Washed Coarse Aggregates cu.m.
c.) Water -
d.) RSB kgs.
407(8) Lean Concrete cu.m. 187.15 CCS-3 sets
a.) Portland Cement bags
b.) Screened and Washed Fine Aggregates cu.m.
b.) Screened and Washed Coarse Aggregates cu.m.
c.) Water -
d.) RSB kgs.
1710(5) Grouted Riprap "A" cu.m. 78.85
a.) Portland Cement bags
b.) Screened and Washed Fine Aggregates cu.m.
c.) Screened and Washed Coarse Aggregates cu.m.
d.) Water -
e.) Boulders cu.m.
1714(1) Gabions cu.m. 300.00 Q-1
1714(2) Mattresses cu.m. 146.10
1716(6) Structural Steel Sheet Pile Furnished l.m. 4,740.00 Q-1
1716(12) Structural Steel Sheet Pile Driven l.m. 4,661.00 P.E. Cert-1
Summary:
cu.m CCS-3 sets (Footing &
900 Reinforced Concrete * 20399.51 Column, Beam & Slab)
(a,b,c,d,e,f) a.) Portland Cement bags 3,315 Q-2
b.) Screened & Washed Fine Aggregate cu.m 206.36 Q-1,G-3
c.) Screened & Washed Coarse Aggregate cu.m 306.99 Q-1,G-4
d.) Water - - PE Cert.-1
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 46,543,684.36 0.5000% Q.C Chart--------- P 232,718.42
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 151,266.97 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 34,907.76 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 46,543.68 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 232,718.42 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:


LEODEGARIO M. MAZO
ME-1, Accred # Engineer III
Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

MANUEL C. NARIO MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Construction Section
63.585 1.413

kgs.
9.107867

2.495333
3
4
QUALITY CONTROL PROGRAM
Name of Project : Rehabilitation/Reconstruction/Upgrading of Damaged Paved along NRJ Cuevas-Bislig
Road (S00464MN)
Limits : K1373+972 - K1374+054 Location: Trento, Agusan del Sur
Appropriation/Contact Amount: P 4,100,000.00 Source of Funds: Regular Infra CY 2017
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)
A. Facilities for the Engineer
Construction of Combined Field Office,
A.1.1(1) Laboratory and Living Quarters Building for the ls. 1.00 P.E. Cert-1
Engineer
B. Other General Requirements
B.4(1) Construction Survey & Staking km 0.086 P.E. Cert-1
B.4(4) Culvert Survey & Staking each 64.00 P.E. Cert-1
B.4(10) Misc. Survey & Staking ls 1.00 P.E. Cert-1
B.5 Project Billboard/Signboard each 4.00 P.E. Cert-1
B.7 Occupational Safety & Health Program mo. 1.20 P.E. Cert-1
B.8 Traffic Management mo. 1.20 P.E. Cert-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert-1
C. Earthworks
100(1) Clearing and Grubbing ha 0.12 P.E. Cert-1
103(3)b5 Removal of Actual Structures/Obstruction, PCCP sq.m. 288.10 P.E. Cert-1
102(2) Surplus Common Excavation cu.m. 324.15 P.E. Cert-1
102(4) Surplus Unclassified Excavation cu.m. 59.56 P.E. Cert-1
103(1)a Structure Excavation cu.m. 128.05 P.E. Cert-1
103(3) Foundation Fill cu.m. 27.34 GPC-1, D-1
103(5)a Pipe Culvert & Drain Excavation cu.m. 410.46 GPC-1, D-13
104(1)a1 Embankment from Roadway Excavation cu.m. 169.53 GPC-1, D-5
105(1)a Subgrade Preparation sq.m. 878.91 GPC-1, D-6

D. Subbase and Base Course


200(1) Aggreagate Subbase Course cu.m. 266.77 GP-1, C-1, CBR-1, D-11
300(1) Aggregate Surface Course cu.m. 55.73 GP-1, Q-1, C-1, D-3
311(2)e1 PCC Pavement (Reinforced) )(0.28 m. thick) sq.m. 576.20 CBS-3 sets
a.) Portland Cement bags 1,532.69 *
b.) Screened and Washed Fine Aggregate cu.m. 88.73 **
c.) Gravel cu.m. 161.34 Q-1, G-3
d.) Water - - P.E. Cert-1
e.) Curing Chemical Compound lit. 167.10 Q-1
f.) Asphalt Sealant lit. 103.72 Q-1
g.) RSB kgs. 19,655.16 Q-1/size per 10,000 kgs.
G. Drainage and Slope Protection Structures
500(1)a5 Pipe Culverts, 1220 mm dia (48" dia) Class II l.m. 64.00 CCS - 3 sets
505(5) Grouted Riprap Class "A" cu.m. 58.69
a.) Portland Cement bags 176.07 *
b.) Screened and Washed Fine Aggregates cu.m. 14.67 **
c.) Water - - P.E. Cert-1
d.) Boulders cu.m. 61.62 Sp.Gr.-1, IR-1
506(1) Stone Masonry cu.m. 29.78
a.) Portland Cement bags 163.79 *
b.) Screened and Washed Fine Aggregates cu.m. 8.93 **
c.) Water - - P.E. Cert-1
d.) Boulders cu.m. 31.27 Sp.Gr-1, IR-1
Summary for 311(2)e1, 505(5) & 506(1):
a.) Portland Cement bags 1,873 Q-1
b.) Screened & Washed Fine Aggregate cu.m 112.34 Q-1, G-2
COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:
1. Q.C Const.(Direct Cost Sub-Total 4,100,000.00 0.5000% Q.C Chart--------- P 20,500.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 13,325.00 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 3,075.00 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 4,100.00 (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P 20,500.00 TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:


CHARLES C.CANONIGO
ME-II, Accred # 0127 ENGINEER II/ME-1, Accred. # D1-00727
Quality Assurance Engineer
RECOMMENDING APPROVAL: NOTED BY:
MANUEL C. NARIO
LEODEGARIO M. MAZO Engineer III
Engineer III Chief, Construction Section
Chief, Quality Assurance Section

APPROVED :
MARCELINO M. OPERARIO
District Engineer
usan del Sur

0.8202
12.3138
5.0859
175.782 5.27346

0.889233 10.6708
2.2292
161.336 2.151147

2.151147

2.56

1
QUALITY CONTROL PROGRAM

Name of Project
Construction of One(1) Storey-Two(2) Classrooms School Building Under CY 2017 Basic
: Educational Facilities Fund (BEFF)-batch 4 @ Buenasuerte Elementary School
Limits : Location: San Francisco, Agusan del Sur
Appropriation/Contract Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00 P.E. Cert. - 1
B.7 Occupational Safety and Health mo. 1.00 P.E. Cert. - 1
B.9 Mobilization / Demobilization ls 1.00 P.E. Cert. - 1
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert. - 1
Structure Excavation
803(1)a Structural Excavation cu.m. 50.16 P.E. Cert. - 1
Embankment
804(4) Gravel Fill cu.m. 114.75 P.E. Cert. - 1
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 20.05 CCS-1 set
(fc=3,000 psi @ 28 days)
Structural Concrete-Footing & Tie Beam
900(1)c3 cu.m CCS-1 set
(fc=3,000 psi @ 28 days) 7.10
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 8.80 CCS-1 set
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 7.35 CCS-1 set
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 6,261.43 Q-1/size per 10,000 kgs.
Forms & Falseworks
903(1) Forms & Framework ls. 1.00 P.E. Cert. - 1
Termite Control Works
1000(1) Soil Poisoning liter 9.50 P.E. Cert. - 1
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36 P.E. Cert. - 1
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50 P.E. Cert. - 1
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00 P.E. Cert. - 1
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00 P.E. Cert. - 1
1004(2) e Finishing Hardwares-Knobs set 4.00 P.E. Cert. - 1
1004(2) g Finishing Hardwares-Hinges set 16.00 P.E. Cert. - 1
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 26.21 P.E. Cert. - 1
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 7.56 P.E. Cert. - 1
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55 P.E. Cert. - 1
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73 P.E. Cert. - 1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated ty sq.m. 269.14 P.E. Cert. - 1
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00 P.E. Cert. - 1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 396.70 P.E. Cert. - 1
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 386.66 Q-1
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 204.30 Q-1
Roof Framing
1047(2)a Structural Steel kgs. 4,874.82 Q-1
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00 P.E. Cert. - 1
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00 P.E. Cert. - 1
1100(2) a2 Conduit Coupling (RSC) pc 45.00 P.E. Cert. - 1
1100(2) a3 Conduit Coupling (RSC) pc 34.00 P.E. Cert. - 1
1100(3) a2 Locknut & Brushing(RSC) pc 34.00 P.E. Cert. - 1
1100(3) a3 Locknut & Brushing(RSC) pc 17.00 P.E. Cert. - 1
1100(4) d1 PVC/uPVC Elbow pc 98.00 P.E. Cert. - 1
1100(4) d2 PVC/uPVC Elbow pc 26.00 P.E. Cert. - 1
1100(8)a2 Conduit Clamp pc 330.00 P.E. Cert. - 1
1100(9)a2 G.I. Wire #16 gauge pc 7.00 P.E. Cert. - 1
1100(10) PVC Solvent Cement-400 cc. pc 4.00 P.E. Cert. - 1
1100(11)a2 Octagonal Junction Box pc 75.00 P.E. Cert. - 1
1100(11)b2 Utility Box-pvc/upvc pc 70.00 P.E. Cert. - 1
1100(11)b3 Grounding Rod Copperweld length 5.00 P.E. Cert. - 1
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00 P.E. Cert. - 1
1101(1)a7 Electrical Wire rolls 2.50 P.E. Cert. - 1
1101(1)a8 Electrical Wire rolls 0.30 P.E. Cert. - 1
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00 P.E. Cert. - 1
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00 P.E. Cert. - 1
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00 P.E. Cert. - 1
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00 P.E. Cert. - 1
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medium base set 15.00 P.E. Cert. - 1
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 4.00 P.E. Cert. - 1
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390 Q-1
b.) Screened & Washed Fine Aggregate cu.m 21.41 Q-1, G-1
c.) Screened & Washed Coarse Aggregate cu.m 42.81 Q-1, G-1
d.) Water - - PE Cert.-1

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P 0.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

CHRISTIAN S. TEMBLIQUE CHARLES C. CANONIGO


ME-1 Accred. # 5153 ENGINEER II/ME-1, Accred. # D1-00088
MRS Builders & Supply Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :

MARCELINO M. OPERARIO
District Engineer
,000 kgs.
0.19
0.29
0.57
QUALITY CONTROL PROGRAM

Name of Project
Construction of One(1) Storey-Two(2) Classrooms School Building Under CY 2017 Basic
: Educational Facilities Fund (BEFF)-batch 4 @ La Fortuna Elementary School
Limits : Location: Veruela, Agusan del Sur
Appropriation/Contract Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY.

