for CS-T240 Auto-Chemistry Analyzer

1
Content
Content..............................................................................................................................................2
Chapter Ⅰ Instrument Specification...............................................................................................3
Chapter 2 Installation ......................................................................................................................10
Chapter 3 Performance and Test Flow ............................................................................................13
Chapter 4. Module Introduction................................................................................................22
Chapter 5. Instrument liquid and Air Line ......................................................................................34
Chapter 6 Instrument Hardware Circuit..........................................................................................42
Chapter 7 Maintenance ...................................................................................................................57
Chapter 8 Analysis methods……………………………………………………………………….75
Chapter 9 Malfunction Analysis ....................................................................................... 87

2
Chapter Ⅰ Instrument Specification

1.1 CS-T240 Model Specification


1.1.1 Product Composition:
The analytical part (host), operation part (computer system), the result output part, accessories and
consumables.
Product applicable scope: used for quantitative analysis of serum, plasma, urine, cerebrospinal
fluid and other clinical chemical constituents of sample.

3
1.1.2 Front ① ②

① Model Logo

② Upper Cover

③ Front Cover

1.1.3 Rear

① Purified Water Inlet

② Low Concentrate Waste Outlet

③ High Concentrate Waste Outlet

④ Detergent Inlet

⑤ Detergent Level Sensor Port

⑥ Left Back Cover

⑦ Syringe Pump

⑧ Right Back Cover

⑨ RS232 Port

① ②③ ④ ⑤ ⑥ ⑦ ⑧ ⑨

4
1.1.4 Working Table

① Reaction Cuvette Rinsing Unit

② Reaction Disk Unit ① ② ③④⑤ ⑥

③ Reaction Tank Liquid Level Detection

④ Stirring Unit

⑤ Sample &Reagent Adding Unit

⑥ Sample & Reagent Disk

⑦ Mixer Rinsing Tank

⑧ Probe Rinsing Tank

⑦ ⑧

1.1.5 Rightside

① Main Switch

② Power Socket

③ Fuse Installation Place

④ Main Power Indicator(Red)

⑤ Refrigeration Power Indicator(Green)


⑥ Analysis Unit Switch(exclude refrigeration power)

① ② ③ ④ ⑤ ⑥

5
1.2 Analysis Unit
The working speed of CS-T240 auto-chemistry analyzer is 240 tests / hour at constant speed
(single / double-reagent item), whose working period is 15 seconds. Instrument overall structure
adopts the project of "2-disks + 1-probe + 1-stirring rod"—one reaction disk, one sample &
reagent disk, one stirring rod, one sample & reagent probe used for adding reagent and sample,
one stirring rod used for mixing. "Grating + diode array" approach is adopted in optical
measurement unit for real-time optical collection of reaction cuvette. The 8-stop 12-step
automatically rinsing of the reaction cuvette is carried out during testing process.

1.2.1 Structure
A / D conversion and
Pipettor
Cleaning pump Log conversion

Pipetting
Stirre
system

Interface
Potometer

Cleaning system

Barcode scanner
Incubator

1.2.2 Reaction Unit


Reaction Cuvette Reaction Disk

Reaction cuvette:120,optical path: 6mm


20×6 sets hard optical plastic cuvette
Incubation bath
Digital liquid sensor
8-stop 12-step rinsing of colorimetric cup

6
1.2.3 Probe and Stirring Unit
Stirring Unit Probe Unit
Probe unit:1

1 sample & reagent probe

High-precision digital liquid detector

Stirring Unit:1

High-speed hollow cup motor

Surface high-intensity Teflon coating

1.2.4 Control unit1

①Circuit panel boxes: 5 panels ① ②


Order: from left to right
ISE control panel(Optional)
Sample reagent disk control panel
Rinsing & stirring control panel
Reaction disk control panel
Main control panel
②Switching Power Supply Box: 3
Order:form outside to inside
+12V(lamp)
+5V(digital circuit)±12V(simulation)
+24V(motor, valve)
③ Circuit panel box power supply interface
④ halogen lamp power supply control interface(+12V)
⑤ Cooling unit power interface(220V)
③ ④ ⑤ ⑥ ⑦

⑥ Fan power interface(220V)


⑦ Solid state relay panel interface(220V)

7
① ② ③ ④

1.2.5 Control Unit 2

Semiconductor refrigeration system:

①+12V refrigerator power


②+5V control panel power
③Fan(15W/220W)
④Control panel(with status indication)

8
1.3 Function Overview
Main work flow:
1. All mechanical moving parts initialization.
2. 3 times water blank measure is implemented after six time automatic rinsing
3. Sample reagent probe assimilates quantitive reagent when it descents to reagent sample disk
after the sample reagent disk rotates to designated R1 reagent position. And then, sample reagent
probe assimilates quantitive sample when it descents to reagent sample disk after the sample
reagent disk rotates to designated sample position.
4. After 8-stop 12-step rinsing, reaction cuvette stops at the sampling position, and sample reagent
probe rotates to reaction disk and descends to reaction cuvette to discharge the mix liquid(reagent
and sample), the reagent 1 and sample adding is finished.
5. Reaction cuvette is stirred immediately when it rotates to R1stirring position.
6. Sample+R1 reagent react in reaction cuvette or temperatured.
7. If it is double reagent item test, sample reagent disk rotates to the designated R2 reagent
position and sample reagent probe descends to sample reagent disk to assimilate quantitive reagent
after a set period (6 mins).
8. The sample reagent probe discharges R2 into reaction cuvette when it rotates to reaction disk.
9. Finishing R2 reagent adding, reaction cuvette is stirred after its one circle (R2 stirring position)
rotation.
10. Reaction cuvette carries out the collection of absorbance data when it passes the optical unit in
every period.
11.The reaction cuvette is rinsed automatically after reaction when passing the rinsing unit, and 15
minutes elapses since sampling to rinsing.

Table 1-3-1 Main Function of Each Unit

Name Main function


Sample reagent probe Execute sample, reagent assimilation and discharge of all
unit biochemical items and ISEitems
Sample reagent Total 21 sample positions for carrying all test samples,
disk unit standard solution and control, 46 reagent positions for
carrying test reagent and detergent
Reaction disk unit Total 120 reaction cuvettes used as container of reaction
and colorimetry test.
Reagent stirring unit Stirring when reagent is added into reaction cuvette.
Optical Measure 12 wavelength absorbance by grating system
system groupware
Auto-rinsing unit Rinse reaction cuvette automatically by 8-stop 12-step
ISE unit (optional) Carry out ISE measurement (K、Na、Cl)
Barcode Total 1 for scanning reagent and sample bottles in sample
reagent disk

9
Chapter 2 Installation

2.1 Space Requirement:


To make sure the space of maintenance, operation and repair, please follow the instruction as
below:
● Space between left (right) side of analyzer and the wall should ≥50cm
● Space between rear board of analyzer and the wall should ≥50cm
● Space in front of analyzer should≥100cm
● Make sure there is enough space for waste device and purified water equipment.

2.2 Power supply requirement:


● Power supply: AC220V±22V 50Hz/60Hz
● Power: 650VA
● Circuit breaker: 250V, 20A
A well grounded power supply socket is a must. Large electrical appliance such as air condition,
refrigerator, even cannot use the same socket with analyzer.
△! Warning:
Incorrect grounding may cause electric shock or instrument damage.
Input voltage should conform to requirement. 3KVA-line UPS power supply is advised.

2.3 Environment requirement


● Working temperature: 15℃~32℃
● Relative humidity: 32 %~85%
● Atmospheric pressure: 76kPa~106kPa
● Environment should with no dust, vibration, major noise source and power interference
● Do not put the analyzer in the vicinity of brush motor, flicker fluorescent tube and other
constant on-off electrical equipment.
● Hard and flat ground is a must for the instrument.
● Avoid direct sunlight, do not put the analyzer in front of heat source and wind source
● Keep good ventilation.
△! warning:
Normal running and accurate result can not be guaranteed if instrument works beyond the
requirements mentioned above.

10
Please use air conditioner if the temperature or humidity can not meet the requirement above.
The heat generated during working process by the instrument will be emitted at the rear of the
instrument. Good ventilation should be kept well and ventilation equipment can be adopted if
necessary, but direct air current should be avoided, or inaccuracy of instrument test may be
caused.

2.4 Purified water equipment:


① water should be obtained from tap water pipe
② water conductivity should within 1uS/cm
③ water supply volume should reach 40L/h or more
④ The hydraulic pressure should within 49-343 Kpa

2.5 Instrument Installation Flow:


Make sure the installation place, space, electrical environment, installation room temperature and
purified water equipment can conform to requirements
Make sure instrument installation tools needed are complete and reagent and QC liquid are
enough.
Please check the prepared items according to packing list when open the package; please write
them down on the check report if any missing.
Place instrument in appropriate position, and mount with computer host, display and printer.
Connect water supply and waste liquid outlet equipment.
Infuse CS-anti-bacterial detergent into the 45th position of sample reagent disk.
Check whether the power and data wires are well connected
Install sample reagent probe and reaction cuvette
Check whether the sample reagent probe can move up and down flexibly

Get through the pure water machine, computer host, display and analytical unit power supply, and
enter CS auto-chemistry analyzer systematic application software. Initial user name: 001, initial
password: 001.
After enter software, follow the steps below in “Maintenance” interface.
(a)Injection pump exhaust
Execute injection pump exhaust to expel air in pipeline.
(b)Cleaning liquid pipeline exhaust
Executing irrigation detergent pipeline exhaust is infusing detergent into pipeline to expel air in
pipeline.
(c)Reagent sample probe horizontal check
Make sure sample reagent probe is right above reaction cuvette, rinsing groove and reagent
bottle.
Place two standard cups at outer circle position 43, inner circle 44 respectively in the sample
reagent disk, and put two blank bottle in inner circle 2 and outer circle 1.Make sure the sample
reagent probe is above reaction cuvette, rinsing groove, standard cup by implementing reagent
sample probe horizontal check.
(d)Stirring rod horizontal check
In order to make sure the stirring rod is above the reaction cup, rinsing groove.

11
(e)Mechanical movement check
Execute 20 times mechanical movement checks to make sure whether the washing block of
rinsing mechanism nozzle abrases the reaction cuvette or not and each mechanism runs normally
or not.
(f)Rinse reaction cup+ ISE
Select rinsing reaction cuvette in “Maintenance” interface, and execute rinsing reaction cuvette +
ISE if ISE equipment is collocated.
(g)Light quantity check
Light quantity result should be attached to installation check report with its value no more than
18000.
(h)Cup blank test
No. 1 cup blank value should be within 18000, and 2-120 reaction cup check value should be
within 18000 ±800.

2.6 Clinical item test


Edit chemical parameters; register reagent info.; testing rate assay ALT, point assay, two-point
rate BUN; calculate the difference of parameter and the result of test should be attached to
installation check report.

2.7 Train Medical Personnel

2.8 Fill the Installation Check Report Detailedly.

12
Chapter 3 Performance and Test Flow

3.1 Main Performance Index

3.1.1 Instrument standard specification


Performance Index Standard Specification

Grating rear spectrophotometry system,


Wavelength simultaneous photometric processing of 12 wavelength:
range 340 、380 、405 、450 、480 、505 、546 、570 、
600 、660 、700 、750nm

Wavelength
±2nm
precision

Reaction
37℃±0.1℃
Characteri temperature
stics
Simultaneously testing 60 colorimetric items and 3 ISE
Test item
items at most

Test
Rate assay ,end-point assay, 2-point assay.
method

Constant speed, 240 tests/ hour ( 360 tests/ hour


Test
speed with ISE)
speed

13
Reagent Sample reagent
sample disk,sample position, Reagent sample disk with refrigerator, semiconductor
system reagent position cooling system.Total 67 positions(21 routine
sample, 45 reagent position “CS-bacterial
phosphate-free detergent”, 1 detergent position)

Serum, plasma, Urine, cerebrospinal fluid, ascites and


Sample type
other body fluids

Sample volume 3~35ul,0.1μl incremental

Test tube Φ(12-16)mm×(75-100)mm(±1 mm)


Test tube
Standard cupΦ14mm×37mm(±1 mm)

Remaining
More than 100μl
sample volume

Sample reagent With liquid level detection and collision detection


probe function

Sample reagent
Inner, outer wall rinsing
probe rinsing

Sample
Digital liquid detecting, integration with
reagentliquid level
sample reagent probe
sensor

Reagent volume 10~350ul,1μl incremental

Reagent bottle 20mL 、70mL、100mL

Remaining
More than 3mL
reagent volume

Reagent storage
5℃~15℃
temperature

14
type:code 128

size: Size : width: 8 ~ 12mm , valid length


within 40mm,start blank and finish blank within
3mm when cutting.
Barcode
information Sticking requirement:the lower edge of barcode should
be within 15mm ~20mm away from the test tube
bottom to make sure right reading barcode,and make
sure the barcode is aligned with sample position gap
when putting the testrack.