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00
B.7 Occupational Safety and Health mo. 1.00
B.9 Mobilization / Demobilization ls 1.00
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00
Structure Excavation
803(1)a Structural Excavation cu.m. 50.16
Embankment
804(4) Gravel Fill cu.m. 38.25
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 20.05
(fc=3,000
Structural psi @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 7.10
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 8.55
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 8.29
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 6,184.10
Forms & Falseworks
903(1) Forms & Framework ls. 1.00
Termite Control Works
1000(1) Soil Poisoning liter 9.50
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00
1004(2) e Finishing Hardwares-Knobs set 4.00
1004(2) g Finishing Hardwares-Hinges set 16.00
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 26.21
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 7.56
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 269.14
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 385.30
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 375.26
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 192.90

Roof Framing
1047(2)a Structural Steel kgs. 4,874.82
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00
1100(2) a2 Conduit Coupling (RSC) pc 45.00
1100(2) a3 Conduit Coupling (RSC) pc 34.00
1100(3) a2 Locknut & Brushing(RSC) pc 34.00
1100(3) a3 Locknut & Brushing(RSC) pc 17.00
1100(4) d1 PVC/uPVC Elbow pc 98.00
1100(4) d2 PVC/uPVC Elbow pc 26.00
1100(8)a2 Conduit Clamp-20mm dia pc 330.00
1100(9)a2 G.I. Wire #16 gauge pc 7.00
1100(10) PVC Solvent Cement-400 cc. pc 4.00
1100(11)a2 Octagonal Junction Box pc 75.00
1100(11)b2 Utility Box-pvc/upvc pc 70.00
1100(11)b3 Grounding Rod Copperweld length 5.00
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00
1101(1)a7 Electrical Wire rolls 2.50
1101(1)a8 Electrical Wire rolls 0.30
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medium base set 15.00
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 4.00
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390
b.) Screened & Washed Fine Aggregate cu.m 21.41
c.) Screened & Washed Coarse Aggregate cu.m 42.81
d.) Water - -

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - -
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - -
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - -
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - -

PREPARED BY: CHECKED BY:

CHRISTIAN S. TEMBLIQUE CHARLES C. CANONIGO


ME-1 Accred. # 5153 ENGINEER II/ME-1, Accred. # D1-00088
MRS Builders & Supply Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :

MARCELINO M. OPERARIO
District Engineer
nder CY 2017 Basic
y School
Veruela, Agusan del Sur

NO. OF TEST (Minimum)

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1

Q-1

Q-1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1 0.19
Q-1, G-1 0.29
Q-1, G-1 0.57
PE Cert.-1

Q.C Chart--------- P 0.00


ent (For Adm.Projects

P
P
P
P

ARLES C. CANONIGO
ER II/ME-1, Accred. # D1-00088
ality Assurance Engineer

MANUEL C. NARIO
Engineer III
ief, Construction Section
QUALITY CONTROL PROGRAM

Name of Project
Construction of One(1) Storey-Two(2) Classrooms School Building Under CY 2017 Basic
: Educational Facilities Fund (BEFF)-batch 4 @ Pulang Lupa Elementary School
Limits : Location: Trento, Agusan del Sur
Appropriation/Contract Amount: ₱2,770,303.94 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00 P.E. Cert. - 1
B.7 Occupational Safety and Health mo. 1.00 P.E. Cert. - 1
B.9 Mobilization / Demobilization ls 1.00 P.E. Cert. - 1
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert. - 1
Structure Excavation
803(1)a Structural Excavation cu.m. 50.16 P.E. Cert. - 1
Embankment
804(4) Gravel Fill cu.m. 38.25 P.E. Cert. - 1
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 20.05 CCS-1 set
(fc=3,000
Structural psi @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 7.10 CCS-1 set
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 8.55 CCS-1 set
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 8.29 CCS-1 set
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 6,184.10 Q-1/size per 10,000 kgs.
Forms & Falseworks
903(1) Forms & Framework ls. 1.00 P.E. Cert. - 1
Termite Control Works
1000(1) Soil Poisoning liter 9.50 P.E. Cert. - 1
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36 P.E. Cert. - 1
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50 P.E. Cert. - 1
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00 P.E. Cert. - 1
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00 P.E. Cert. - 1
1004(2) e Finishing Hardwares-Knobs set 4.00 P.E. Cert. - 1
1004(2) g Finishing Hardwares-Hinges set 16.00 P.E. Cert. - 1
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 26.21 P.E. Cert. - 1
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 7.56 P.E. Cert. - 1
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55 P.E. Cert. - 1
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73 P.E. Cert. - 1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 269.14 P.E. Cert. - 1
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00 P.E. Cert. - 1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 385.30 P.E. Cert. - 1
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 375.26 Q-1
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 192.90 Q-1
Roof Framing
1047(2)a Structural Steel kgs. 4,874.82 Q-1
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00 P.E. Cert. - 1
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00 P.E. Cert. - 1
1100(2) a2 Conduit Coupling (RSC) pc 45.00 P.E. Cert. - 1
1100(2) a3 Conduit Coupling (RSC) pc 34.00 P.E. Cert. - 1
1100(3) a2 Locknut & Brushing(RSC) pc 34.00 P.E. Cert. - 1
1100(3) a3 Locknut & Brushing(RSC) pc 17.00 P.E. Cert. - 1
1100(4) d1 PVC/uPVC Elbow pc 98.00 P.E. Cert. - 1
1100(4) d2 PVC/uPVC Elbow pc 26.00 P.E. Cert. - 1
1100(8)a2 Conduit Clamp-20mm dia pc 330.00 P.E. Cert. - 1
1100(9)a2 G.I. Wire #16 gauge pc 7.00 P.E. Cert. - 1
1100(10) PVC Solvent Cement-400 cc. pc 4.00 P.E. Cert. - 1
1100(11)a2 Octagonal Junction Box pc 75.00 P.E. Cert. - 1
1100(11)b2 Utility Box-pvc/upvc pc 70.00 P.E. Cert. - 1
1100(11)b3 Grounding Rod Copperweld length 5.00 P.E. Cert. - 1
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00 P.E. Cert. - 1
1101(1)a7 Electrical Wire rolls 2.50 P.E. Cert. - 1
1101(1)a8 Electrical Wire rolls 0.30 P.E. Cert. - 1
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00 P.E. Cert. - 1
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00 P.E. Cert. - 1
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00 P.E. Cert. - 1
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00 P.E. Cert. - 1
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medium base set 15.00 P.E. Cert. - 1
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 4.00 P.E. Cert. - 1
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390 Q-1
b.) Screened & Washed Fine Aggregate cu.m 21.41 Q-1, G-1
c.) Screened & Washed Coarse Aggregate cu.m 42.81 Q-1, G-1
d.) Water - - PE Cert.-1

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 2,770,303.94 0.5000% Q.C Chart--------- P 13,851.52
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 9,003.49 Lab.(66%) (P-L) - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 2,077.73 Reg.l Lab. - - - - - - -- - - P
c.) Misc. & Other - (20%) - - - -- P 2,770.30 (34%) (B-1A) - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

CHARLES C. CANONIGO
ME-1 Accred. # ENGINEER II/ME-1, Accred. # 00088
LM Construction and Supply Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :
MARCELINO M. OPERARIO
District Engineer
2017 Basic

usan del Sur

NO. OF TEST (Minimum)

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

0.19
0.29
0.57

13,851.52

. CANONIGO
-1, Accred. # 00088
rance Engineer

C. NARIO
neer III
uction Section
QUALITY CONTROL PROGRAM

Name of Project
Construction of One(1) Storey-Two(2) Classrooms School Building Under CY 2017 Basic
: Educational Facilities Fund (BEFF)-batch 4 @ Lugom Elementary School
Limits : Location: Veruela, Agusan del Sur
Appropriation/Contract Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY.

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00
B.7 Occupational Safety and Health mo. 1.00
B.9 Mobilization / Demobilization ls 1.00
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00
Structure Excavation
803(1)a Structural Excavation cu.m. 50.16
Embankment
804(4) Gravel Fill cu.m. 38.25
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 20.05
(fc=3,000
Structural psi @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 7.10
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 8.55
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 8.29
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 6,184.10
Forms & Falseworks
903(1) Forms & Framework ls. 1.00
Termite Control Works
1000(1) Soil Poisoning liter 9.50
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00
1004(2) e Finishing Hardwares-Knobs set 4.00
1004(2) g Finishing Hardwares-Hinges set 16.00
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 26.21
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 7.56
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 269.14
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 385.30
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 375.26
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 192.90

Roof Framing
1047(2)a Structural Steel kgs. 4,874.82
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00
1100(2) a2 Conduit Coupling (RSC) pc 45.00
1100(2) a3 Conduit Coupling (RSC) pc 34.00
1100(3) a2 Locknut & Brushing(RSC) pc 34.00
1100(3) a3 Locknut & Brushing(RSC) pc 17.00
1100(4) d1 PVC/uPVC Elbow pc 98.00
1100(4) d2 PVC/uPVC Elbow pc 26.00
1100(8)a2 Conduit Clamp-20mm dia pc 330.00
1100(9)a2 G.I. Wire #16 gauge pc 7.00
1100(10) PVC Solvent Cement-400 cc. pc 4.00
1100(11)a2 Octagonal Junction Box pc 75.00
1100(11)b2 Utility Box-pvc/upvc pc 70.00
1100(11)b3 Grounding Rod Copperweld length 5.00
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00
1101(1)a7 Electrical Wire rolls 2.50
1101(1)a8 Electrical Wire rolls 0.30
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medium base set 15.00
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 4.00
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390
b.) Screened & Washed Fine Aggregate cu.m 21.41
c.) Screened & Washed Coarse Aggregate cu.m 42.81
d.) Water - -

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - -
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - -
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - -
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - -

PREPARED BY: CHECKED BY:

ME-1 Accred. # ENGINEER II/ME-1, Accred. #


Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :

MARCELINO M. OPERARIO
District Engineer
nder CY 2017 Basic
hool
Veruela, Agusan del Sur

NO. OF TEST (Minimum) s

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1

Q-1

Q-1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1 0.19
Q-1, G-1 0.29
Q-1, G-1 0.57
PE Cert.-1

Q.C Chart--------- P 0.00


ent (For Adm.Projects

P
P
P
P

GINEER II/ME-1, Accred. #


ality Assurance Engineer

MANUEL C. NARIO
Engineer III
ief, Construction Section
QUALITY CONTROL PROGRAM

Name of Project
Construction of One(1) Storey-Two(2) Classrooms School Building Under CY 2017 Basic
: Educational Facilities Fund (BEFF)-batch 4 @ Don Mateo Elementary School
Limits : Location: Veruela, Agusan del Sur
Appropriation/Contract Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY.