Reaction cuvette
Discrete
mode

Reaction cuvette
6mm
optical path

Reaction cuvette
6 sets, 20 for each,total 120
number

Reaction time 15 mins

Reacti Reaction liquid


on System 150~550ul
volume

Light source 20W/12V Long-life quartz halogen

Absorbance range 0~3.3ABS

QC QC interval, monthly QC

Automatically rinsing reaction cuvette, sample reagent


Automatic rinsing
probe, stirring rod.

Stirring system separately stirring after adding

port TCP/IP network port,standard RS-232 and USB 2.0 port

Stylus printer, supporting the user-defined mode for


Data Printer
report sheet
system
Connecting LIS/HIS
LIS/HIS system available
system

Instrument weight About 120Kg


system
Dimensions 998*752*515 (length×width×height)

15
power(VA) 650VA

Water
5L/小时
consumption

Installation power 220V/230V,50Hz/60Hz,1000VA


requireme
Using environment System storage temperature:0℃ ~ 40℃ , volatility
nt
<±2℃/H ; storage humidity:30%RH ~ 80%R ,
non-condensing ; at working,
temperature:15℃ ~ 30℃ , volatility<±2℃/H ;
atworking, relative humidity:35%RH ~
80%RH ,non-condensing ;not higher than 2000
meters above sea level.

3.1.2 Testing speed

Test conditions Degree of reduced ability to process (estimated)

Retest after sample


prediluted 80 tests/h(all tests after predilution )

Use avoiding
cross
120 tests/h at least(reaction cuvette、sample reagent probe)
contamination function

R1 and R2 items are


used simultaneously in 240 tests/h at least
testing

16
3.2 Test Flow

17
3.2.1 Test Flow Instruction
1. Periodic movement sequence of sample reagent probe
a. Switch the pump to zero, internal and external wall rinsing
b.Inhale 3ul air.
c.Rotate to the position above the sample reagent disk
d.Descend till the sample reagent probe point into liquid level about 2mm
e. Assimilate quantitive volume + push back redundant sample
f.Move to above the rinsing pool from the reagent bottle to rinse the external wall.
g. Inhale 3ul air
h. Move to above the sample reagent disk
i. Assimilate quantitive volume sample
j.Move to above the reaction disk from sample cup or tube
k.Add sample, reagent into the reaction cuvette
l. Rotate to above the rinsing pool from reaction cuvette
→ (next periodic movement sequence).

2. Stirring rod periodic movement sequence:


a. Rotate to above reaction disk
b.Descend into reaction cuvette
c.Mix reaction liquid
d.Rise from reaction cuvette and rotate to rinsing bath
e.Descend into rinsing bath
f.Stirring rod rinsing
g.Rise from rinsing bath

3. Movement and time sequence of reaction disk


A track includes total 120 reaction cuvettes in reaction disk, and rotates in a fixed way when
testing. The reaction cup always rotates and stops 4 times counterclockwise, total 36+4+
82=122 (rotation and stop sequence 36-4-82)patches, in every working period, 15
seconds elapsed.

18
120 reaction cuvette
position No.

Reaction cuvette
rinsing unit

Reaction disk
Reagent resetting
sample
adding
position

Stirring position Photoelectric detection


position

Reference position
No.

Figure 3-2

figure 3-2 Position of reaction disk and probe

Outer circle figure: No. of reaction cuvette;inner circle figure: No. of mechanism position.

Reset point is in 71 position of reaction disk.

Reagent1、2 and sample probe is in NO.1 position, stirring is in No.3 position.

Reaction cuvette rinsing unit: NO.71、73、81 position


Reaction cuvette rinsing sequence:
1 → 3 → 5 → 7 → 9 → …… →117 → 119 (18 mins,60 times)
2 → 4 → 6 → 8 → 10 → …… → 118 → 120 (18 mins,60 times)

19
i. Reaction Cuvette Rinsing Movement Sequence

A B C D E F G H

Reaction disk rotate direction Test cell blank for 3 times(1 stop,2 pass)
figure 3-3 Reaction cuvette rinsing probe position

Above figure shows that 8 steps are needed when rinsing reaction cuvette. (3 times cell blank test
is added) , therefore, to finish rinsing one reaction cuvette, 12 steps are needed:
ii. Optical measurement movement sequence
Photometry in the entire process is adopted. In 13-minute reaction time, the continuous
determination of the absorbance of reaction solution is carried out. Reaction disk rotates 1 plus 2
pitches, about 15 seconds, absorbance values are measured out when the 120 reaction cups passing
optical axis of the photometer one by one.
Each reaction Cup in 3-minute reaction time was measured 12 times (12 photometric points),
4-minute reaction time was measured 16 times (16 photometric points), 5-minute reaction time
was measured 20 times (20 photometric points), 10-minute reaction time was measured 40 times
(40 photometric points), 13-minute reaction time was measured 49 times (49 photometric
points).
Light starting from the light source was focused by the lens, and passed the reaction cup first, and
then was disparted by concave grating. After spectrophotometry, each wavelength were
received by 12 fixed photoelectric sensor simultaneously, and were amplified 12 amplifier,
after Log transformation to derive the rate of change of absorbance or absorbance. When
dual-wavelength testing is used, the concentration value is calculated by the difference of the
main and sub-wavelength absorbance or that of absorbance change rate, and therefore
dual-wavelength testing can not only compensate the blood lipid, hemolytic, jaundice sample
test, but also compensate on the result impacted by voltage changes, so that measurement is more
accurate, more stable.

20
21
Chapter 4. Module Introduction

4.1 Sample / reagent probe unit


4.1.1 Function introduction
Sample reagent probe can realize the assimilation from the sample test tube and reagent bottle
and add into reaction cuvette.

In addition, main function of reagent sample probe component: liquid level detecting and
collision detection in movement process, probe block detecting function.

Other subsidiary function includes mechanical limit, power-down self-locking function.

Probe working position:

Reagent sample probe component : rinsing bath→sample reagent disk assimilating


position→reaction disk/ISE sampling position;

Probe drive mechanism plays a key role of reagents and samples adding. The way of probe are
only up-down and circular moving, so two step motors are necessary to drive.

22
4.1.2 Composition
Probe rotating arm
Probe rotating gear belt

Probe up-down light sensor block tablet

Probe rotating step motor

Probe up-down gear belt

Probe up-down step motor

Probe up-down weight

Figure 4-1 probe components configuration

Rotating fixed light sensor Rotating motor mounting

position hole

Up-down motor
mounting hole
Lower rotating axie centor

figure 4-2 Probe body and rotating body

Mandrel

Probe rotating gear

23
Rotating probe drive ratio 12:34, using 0.9° stepper motor and 8 segment controller. Control
accuracy can achieve 0.0398°.

Up-down main gear driver diameter is 19.1mm, the 60mm for the perimeter, also using 0.9°
stepper motor and 8 segment controller.Up-down control accuracy can achieve 0.01875mm.

4.2 Rotating mechanism unit


4.2.1 Function Introduction
The main function of rotating mechanism is bearing of the sample warehouse,reagent warehouse
and reaction disk, and drive it to rotate, so that sample,reagentcarried in reaction cup rotate to
the designated location to finish sampling, mixing and other work.

Reagent sample disk and reaction disk mechanisms are classified as turntable mechanism.
Meeting the requirements of functionality and performance simultaneously, in order to improve
the craftwork of product, the disks are designed as the same frame structure.

4.2.2 Rotating mechanism composition


1, Reagent sample turntable: The sample reagent storehouse, disk rotating bracket, step
motor-driven components

2, The reaction disk turntable: reaction plate, the reaction cuvette, incubation bath, disk rotating
bracket, step motor-driven components

Mandrel Storehouse fixing

S/Driving seat

Zero light sensor

Reaction disk
Storehouse cover light sensor motor seat

Code disk light sensor The foot of bracket

4-4 Disk rotating bracket

24
Driven gear
Drive gear belt

Code Driving step motor

disk and
light sensor

4-5 sample &reagent disk motor driver configuration

System transmission ratio is 10:1.Because of using 0.9 °step motor with 8 segment driver circuit,

the wheel rotation accuracy can achieve 0.01125°.

Leader of disk cover touch


switch

Connecting loop reagent


box rack or sample tube disk
Connecting loop of
rack
disk cover

4-6 Sample/reagent disk assembly configuration

Disk cover
45 teeth of reagent switch light sensor
code disk

Original point block


and light
sensor

4-7 sample &reagent disk transmission code disk configuration

4.3 Refrigerator Unit

4.3.1 Function Introduction


The reagent sample storehouse with refrigerator adopting semiconductor refrigeration, the

25
temperature maintains at 6 degrees -10 degrees, 21 sample positions and 46 reagent positions (the
45th fixed position for placing phosphor-free CS-anti-bacterial detergent)

4.3.2 Cooling system configuration and installation

Equipped
with
temperature-keeping
reagent
cooling storehouse

4-8 reagent sample cooling storehouse reagent box rack assembly configuration (1)

Barcode reader scanning


window
Sample cup

Air inlet

Reagent kit

Air cooling fan

4-9 reagent sample cooling storehouse reagent box rack assembly configuration (2)

4.4 Reaction disk unit

Gear drive adopted reaction disk due to the relatively high positioning precision.

26
Colorimetric cup Fixing pin
rotating rack

Driving gear

Driven gear

motor vibrator

4-10 reaction disk assembly configuration

120 colorimetric cup


120 teeth of code disk in
colorimetric cup position

4-11 reaction cup installation disk assembly configuration(1)

cuvette
cuvette install pin

Locking screw of
colorimetric cup rack

4-12 reaction cup installation disk assembly configuration(2)

27
stirring rod rinsing
bath

Liquid level sensor


probe rinsing bath
rack

Spilling outlet of
Optical window incubation bath

Circular constant
Circular constant
temperature water
temperature water
outlet
inlet
4-13 Incubation bath components configuration

Phosphor-free
Incubation bath detergent inlet

4-14 reaction disk with incubation bath components assembly configuration

Optical system

4-15 reaction disk and optical system components assembly configuration

28
4.4 Stirring Unit

Stir and mix reagent, sample after adding it

Rotating mechanism of stirring and rotating arm adopts the direct drive way ofstep motor output
axle, using 8 segment drive circuit of 0.9 ° motor, and the controlaccuracy can achieve 0.1125 °.
The largest angle is limited by the open angle of rotatation code disk mechanical limit. And
positioning is determined separately by the left and right light sensors.

Mechanism rotation
mechanical limit

Rotation code disk


Stirring unit swing
and light sensor
motor

Stirring mechanism
up-down motor

Stirring mechanism
up-down slider

Stirring mechanism
up-down 4-16 Stirring components configuration
light
sensor

Stirring mechanism
up-down motor
Up-down slider axle

4-17 stirring up-down driver configuration

Curve axle and curve handle drive is adopted by stirring up-down mechanism .

29
Up-down linear
sliding axle

Up-down
Up-down slider
guide axle

4-18 stirring up-down slider drive configuration

Because of mixing body movements are used by way of the crankshaft crank, so the

movements of the positioning accuracy at different locations different. Landing and taking-off

between the location of the speed of the highest, lowest accuracy, and precision at both ends of the

highest, the lowest speed.

Electrical axis from the axis of the slider bearings the size of 16.5mm, crank in horizontal position,

the landing position accuracy of 0.032mm.

Due to curve axle and curve handle drive is adopted by stirring up-down mechanism, the

up-down positioning precision are different at different position. The speed is the highest and

precision is lowest at the middle, however the precision is highest and speed is lowest at the two

ends.

The size of Motor axis from the axis of the slider bearings is 16.5mm, when curve handle locates

horizontally; the up-down position precision is 0.032mm.

30
Up-down slider
Up-down slider

4-19 stirring mechanism up and down positions

31
4.6 Colorimetric cup rinsing mechanism

Rinsing probe Colorimetric


rack of cup rinsing
colorimetric cup probe

Up-down
slider
Up-down step motor

4-20

Only one-dimensional movementavailable to colorimetric cup rinsing mechanism,and driving


mechanism adopts the up-down driving mechanism of stirring rod.

4.7 Rack
Rack includes the main rack, electrical, gas liquid valve and water tanks and other racks.

Bottom-Board Main working table board

Isolating
standing
board

Adjusting foot

4-21 Main rack configuration

32
Electrical control
Cooling controller
box

Switch

Switch power

4-22

33
Chapter 5. Instrument liquid and Air Line

5.1 Main function of liquid line

The CS-T240 liquid line system can be divided into four parts: water inlet tank, 37 degrees
centigrade temperature, colorimetric cup cleaning, the inner and outer arms and stirring rod
cleaning.

1. CS-T240 liquid line system includes sampling subsystem and cleaning subsystem.

2. Sampling subsystem uses one probe plus one stirring rod and one injector. The injector use
500uL

3. The inner and outer wall cleaning of probe and stirring rod uses barotropic driving.

4.Cleaning bath: two cleaning bathes plus waste liquor in the reagent storehouse, together
with the flooding waste liquor in the reaction disk etc.
5. The reaction cuvette cleaning uses the way named 8-stop 12-step.

6.Water supply: uses the special outboard water-supply equipment and the special
water-supplying machine.

7. Waste liquor: reticulate pattern pipe as low concentrate waste pipe with inside diameter of
12mm, wall thickness 3mm, high concentrate waste pipe is also reticulate pattern pipe with inside
diameter of 8mm, wall thickness 2mm

8. Source of power: the power of cleaning comes from the magnetic pump..

9. The cleaning of reaction cup should use one detergent..

10. The vacuum degree for vacuum pump assimilating≥ -70kPa

11. The inner and outer wall cleaning of probe uses independent solenoid valve while the
stirring rod use one solenoid valve.

34
5.2 Liquid Line Principle
5.2.1 CS-T240 Liquid line principle sketch map

35
5.2.1 liquid line of water inlet tank

Explanation:
Z1——heater; Z2——lamp coller; Z3——float; Z4——temperature sensor;
Z5——water tank; Z6——magnetic pump; Z7——water seven-pass;Z8——air discharger
Z9——flow controller;Z10——pressure sensor;Z11——5 valve plate assembly;A——detergent;
B——probe inner wall rinsing;C——Cuvette rinsing;D——stirring rod rinsing;E——probe external
wall rinsing ; F——water inlet ; G——incubation bath inlet ; H——air outlet ;
M——overflow outlet; N——cuvette rinsing

1, When the low water level float detects out the signal, open the inlet valves SV13, and water tank
begins to be infused water until the high water level float detects out signal, then turn off SV13 to stop
the water. Influent flow is as follows:

Stop
Alarm of low influent Alarm of high water influent
water level check water level check water

2, When the low water level float did not detect out signal, the water tank heater began to work,and
temperature control started. Magnetic pump began to work simultaneously.
3, Output water pressure of water tank is controlled by the magnetic pump and fixed damper regulator.
Magnetic pump head is 4.6 m(50Hz). Control water pressure is around 0.45kgf/cm2.
4,The tank water is pumped into the seven-pass through magnetic pump: the first pass to the

36
five-valve plate assembly, used for cuvette rinsing, stirring rinsing and external wall rinsing of the probe;
second pass through the degassing device for the internal wall rinsing of the probe; third pass with the
detergent used for the first probe rinsing of rinsing unit; fourth pass for the incubation bath; fifth pass
access to pressure sensor for detecting the tank pressure; sixth pass for regulating the water tank
pressure.
5, When abnormality occurs to the float, possibly water tank remains the status of inputting water. When
the water tank is full of water, SV13 not shut down, tank outflow water spills out from the overflow pipe
into the waste liquid pipe.

5.2.2 Constant temperature system liquid line

This system offers precise constant 37 degrees water to the incubation bath of reaction disk, and cools
the high temperature light source simultaneously. This system consists of magnetic pump, incubation
bath water inlet valve, incubation bath water outlet valve, liquid level detector and temperature
controller consists of the heater, temperature detector and the shell.

Explanation:Z1——incubation bath; Z2——liquid level detector; Z3——halogen lamp; Z4


——flow controller;Z5——lamp cooler;Z6——constant temperature unit; Z7——block; Z8
——magnetic pump;Z9——flow controller; A——incubation bath water outlet; B——incubation
bath water inlet;C——overflow outlet

1, Open the inlet valve SV6 and turn off outlet valves SV10 to infuse water into incubation bath,
simultaneously with reagent sample probe adding phosphor-free anti-bacterial rinsing liquid to the
incubation bath, liquid level detector determining whether to stop water.
2, Turn off outlet valve and inlet valve, and start the water circulation magnetic pump and temperature

37
controller. In order to improve the adjusting performance of the PID temperature controller in high
temperature environment, the system is added the cooling device through the water tank to get a
small amount of temperature cooled.
3, Turn off magnetic pump and temperature controller, open the drain valve SV10, time to turn off the
drain valve when the incubation bath is draining.
5.2.3 Probe internal and external wall rinsing

1,Open valve SV9 can get the inner wall of reagent sample probe rinsed. Probe position should be at
the top of the corresponding cleaning trough when cleaning so that waste liquid can get out of the
instrument.
2,Open the valve SV4、SV5 to rinse the external wall of sample reagent probe and stirring rod. Fixing
pressure adjusting piston is adopted to every external wall rinsing pipeline to avoid rinsing water spilling
out of rinsing bath.

Explanation:Z1——syringe pump unit;Z2——sample reagent probe;Z3——probe rinsing bath;Z4

——stirring rob rinsing bath;Z5——five value plate unit;A——water tank;B——waste outlet

5.2.4 Colorimetric cup rinsing liquid line


In order to achieve the cleaning effectively, colorimetric cup rinsing adopts warm water. In order to

improve cleaning speed, colorimetric cup adopts hydraulic valve switch and vacuum liquid exhaust.

1, warm water provided by heating tank of inlet water is about 34 ℃. Water pressure is produced by

38
magnetic pump from the water tank and adjusted by voltage regulator to the stable pressure, about

0.45kgf/cm2.

2, vacuum pump, vacuum tank and pressure detector composes vacuum source with pressure value about

-0.7kgf/cm2. Vacuum tank has the function of stable vacuum pressure.

3,Vacuum liquid discharging is high concentrate liquid – reaction liquid including concentrated patient

sample and reagent,requiring separate collection.

4, when the colorimetric cup cleaning mechanism descends, turn off valves open the valve SV11. It tarts

assimilating sample under the vacuum pressure, and the liquid of colorimetric cup will be discharged

after a short period of time when the rinsing mechanism arrives at the bottom of Colorimetric Cup.

5, cleaning liquid and ionized water adding is completed by the SV1、SV2、SV3、SV7 and SV8 which

are timed. Because the vacuum liquid discharging begins to work simultaneously when adding liquid to

discharge redundant liquid, the liquid will not spill outside colorimetric cup.

6, SV7 and SV8 valves are responsible for adding cleaning liquid.

SV8 valves is three links, NO port connect with vacuum tank, NC connect with water seven pass.Before

adding or after the previous adding, open the valve SV7, but SV8 valve is at COM and NO conduction

status (power off status). Because there is a one-way valve in the 3-way top pipeline, cleaning fluid

flows into the middle pipeline of the SV7 and SV8 valves, and time valve SV7, cleaning liquid will

remain in pipeline. Open SV8 valve when adding, cleaning liquid will be added into colorimetric cup

through single way valve under the pressure. About 500ul cleaning liquid is consumed each time.

39
Explanation:Z1——cuvette rinsing unit;Z2——detergent component;Z3——five value plate unit;

Z4——vacuum pump unit;Z5——liquid collection vaccum tank unit;Z6——nozzle1;Z7——nozzle

2;Z8——nozzle 3;Z9——nozzle 4;A——water tank;B——iquid collection vaccum tank;C——

high concentrate waste outlet

5.2.5 ISE Part

40
Probe Pinch
valve

Air
defoamer
Drainage

Reference
liquid

Syringe

41
Chapter 6 Instrument Hardware Circuit

6.1 Hardware configuration

PC

SOPC main control board


(including the control of AC
and pressure temperature
monitoring)

Reation Sample Stirring ISE


Rinsing A/D
module module module module
collection
A/D

ISE A/D collection


amplification
Photoelectricity conversion and
Reaction disk

Sampling mechanism

Rinsing unit

Stirring unit

ISE pump sets


ISE valve sets
Sample disk

convertion

Figure 6-1 Hardware main frame


and

42
6.2 Security Note:
At working, touching hardware panel with hand or any other objects is forbidden.

In order to dismount panels, operation is only allowed when cut off power (220V, AC).

6.3 Circuit board and function list


PCB Name Function Description Circuit
board No.
1. Carrying on the communications between upper and lower
machine, and that with cooling board.
Main control
2. Magnetic valve control:SV6、SV10、SV13

board 3. Monitoring of high and low temperature water tanks


4. Monitoring of incubation bath and vacuum tank liquid level
5. AD board data processing
6. Solid-state relay board control
Reaction disk 1. Communications with the main control board

2. The reaction disk rotation mechanism control


Circuit board
Reagent sample 1. Communication with the main control board
disk circuit board
2. Sample reagent probe mechanism control
3. Sample reagent disk control
4. Injection pump control

5. Magnetic valve control: SV5、SV9


Stirring board 1. Communication with the main control board
rinsing
2. Stirring mechanism control
3. Rinsing mechanism control

4. Magnetic valve control: SV1、SV2、SV3、SV4、SV7、SV8、


SV11
AD board 12 AD-wavelength data collection

43
ISE 1. Communication with the main control board
2. ISE pump motor control
Circuit board
4. Magnetic valve control: ISV1、ISV2、ISV3、ISV4

5. ISE preamp board data collection

1. 37℃constant temperature heater control(200W)

2. Water tank heater control(200W)


Solid relay board
3. Gear pump control
4. Water circulation pump
7. Halogen control
Cooling board 1.Semiconductor cooling control and temperature display
2.Semiconductor current monitoring and current value display
3. Fan control
Level detecting 1. Sample reagent probe liquid level detection
board
2. Incubation bath liquid level detection
3. Alkaline detergent liquid level detection
4. Vacuum liquid level detection

ISE Preamp board K、Na、Cl electrode preamp

Mother board 1. Providing reaction disk board, sample reagent board, rinsing
stirring board, main control board, ISE board with connection and
power supply.

2. Communication among circuit panel

6.4 Instrument electrical principle wiring and function

6.4.1 Communication system and switch power

1. Wiring

44
2. Function
As shown in above figure:
Power input: ~220V
L1、N1: AC power filter S1: power switch

G1: power filter connecting with the ground of bottom-board


P131: AC port of solid state relay board
J501: fan port of AC system J502: AC power port of cooling system
J503: power Supply Port of Halogen J504: Zero line port
J505: power switch of circuit board box J506: power port of solid state relay board
N1:±12V, 5V switch power, power supply for the mother board of circuit board

N2: 12V switch power,power supply for halogen

N4: 24V switch power,power supply for step motor

45
6.4.2 Cooling system
1. Wiring
Stirrer

Ambient
temperature
SV Power rupply sensor

Cooling sensor

Heater
indicator

12V Power rupply

Pelter

Pelter

Fan

2. Function
Cooling system is composed of semiconductor cooling module, radiator, fan.
The main function of cooling board is controlling the semiconductor cooling module, to keep the
reagent disk temperature within 6-10℃.
As shown in the figure :
U1:cooling control board is the CPU of cooling system. It controls the working of cooling system
on the basis of the reagent disk temperature detected by temperature sensor. Semiconductor cooling
module and fan are controllable. The cooling control board starts when the temperature beyond
6-10℃ to adjust the temperature. It also communicates with the main control board.
DS18B20:the sensor used to detect the reagent disk and environment temperature
D1-D2:semiconductor cooling module(Peltier)
N3:12V switch power
N2:5V switch power

6.4.3 Main control board


1.Wiring

46
Water-in valve
of water tank

Vacuum pump 1
Water-in valve
of water bath

Water-out valve of water bath


Vacuum pump
Computer

Board
A/D
Water tank
pressure sensor

Water bath
pressure sensor

Water bath teperature sensor

Water tank teperature sensor


Solid-state electrical board

Water tank
lower floater
Water tank
Higher floater
Computer
serial port Floater in
alkaline liquid
Floater in waste liquid

Water bath liquid level


Cuvette
Reagent disk cover

2.Function
Communicate with PC through serial port to transmit data, command and alarm information.