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00
B.7 Occupational Safety and Health mo. 1.00
B.9 Mobilization / Demobilization ls 1.00
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00
Structure Excavation
803(1)a Structural Excavation cu.m. 50.16
Embankment
804(4) Gravel Fill cu.m. 38.25
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 20.05
(fc=3,000
Structural psi @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 7.10
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 8.55
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 8.29
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 6,184.10
Forms & Falseworks
903(1) Forms & Framework ls. 1.00
Termite Control Works
1000(1) Soil Poisoning liter 9.50
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00
1004(2) e Finishing Hardwares-Knobs set 4.00
1004(2) g Finishing Hardwares-Hinges set 16.00
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 26.21
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 7.56
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 269.14
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 385.30
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 375.26
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 192.90

Roof Framing
1047(2)a Structural Steel kgs. 4,874.82
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00
1100(2) a2 Conduit Coupling (RSC) pc 45.00
1100(2) a3 Conduit Coupling (RSC) pc 34.00
1100(3) a2 Locknut & Brushing(RSC) pc 34.00
1100(3) a3 Locknut & Brushing(RSC) pc 17.00
1100(4) d1 PVC/uPVC Elbow pc 98.00
1100(4) d2 PVC/uPVC Elbow pc 26.00
1100(8)a2 Conduit Clamp-20mm dia pc 330.00
1100(9)a2 G.I. Wire #16 gauge pc 7.00
1100(10) PVC Solvent Cement-400 cc. pc 4.00
1100(11)a2 Octagonal Junction Box pc 75.00
1100(11)b2 Utility Box-pvc/upvc pc 70.00
1100(11)b3 Grounding Rod Copperweld length 5.00
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00
1101(1)a7 Electrical Wire rolls 2.50
1101(1)a8 Electrical Wire rolls 0.30
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medium base set 15.00
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 4.00
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390
b.) Screened & Washed Fine Aggregate cu.m 21.41
c.) Screened & Washed Coarse Aggregate cu.m 42.81
d.) Water - -

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - -
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - -
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - -
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - -

PREPARED BY: CHECKED BY:

ME-1 Accred. # ENGINEER II/ME-1, Accred. #


Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :

MARCELINO M. OPERARIO
District Engineer
nder CY 2017 Basic
y School
Veruela, Agusan del Sur

NO. OF TEST (Minimum) s

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1

Q-1

Q-1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1 0.19
Q-1, G-1 0.29
Q-1, G-1 0.57
PE Cert.-1

Q.C Chart--------- P 0.00


ent (For Adm.Projects

P
P
P
P

GINEER II/ME-1, Accred. #


ality Assurance Engineer

MANUEL C. NARIO
Engineer III
ief, Construction Section
QUALITY CONTROL PROGRAM

Name of Project
Construction of One(1) Storey-Two(2) Classrooms School Building Under CY 2017 Basic
: Educational Facilities Fund (BEFF)-batch 4 @ Bonifacio Central Elementary School
Limits : Location: Rosario, Agusan del Sur
Appropriation/Contract Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY.

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00
B.7 Occupational Safety and Health mo. 1.00
B.9 Mobilization / Demobilization ls 1.00
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00
Structure Excavation
803(1)a Structural Excavation cu.m. 50.16
Embankment
804(4) Gravel Fill cu.m. 76.50
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 20.05
(fc=3,000
Structural psi @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 7.10
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 8.55
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 8.29
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 6,184.10
Forms & Falseworks
903(1) Forms & Framework ls. 1.00
Termite Control Works
1000(1) Soil Poisoning liter 9.50
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00
1004(2) e Finishing Hardwares-Knobs set 4.00
1004(2) g Finishing Hardwares-Hinges set 16.00
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 26.21
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 7.56
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 269.14
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 385.30
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 375.26
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 192.90

Roof Framing
1047(2)a Structural Steel kgs. 4,874.82
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00
1100(2) a2 Conduit Coupling (RSC) pc 45.00
1100(2) a3 Conduit Coupling (RSC) pc 34.00
1100(3) a2 Locknut & Brushing(RSC) pc 34.00
1100(3) a3 Locknut & Brushing(RSC) pc 17.00
1100(4) d1 PVC/uPVC Elbow pc 98.00
1100(4) d2 PVC/uPVC Elbow pc 26.00
1100(8)a2 Conduit Clamp-20mm dia pc 330.00
1100(9)a2 G.I. Wire #16 gauge pc 7.00
1100(10) PVC Solvent Cement-400 cc. pc 4.00
1100(11)a2 Octagonal Junction Box pc 75.00
1100(11)b2 Utility Box-pvc/upvc pc 70.00
1100(11)b3 Grounding Rod Copperweld length 5.00
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00
1101(1)a7 Electrical Wire rolls 2.50
1101(1)a8 Electrical Wire rolls 0.30
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medium base set 15.00
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 4.00
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390
b.) Screened & Washed Fine Aggregate cu.m 21.41
c.) Screened & Washed Coarse Aggregate cu.m 42.81
d.) Water - -

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - -
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - -
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - -
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - -

PREPARED BY: CHECKED BY:

ME-1 Accred. # ENGINEER II/ME-1, Accred. #


Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :

MARCELINO M. OPERARIO
District Engineer
nder CY 2017 Basic
mentary School
Rosario, Agusan del Sur

NO. OF TEST (Minimum) s

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1

Q-1

Q-1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1 0.19
Q-1, G-1 0.29
Q-1, G-1 0.57
PE Cert.-1

Q.C Chart--------- P 0.00


ent (For Adm.Projects

P
P
P
P

GINEER II/ME-1, Accred. #


ality Assurance Engineer

MANUEL C. NARIO
Engineer III
ief, Construction Section
QUALITY CONTROL PROGRAM

Construction of One(1) Storey-Two(2) Classrooms School Building Under CY 2017 Basic


Name of Project
: Educational Facilities Fund (BEFF)-batch 4 @ Cabantao Elementary School
Limits : Location: Rosario, Agusan del Sur
Appropriation/Contract Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY.

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00
B.7 Occupational Safety and Health mo. 1.00
B.9 Mobilization / Demobilization ls 1.00
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00
Structure Excavation
803(1)a Structural Excavation cu.m. 50.16
Embankment
804(4) Gravel Fill cu.m. 38.25
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 20.05
(fc=3,000
Structural psi @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 7.10
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 8.06
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 7.35
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 6,029.46
Forms & Falseworks
903(1) Forms & Framework ls. 1.00
Termite Control Works
1000(1) Soil Poisoning liter 9.50
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00
1004(2) e Finishing Hardwares-Knobs set 4.00
1004(2) g Finishing Hardwares-Hinges set 16.00
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 26.21
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 7.56
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 269.14
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 362.50
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 352.46
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 170.10

Roof Framing
1047(2)a Structural Steel kgs. 4,874.82
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00
1100(2) a2 Conduit Coupling (RSC) pc 45.00
1100(2) a3 Conduit Coupling (RSC) pc 34.00
1100(3) a2 Locknut & Brushing(RSC) pc 34.00
1100(3) a3 Locknut & Brushing(RSC) pc 17.00
1100(4) d1 PVC/uPVC Elbow pc 98.00
1100(4) d2 PVC/uPVC Elbow pc 26.00
1100(8)a2 Conduit Clamp-20mm dia pc 330.00
1100(9)a2 G.I. Wire #16 gauge pc 7.00
1100(10) PVC Solvent Cement-400 cc. pc 4.00
1100(11)a2 Octagonal Junction Box pc 75.00
1100(11)b2 Utility Box-pvc/upvc pc 70.00
1100(11)b3 Grounding Rod Copperweld length 5.00
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00
1101(1)a7 Electrical Wire rolls 2.50
1101(1)a8 Electrical Wire rolls 0.30
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medium base set 15.00
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 4.00
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390
b.) Screened & Washed Fine Aggregate cu.m 21.41
c.) Screened & Washed Coarse Aggregate cu.m 42.81
d.) Water - -

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - -
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - -
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - -
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - -

PREPARED BY: CHECKED BY:

ME-1 Accred. # ENGINEER II/ME-1, Accred. #


Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :

MARCELINO M. OPERARIO
District Engineer
nder CY 2017 Basic
School
Rosario, Agusan del Sur

NO. OF TEST (Minimum) s

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1

Q-1

Q-1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1 0.19
Q-1, G-1 0.29
Q-1, G-1 0.57
PE Cert.-1

Q.C Chart--------- P 0.00


ent (For Adm.Projects

P
P
P
P

GINEER II/ME-1, Accred. #


ality Assurance Engineer

MANUEL C. NARIO
Engineer III
ief, Construction Section
QUALITY CONTROL PROGRAM

Name of Project
Construction of One(1) Storey-Two(2) Classrooms School Building Under CY 2017 Basic Educatio
: Facilities Fund (BEFF)-batch 4 @ Manat Elementary School
Limits : Location: Trento, Agusan del Sur
Appropriation/Contract Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY.

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00
B.7 Occupational Safety and Health mo. 1.00
B.9 Mobilization / Demobilization ls 1.00
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00
Structure Excavation
803(1)a Structural Excavation cu.m. 50.16
Embankment
804(4) Gravel Fill cu.m. 38.25
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 20.05
(fc=3,000
Structural psi @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 7.10
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 8.31
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 7.35
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 6,106.78
Forms & Falseworks
903(1) Forms & Framework ls. 1.00
Termite Control Works
1000(1) Soil Poisoning liter 9.50
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00
1004(2) e Finishing Hardwares-Knobs set 4.00
1004(2) g Finishing Hardwares-Hinges set 16.00
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 26.21
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 7.56
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 269.14
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 373.90
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 363.86
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 181.50

Roof Framing
1047(2)a Structural Steel kgs. 4,874.82
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00
1100(2) a2 Conduit Coupling (RSC) pc 45.00
1100(2) a3 Conduit Coupling (RSC) pc 34.00
1100(3) a2 Locknut & Brushing(RSC) pc 34.00
1100(3) a3 Locknut & Brushing(RSC) pc 17.00
1100(4) d1 PVC/uPVC Elbow pc 98.00
1100(4) d2 PVC/uPVC Elbow pc 26.00
1100(8)a2 Conduit Clamp-20mm dia pc 330.00
1100(9)a2 G.I. Wire #16 gauge pc 7.00
1100(10) PVC Solvent Cement-400 cc. pc 4.00
1100(11)a2 Octagonal Junction Box pc 75.00
1100(11)b2 Utility Box-pvc/upvc pc 70.00
1100(11)b3 Grounding Rod Copperweld length 5.00
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00
1101(1)a7 Electrical Wire rolls 2.50
1101(1)a8 Electrical Wire rolls 0.30
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medium base set 15.00
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 4.00
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390
b.) Screened & Washed Fine Aggregate cu.m 21.41
c.) Screened & Washed Coarse Aggregate cu.m 42.81
d.) Water - -

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - -
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - -
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - -
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - -

PREPARED BY: CHECKED BY:

ME-1 Accred. # ENGINEER II/ME-1, Accred. #


Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :

MARCELINO M. OPERARIO
District Engineer
nder CY 2017 Basic Educational

Trento, Agusan del Sur

NO. OF TEST (Minimum) s

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1

Q-1

Q-1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1 0.19
Q-1, G-1 0.29
Q-1, G-1 0.57
PE Cert.-1

Q.C Chart--------- P 0.00


ent (For Adm.Projects

P
P
P
P

NGINEER II/ME-1, Accred. #


Quality Assurance Engineer

MANUEL C. NARIO
Engineer III
Chief, Construction Section
QUALITY CONTROL PROGRAM

Name of Project
Construction of One(1) Storey-Four(4) Classrooms School Building Under CY 2017 Basic Educatio
: Facilities Fund (BEFF)-batch 4 @ San Isidro National High School
Limits : Location: Trento, Agusan del Sur
Appropriation/Contract Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY.