47
Transmit data and command with reaction disk board, sample reagent disk board, ISE board, cooling
board and AD board communication through mother board.

As shown in figure:

Solenid Valve:

Refer to 5.2.1

SV6 -water inlet valve of incubation bath

SV10- water outlet valve of incubation bath

SV13-water inlet valve of water tank

J01:control port of vacuum pump, valve.

J02:communication port with computer(COM port)

J03:AD board data collection port

J04:pressure sensor of water tank, incubation bath.

J05:temperature sensor of water tank, incubation bath.

J06:solid state relay board port .

J07:float and liquid level signal interface.

J10:serial port monitor communication port.

J705:optocoupler signal interface of reaction disk.

48
6.4.4 Solid state relay board
1. Wiring

Solid state relay


board

12V swith power supply

2. Function
Its main function is to control the solid state relay through main board to turn on and turn off the pump
motor, heater and the lamp.

As shown in figure :

Heater 200WA:water heater of incubation bath

WATER TANK PUMP:water circulation pump of water tank

GEAR PUMP:gear pump

FLUME PUMP:water circulation pump of incubation bath

LAMP:Halogen

49
6.4.5 Circuit board of reaction disk
1. Wiring

A/D BOARD
Main
board
Zero
light
coupler

Counting
light
coupler 1

Counting
light
coupler 2

Reaction
moter

Motor wiring of reaction disk

2. Function
The main function of circuit board of reaction disk is to receive the command from the main control
board, communicate with the main control board, transmit data and alarm command.
Controlling sample reagent unit includes sample reagent disk rotation, probe unit running.
Barcode scanning of sample reagent disk
J702:motor drive port of reaction disk
J704:signal receiving port of reaction disk clear optocoupler, count optocoupler. J705:output port of
reaction disk count optocoupler
J706:output control signal port with AD board

50
6.4.6 Rinsing mixing circuit board
1. Wiring
Stirring
zero light
coupler

Stirring 2
light
coupler

Stirring
up/down light
coupler

Cleaning
zero light
coupler

Cleaning
motor

Stirrer
motor

Stirrer
swaying
motor

Stirrer
up/down
motor
communication
Cooling

Wiring of cleaning and stirring

51
2. Function
The main function of rinsing mixing circuit board is to receive the command from the main control
board, communicate with the main control board, transmit data and alarm command.
Controlling sample reagent unit includes sample reagent disk rotation, probe unit running.
Barcode scanning of sample reagent disk
As shown in figure:
J041: signal port of rinsing mixing optocoupler
J042: drive port of solenid valve
J045: stirring motor control port.
J048: communication port with cooling board
Solenid valve:refer to 5.2.1
SV1:cuvette rinsing probe(the second one)control solenid valve
SV2:cuvette rinsing probe(the third one)control solenid valve
SV3:cuvette rinsing probe(the fourth one)control solenid valve
SV4:stirring rod rinsing control solenid valve
SV7,SV8:cuvette rinsing probe(the first one)control solenid valve
SV11:cuvette vacuum control solenid valve

52
6.4.7 Circuit board of sample reagent disk
1. Wiring

Zero light coupler

Counter light coupler 2

Counter light coupler 2

Swaying light coupler

Up/down light coupler 2

Liquid diction board

Syringe light coupler

Reagent kit motor

Syringe motor

Probe swaying motor

Probe Up/down motor

Wiring of sample/reagent unit

53
2. Function
Receive the command from the main control board, communicate with the main control board, transmit
data and alarm command.
Controlling sample reagent unit includes sample reagent disk rotation, probe unit running.
Barcode scanning of sample reagent disk
As shown in figure :
J041: signal port of sample reagent disk optocoupler
J042: signal inlet port of probe position limit optocoupler and liquid level detection optocoupler
J043: signal inlet port of injection pump optocoupler
J044: SV5,SV9 drive signal port of solenid valve
J045: motor drive port of sample reagent disk
J046: motor drive port of injection pump
J047: motor drive port of probe
J048: communication port of barcode scanning

54
6.4.8 ISE circuit board
1. Wiring

SIP up/down motor light coupler

SIP syringe

SIP syringe light coupler

SIP up/down motor

Pinch valve ISV1

Reference valve ISV2

Main wire valve ISV3

Waste liquid valve ISV3


Preamplifier

2. Function

55
The instrument add calibrator into the reaction cuvette.The SIP injection pump aspirate the calibrator,
and pump it into the Na、K、Cl electrode pipeline of the reaction tank. Test the electric potential on the
basis of reference electrode. The sample probe aspirates sample and diluent, and pump it into the
reaction cuvette. Test the electric potential, and the concentration can be calculated.
J2:optocoupler port of aspirate nozzle elevator mechanism
J5:motor port of proportioning pump
P13:optocoupler port of proportioning pump
J61:motor port of aspirate nozzle elevator mechanism
J62:solenid valve port
J64:preamplifier board port
ISE preamplifier board:amplify electrode signal

56
Chapter 7 Maintenance

In order to ensure reliable system performance, excellent working status and span, please conduct
system operation and regular maintenance strictly in accordance with the requirements in the service
manual. Learning maintenance and overhaul of this chapter is also very important and in-depth study
will enable the instrument to achieve the best running status and exert the best performance.

Warning:

Do not carry out maintenance this chapter doesn’t mention. Otherwise,


it could lead to system damage and personal injury.

Do not touch any other parts except user self-operation and maintenance
which are clear recorded.

Unauthorized repair of the system may lead to system damage and


personal injury, and commitment term of the repair contract is no longer
valid.

Upon completion of maintenance work, make sure the system is


working normally.

Do not splash water, reagent and other liquid onto the system's
mechanical or electrical parts.

Biological contamination danger :

In the process of maintenance work, be sure to wear gloves, put on work


clothes to prevent them from being infected and, if necessary, wear
protective glasses.

57
7.1 Maintenace preparation
Tools, high concentrate detergent and alcohol maybe used in maintenance.

1.Tools
z One set of hexagon wrench
z Cruciform Screwdriver (large, medium and small)
z Injection needle hose
z Small tweezers
z Clean gauze

2. High concentrate detergent


z Acid detergent,0.1mol/L hydrochloric acid
z Alkaline detergent,0.5%(V/V) sodium hypochlorite

Warning:
Acidic high concentrate detergent and alkaline high concentrate detergent
mixed generate poisonous gas. Do not mix them.

Caution:
Following high concentrate detergent designated by Dirui:
Acidic high concentrate detergent: 0.1mol / l hydrochloric acid; alkaline
high concentrate detergent: 0.5% (V / V) sodium hypochlorite.
Please use the high concentrate detergent designated by Dirui. If
undesignated types of high concentrate detergent are used, inappropriate
analysis results might be received.
Dirui recommends the use of alternating acidic and alkaline high
concentrate detergent, for example, use acidic high concentrate detergent
after power on, then use alkaline high concentrate detergent next time
after power on.

7.2 Daily maintenance


7.2.1 Check injection pump
The purpose of checking the injection pump is check whether leakage exists.

1 Make sure that Power of analysis part has been switched off.

58
2 The injection pump can be seen in figure.

3 Observe whether the injection pump is leaking.

If so, check the leakage causes, and check the pipeline and connector timely.

7.2.2 Check/rinse sample & reagent probe


1 In online status, click “Instrument resetting” in “Maintenance”, and instrument
executes resetting.

2 When cleaning samle reagent probe, carefully observe whether the outflow of
sample probe internal wall is continuous, whether the direction of flow is
consistent with the sample reagent probe and the outflow of external wall is
continuous, and whether water volume is normal.
If not normal, clean sample reagent probe(refer to 7.3.1)
If still not normal, check the corresponding liquid line channel; check whether
water supply of water tank and water pressure is normal.

7.2.3 Rinsing stirring rod


1 In online status, click “Instrument resetting” in “Maintenance”, and instrument
executes resetting.

2 When cleaning, carefully observe whether the stirring rod works normally, If not
normal, check the corresponding liquid line channel, check whether water supply
of water tank and water pressure is normal.

7.2.4 Rinse rinsing mechanism


1 In online status, click “Rinse reaction cuvette” in “Maintenance”, and instrument
executes reaction cuvette rinsing.

59
2 When rinsing, carefully observe rinsing probe working and whether probe infusing
is normal and assimilating is completely.
If infusing abnormal, check pressure value of water infusing pressure gauge
If assimilating abnormal, check pressure value of assimilating vacuum
7.2.5 Check waste connection and discharging

Biological contamination danger:


1 Check whether liquid waste disposal system is normal every day, and maintain
During waste water operation, please put on gloves, put on work
waste liquid pipe is not bent and discharges smoothly and high and low
clothes and if necessary, wear protective glasses.
concentration waste liquid are disposed properly (refer to local standards of
dispose waste liquid).

7.2.6 Rinse instrument surface


Check whether liquid waste disposal system is normal every day, and
1
maintain waste liquid pipe is not bent and discharges smoothly and high
and low concentration waste liquid are disposed properly (refer to local
standards of dispose waste liquid).

7.2.7 Check printer and printing paper


1 Check printer power supply indicator, preparation indicator and printing paper
daily.

7.3 Weekly maintenance


7.3.1 Rinse sample reagent probe

Warning:
Please be careful to avoid hands from being scratched
Biological contamination danger:

In operation, please put on gloves, work cloths, and put on protective glasses
for the best.

Do not dispose the gauze used to clean sample probe at your own will, please
follow the relevant provisions for proper disposal.

1 Make sure the analysis part power supply is switched off.

60
2 Lift the rotating arms of sample reagent probe by hands to the top position, and
rotate it to the top of sample reagent storehouse for convenient operation.

3 Caution:
When cleaning, do not touch directly the probe surface to
prevent probe scratch; avoid too much hand force to prevent
deformation of the sample probe.
Note:
Acidic and alkaline detergent can be used alternatively, for
instance, acidic detergent is used at previous time
maintenance, use alkaline detergent at this time maintenance.
Wipe the external walls of sample reagent probe lightly with cotton
stick moisturized with alcohol, especially the point of probe, until no
impurities left at all.

4 Wipe sample reagent probe with the gauze dipped with deionized water.
5 After cleaning, lift the rotating arms of sample reagent probe to the top position,
and rotate the rotating arm of sample reagent probe to locate the sample reagent
probe above the rinsing bath of sample reagent probe.
Caution:
After cleaning the surface of a sample reagent probe, please
make sure sample reagent probe must be rotated to the top of
sample reagent probe rinsing bath.

6 Switch on the power of analysis part and wait 30 seconds, enter the
"maintenance - routine maintenance" column to implement “instrument
resetting", the system will automatically reset the sample reagent probe and rinse
them with deionized water.

61
7.3.2 Rinse stirring rod

Biological contamination danger:


In operation, please put on gloves, work cloths, and put on protective
glasses for the best.
Do not dispose the gauze used to clean stirring rod at your own will,
please follow the relevant provisions for proper disposal.
1 Make sure the analysis part power supply is switched off.

2 Lift the stirring rod by hands to the top position, and rotate its rotating arm to a
position for convenient operation.
Caution:
When cleaning, do not touch the stirring rod surface directly to
prevent scratch; avoid too much hand force to prevent deformation
of the sample probe.
Note:
Acidic and alkaline detergent can be used alternatively, for instance,
acidic detergent is used at previous time maintenance, use alkaline
detergent at this time maintenance.
Wipe the surface of stirring rod lightly with cotton stick moisturized with
alcohol, especially the point of probe, until no impurities left at all.