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00
B.7 Occupational Safety and Health mo. 3.00
B.9 Mobilization / Demobilization ls 1.00
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00
Structure Excavation
803(1)a Structural Excavation cu.m. 90.68
Embankment
804(4) Gravel Fill cu.m. 76.50
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 39.72
(fc=3,000 psi @ 28 days)
Structural Concrete-Footing & Tie Beam
900(1)c3 cu.m
(fc=3,000 psi @ 28 days) 13.50
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 14.02
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 14.00
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 10,925.33
Forms & Falseworks
903(1) Forms & Framework ls. 1.00
Termite Control Works
1000(1) Soil Poisoning liter 9.50
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 356.96
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 46.50
1003(9) Carpentry & Joinery Works (Blackboard) set 4.00
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00
1004(2) e Finishing Hardwares-Knobs set 4.00
1004(2) g Finishing Hardwares-Hinges set 16.00
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 52.42
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 15.12
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 16.73
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 526.84
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 523.90
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 688.46
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 331.50

Roof Framing
1047(2)a Structural Steel kgs. 10,039.09
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00
1100(2) a2 Conduit Coupling (RSC) pc 45.00
1100(2) a3 Conduit Coupling (RSC) pc 34.00
1100(3) a2 Locknut & Brushing(RSC) pc 34.00
1100(3) a3 Locknut & Brushing(RSC) pc 17.00
1100(4) d1 PVC/uPVC Elbow pc 98.00
1100(4) d2 PVC/uPVC Elbow pc 26.00
1100(8)a2 Conduit Clamp-20mm dia pc 330.00
1100(9)a2 G.I. Wire #16 gauge pc 7.00
1100(10) PVC Solvent Cement-400 cc. pc 4.00
1100(11)a2 Octagonal Junction Box pc 75.00
1100(11)b2 Utility Box-pvc/upvc pc 70.00
1100(11)b3 Grounding Rod Copperweld length 5.00
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 10.00
1101(1)a7 Electrical Wire rolls 3.80
1101(1)a8 Electrical Wire rolls 0.30
1101(7)a1 Single Pole Wall on one Switch Plate set 8.00
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 8.00
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 16.00
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medium base set 32.00
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 8.00
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390
b.) Screened & Washed Fine Aggregate cu.m 21.41
c.) Screened & Washed Coarse Aggregate cu.m 42.81
d.) Water - -

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - -
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - -
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - - -
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - -

PREPARED BY: CHECKED BY:

ME-1 Accred. # ENGINEER II/ME-1, Accred. #


Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :
MARCELINO M. OPERARIO
District Engineer
der CY 2017 Basic Educational

rento, Agusan del Sur

NO. OF TEST (Minimum) s

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

CCS-1 set

CCS-1 set

CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1

Q-1

Q-1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1 0.19
Q-1, G-1 0.29
Q-1, G-1 0.57
PE Cert.-1

Q.C Chart--------- P 0.00


t (For Adm.Projects

P
P
P
P

NGINEER II/ME-1, Accred. #


uality Assurance Engineer

MANUEL C. NARIO
Engineer III
hief, Construction Section
QUALITY CONTROL PROGRAM

Construction of One(1) Storey-Two(2) Classrooms School Building Under CY 2017 Basic Educatio
Name of Project
: Facilities Fund (BEFF)-batch 4 @ Novele National High School
Limits : Location: Rosario, Agusan del Sur
Appropriation/Contract Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY.

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00
B.7 Occupational Safety and Health mo. 1.00
B.9 Mobilization / Demobilization ls 1.00
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00
Structure Excavation
803(1)a Structural Excavation cu.m. 50.16
Embankment
804(4) Gravel Fill cu.m. 191.25
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 20.05
(fc=3,000 psi
Structural @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 7.10
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 9.29
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 7.35
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 6,416.07
Forms & Falseworks
903(1) Forms & Framework ls. 1.00
Termite Control Works
1000(1) Soil Poisoning liter 9.50
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00
1004(2) e Finishing Hardwares-Knobs set 4.00
1004(2) g Finishing Hardwares-Hinges set 16.00
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 26.21
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 7.56
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 269.14
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 419.50
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 409.46
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 227.10

Roof Framing
1047(2)a Structural Steel kgs. 4,874.82
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00
1100(2) a2 Conduit Coupling (RSC) pc 45.00
1100(2) a3 Conduit Coupling (RSC) pc 34.00
1100(3) a2 Locknut & Brushing(RSC) pc 34.00
1100(3) a3 Locknut & Brushing(RSC) pc 17.00
1100(4) d1 PVC/uPVC Elbow pc 98.00
1100(4) d2 PVC/uPVC Elbow pc 26.00
1100(8)a2 Conduit Clamp-20mm dia pc 330.00
1100(9)a2 G.I. Wire #16 gauge pc 7.00
1100(10) PVC Solvent Cement-400 cc. pc 4.00
1100(11)a2 Octagonal Junction Box pc 75.00
1100(11)b2 Utility Box-pvc/upvc pc 70.00
1100(11)b3 Grounding Rod Copperweld length 5.00
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00
1101(1)a7 Electrical Wire rolls 2.50
1101(1)a8 Electrical Wire rolls 0.30
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medium base set 15.00
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 4.00
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390
b.) Screened & Washed Fine Aggregate cu.m 21.41
c.) Screened & Washed Coarse Aggregate cu.m 42.81
d.) Water - -

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - -
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - -
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - - -
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - -

PREPARED BY: CHECKED BY:

ME-1 Accred. # ENGINEER II/ME-1, Accred. #


Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :

MARCELINO M. OPERARIO
District Engineer
der CY 2017 Basic Educational

osario, Agusan del Sur

NO. OF TEST (Minimum) s

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1

Q-1

Q-1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1 0.19
Q-1, G-1 0.29
Q-1, G-1 0.57
PE Cert.-1

Q.C Chart--------- P 0.00


t (For Adm.Projects

P
P
P
P

NGINEER II/ME-1, Accred. #


uality Assurance Engineer

MANUEL C. NARIO
Engineer III
hief, Construction Section
QUALITY CONTROL PROGRAM

Name of Project
Construction of One(1) Storey-Two(2) Classrooms School Building Under CY 2017 Basic Educatio
: Facilities Fund (BEFF)-batch 4 @ Novele National High School
Limits : Location: Rosario, Agusan del Sur
Appropriation/Contract Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY.

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00
B.7 Occupational Safety and Health mo. 2.00
B.9 Mobilization / Demobilization ls 1.00
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00
Structure Excavation
803(1)a Structural Excavation cu.m. 72.12
Embankment
804(4) Gravel Fill cu.m. 286.88
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 33.57
(fc=3,000 psi
Structural @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 10.30
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 12.87
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 10.59
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 9,065.36
Forms & Falseworks
903(1) Forms & Framework ls. 1.00
Termite Control Works
1000(1) Soil Poisoning liter 9.50
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 269.66
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 37.50
1003(9) Carpentry & Joinery Works (Blackboard) set 3.00
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00
1004(2) e Finishing Hardwares-Knobs set 4.00
1004(2) g Finishing Hardwares-Hinges set 16.00
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 39.31
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 11.34
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 12.64
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 397.99
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 514.50
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 591.76
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 322.10

Roof Framing
1047(2)a Structural Steel kgs. 7,482.93
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00
1100(2) a2 Conduit Coupling (RSC) pc 45.00
1100(2) a3 Conduit Coupling (RSC) pc 34.00
1100(3) a2 Locknut & Brushing(RSC) pc 34.00
1100(3) a3 Locknut & Brushing(RSC) pc 17.00
1100(4) d1 PVC/uPVC Elbow pc 98.00
1100(4) d2 PVC/uPVC Elbow pc 26.00
1100(8)a2 Conduit Clamp-20mm dia pc 330.00
1100(9)a2 G.I. Wire #16 gauge pc 7.00
1100(10) PVC Solvent Cement-400 cc. pc 4.00
1100(11)a2 Octagonal Junction Box pc 75.00
1100(11)b2 Utility Box-pvc/upvc pc 70.00
1100(11)b3 Grounding Rod Copperweld length 5.00
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 8.00
1101(1)a7 Electrical Wire rolls 3.20
1101(1)a8 Electrical Wire rolls 0.30
1101(7)a1 Single Pole Wall on one Switch Plate set 6.00
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 6.00
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 12.00
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medium base set 23.00
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 6.00
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390
b.) Screened & Washed Fine Aggregate cu.m 21.41
c.) Screened & Washed Coarse Aggregate cu.m 42.81
d.) Water - -

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - -
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - -
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - - -
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - -

PREPARED BY: CHECKED BY:

ME-1 Accred. # ENGINEER II/ME-1, Accred. #


Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :

MARCELINO M. OPERARIO
District Engineer
der CY 2017 Basic Educational

osario, Agusan del Sur

NO. OF TEST (Minimum) s

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1

Q-1

Q-1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1 0.19
Q-1, G-1 0.29
Q-1, G-1 0.57
PE Cert.-1

Q.C Chart--------- P 0.00


t (For Adm.Projects

P
P
P
P

NGINEER II/ME-1, Accred. #


uality Assurance Engineer

MANUEL C. NARIO
Engineer III
hief, Construction Section
QUALITY CONTROL PROGRAM

Construction of One(1) Storey-Two(2) Classrooms School Building Under CY 2017 Basic Educatio
Name of Project
: Facilities Fund (BEFF)-batch 4 @ Mambaili Elementary School
Limits : Location: Bunawan, Agusan del Sur
Appropriation/Contract Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY.

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00
B.7 Occupational Safety and Health mo. 1.00
B.9 Mobilization / Demobilization ls 1.00
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00
Structure Excavation
803(1)a Structural Excavation cu.m. 50.16
Embankment
804(4) Gravel Fill cu.m. 191.25
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 20.05
(fc=3,000
Structural psi @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 7.10
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 9.29
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 6.20
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 6,416.07
Forms & Falseworks
903(1) Forms & Framework ls. 1.00
Termite Control Works
1000(1) Soil Poisoning liter 9.50
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00
1004(2) e Finishing Hardwares-Knobs set 4.00
1004(2) g Finishing Hardwares-Hinges set 16.00
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 26.21
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 7.56
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 269.14
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 419.50
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 409.46
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 227.10

Roof Framing
1047(2)a Structural Steel kgs. 2,874.82
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00
1100(2) a2 Conduit Coupling (RSC) pc 45.00
1100(2) a3 Conduit Coupling (RSC) pc 34.00
1100(3) a2 Locknut & Brushing(RSC) pc 34.00
1100(3) a3 Locknut & Brushing(RSC) pc 17.00
1100(4) d1 PVC/uPVC Elbow pc 98.00
1100(4) d2 PVC/uPVC Elbow pc 26.00
1100(8)a2 Conduit Clamp-20mm dia pc 330.00
1100(9)a2 G.I. Wire #16 gauge pc 7.00
1100(10) PVC Solvent Cement-400 cc. pc 4.00
1100(11)a2 Octagonal Junction Box pc 75.00
1100(11)b2 Utility Box-pvc/upvc pc 70.00
1100(11)b3 Grounding Rod Copperweld length 5.00
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00
1101(1)a7 Electrical Wire rolls 2.50
1101(1)a8 Electrical Wire rolls 0.30
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medium base set 15.00
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 4.00
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390
b.) Screened & Washed Fine Aggregate cu.m 21.41
c.) Screened & Washed Coarse Aggregate cu.m 42.81
d.) Water - -

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - -
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - -
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - - -
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - -

PREPARED BY: CHECKED BY:

ME-1 Accred. # ENGINEER II/ME-1, Accred. #


Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :

MARCELINO M. OPERARIO
District Engineer
der CY 2017 Basic Educational

unawan, Agusan del Sur

NO. OF TEST (Minimum) s

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1

Q-1

Q-1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1 0.19
Q-1, G-1 0.29
Q-1, G-1 0.57
PE Cert.-1

Q.C Chart--------- P 0.00


t (For Adm.Projects

P
P
P
P

NGINEER II/ME-1, Accred. #


uality Assurance Engineer

MANUEL C. NARIO
Engineer III
hief, Construction Section
QUALITY CONTROL PROGRAM

Construction of One(1) Storey-Two(2) Classrooms School Building w/ Attached Toilet Under CY 20


Name of Project
: Basic Educational Facilities Fund (BEFF)-batch 4 @ Bonifacio Central Elementary School
Limits : Location: Rosario, Agusan del Sur
Appropriation/Contract Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY.

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00
B.7 Occupational Safety and Health mo. 1.00
B.9 Mobilization / Demobilization ls 1.00
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00
803(1)a Structural Excavation cu.m. 53.04
803(3) Foundation Fill cu.m. 6.50
804(1)a Embankment cu.m. 61.58
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 20.77
(fc=3,000
Structural psi @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 7.10
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 9.52
900(1)c5 Structural Concrete-Suspended Slab(fc=3,000 psi @ 28 days) cu.m 1.29
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 7.31
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 7,802.23
Forms & Falseworks
903(1) Forms & Framework ls. 1.00
Termite Control Works
1000(1) Soil Poisoning liter 9.50
C. FINISHING
Storm Drainage and Sewerage System
1001(1)a5 Pipe meter 20.00
1001(1)a7 Pipe meter 16.80
1001(2)a1 Fittings each 6.00
1001(2)a3 Fittings each 9.00
1001(2)b1 Fittings each 10.00
1001(2)c1 Fittings each 4.00
1001(2)c3 Fittings each 6.00
1001(2)d1 Fittings each 6.00
1001(2)d3 Fittings each 4.00
1001(2)e1 Fittings each 4.00
1001(2)e3 Fittings each 6.00
1001(2)f1 Fittings each 6.00
1001(2)f3 Fittings each 6.00
1001(2)g1 Fittings each 6.00
1001(2)g3 Fittings each 4.00
Plumbing
1002(3)a6 PPR-C Pipes each 16.00
1002(3)c2 PPR-C Pipes each 16.00
1002(3)d2 PPR-C Pipes each 12.00
1002(3)h2 PPR-C Pipes each 6.00
1002(5)a2 Water Closet, Elongated, Complete-Flush Type each 2.00
1002(5)f1 Lavatory, Wall Hung, Complete-manually Operated each 2.00
1002(5)h3 Floor Drain-stainless 100mm dia each 2.00
1002(5)i Toilet Soap Holder each 2.00
1002(5)k Toilet Tissue Holder each 2.00
1002(5)q Faucet each 2.00
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00
1004(2) e Finishing Hardwares-Knobs set 4.00
1004(2) g Finishing Hardwares-Hinges set 16.00
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 23.23
Wooden Doors & Window
1010(2) a Doors-flush sq.mt. 4.26
1010(2) b Doors-wood panel sq.mt. 7.56
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 269.14
Ceramic/Granite Tiles
1018(1) Glazed Tiles and Trims sq.m. 14.40
1018(2) Unglazes Tiles sq.m. 4.80
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 362.50
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 352.46
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 170.10
Roof Framing
1047(2)a Structural Steel kgs. 5,998.74
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00
1100(2) a2 Conduit Coupling (RSC) pc 45.00
1100(2) a3 Conduit Coupling (RSC) pc 34.00
1100(3) a2 Locknut & Brushing(RSC) pc 34.00
1100(3) a3 Locknut & Brushing(RSC) pc 17.00
1100(4) d1 PVC/uPVC Elbow pc 98.00
1100(4) d2 PVC/uPVC Elbow pc 26.00
1100(8)a2 Conduit Clamp-20mm dia pc 330.00
1100(9)a2 G.I. Wire #16 gauge pc 7.00
1100(10) PVC Solvent Cement-400 cc. pc 4.00
1100(11)a2 Octagonal Junction Box pc 75.00
1100(11)b2 Utility Box-pvc/upvc pc 70.00
1100(11)b3 Grounding Rod Copperweld length 5.00
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00
1101(1)a7 Electrical Wire rolls 2.50
1101(1)a8 Electrical Wire rolls 0.30
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00
Lighting Fixture
1103(2)a33 Flourescent Lighting Fixture set 17.00
1103(4)a7 Compact Flourscent Lamp (CFL) set 17.00
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 4.00
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390
b.) Screened & Washed Fine Aggregate cu.m 21.41
c.) Screened & Washed Coarse Aggregate cu.m 42.81
d.) Water - -

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - -
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - -
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - - -
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - -

PREPARED BY: CHECKED BY:

ME-1 Accred. # ENGINEER II/ME-1, Accred. #


Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :

MARCELINO M. OPERARIO
District Engineer
Attached Toilet Under CY 2017
Elementary School
osario, Agusan del Sur

NO. OF TEST (Minimum) s

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 2
P.E. Cert. - 1

CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 0
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
Q-1

Q-1

Q-1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 0
P.E. Cert. - 1

P.E. Cert. - 1

Q-1 0.19
Q-1, G-1 0.29
Q-1, G-1 0.57
PE Cert.-1

Q.C Chart--------- P 0.00


t (For Adm.Projects

P
P
P
P

NGINEER II/ME-1, Accred. #


uality Assurance Engineer

MANUEL C. NARIO
Engineer III
hief, Construction Section
QUALITY CONTROL PROGRAM

Construction of One(1) Storey-Two(2) Classrooms School Building w/ Attached Toilet Under CY 20


Name of Project
: Basic Educational Facilities Fund (BEFF)-batch 4 @ J.A. Morales Elementary School
Limits : Location: Rosario, Agusan del Sur
Appropriation/Contract Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minim

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00 P.E. Cert. - 1
B.7 Occupational Safety and Health mo. 1.00 P.E. Cert. - 1
B.9 Mobilization / Demobilization ls 1.00 P.E. Cert. - 1
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert. - 1
803(1)a Structural Excavation cu.m. 53.04 P.E. Cert. - 1
803(3) Foundation Fill cu.m. 6.50 P.E. Cert. - 1
804(1)a Embankment cu.m. 61.58 P.E. Cert. - 1
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 20.77 CCS-1 set
(fc=3,000 psi
Structural @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 7.10 CCS-1 set
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 9.52 CCS-1 set
900(1)c5 Structural Concrete-Suspended Slab(fc=3,000 psi @ 28 days) cu.m 1.29 CCS-1 set
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 7.31 CCS-1 set
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 7,802.23 Q-1/size per 10,000 kg
Forms & Falseworks
903(1) Forms & Framework ls. 1.00 P.E. Cert. - 1
Termite Control Works
1000(1) Soil Poisoning liter 9.50 P.E. Cert. - 1
C. FINISHING
Storm Drainage and Sewerage System
1001(1)a5 Pipe meter 20.00
1001(1)a7 Pipe meter 16.80
1001(2)a1 Fittings each 6.00
1001(2)a3 Fittings each 9.00
1001(2)b1 Fittings each 10.00
1001(2)c1 Fittings each 4.00
1001(2)c3 Fittings each 6.00
1001(2)d1 Fittings each 6.00
1001(2)d3 Fittings each 4.00
1001(2)e1 Fittings each 4.00
1001(2)e3 Fittings each 6.00
1001(2)f1 Fittings each 6.00
1001(2)f3 Fittings each 6.00
1001(2)g1 Fittings each 6.00
1001(2)g3 Fittings each 4.00
Plumbing
1002(3)a6 PPR-C Pipes each 16.00
1002(3)c2 PPR-C Pipes each 16.00
1002(3)d2 PPR-C Pipes each 12.00
1002(3)h2 PPR-C Pipes each 6.00
1002(5)a2 Water Closet, Elongated, Complete-Flush Type each 2.00
1002(5)f1 Lavatory, Wall Hung, Complete-manually Operated each 2.00
1002(5)h3 Floor Drain-stainless 100mm dia each 2.00
1002(5)i Toilet Soap Holder each 2.00
1002(5)k Toilet Tissue Holder each 2.00
1002(5)q Faucet each 2.00
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36 P.E. Cert. - 1
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50 P.E. Cert. - 1
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00 P.E. Cert. - 1
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00 P.E. Cert. - 1
1004(2) e Finishing Hardwares-Knobs set 4.00 P.E. Cert. - 1
1004(2) g Finishing Hardwares-Hinges set 16.00 P.E. Cert. - 1
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 23.23 P.E. Cert. - 1
Wooden Doors & Window
1010(2) a Doors-flush sq.mt. 4.26 P.E. Cert. - 1
1010(2) b Doors-wood panel sq.mt. 7.56 P.E. Cert. - 1
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55 P.E. Cert. - 1
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73 P.E. Cert. - 1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 269.14 P.E. Cert. - 1
Ceramic/Granite Tiles
1018(1) Glazed Tiles and Trims sq.m. 14.40
1018(2) Unglazes Tiles sq.m. 4.80
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00 P.E. Cert. - 1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 362.50 P.E. Cert. - 1
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 352.46 Q-1
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 170.10 Q-1
Roof Framing
1047(2)a Structural Steel kgs. 5,998.74 Q-1
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00 P.E. Cert. - 1
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00 P.E. Cert. - 1
1100(2) a2 Conduit Coupling (RSC) pc 45.00 P.E. Cert. - 1
1100(2) a3 Conduit Coupling (RSC) pc 34.00 P.E. Cert. - 1
1100(3) a2 Locknut & Brushing(RSC) pc 34.00 P.E. Cert. - 1
1100(3) a3 Locknut & Brushing(RSC) pc 17.00 P.E. Cert. - 1
1100(4) d1 PVC/uPVC Elbow pc 98.00 P.E. Cert. - 1
1100(4) d2 PVC/uPVC Elbow pc 26.00 P.E. Cert. - 1
1100(8)a2 Conduit Clamp-20mm dia pc 330.00 P.E. Cert. - 1
1100(9)a2 G.I. Wire #16 gauge pc 7.00 P.E. Cert. - 1
1100(10) PVC Solvent Cement-400 cc. pc 4.00 P.E. Cert. - 1
1100(11)a2 Octagonal Junction Box pc 75.00 P.E. Cert. - 1
1100(11)b2 Utility Box-pvc/upvc pc 70.00 P.E. Cert. - 1
1100(11)b3 Grounding Rod Copperweld length 5.00 P.E. Cert. - 1
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00 P.E. Cert. - 1
1101(1)a7 Electrical Wire rolls 2.50 P.E. Cert. - 1
1101(1)a8 Electrical Wire rolls 0.30 P.E. Cert. - 1
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00 P.E. Cert. - 1
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00 P.E. Cert. - 1
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00 P.E. Cert. - 1
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00 P.E. Cert. - 1
Lighting Fixture
1103(2)a33 Flourescent Lighting Fixture set 17.00 P.E. Cert. - 0
1103(4)a7 Compact Flourscent Lamp (CFL) set 17.00 P.E. Cert. - 1
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 4.00 P.E. Cert. - 1
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390 Q-1
b.) Screened & Washed Fine Aggregate cu.m 21.41 Q-1, G-1
c.) Screened & Washed Coarse Aggregate cu.m 42.81 Q-1, G-1
d.) Water - - PE Cert.-1