4 Wipe stirring rod with the gauze dipped with deionized water
5 After cleaning, lift the rotating arm of stirring rod to the top position, and rotate
the rotating arm of stirring rod to locate the stirring rod to the top of the rinsing
bath.
6 Switch on the power of analysis part and wait 30 seconds, enter the "maintenance
- routine maintenance" column to implement “instrument resetting", the system
will automatically reset the sample reagent probe and rinse them with deionized
water.

7.3.3 Sample/ barcode window rinsing

62
Caution:
Do not gaze scanning laser light, or it may cause eyes injury

1 Make sure the analysis part power is switched off.


2 Remove the reagent sample disk cover, and then remove the sample reagent disk.
3 Wipe the scanning glass window lightly with gauze dipped with deionized water.
4 Remount the sample reagent disk and cover them.
5 Switch on the analysis part and wait 30 seconds, the system will reset
automatically.

7.3.4 Rinse reaction cuvette


The contamination of sample reagent probe, stirring rod and reaction cuvette will affect the accuracy
of measurement. The reaction cuvette requires intensive rinsing.

1 Place 70 ml detergent (1mol of hydrochloric acid or 0.5% NaOH solution, use


the two types of solution alternatively, one week one solution) at the 45th
detergent position of reagent disk.

2 Click “Maintenance” functional key to enter “System maintenance” menu,


and select “Rinse reaction cuvette” to execute.

7.4 Monthly maintenance


7.4.1 Rinse sample, reagent probe rinsing bath

Warning:
Please be careful to avoid being scratched by probe.
Biological contamination danger:
In operation, please put on gloves, work cloths, and put on
protective glasses for the best.
Do not dispose the gauze used to clean sample probe rinsing bath
at your own will, please follow the relevant provisions for proper
disposal.

1 Make sure the analysis part power is switched off.

2 Lift the rotating arm of sample reagent probe by hands to the its top position, and
rotate its rotating arm to keep reagent sample probe away from rinsing bath for
convenient operation.

63
3 Clean the inside and appearance of sample reagent probe rinsing bath with clean
cotton stick.
4 After cleaning, lift the rotating arm of sample reagent probe to the top position,
and rotate the rotating arm of sample reagent probe to locate the probe to the top
of the rinsing bath.

Caution:
After the work of sample reagent probe surface rinsing,
please make sure to rotate reagent sample probe to the top of
reagent sample probe rinsing bath.

5 Switch on the power of analysis part and wait 30 seconds, enter the "maintenance -
routine maintenance" column to implement “instrument resetting", the system will
automatically reset the sample reagent probe.

7.4.2 Rinse stirring rod rinsing bath

Warning:
Please be careful to avoid being scratched.
Biological contamination danger:
In operation, please put on gloves, work cloths, and put on
protective glasses for the best.
Do not dispose the gauze used to clean stirring rod at your own
will, please follow the relevant provisions for proper disposal.

1 Make sure the analysis part power is switched off.


2 Lift the stirring arm to the top position by hand to one side of rinsing bath.
3 Wipe stirring rod with clean soft gauze.

7.5 Every 6 months maintenance


7.5.1 Check light source lamp
Lamp light source of optical system will gradually be aged in use, and will cause an increase in noise
during measurements. If the cuvette blank and light source intensity attenuation is out of range or the
working time of light source lamp accumulates over 2000 hours, the light source lamp should be
checked.

64
Caution:

Please use consumables recommended by DIRUI company, using other


consumables may cause system performance degradation.

Do not touch the light source lamp shell surface and lens in front of
the light source lamp by hand, because it may change the characteristics
of the light source. If you accidentally make noodle stained with filth,
absorbent cotton dipped by absolute alcohol can be used to clean it.

1 Turn off the system main power, so that the light source box and light source
lamp will be cooled for at least 15 minutes.

Warning:

High-temperature light source lamp and light box will cause


burn. Operation is carried out only after the light source and light
source lamp are cooled.

2 Loosen the fixing screws of rinsing mechanism; remove the rinsing mechanism
of reaction cuvette. Loosen the setscrews of reaction disk and remove the
reaction disk. Place the reaction cuvette at dry and clean position. Loosen the
two fixing wire connecting poles of halogen and remove down-lead.

65
3 Loosen the two screws fixing light source seat to remove halogen lamp.

4 Mount a new halogen lamp according to the above opposite steps; pay attention to
tighten the screws. The cooling rubber hose in the lamp room can not be twisted and
down-lead can not be loosed or cocked.

5 Remount the reaction disk, the reaction cuvette and rinsing mechanism; switch on
the power supply of analysis part. After standby mode, single-click “Next” in
“System maintenance” window; infuse purified water into reaction groove. After
instrument standby mode, execute light quantity check function. Check the back of
halogen lamp if the light quantity conforms to the requirement to start test.

7.6 Every year maintenance


7.6.1 Check water of cooling system
7.7 Irregular check
7.7.1 Rinse sample reagent probe
If the water flow is not normal when rinsing sample reagent probe, sample reagent probe probe may
have been blocked and cleaning is needed to reagent sample probe.

Warning:
Please be careful to avoid being scratched.

Biological contamination danger:


In operation, please put on gloves, work cloths, and put on
protective glasses for the best.

66
1 Make sure the analysis part power is switched off.

2 Remove sample disk cover and then sample reagent disk

3 Lift the rotating arm of sample reagent probe by hands to its top position, and
rotate its rotating arm to keep sample reagent probe away from rinsing bath for
convenient operation.
4 Hold shell claw of probe rotating arm with fingers and lift to remove.

5
6 Loosen pipeline interface

7 warning:
Carefully place dismounted sample reagent probe and prevent it
scratching human body and sample reagent probe damage.
Note:
Take out sample reagent probe from the rotating arm and be
careful to operate to avoid the damage of probe point caused by
touching rotating arm.

67
Note:
Sample reagent probe is precisely processed to ensure the sample adding
precision. If the probe point is damaged or bent, checking sample reagent
probe is a must, or no guarantee can be made for test precision.

7.7.2 Clean sample reagent probe

Warning:
Please be careful to avoid being scratched by probe.
Biological contamination danger:
In operation, please put on gloves, work cloths, and put on protective glasses
for the best.
Do not dispose the gauze used to clean sample reagent probe at your own
will, please follow the relevant provisions for proper disposal.

1 Put a stainless steel wire through the sample reagent probe point to clean the
impurity in the probe.

Caution:
Sample reagent probe is precisely processed to ensure the sample adding
precision. If the probe point is damaged or bent, checking reagent sample
probe is a must, or no guarantee can be made for test precision.

7.7.3 Install sample reagent probe

Warning:
Please be careful to avoid being scratched by probe.

Biological contamination danger:


In operation, please put on gloves, work cloths, and put on protective
glasses for the best

Dismounting sequence is opposite to that of sample reagent probe.

68
Caution:
Sample reagent probe is precisely processed to ensure the sample adding
precision. If the probe point is damaged or bent, checking sample reagent
probe is a must, or no guarantee can be made for test precision.

7.7.4 Rinse sample reagent probe

When it is found that the water level of rinsing bath is too high when rinsing sample reagent probe
because of no discharging available, which may be caused by the blocked leaking hole. Cleaning sample
reagent rinsing bath is necessary.

Warning:

Please be careful to avoid being scratched by probe.

Biological contamination danger:

In operation, please put on gloves, work cloths, and put on protective glasses
for the best

1 Make sure the analysis part power is switched off.

2 Lift the rotating arm of sample reagent probe by hands to its top position, and
rotate its rotating arm to keep sample reagent probe away from rinsing bath
for convenient operation.

3 Infuse about 1ml alkaline detergent of 0.5% (V / V) sodium hypochlorite or 84


disinfectant into rinsing bath for 10 minutes.

4 Switch on the power supply of analysis part

5 Lift the rotating arm of sample reagent probe by hands to its top position, and
rotate its rotating arm to keep sample reagent probe above the rinsing bath of
sample reagent probe.

Caution:
Please rotate the sample reagent probe to the top of sample
reagent probe rinsing bath after clean rinsing bath of sample
reagent probe.

6 Select and execute “Instrument resetting” after enter “Maintenance-routine


maintenance”, and the system will reset sample probe reagent probe and
rinsing bath will be rinsed with deionized water automatically. Observe the
outflow of reagent sample probe rinsing bath.

69
7.7.5 Rinse stirring rod
If the stirring rod is damaged, please check stirring rod in accordance with following steps strictly.

Warning:

Please be careful to avoid being scratched by probe.

Any touch is forbidden except at the knurling of it only by hand when


checking, and prevent any scratch on the flat part of stirring part.
Biological contamination danger:
In operation, please put on gloves, work cloths, and put on protective glasses
for the best
Please deal with removed stirring rod properly.
Caution:
Please use consumables recommended by DIRUI company, using other
consumables may cause system performance degradation.

1 Make sure the analysis part power is switched off.


2 Prepare a new stirring rod and wipe the flat part of it with gauze or cotton
stick dipped with cleaning liquid, and then wipe it with gauze dipped with
deionized water.
3 Lift the rotating arm of stirring rod by hands to its top position, and rotate its
rotating arm for convenient operation.
4
Caution:
When pulling out stirring rod, make sure the direction of force is
vertical to that of axis of rotating arm. Lateral force may damage
the axis or stirring rod.
Remove stirring rod after loosen the two fixing screws.

5 Prepare a new stirring rod, and wipe the front of the stirring rod with gauze
dipped with 2% -antibacterial detergent.

70
6 When mounting new stirring rod, insert stirring rod till the bottom of motor
axis and tighten it with M2 screw.

Caution:
When inserting stirring rod, make sure the direction of force is
vertical to that of axis of rotating arm. Lateral force may damage the
axis or stirring rod.
Pushing the stirring rod completely

7 After stirring rod check, visually check whether stirring rod and its rotating
arm are vertical with each other.
If not vertical, return to step 5 and remount the stirring rod.
If vertical, continue to next.
8 Lift the rotating arm of stirring rod by hands to its top position, and rotate its
rotating arm to the top of its rinsing bath.

Caution:
Please make sure to rotate stirring rod to its rinsing bath top after
mount it.
9 Switch on the power of analysis part and wait 30 seconds, enter the
"maintenance - routine maintenance" column to implement “instrument
resetting", the system will automatically reset the sample reagent probe and
rinse it with deionized water. Observe the outflow of reagent sample probe.

7.8.6 Check reaction cuvette

Warning:
Please be careful to avoid being scratched by sample reagent probe.
Place each probe and pole into proper position for convenience.
Biological contamination danger:
In operation, please put on gloves, work cloths, and put on protective glasses
for the best
Please deal with removed reaction cuvette properly which is broken.
Caution:
Please use consumables recommended by DIRUI company, using other
consumables may cause system performance degradation.

1 Make sure the analysis part power is switched off.

71
2

Put on protective gloves to remove fixing screws.


3 Rotate reaction disk by hand and remove the reaction cuvette sequently. Take
out reaction cuvette while rotating it.

4 Rinse the new reaction cuvette dipped in with water; rinse inside and outside
of reaction cuvette and no scratch is allowed.
5 Rotate reaction disk by hands, and mount new reaction cuvette on reaction
disk and check the six sets reaction cuvette simultaneously.

6 Mount reaction disk with the opposite steps and make sure the fixing screw of
reaction disk is tight.
7 Switch on the power of analysis part

72
Select and execute “cuvette blank test” after click “System maintenance”, and
observe execution result and reaction status.

73
74
Chapter 8 Analysis Method

CS-T240 adopts three analysis methods as follows:

End point analysis method

Two-points analysis method

Rate analysis method

8.1 Analysis principle

The analysis principle of auto-chemistry analyzer is based on the Beer-Lambert law that material
absorpts light selectively.