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P 0.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

ME-1 Accred. # ENGINEER II/ME-1, Accred. #


Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :

MARCELINO M. OPERARIO
District Engineer
oilet Under CY 2017
ool

NO. OF TEST (Minimum)

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 0
P.E. Cert. - 1
P.E. Cert. - 1

0.00

ME-1, Accred. #
ance Engineer

C. NARIO
eer III
uction Section
QUALITY CONTROL PROGRAM

Name of Project
Construction of One(1) Storey-Unique Workshop(7m x 22.50m) Under CY 2017 Basic Educational
: Facilities Fund (BEFF)-batch 4 @ Nueva Gracia National Highscool
Limits : Location: Loreto, Agusan del Sur
Appropriation/Contract Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY.

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00
B.7 Occupational Safety and Health mo. 1.00
B.9 Mobilization / Demobilization ls 1.00
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00
803(1)a Structural Excavation cu.m. 38.13
803(3) Foundation Fill cu.m. 4.92
804(1)a Embankment cu.m. 57.85
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 25.71
(fc=3,000 psi
Structural @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 11.13
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 6.91
900(1)c5 Structural Concrete-Suspended Slab(fc=3,000 psi @ 28 days) cu.m 1.08
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 8.59
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 7,775.53
Forms & Falseworks
903(1) Forms & Framework ls. 1.00
Termite Control Works
1000(1) Soil Poisoning liter 9.50
C. FINISHING
Storm Drainage and Sewerage System
1001(1)a5 Pipe meter 20.00
1001(1)a7 Pipe meter 16.80
1001(2)a1 Fittings each 6.00
1001(2)a3 Fittings each 9.00
1001(2)b1 Fittings each 10.00
1001(2)c1 Fittings each 4.00
1001(2)c3 Fittings each 6.00
1001(2)d1 Fittings each 6.00
1001(2)d3 Fittings each 4.00
1001(2)e1 Fittings each 4.00
1001(2)e3 Fittings each 6.00
1001(2)f1 Fittings each 6.00
1001(2)f3 Fittings each 6.00
1001(2)g1 Fittings each 6.00
1001(2)g3 Fittings each 4.00
Plumbing
1002(3)a6 PPR-C Pipes each 16.00
1002(3)c2 PPR-C Pipes each 16.00
1002(3)d2 PPR-C Pipes each 12.00
1002(3)h2 PPR-C Pipes each 6.00
1002(5)a2 Water Closet, Elongated, Complete-Flush Type each 1.00
1002(5)f1 Lavatory, Wall Hung, Complete-manually Operated each 3.00
1002(5)h3 Floor Drain-stainless 100mm dia each 2.00
1002(5)i Toilet Soap Holder each 1.00
1002(5)k Toilet Tissue Holder each 1.00
1002(5)q Faucet each 2.00
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 226.01
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 33.00
1003(9) Carpentry & Joinery Works (Blackboard) set 1.00
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00
1004(2) e Finishing Hardwares-Knobs set 4.00
1004(2) g Finishing Hardwares-Hinges set 16.00
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 16.32
Wooden Doors & Window
1010(2) a Doors-flush sq.mt. 2.13
1010(2) b Doors-wood panel sq.mt. 3.78
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 10.59
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 333.57
Ceramic/Granite Tiles
1018(1) Glazed Tiles and Trims sq.m. 4.02
1018(2) Unglazes Tiles sq.m. 4.62
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 466.44
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 466.44
Folding Door/Partition
1044(1)b Folding Door- Steel sq.mt. 36.11
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 240.43
Roof Framing
1047(2)a Structural Steel kgs. 4,765.51
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00
1100(2) a2 Conduit Coupling (RSC) pc 45.00
1100(2) a3 Conduit Coupling (RSC) pc 34.00
1100(3) a2 Locknut & Brushing(RSC) pc 34.00
1100(3) a3 Locknut & Brushing(RSC) pc 17.00
1100(4) d1 PVC/uPVC Elbow pc 98.00
1100(4) d2 PVC/uPVC Elbow pc 26.00
1100(8)a2 Conduit Clamp-20mm dia pc 330.00
1100(9)a2 G.I. Wire #16 gauge pc 7.00
1100(10) PVC Solvent Cement-400 cc. pc 4.00
1100(11)a2 Octagonal Junction Box pc 75.00
1100(11)b2 Utility Box-pvc/upvc pc 70.00
1100(11)b3 Grounding Rod Copperweld length 5.00
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00
1101(1)a7 Electrical Wire rolls 2.50
1101(1)a8 Electrical Wire rolls 3.00
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 16.00
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00
Lighting Fixture
1103(2)a33 Flourescent Lighting Fixture set 20.00
1103(4)a7 Compact Flourscent Lamp (CFL) set 1.00
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390
b.) Screened & Washed Fine Aggregate cu.m 21.41
c.) Screened & Washed Coarse Aggregate cu.m 42.81
d.) Water - -

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - -
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - -
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - - -
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - -

PREPARED BY: CHECKED BY:

ME-1 Accred. # ENGINEER II/ME-1, Accred. #


Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :

MARCELINO M. OPERARIO
District Engineer
CY 2017 Basic Educational

oreto, Agusan del Sur

NO. OF TEST (Minimum) s

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 2
P.E. Cert. - 1

CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
Q-1

Q-1

Q-1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 0
P.E. Cert. - 1

Q-1 0.19
Q-1, G-1 0.29
Q-1, G-1 0.57
PE Cert.-1

Q.C Chart--------- P 0.00


t (For Adm.Projects

P
P
P
P

NGINEER II/ME-1, Accred. #


uality Assurance Engineer

MANUEL C. NARIO
Engineer III
hief, Construction Section
QUALITY CONTROL PROGRAM

Construction of One(1) Storey-Two(2) Classrooms School Building Under CY 2017 Basic


Name of Project
: Educational Facilities Fund (BEFF)-batch 4 @ Simeon S. Castor Elementary School
Limits : Location: Sta. Josefa, Agusan del Sur
Appropriation/Contract Amount: P Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY.

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00
B.7 Occupational Safety and Health mo. 1.00
B.9 Mobilization / Demobilization ls 1.00
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00
Structure Excavation
803(1)a Structural Excavation cu.m. 50.16
Embankment
804(4) Gravel Fill cu.m. 76.50
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 20.05
(fc=3,000
Structural psi @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 7.10
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 8.55
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 7.35
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 6,184.10
Forms & Falseworks
903(1) Forms & Framework ls. 1.00
Termite Control Works
1000(1) Soil Poisoning liter 9.50
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00
1004(2) e Finishing Hardwares-Knobs set 4.00
1004(2) g Finishing Hardwares-Hinges set 16.00
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 26.21
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 7.56
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 269.14
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 385.30
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 375.26
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 192.90
Roof Framing
1047(2)a Structural Steel kgs. 4,874.82
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00
1100(2) a2 Conduit Coupling (RSC) pc 45.00
1100(2) a3 Conduit Coupling (RSC) pc 34.00
1100(3) a2 Locknut & Brushing(RSC) pc 34.00
1100(3) a3 Locknut & Brushing(RSC) pc 17.00
1100(4) d1 PVC/uPVC Elbow pc 98.00
1100(4) d2 PVC/uPVC Elbow pc 26.00
1100(8)a2 Conduit Clamp-20mm dia pc 330.00
1100(9)a2 G.I. Wire #16 gauge pc 7.00
1100(10) PVC Solvent Cement-400 cc. pc 4.00
1100(11)a2 Octagonal Junction Box pc 75.00
1100(11)b2 Utility Box-pvc/upvc pc 70.00
1100(11)b3 Grounding Rod Copperweld length 5.00
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00
1101(1)a7 Electrical Wire rolls 2.50
1101(1)a8 Electrical Wire rolls 0.30
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medium base set 15.00
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 4.00
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390
b.) Screened & Washed Fine Aggregate cu.m 21.41
c.) Screened & Washed Coarse Aggregate cu.m 42.81
d.) Water - -

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - -
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - -
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - -
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - -

PREPARED BY: CHECKED BY:

ME-1 Accred. # ENGINEER II/ME-1, Accred. #


Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :

MARCELINO M. OPERARIO
District Engineer
nder CY 2017 Basic
mentary School
Sta. Josefa, Agusan del Sur

NO. OF TEST (Minimum) s

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

CCS-1
set
CCS-1
set
CCS-1
set
CCS-1
set
Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1

Q-1

Q-1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

Q-1 0.19
Q-1, G-1 0.29
Q-1, G-1 0.57
PE Cert.-1

Q.C Chart--------- P 0.00


ent (For Adm.Projects

P
P
P
P

GINEER II/ME-1, Accred. #


ality Assurance Engineer

MANUEL C. NARIO
Engineer III
ief, Construction Section
MRS BUILDERS & SUPPLY
QUALITY CONTROL PROGRAM

Construction of One(1) Storey-Two(2) Classrooms School Building Under CY 2017 Basic


Name of Project
: Educational Facilities Fund (BEFF)-batch 4 @ Upper Consuelo 1 Elementary School
Limits : Location: Bunawan, Agusan del Sur
Appropriation/Contract Amount: P 2,798,497.33 Source of Funds: BEFF batch 4
Test to be Performed
ITEM DESCRIPTION UNIT QTY.

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00
B.7 Occupational Safety and Health mo. 1.00
B.9 Mobilization / Demobilization ls 1.00
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00
Structure Excavation
803(1)a Structural Excavation cu.m. 50.16
Embankment
804(4) Gravel Fill cu.m. 76.50
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 20.05
(fc=3,000 psi
Structural @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 7.10
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 8.55
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 7.35
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 6,184.10
Forms & Falseworks
903(1) Forms & Framework ls. 1.00
Termite Control Works
1000(1) Soil Poisoning liter 9.50
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00
1004(2) e Finishing Hardwares-Knobs set 4.00
1004(2) g Finishing Hardwares-Hinges set 16.00
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 26.21
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 7.56
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 269.14
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 385.30
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 375.26
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 192.90

Roof Framing
1047(2)a Structural Steel kgs. 4,874.82
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00
1100(2) a2 Conduit Coupling (RSC) pc 45.00
1100(2) a3 Conduit Coupling (RSC) pc 34.00
1100(3) a2 Locknut & Brushing(RSC) pc 34.00
1100(3) a3 Locknut & Brushing(RSC) pc 17.00
1100(4) d1 PVC/uPVC Elbow pc 98.00
1100(4) d2 PVC/uPVC Elbow pc 26.00
1100(8)a2 Conduit Clamp-20mm dia pc 330.00
1100(9)a2 G.I. Wire #16 gauge pc 7.00
1100(10) PVC Solvent Cement-400 cc. pc 4.00
1100(11)a2 Octagonal Junction Box pc 75.00
1100(11)b2 Utility Box-pvc/upvc pc 70.00
1100(11)b3 Grounding Rod Copperweld length 5.00
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00
1101(1)a7 Electrical Wire rolls 2.50
1101(1)a8 Electrical Wire rolls 0.30
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medium base set 15.00
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 4.00
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390
b.) Screened & Washed Fine Aggregate cu.m 21.41
c.) Screened & Washed Coarse Aggregate cu.m 42.81
d.) Water - -

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 2,798,497.33 0.5000% Q.C Chart--------- P
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 9,095.12 Lab.(66%) (P-L) - - - - - -
b.) Q. Test - (15%) (B-1) - - - - - - P 2,098.87 Reg.l Lab. - - - - - - -- - - -
c.) Misc. & Other - (20%) - - - -- P 2,798.50 (34%) (B-1A) - - - - - - - -
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - -

PREPARED BY: CHECKED BY:

CHRISTIAN S. TEMBLIQUE
ME-1 Accred. # 5153 ENGINEER II/ME-1, Accred. #
MRS Builders & Supply Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section

APPROVED :
MARCELINO M. OPERARIO
District Engineer
PLY

nder CY 2017 Basic


mentary School
Bunawan, Agusan del Sur
BEFF batch 4

NO. OF TEST (Minimum) s

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1

Q-1

Q-1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

Q-1 0.19
Q-1, G-1 0.29
Q-1, G-1 0.57
PE Cert.-1

Q.C Chart--------- P 13,992.49


ent (For Adm.Projects

P
P
P
P

GINEER II/ME-1, Accred. #


ality Assurance Engineer

MANUEL C. NARIO
Engineer III
ief, Construction Section
MRS BUILDERS & SUPPLY

QUALITY CONTROL PROGRAM


Construction of One(1) Storey-Two(2) Classrooms School Building Under CY 2017
Name of Project : Basic Educational Facilities Fund (BEFF)-batch 4 @ Simeon S. Castor Elementary
School
Limits : Location: Trento, Agusan del Sur
Appropriation/Contract Amount ₱2,735,763.28 Source of Funds: BEFF batch 4
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00 P.E. Cert. - 1
B.7 Occupational Safety and Health mo. 1.00 P.E. Cert. - 1
B.9 Mobilization / Demobilization ls 1.00 P.E. Cert. - 1
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert. - 1
Structure Excavation
803(1)a Structural Excavation cu.m. 50.16 P.E. Cert. - 1
Embankment
804(4) Gravel Fill cu.m. 114.75 P.E. Cert. - 1
B. PLAIN & REINFORCED CONCRETE WORK
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill CCS-1 set
900(1)c2 cu.m 20.05
(fc=3,000 psi @ 28 days)
Structural Concrete-Footing & Tie Beam CCS-1 set
900(1)c3 cu.m
(fc=3,000 psi @ 28 days) 7.10
Structural Concrete-Columns(fc=3,000 psi @ 28 CCS-1 set
900(1)c4 cu.m
days) 8.55
Structural Concrete-Beams/Girder(fc=3,000 psi CCS-1 set
900(1)c6 cu.m
@ 28 days) 6.20
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 6,184.10 Q-1/size per 10,000 kgs.
Forms & Falseworks
903(1) Forms & Framework ls. 1.00 P.E. Cert. - 1
Termite Control Works
1000(1) Soil Poisoning liter 9.50 P.E. Cert. - 1
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36 P.E. Cert. - 1
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50 P.E. Cert. - 1
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00 P.E. Cert. - 1
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00 P.E. Cert. - 1
1004(2) e Finishing Hardwares-Knobs set 4.00 P.E. Cert. - 1
1004(2) g Finishing Hardwares-Hinges set 16.00 P.E. Cert. - 1
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 26.21 P.E. Cert. - 1
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 7.56 P.E. Cert. - 1
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rool lm 8.55 P.E. Cert. - 1
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge lm 9.73 P.E. Cert. - 1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-c sq.m. 269.14 P.E. Cert. - 1
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00 P.E. Cert. - 1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 385.30 P.E. Cert. - 1
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 375.26 Q-1
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 192.90 Q-1
Roof Framing
1047(2)a Structural Steel kgs. 4,874.82 Q-1
Electrical
1100(1) a2Rigid Steel Conduit (RSC)-20mm dia. length 30.00 P.E. Cert. - 1
1100(1) a3Rigid Steel Conduit (RSC)-25mm dia. length 21.00 P.E. Cert. - 1
1100(2) a2Conduit Coupling (RSC) pc 45.00 P.E. Cert. - 1
1100(2) a3Conduit Coupling (RSC) pc 34.00 P.E. Cert. - 1
1100(3) a2Locknut & Brushing(RSC) pc 34.00 P.E. Cert. - 1
1100(3) a3Locknut & Brushing(RSC) pc 17.00 P.E. Cert. - 1
1100(4) d1PVC/uPVC Elbow pc 98.00 P.E. Cert. - 1
1100(4) d2PVC/uPVC Elbow pc 26.00 P.E. Cert. - 1
1100(8)a2 Conduit Clamp-20mm dia pc 330.00 P.E. Cert. - 1
1100(9)a2 G.I. Wire #16 gauge pc 7.00 P.E. Cert. - 1
1100(10) PVC Solvent Cement-400 cc. pc 4.00 P.E. Cert. - 1
1100(11)a2Octagonal Junction Box pc 75.00 P.E. Cert. - 1
1100(11)b2Utility Box-pvc/upvc pc 70.00 P.E. Cert. - 1
1100(11)b3Grounding Rod Copperweld length 5.00 P.E. Cert. - 1
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00 P.E. Cert. - 1
1101(1)a7 Electrical Wire rolls 2.50 P.E. Cert. - 1
1101(1)a8 Electrical Wire rolls 0.30 P.E. Cert. - 1
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00 P.E. Cert. - 1
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00 P.E. Cert. - 1
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding T set 8.00 P.E. Cert. - 1
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00 P.E. Cert. - 1
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medi set 15.00 P.E. Cert. - 1
Air Conditioning and Refrigeration System
1200(14)b2Oscillating Wall Fan set 4.00 P.E. Cert. - 1
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390 Q-1
b.) Screened & Washed Fine Aggregate cu.m 21.41 Q-1, G-1
c.) Screened & Washed Coarse Aggregate cu.m 42.81 Q-1, G-1
d.) Water - - PE Cert.-1

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total - 0.5000% Q.C Chart--------- P 0.00
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P - Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P - Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P - (34%) (B-1A) - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

CHRISTIAN S. TEMBLIQUE CHARLES C. CANONIGO


ME-1 Accred. # 5153 ENGINEER II/ME-1, Accred. # 00088
MRS Builders & Supply Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section
APPROVED :

MARCELINO M. OPERARIO
District Engineer
QUALITY CONTROL PROGRAM

Name of Project
Construction of One(1) Storey-Two(2) Classrooms School Building Under CY 2017 Basic
: Educational Facilities Fund (BEFF)-batch 4 @ Baubo Elementary School
Limits : Location: Veruela, Agusan del Sur
Appropriation/Contract Amount: ₱2,728,218.85 Source of Funds: BEFF batch 4
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST(Minimum)