The main principle is: When monochromatic light with specific wavelength passes through the cuvette
with sample, the monochromatic light absorbency and sample liquid concentration vary in positivw
proportion as the distance of the light possing through the liquid.
I0
A = lg (1/T )= lg ( )= ε b c
It
A -Absorbency of the light when passes through liquid

T -Transmitted intensity and incident intensity ratio: transmittance It/I0;

I0 - Incident intensity

It - Transmitted intensity

ε - Molar absorption coefficient of solution(ml×mmol-1×cm-1);

c - Mol concentration of the solution(mmol/ml);

b - Solution layer thickness(cm);

Solution layer thickness (b): Optical path, which is fixed by instrument. Molar absorption
coefficient (ε) is the correlation coefficient of the wavelength, solution and solution temperature.
Linear relationship is displayed between solution thickness and absorbency when in stable temperature
and single wavelength(ε value is given on the reagent bottle by factory)

If the sample liquid adequate distribution, interaction between liquid and incidence
monochromatic light only happens during absorbing process. No fluorescence, disperse and
photochemical appear. No interaction between substances in the solution while absorbing process. The
absorbency possess conducts nature, and this condition conforms to the Beer-Lambert law

75
8.2 Types of analysis methods

Method Photometry point Cell Blank Absorbance Formula Remark

1-point
L– 0– 0– 0 B1 + B 2 + B 3 AL + AL −1
End point
analysis 1<L≤49 3 2
method

2-points L– M– 0- 0 B1 + B 2 + B 3 ( AM + AM −1 ) − k ( AL + AL −1 )
analysis
1<L<M≤49 3 2
method

Time
2-points AM + AM −1 AL + AL −1 (minutes)
B1 + B 2 + B 3 −
Rate analysis L– M– 0– 0 3
2 2 between
method t metering
1<L<M≤49 points L,M

L– M – 0 - 0
B1 + B 2 + B 3
Rate method A 1<L<M≤49 △A(M-L)
3
L +2<M

Fist half

L– 0 – 0 – 0 B1 + B 2 + B 3 AL + AL −1
3 2
1 < M < N≤L < P <
1-point rate Q≤49
double items
Second half
analysis
method M – N – P – Q
B1 + B 2 + B 3
1 < M < N≤L < P < △(AQ- P)-k△(AN -M)
3
Q≤49

M+2<N ,P+2<Q

76
Fist half
B1 + B 2 + B 3 AL + AL −1
L– 0 – 0 – 0
3 2
3-points 1<L≤M<N≤49
double items
Second half
B1 + B 2 + B 3 ( AN + AN −1 ) − k ( AM + AM −1 )
M – N – 0 – 0
3 2
1<L≤M<N≤49

Fist half

L– M – 0 - 0 B1 + B 2 + B 3
△A(M-L)
3≤L<M<N<P≤49 3
Rate B double
items L +2<M
analysis
When it is different from the
method Assay Second half
first half part wavelength of
(mode 1 ) the project △ A (P-N)
N – P – 0 – 0 B1 + B 2 + B 3 When it is the same with the Two conditions
3≤L<M<N<P≤49 3 second part of wavelength of
the project: △A (P-N)–k
N+2<P △A(M-L)

Fist half part of


the project

L– M – 0 – 0 B1 + B 2 + B 3
△A(M-L)
3≤L<M<N<P<Q< 3
R≤49
Rate B double
items L +2<M
analysis
method Assay Second half part of
(mode 2 ) the project

N – P –Q – R B1 + B 2 + B 3
△A(R-Q)–k△A(P-N)
3≤L<M<N<P<Q< 3
R≤49

N+2<P ,Q+2<R

77
L,m,n,p,q,r : Photometric points

Rn :Volume of the reagent, n=1 to 4


B1、B 2、B 3 :Through cell blank

(B1,B2,B3 )/3 :Average value of three times passing through cell blanks

Ax :Absorbance at photometric point x

△A(m-L) :Change in absorbance per minute between photometric points L


and M

k :Liquid volume correction factor


a
S + ∑ Rj
j =1
k= b
S + ∑ Ri
i =1

S :Sample volume
Rj 、Ri: a is the volumn of reagents without correction

b is the volumn of reagents with correction

Note 1: After adding reagent 2, the 5th metering point does not immediately stir. But after the reaction
disk rotates one circle around plus 2 reaction cuvettes and then pause, it need to rotate another 22
reaction cuvettes, after which will pause and then stir.
Note 2: During photometry , the reaction liquid should be more than or equal to 150μL, and less than
or equal to 450μL.
Note 3: Be sure to enter "0(zero)" when there will be no photomitric point.

Endpoint analysis method

Endpoint analysis method is reaction takes a period of time to reach


equilibrium, due to reaction balance constants are big, all substrates (tested
substance) are transformed into product, and no increase (decrease) of
reaction solution absorbance will occur, and the degree of absorbance increase
(decrease) and the concentration of tested substance is directly proportional.
This method is called “endpoint analysis method” or balance analysis method
to be more accurately, which is the ideal analysis method mode. .

The endpoint analysis method is not sensitive to small changes of conditions


(such as enzyme amount, pH, temperature, etc.) as long as this change does
not affect the balance in a certain period of time.

figure 8-1 endpoint assay reaction curve

78
bs
A

Cell blank

Time

Example 1:TBIL-Total bilirubin reagent kit (Surfactant / diazonium salt method)

wavelength Main 550nm,sub 660nm Absorbance 0~2A;


range
test mode Endpoint analysis method Optical path 10mm
reagent 1:250uL sample 10uL
Single reagent A:B=50:1 Mixing
reagent storage
temperature 37℃ incubation 10min
reaction 10min “0” 550nm,blank pipe
sensitivity 5mA equals to 1umol/L Linearity 300umol/L(18mg/dL)

79
range
calibrator 89.6umol/L,0.425A Unit 1umol/L=0.0585mg/dL
conversion
Reference Adult;5.1~19umol/L(0.3~1.1mg/dL)
value Newly born:20~200umol/L(1.2~12mg/dL)

Example 2、UA(uric acid)-Uric acid liquid reagent kit

wavelength Main 520nm ( 500,550 Absorbance 0~2A


optional) range
Test mode Endpoint analysis method Optical path 10mm
Reagent 1:200uL;2:50uL sample 4uL
Single 4 parts of reagent 1 part of Mixing storage 2~8℃ 5 days stablity
reagent reagent 2
temperature 37℃(30℃, 25℃) incubation 5min(6min , 8min )
reaction 5min adjust “0” 520nm,blank pipe
sensitivity 0.42mA equals to1umol/L Linearity range 1.5mmol/L(25mg/dL)
calibration 0.72mmol/L,0.302A Unit 1mmol/L=16.8mg/dL
conversion
Reference child:0.12~0.33mmol/L(2.0~5.5mg/dL) ;
value Male:0.21~0.43mmol/L(3.5~7.2mg/dL) ;
female:0.15~0.36mmol/L(2.5~6.0mg/dL);
urine :14.9~44.6mmol/L(250~750mg/dL);

8.4 Two Points analysis method

Two points analysis method (fixed time assay) is also named as first class
dynamics analysis method, which means during a certain period time of reaction,
reaction speed is in direct proportion to the simple power of substrate
concentration in specified time, namely v=k[S]. Due to the reduction of
substrate, the whole reaction speed is decreasing gradually, which shows the
increase (decrease) of absorbance. Because it takes a very long time to reach
balance, it can be monitored at any time theoretically, but due to the
complexity of serum ingredient, it must take a certain period of time to enter
into stable reaction phase.
Absorbance

Figure 8-2 2-point assay reaction curve

Reaction limit level


Absorbance

Cell blank

Time
Time

80
Two points end point analysis two points rate analysis

8.5 Rate Analysis

Rate analysis, also known as zero-class dynamics analysis, refers to the


reaction rate is directly proportional to the zero power of substrate
concentration, which has nothing to do with the substrate concentration. Hence,
the reactants can generate a certain product at constant speed throughout the
reaction process, resulting in even decrease or increase of absorbance of
measured solution at a wavelength, and the decrease or increase speed (△ A
/ min) is directly proportional to the activity or concentration of the tested
substance (catalytic material). Dynamics assay is also called as the
continuous monitoring assay, mainly used for the measurement of enzyme
activity.

In fact, because substrate concentration is not high enough, with the reaction
proceeds, the reaction is no longer zero class when substrate is consumed to
a certain extent, Therefore, zero-class dynamics analysisn is targeted at a
certain period of time; Because reaction time to reach balance is very long,
it can be monitored at any time theoretically, but because of the complexity
of serum ingredient and much reaction, therefore, it takes a certain period
of time to enter in stable reaction phase. So all reagent manufactures have
strict requirements to thesse two time periods

Dynamics analysis is based on the changes between specified photometric points


to obtain the absorbance concentration or activity value.

Metering point in accordance with the input form, dynamics method can be
divided into single-band and dual-band dynamics analysis.

Figure 8-3 Rate assay reaction curve


Absorbance

Cell blank

Time

81
Example 3:ALT/GPT - Alanine aminotransferase (IFCC)

wavelength Main 340nm Absorbance 0~2A


range
Test mode Rate assay Optical path10mm
Reagent 1:240uL;2:60uL sample 15uL
Single reagent 4 reagent 1and 1reagent 2 Mixing storage
2~8℃ 5days stability
temperature 37℃ incubation 5min
reaction 60s delay,measure 60-120s “0” 340nm,blank pipe
sensitivity 0.30mA/min equals to 1.0U/L
Linearity range
450U/L(7.5ukat/L)
calibration Unit conversion
1U/L =
16.67×10-3ukat/L
Reference 37℃:Male:<40U/L(<0.67ukat/L);Female:<31U/L(<0.52ukat/L)
value

Calculating method:

A/min * TV *1000

ALT(U/L)=
6.22 * SV * P

TV=The total reaction volume (mL)

SV=sample volume(mL)

P=optical path of colorimetric cup(cm)

6.22=NADH position mmol extinction coefficient at 340nm (334nm:6.18,365nm:


3.40)

82
8.6 Principle of electrolyte measurement

8.6.1 Principle

Internal standard solution is firstly added into the instrument reaction


cuvettes, and assimilates it and discharges it into the Na, K, and Cl electrode
solution line through the SIP injection pump to measure its electrode potential
which is relative to reference electrode potential. Then needle draws the
samples and then sample is diluted then added to the reaction cuvette. To test
liquid electric potential mixed with electric potential, the calculation of
the concentration comes out.

8.6.2 Principle of generating electrode potential

Electrode potential is obtained by Nernst's formula.

RT
E = E 0 + 2.303 × × l og(ai )
nF ………………………………………………………(1)
ai = f × Ci ……………………………………………………………………………(2)

E0 : The standard potential of the measured system

R: gas constant (8.314510 J × mol-1 × K-1)

83
T: absolute temperature (t ℃ +273.15) (K)

F: Faraday constant (9.6485309 × 104 C × mol-1)


ai : Ion (i) activity

f: activity coefficient

Ci: concentration

n: a given ion (i) the charge number (Cation is positive, anion is


negative)

8.6.3 Test method

Working curve preparation, the internal standard solution concentration


measurement, concentration calculation, and result modification are explained
as follow.
8.6.3.1 Working curve preparation

Measure low concentration slope of liquid (S1) and high concentration slope
liquid (S2), and determine slope value (sensitivity) of K, Na, Cl the
electrode.

E ( H ) − E ( L)
SL =
C(H )
log
C ( L) …………………………………………………… (3)

SL: slope value (slope)

E (H): the potential of high concentration slope solution

E (L): the potential of low concentration slope solution

C (H): high concentration of the concentration slope solution (input value)

C (L): low concentration of the concentration slope solution (input value)

8.6.3.2 The measurement of internal liquid concentration

E ( IS ) − E ( L )
C ( IS ) = C ( L) × 10 SL
…………………………………………… (4)

84
C (IS): the concentration of internal standard solution

E (IS): the potential of internal standard solution

8.6.3.3 concentration calculation

The calculation of routine sample, STAT sample, and concentration of quality


control liquid is based on the concentration of internal standard solution.
Internal standard solution is different with the different sample.

E ( S ) − E ( IS )
C ( S ) = C ( IS ) × 10 SL
………………………………………… (5)

C(S) : Sample concentration

E(S): Sample potential


8.6.3.4 result modification

Test calibrator (calibrator S3)of serum category after calibration to


calculate its concentration, and the difference between the tested
concentration and input value is used as compensation value to increase or
decrease sample quantitative value.

C (VALUE ) = C (C ) − C ( X ) ………………………………………… (6)

C (VALUE): compensation value (compensation value)

C (C): Concentration input value of the serum calibrator

C (X): Concentration tested value of the serum calibrator

C ' ( S ) = IF {C ( S ) + C (VALUE )}
.. ... ... ... ... ... ... ... ... ... ... ..
. ... ... (7)

C '(S): modified sample concentration

IF: Instrument constant (usually 1.0)


8.6.3.5 Standard specification of electrolyte

Item specification

Sample volume 15ul

85
Diluent volume 600ul
Processing
100samples/h(only measuring electrolyte)
ability
Na + 20 ~ 200mmol / L (when only serum )
10 ~ 400mmol / L (when measuring urine)
K + 1.0 ~ 15.0mmol / L (when only serum)
Measuring
1 ~ 200mmol / L (when measuring urine)
range
Cl-20 ~ 200mmol / L (when only serum)
10 ~ 400mmol / L (when measuring urine)

Internal standard solution 600ul/sample


Reagent
(only for continuous determination of electrolyte )
consumption
Diluent 600ul /sample
volume
Reference Electrode Solution 130 ul / sample

Note:

Internal standard solution will be added one time in order to activate the
electrode if there is no electrolyte analysis for more than 10 minutes.

86
Chapter 9 Malfunction Analysis

9.1 Stirring mechanism malfunction analysis

Alarm Detailed
Description Solution
Code description

¾ In the CS-T240 software, enter "system maintenance"


interface after getting on-line, implement "mechanical
movement check", and observe the stirring rod
running status

Malfunction 1:stirring mechanism doesn’t move

Solution:

1, Check stirring mechanism up-down movements,


mechanical repair is required if resistance is big.

2, check whether both ends of connector of the motor are


connected well.

3, check whether the conductivity of motor lead wire is


good.
R1stirring
mechanism 4, check the motor drive module of circuit board is
stirring working normally
fails to reach
1-1 mechanism
the top of
abnormal Malfunction 2:stirring mechanism can reach the top, but
rinsing bath
side. can not check the zero position.

solution:Manually make stirring mechanism repeatedly rise


to peak, DC files transferred to the multimeter, plug the
negative point of the first 6-core P02, P02 positive pole
core plugs 5

1、Multimeter readings between the positive changes in 5V


and 0

(1) Check whether the conductivity from adapter to reaction


disk circuit board is good and both ends of connector are
connected well.

(2) Check input part circuit of reaction disk circuit board


light sensor signal.

2、No change on multimeter reading

87
(1) Check conductors

Check whether the P02 plug 4,5,6 core well-connected, the


connection is connected at both ends of good

(2) Check the coupler signal

Check voltage between P02 plug 4,6 feet, if the voltage is


not 5v, check the connection plug is connected good. If the
voltage is 5v, check the J02 socket 5 feet of potential,
rising to peak when the potential was high or low potential.
If the potential is not normal, check the coupler

Malfunction 3:Stirring mechanism cannot reach the zero


position.

solution:Mechanical repair

R1stirring
Stirring mechanism
1-2 mechanism fails to reach ¾ R1 stirring mechanism fails to reach the top,the
abnormal the top of solution is the same as 1-1
reaction side.

¾ In the CS-T240 software, enter into the "system


maintenance" interface after on-line, implement
"mechanical movement check", and observe the
stirring rod running status
Malfunction 1:stirring mechanism stops
solution:

1, Check stirring mechanism up-down movements,


mechanical repair is required if resistance is big.
R1tirring 2, check whether both ends of connector of the motor are
Stirring mechanism connected well.
1-3 mechanism can leave the
abnormal top when it 3, check whether the conductivity of motor lead wire is
descents good.

4, check the motor drive module of circuit board is


working normally

Malfunction 2:stirring mechanism can reach the top but not


leave

Solution :the same to 1-1 Malfunction 2

R1stirring
Stirring ¾ In the CS-T240 software, enter into the "system
mechanism
1-4 mechanism maintenance" interface after on-line, implement
fails to reach
abnormal "mechanical movement check", and observe the
the rinsing
stirring rod running status
bath when it

88
moves to Malfunction 1::stirring mechanism doesn’t move
rinsing bath.
Solution:

1, Check stirring mechanism up-down movements,


mechanical repair is required if resistance is big.

2, check whether both ends of connector of the motor are


connected well.

3, check whether the conductivity of motor lead wire is


good.

4, check the motor drive module of circuit board is


working normally

5、Check whether the it is at top position, check whether


up-down zero light sensor works normally at top position.

Malfunction 2: stirring mechanism can sway, but can not


reach rinsing bath.

Solution:

1、check whether the installation of left and right limit light


sensors is correct.

2、When the instrument is turned on, manualy sway the


stirring mechanism to observe the right limit coupler,
transferr the multimeter to DC, negative points P02 core
plug No.9, then plug positive P02 to the first pole core No.8.

(1)Multimeter readings changes between 5V and 0, the light


sensor, lead and adaptor are normal.

1) Check conductors

Check whether the P02 plug 7,8,9 core well-connected, the


connection is connected at both ends of good

2) Check the reaction plate coupler circuit board part of the


circuit signal input

(2)No change multimeter reading

1) Check conductors

Check whether the P02 plug 7,8,9 core well-connected,


the connection is connected at both ends of good

2) Check the coupler signal

Check voltage between P02 plug 7,9 feet, if the voltage is


not 5v, check the connection plug is connected good. If
the voltage is 5v, check the J02 socket 8-foot potential, up
to the peak when the potential was high or low potential.

89
If the potential is not normal, check the coupler.

¾ In CS-T240 software, enter into the "system


maintenance" interface after on-line, implement
"mechanical movement check", and observe the
stirring rod running status
Malfunction 1:stirring mechanism doesn’t move

Solution:

1, Check stirring mechanism up-down movements,


mechanical repair is required if resistance is big.

2, check whether both ends of connector of the motor are


connected well.

3, check whether the conductivity of motor lead wire is


good.

4, check the motor drive module of circuit board is


working normally

5、Check whether the it is at top position, check whether


up-down zero light sensor works normally at top position.
R1stirring
mechanism Malfunction 2: Stirring mechanism can realize its sway
Stirring fails to reach movement, but can not reach the reaction cuvette.
1-5 mechanism the reaction
abnormal cup when it Solution:
moves to
reaction cup. 1、check whether the installation of left and right limit light
sensors is correct.

2、When the instrument is turned on, manually swing the


stirring mechanism to observe the left limit coupler, transfer
the multimeter to DC, negative points, 12 of the plug core
P02, P02 plug is the 11th pole core. .

(1) multimeter reading in is between 5V and 0 change,


indicating coupler, lead normal
1) Check conductors
Check whether the P02 plug 10,11,12 core well-connected, the
connection is connected at both ends of good
2) Check the reaction plate coupler circuit board part of the
circuit signal input
(2) multimeter reading of no change
1) Check conductors
Check whether the P02 plug 10,11,12 core well-connected, the
connection is connected at both ends of good
2) Check the coupler signal
Check voltage between P02 pin plugs 10,12, if the voltage is
not 5v, check the connection plug is connected good. If the
voltage is 5v, check the J02 socket 11 feet of potential, rising to
peak when the potential was high or low potential. If the

90
potential is not normal, check the coupler.

When
resetting,
Stirring Stirring
1-6 mechanism mechanism The solution is the same as 1-4
abnormal failed to
reach rinsing
bath.

¾ Enter into system maintenance window and execute


“Mechanical movement check”. Observe the running
When status of stirring rod.
resetting, Malfunction 1:stirring mechanism doesn’t move
Stirring Stirring
1-7 mechanism mechanism The solution is the same as 1-4
abnormal failed to
leave rinsing Malfunction 2: Stirring mechanism can realize its sway
bath. movement to rinsing bath, but can not leave it.

The solution is the same as 1-4

R1 Stirring
Stirring mechanism
1-8 mechanism ¾ If stirring mechanism failed to reach the top when
failed to
abnormal rotating,the solution is the same as 1-1
reach the top
when

91
rotating.

9.2 Rinsing mechanism of reaction cup

Alarm Detailed
Description Solution
Code description

¾ Enter into system maintenance window and execute


“Mechanical movement check”. Observe the
running status of stirring rod.
Malfunction 1:Rinsing mechanism doesn’t move

Solution:

1, Check rinsing mechanism sway movements,


mechanical repair is required if resistance is big.

2, check whether both ends of connector of the motor are


connected well.

3, check whether the conductivity of motor lead wire is


good.

4, check the motor drive module of circuit board is


working normally
Rinsing Malfunction 2:Rinsing mechanism can reach the top,
Rinsing
mechanism of but can not check the zero position.
mechanism of
3-1 reaction cup
reaction cup
fails to reach the solution:Manually make rinsing mechanism repeatedly
abnormal
top rise to peak, transferred the multimeter To DC, plug the
negative point of the first three core P02, P02 plugs are 2
pole core.

1、Multimeter readings between the positive changes in


5V and 0, indicating coupler, lead normal

1) Check conductorsCheck 1,2,3 P02 core plug is


connected well and good connections at both ends is
connected

2) Check the reaction plate coupler circuit board part of


the circuit signal input

2、 No change on multimeter reading

1) Check conductors
Check 1,2,3 P02 core plug is connected well and good
connections at both ends is connected

92
2) Check the coupler signal
Check voltage between P02 plug 1,3 feet, if the voltage
is not 5v, check the connection plug is connected good. If
the voltage is 5v, check the J02 socket 2 feet of potential,
rising to peak when the potential was high, or low
potential. If the potential is not normal, check the coupler

Malfunction 3:Rinsing mechanism can not reach the zero


position.

solution:Mechanical repair

¾ Enter into system maintenance window and execute


“Mechanical movement check”. Observe the
running status of stirring rod.
Malfunction 1:stirring mechanism doesn’t move

Solution:

1, Check stirring mechanism up-down movements,


mechanical repair is required if resistance is big.
Rinsing
mechanism of 2, check whether both ends of connector of the motor are
Rinsing reaction cup connected well.
3-2
mechanism fails to leave the
top when 3, check whether the conductivity of motor lead wire is
abnormal good.
descending.
4, check the motor drive module of circuit board is
working normally

Malfunction 2:Rinsing mechanism of reaction cup


cannot reach the top

solution:the same to that of malfunction 2 in 3-1

93
9.3 Reaction disk malfunction analysis

Alarm Detailed
Description Solution
Code description

Malfunction:The quantity counted by reaction cup light


sensor does not conform to real quantity of cup rotated.

solution:Check whether the signal status of counting light


Reaction disk fails sensor is normal.
Reaction
to rotate to the
4-1 disk
designated
(1)check whether the conductivity from counting light
abnormal sensor 1 to lead wire is good.
position.
(2)check whether the counting light sensor 1 is ok.

(3)Check input part circuit of reaction disk circuit board


light sensor signal.

Reaction disk fails Malfunction:Reaction disk fails to stop at the position


Reaction
to stop at the matching with light sensor.
4-2 disk
designated
abnormal
position solution:the same as 4-1

Malfunction:Reaction disk fails to stop at the zero


position after resetting or the light sensor of zero position
did not check resetting point.

solution:Check whether the signal status of counting light


Reaction disk fails sensor is normal.
Reaction
to stop at the zero
4-3 disk
position when
(1)check whether the conductivity from zero light sensor
abnormal to lead wire is good and the both ends of connector are
resetting.
connected well.

(2)check whether the zero light sensor 1 is ok

(3)Check input part circuit of reaction disk circuit board


light sensor signal.

cleaning Liquid level of


4-6 liquid level alkaline cleaning Add cleaning liquid into cleaning liquid kit.
low liquid kit low.