A.1 OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard units 2.00 P.E. Cert. - 1
B.7 Occupational Safety and Health mo. 1.00 P.E. Cert. - 1
B.9 Mobilization / Demobilization ls 1.00 P.E. Cert. - 1
A. Earthworks
801(1) Removal of Obstruction & Structures ls 1.00 P.E. Cert. - 1
Structure Excavation
803(1)a Structural Excavation cu.m. 50.16 P.E. Cert. - 1
Embankment
804(4) Gravel Fill cu.m. 76.50 P.E. Cert. - 1
B. PLAIN & REINFORCED CONCRETE WORKS
Reinforced Concrete Works
Structural Concrete-Footing & Slab on Fill
900(1)c2 cu.m 20.05 CCS-1 set
(fc=3,000 psi
Structural @ 28 days) & Tie Beam
Concrete-Footing
900(1)c3 cu.m 7.10 CCS-1 set
(fc=3,000 psi @ 28 days)
900(1)c4 Structural Concrete-Columns(fc=3,000 psi @ 28 days) cu.m 8.55 CCS-1 set
900(1)c6 Structural Concrete-Beams/Girder(fc=3,000 psi @ 28 days) cu.m 8.29 CCS-1 set
Reinforcing Steel
902(1)a2 Reinforcing Steel(Deformed) Grade 40 kgs. 6,184.10 Q-1/size per 10,000 kgs.
Forms & Falseworks
903(1) Forms & Framework ls. 1.00 P.E. Cert. - 1
Termite Control Works
1000(1) Soil Poisoning liter 9.50 P.E. Cert. - 1
C. FINISHING
Carpentry & Joinery Works
1003(1)a1 Ceiling-4.5mm Fiber Cement Board on Metal Frame sq.m. 182.36 P.E. Cert. - 1
1003(5)a1 Fascia Board-19mm Fiber Cement Board mts. 28.50 P.E. Cert. - 1
1003(9) Carpentry & Joinery Works (Blackboard) set 2.00 P.E. Cert. - 1
Hardwares
1004(2) a Finishing Hardwares-Lockset set 4.00 P.E. Cert. - 1
1004(2) e Finishing Hardwares-Knobs set 4.00 P.E. Cert. - 1
1004(2) g Finishing Hardwares-Hinges set 16.00 P.E. Cert. - 1
Jalousie Window
1009(1) a Jalousie Windows-Glass sq.mt. 26.21 P.E. Cert. - 1
Wooden Doors & Window
1010(2) b Doors-wood panel sq.mt. 7.56 P.E. Cert. - 1
Corrugated Metal Roofing
1013(2) a Fabricated Metal Roofing Accessory-Ridge/Hip rools Gauge 26 lm 8.55 P.E. Cert. - 1
1013(2) b Fabricated Metal Roofing Accessory-Flashing gauge 24 lm 9.73 P.E. Cert. - 1
Prepainted Metal Sheets
1014(1)b1 Prepainted Metal Sheets-above 0.427mm. Longspan-corrugated type sq.m. 269.14 P.E. Cert. - 1
Cement Floor Finish
1021(1)a Cement Floor Finish-Plain sq. mt. 171.00 P.E. Cert. - 1
Cement Plaster Finish
1027(1) Cement Plaster Finish sq. mt. 385.30 P.E. Cert. - 1
Painting, Vanishing and Other Related Works
1032(1)a1 Painting Works sq.mt. 375.26 Q-1
Masonry Works
1046(2)b CHB Non Load Bearing-including RSB150mm. sq.mt. 192.90 Q-1
Roof Framing
1047(2)a Structural Steel kgs. 4,874.82 Q-1
Electrical
1100(1) a2 Rigid Steel Conduit (RSC)-20mm dia. length 30.00 P.E. Cert. - 1
1100(1) a3 Rigid Steel Conduit (RSC)-25mm dia. length 21.00 P.E. Cert. - 1
1100(2) a2 Conduit Coupling (RSC) pc 45.00 P.E. Cert. - 1
1100(2) a3 Conduit Coupling (RSC) pc 34.00 P.E. Cert. - 1
1100(3) a2 Locknut & Brushing(RSC) pc 34.00 P.E. Cert. - 1
1100(3) a3 Locknut & Brushing(RSC) pc 17.00 P.E. Cert. - 1
1100(4) d1 PVC/uPVC Elbow pc 98.00 P.E. Cert. - 1
1100(4) d2 PVC/uPVC Elbow pc 26.00 P.E. Cert. - 1
1100(8)a2 Conduit Clamp-20mm dia pc 330.00 P.E. Cert. - 1
1100(9)a2 G.I. Wire #16 gauge pc 7.00 P.E. Cert. - 1
1100(10) PVC Solvent Cement-400 cc. pc 4.00 P.E. Cert. - 1
1100(11)a2 Octagonal Junction Box pc 75.00 P.E. Cert. - 1
1100(11)b2 Utility Box-pvc/upvc pc 70.00 P.E. Cert. - 1
1100(11)b3 Grounding Rod Copperweld length 5.00 P.E. Cert. - 1
Wires & Wiring Devices
1101(1)a6 Electrical Wire rolls 6.00 P.E. Cert. - 1
1101(1)a7 Electrical Wire rolls 2.50 P.E. Cert. - 1
1101(1)a8 Electrical Wire rolls 0.30 P.E. Cert. - 1
1101(7)a1 Single Pole Wall on one Switch Plate set 4.00 P.E. Cert. - 1
1101(7)a2 Duplex 2 single Pole wall on one switch plate set 4.00 P.E. Cert. - 1
1101(8)a2 Duplex Convenience Outlet/Receptacle, Grounding Type set 8.00 P.E. Cert. - 1
Power Load Center, Switchgear and Panel Boards
1102(1)a1 Panel Board w/ Main and Branch Breakers set 1.00 P.E. Cert. - 1
Lighting Fixture
1103(4)a7 Compact Flourscent Lamp (CFL) w/ Medium base set 15.00 P.E. Cert. - 1
Air Conditioning and Refrigeration System
1200(14)b2 Oscillating Wall Fan set 4.00 P.E. Cert. - 1
Summary for 900(1);
Reinforced Concrete
a.) Portland Cement bags 390 Q-1
b.) Screened & Washed Fine Aggregate cu.m 21.41 Q-1, G-1
c.) Screened & Washed Coarse Aggregate cu.m 42.81 Q-1, G-1
d.) Water - - PE Cert.-1

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 2,728,218.85 0.5000% Q.C Chart--------- P 13,641.09
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 8,866.71 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 2,046.16 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 2,728.22 (34%) (B-1A) - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

HALLY JOHN D. DIEZ HANNIBAL M. SALCEDO


ME-1 Accred. # 4171 ENGINEER II/ME-1
DDS Builders & Supply Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO MANUEL C. NARIO


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Construction Section
APPROVED :

MARCELINO M. OPERARIO
District Engineer
017 Basic

usan del Sur


4

NO. OF TEST(Minimum)

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

CCS-1 set
CCS-1 set
CCS-1 set
CCS-1 set

Q-1/size per 10,000 kgs.

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1
P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

P.E. Cert. - 1

13,641.09

M. SALCEDO
R II/ME-1
nce Engineer

C. NARIO
eer III
ction Section
ADFiL CORPORATION
QUALITY CONTROL PROGRAM

Name of Project : Installation of Guardrails along Daang Maharlika (Agusan-Davao Road)


Limits : K1304+(-404)-K1360+339(S00439MN) Location: San Francisco,ADS
Appropriation/Contact Amount: P 47,912,334.33 Source of Funds:
Test to be Performed

ITEM DESCRIPTION UNIT QTY. NO. OF TEST (Minimum)


A. FALCILITIESConstruction
FOR THEof ENGINEERS
Combined Field Office, Laboratory and Living
A.1.1(1) Quarters Building for the Engineer l.s. 1.00 P.E. Cert.-1
Structure of Excavation
B. Other General Requirements
B.5 Project Billboard/Signboard each 4.00 P.E. Cert.-1
B.7 Occupational Safety and Health Program month 3.07 P.E. Cert.-1
B.8 Traffic Management month 3.07 P.E. Cert.-1
B.9 Mobilization/Demobilization ls 1.00 P.E. Cert.-1
H. MISCELLANEOUS STRUCTURES
603(3)a1 Metal guardrails(Metal Beam) including Posts l.m. 10,452.00 Q-1
603(3)b1 Metal Beam End Piece each 210.00 Q-1
612(1) Reflectorized Thermoplastic Pavement Markings (white) sq.m. 7,000.00 Q-23
612(2) Reflectorized Thermoplastic Pavement Markings (white) sq.m. 120.00 Q-1

PREPARED BY: CHECKED BY:

JOSEPHINE B. GORME LEODEGARIO M. MAZO


ME-1, Accred # 5009 Engineer III
ADFIL Corporation Chief, Quality Assurance Section

SUBMITTED BY: APPROVED :

FRANCISCO O. OLAER MARCELINO M. OPERARIO


Engineer III District Engineer
Chief, Maintenance Section
ADFiL CORPORATION
QUALITY CONTROL PROGRAM

Name of Project Installation of Guardrails along Daang Maharlika (Agusan-Davao Road)


:
Limits : K1304+(-404)-K1360+339(S00439MN) Location: San Francisco,ADS
Appropriation/Contract Amount: ₱47,912,334.33 Source of Funds:
Test to be Performed
ITEM DESCRIPTION UNIT QTY. NO. OF TEST(Minimum)

A. FALCILITIES FOR THE


Construction ENGINEERS
of Combined Field Office, Laboratory and Living
A.1.1(1) Quarters Building for the Engineer l.s. 1.00 P.E. Cert.-1
Structure of Excavation
B. Other General Requirements
B.5 Project Billboard/Signboard each 4.00 P.E. Cert.-1
B.7 Occupational Safety and Health Program month 3.07 P.E. Cert.-1
B.8 Traffic Management month 3.07 P.E. Cert.-1
B.9 Mobilization/Demobilization ls 1.00P.E. Cert.-1
H. MISCELLANEOUS STRUCTURES
603(3)a1 Metal guardrails(Metal Beam) including Posts l.m. 10,452.00 Q-1
603(3)b1 Metal Beam End Piece each 210.00 Q-1
612(1) Reflectorized Thermoplastic Pavement Markings (white) sq.m. 7,000.00 Q-23
612(2) Reflectorized Thermoplastic Pavement Markings (yellow) sq.m. 120.00 Q-1

COMPUTATION BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST:


1. Q.C Const.(Direct Cost Sub-Total 47,912,334.33 0.5000% Q.C Chart--------- P 239,561.67
2. Breakdown of Test Per Regional Memos Apportionment (For Adm.Projects
dated Dec. 12,1973 & July 17, 1974 For Dist./City Project
a.) Serv./Fld. Test - (65%) (B-1)-- P 155,715.09 Lab.(66%) (P-L) - - - - - - P
b.) Q. Test - (15%) (B-1) - - - - - - P 35,934.25 Reg.l Lab. - - - - - - -- - - - P
c.) Misc. & Other - (20%) - - - -- P 47,912.33 (34%) (B-1A) - - - - - - - - P
d.) TOTAL COST - - - - - - - - - - - P - TOTAL - - - - - - - - - - - - - P

PREPARED BY: CHECKED BY:

JOSEPHINE B. GORME HANNIBAL M. SALCEDO


ME-1, Accred # 5009 ENGINEER II/ME-1
ADFIL Corporation Quality Assurance Engineer

RECOMMENDING APPROVAL: NOTED BY:

LEODEGARIO M. MAZO FRANCISCO O. OLAER


Engineer III Engineer III
Chief, Quality Assurance Section Chief, Maintenance Section

APPROVED :

MARCELINO M. OPERARIO
District Engineer
N

NO. OF TEST(Minimum)

239,561.67

M. SALCEDO
R II/ME-1
nce Engineer

O O. OLAER
eer III
nance Section

You might also like