94
9.4 Sample probe mechanism malfunction analysis

Alarm Detailed
Description Solution
Code description

Enter system maintenance window, execute "mechanical


inspection." Observe running probe arm

Malfunction 1: no liquid in sample cup


Sample probe Solution:
Sample probe malfuntions (1) confirm whether there are samples left int the sample
5-3 cup.
abnormal. while
descending Malfunction 2: there are liquid in the sample cup
Solution:
(1) confirm the correct location of the sample cup.
(2) check and confirm whether the detection board of the
liquid is working ok

Malfunction 1: no putting of the sample cup in the sample


position
Solution:
Alarm
Sample probe
Malfunction 2: putting of the sample cup in the sample
Sample probe cannot find
5-13 position
abnormal. reaction
Solution:
cuvette
(1) Check whether there are sampel cup in the current
sample tray.
(2) check and confirm whether the detection board of the
liquid is working ok

9.8 Reagent probe mechanism malfunction analysis

Alarm Detailed
Description Solution
Code description

Enter system maintenance window of the operation


system, execute "reset". Observe probe running status

Malfunction 1: The arm of the probe couldn’t move


Solution:
Reagent probe 1 Manually move the probe mechanism, need mechanical
Reagent probe couldn’t reach repair if resistance is big
8-1
abnormal. the top while
rising 2, check whether the motor connector body is connected at
both ends in a good well function way
3, check whether the connection of electrical conductor is
good
4, check the sample reagent motor drive circuit board
Malfunction 2: probe arm to the coupler's position can

95
run, but the photo sensor cannot detect any signal
Solution: Manually make the probe body go up to the
peak repeatedly, transfer the multimeter to DC, negative
points the first 6-core plugs P042, P042 positive pole core
plugs 5.
1, multimeter readings between the positive changes from
5V to 0, indicating photo sensor and lead are normal
(1) Check conductors
Check whether the sample probe’s photo sensor J202 to
the reagent disc circuit board (P042) is in good
connection, and whether the both ends of the connectors
are good.
(2) Check the input of the sample reagent disc circuit
board’s photo sensor.
2, No change on multimeter reading
(1) Check conductors
Check P042 plugs 4,5,6 core is connected well,
connection of both ends is good.
(2) Check the photo sensor
Check voltage between P042 pin plugs 4,6, if the voltage
is not 5v, check the connection plug is connected well. If
the voltage is 5v, check the J042 socket 11 feet’s potential.
Rising to the peak when the potential is high, if not, the
potential is low. If the potential is not normal, check the
photo sensor.

Malfunction: When reagent probe’s running, it’s touching


the side of the reagent cup or the botom of the cup
Solution:
Observe the reagent probe’s running status
(1) If the reagent probe is touching the side of the cup
Probe senses while it’s running, need to ajust the position of the
Reagent probe the liquid reagent’r probe’s and the position of the cup
8-2
abnormal. touches the
side (2)If the probe directly touches the botom of the cup while
it’s running, check whether there is reagent in the reagent
cup. If not, need to add reagent and then check. If yes,
need to check the circuit board of the liquid surface, check
whether the sensitivity of the reagent probe is working
normally.

Enter system maintenance window of the operation


system, execute "reset". Observe probe running status

Malfunction 1: The arm of the probe couldn’t move


Reagent probe Solution: 1 Manually move the probe mechanism, need
Reagent probe couldn’t leave mechanical repair if resistance is big
8-3
abnormal the top while
descending 2, check whether the motor connector body is connected at
both ends in a good well function way
3, check whether the connection of electrical conductor is
good
4, check the sample reagent motor drive circuit board

96
Malfunction 2: probe arm to the coupler's position can
run, but the photo sensor cannot detect any signal
Solution: 1, multimeter readings between the positive
changes from 5V to 0, indicating photo sensor and lead
are normal
(1) Check conductors
Check whether the sample probe’s photo sensor J202 to
the reagent disc circuit board (P042) is in good
connection, and whether the both ends of the connectors
are good.
(2) Check the input of the sample reagent disc circuit
board’s photo sensor.
2, No change on multimeter reading
(1) Check conductors
Check P042 plugs 4,5,6 core is connected well,
connection of both ends is good.
(2) Check the photo sensor
Check voltage between P042 pin plugs 4,6, if the voltage
is not 5v, check the connection plug is connected well. If
the voltage is 5v, check the J042 socket 11 feet’s potential.
Rising to the peak when the potential is high, if not, the
potential is low. If the potential is not normal, check the
photo sensor.

Malfunction 1:Reagent probe is in the effective status of


touching and liquid detecting all the time

Solution: If the arm of the probe is not moving,


repeatedly and manually pull up the probe (imitate the
touching), repeatedly touch the tip of the probe
gently(imitate the liquid detection), transfer the multimeter
to DC, negative point of P042 plug No.10 core, positive
point P042 plug No.9 core

Initial State: Multimeter reads “0”


Reagent probe
is in the Touching: Multimeter reads “1”
effective
Reagent probe status of 1. Multimeter reads between 5V and 0, indicates that the
8-4
abnormal touching and photo sensor and the lead are normal
liquid
detecting all (1) Check the lead
the time
Check the connection of probe’s photo sensor J202 to the
sample reagent circuit board (P042)

check whether the connection of probe photo sensor J202


with sample reagent dick circuit board wire(P042)is
good or not, check the connection of the both ends.

(2) check sample reagent dick circuit board

2. No chang on multimeter readings

(1) Check the liquid level detection of flexible cable is

97
connected well, check the conductivity

(2) Check the liquid level detection signal line (P042) is in


good connection or not, check conductivity
(3) Check whether the liquid level detector is well
connected or not
(4) measurement of P042 in the 8 (surface), 9 (touch) pin
voltage is normal or not.

When liquid surface is detected, P042-8 surface is high


level
When liquid surface is not detected, P042-8 surface is low
level
When touches, the photo sensor blocks, P042-9touch is
high level,
No touch, the photo sensor is without shelter, P042-9touch
is low level.
(5) Check the P042's 8 (surface), 9 (touch) feet whether 7
(+5 v) is short-circuit, so that potential is pulled up.
(6) Check the liquid level detection board is working
regularly, when the status is not , check the circuit board.
Unplug the surface detection panel J6, J7 on the flexible
cable, measuring J6, J7-level state of the foot, right to left
(J7: 1 empty, 2touch, 3surface) (J6: 1 ground, 2 air, 3 +5
v, 4 blank)
When liquid level is detected, J7-3surface is high, and the
on-board indicator lights;
When liquid is not detected, J7-3surface is low, on-board
light goes out;
When there’s touch, the photo sensor blocks, and
J7-2touch is high;
When there’s no touch, the photo sensor is not blocked,
J7-2touch is low.

Enter CS-T240 operation system, system maintenance


window, execute "mechanical movement". Observe
sample reagent probe running status.
When reagent Malfunction 1: Sample reagent probe couldn’t sway.
probe changes
its direction to Solution:
cup side, and
couldn’f find 1. Manually sway the mechanism, need mechanical repair
Reagent probe if resistance is big
8-5 reaction disk’s
abnormal
position.
(Reagent 2. Check both ends of the motor connector are connected
probe swings well
can not be set 3, Check whether the conductivity of the conductor’s lead
back as zero) are good
4, Check the sample reagent disc motor drive circuit board
5, Check if the up down and back to zero of photo sensor
are working normally

Malfunction 2: When the arm sways to reaction disk

98
position, photo sensor couldn’t detect signal

Solution: Manually make the probe mechanism rise to


peak repeatedly, transfer the multimeter to DC, negative
point P042 core plug No.3, positive point P042 plugs to
core plug No. 2.

1, multimeter readings between the positive changes in 5V


and 0, indicates photo sensor and lead are normal

(1) Check conductors

Check conductivity of probe photo sensor J202 to the


reagent disc circuit board (P042) is connected good or not,
check both ends of the connector are connected well or
not.

(2) Check sample reagent disc circuit board’s photo


sensor’s input electric circuit

2, No change on multimeter reading

(1) Check lead

Check plug P042 core plug 1,2,3 is connected well or not


and whether both ends of the connection wire is good or
not

(2) Check photo sensor signal

Check voltage between P042 pin plugs 1,3, if the voltage


is not 5v, check the connection plug is connected well or
not. If the voltage is 5v, check the J042 socket 2 feet of
potentials, when it is up to peak, when the potentials is
high, if not, potential’s low. If the potential is not normal,
check photo sensor.

Malfunction 3: Couldn’t sway to reaction disk position

Solution: mechanical repair

Enter CS-T240 operation system, system maintenance


window, execute "mechanical movement". Observe probe
When the running status.
reagent probe
Malfunction 1: sample probe couldn’t sway
switches to
Reagent probe
8-6 another Solution:same as to 8-5
abnormal
location, it
couldn’t leave Malfunction 2:The arm can leave reaction disk position,
reaction disk however, the photo sensor couldn’t detect any signal

Solution:same as to 8-5

99
When reagent
Reagent probe probe rotates,
8-7 Probe couldn’t rise to the peak, solution same as to 8-1.
abnormal it deciates
from the peak

Malfunction: When there is liquid in the reagent bottle,


sample probe cannot detect it

Solution:
In R1 position,
1, Check the liquid level detection reagent with the sample
it couldn’t
Reagent probe plate to connect the circuit board is the connection of a
8-8 detect liquid
abnormal good guide, the connector ends are good
surface
existence 2, check the liquid level detection circuit board, test the
sensitivity of the sample reagent is normal needle

3, check the sample reagent circuit board part of the


electrical signal input

Malfunction: Cannot reach the height of probe arm


falling liquid reagent
Solution:
1, Manually move the probe mechanism, if the resistance
is big, mechanical repair is needed
Cannot reach 2, Check the liquid level detection plate flexible cable is
Reagent probe
8-9 the liquid drop connected well or not
abnormal
height 3, Check both ends of the electrical connector body is
connected well
4, Check whether the connection of electrical conductor
lead is good
5, Check whether there is malfuction of surface detection
6, Check the sample kit circuit board

9.10 Sample reagent disk malfunction analysis

Alarm Detailed
Description Solution
Code description

Malfunction 1: Sample reagent disk doesn’t move


Solution:
1, Manually rotate the sample reagent disk, if the
Sample resistance is big, mechanical repair is needed
reagent disk is 2, Check both ends of the motor connector is connected
Sample reagent
10-2 not stop at the well
disk abnormal
specified 3, Check the conductivity of the electrical conductor lead
location is good
4, Check sample reagent circuit board’s motor drive
circuit board kit part
Malfunction 2: When sample reagent disc rotates to the

100
specified location, the sample reagent disk does not stop at
the specified position, or when turns to specified location,
the photo sensor couldn’t detect it, or the signal of the
photo sensor is not correct

Solution:

Manually rotate the sample reagent disk, transfer the


multimeter to DC, negative points P041, core plug No.6,
positive points P041, core plugs No.5

1, Multimeter readings between the positive changes in


5V and 0, indicates photo sensor and lead are normal

(1) Check lead

Check the conductivity of probe photo sensor J047 to


sample reagent disk circuit board lead (P041) is good or
not, check both ends of connector is connected good or
not

(2) Check photo sensor’s electric circuit input of sample


reagent disk’s circuit board

2, No change on multimeter reading

(1) Check wire

Check P041 plugs 4,5,6 core is connected well, a good


connection is connected at both ends

(2) Check the photo sensor signal

Check voltage between P041 pin plugs 4,6, if voltage is


not 5v, check the whether the connection plug is
connected well or not. If the voltage is 5v, check the J041
socket 5 feet of potential, raise up to the peak when the
potential is high, if not, the potential is low. If the
potential is not normal, check the photo sensor.

Enter into system maintenance window, execute


“mechanical movement check”, observe disk retoating
status

Malfunction 1: The sample reagent disk doesn’t move


Cannot find Solution:
the sample 1. Manually rotate the sample reagent disk, need
Sample reagent
10-3 reagent disk mechanical repair if the resistance is big
disk abnormal
position of
back to zero 2. Check both ends of the motor connector are connected
well of this mechanism
3, Check whether the conductivity of the conductor’s lead
are good
4, Check the circuit board of the sample reagent disk

Malfunction 2: Sample reagent disk rotates, back

101
couldn’t find the position of back to zero

Solution: Manually rotate the sample reagent disk,


transfer the multimeter to DC, negative points P041 core
plug No.3, positive points P041 core plug No.2

1. If multimeter reading is between positive 0 to 5V,


indicates that the photo sensor and the lead are normal

(1)Check the lead

Check the conductivity of probe photo sensor J047 to the


sample reagent disk’s circuit board lead (P041) is good or
not, check both ends of the connector are connected well
or not

(2)Check photo sensor’s electric circuit input of sample


reagent disk

Check voltage between P041 pin plugs 1,3, if voltage is


not 5v, check whether the connection plug is connected
well or not. If the voltage is 5v, check the J041 socket 2
feet of potential, raise up to the peak when the potential is
high, if not, the potential is low. If the potential is not
normal, check photo sensor.

Malfunction 1: Sample reagent disk couldn’t find barcode


reader
Solution:

Sample reagent Couldn’t find 1, Check whether the barcode reader is well connected to
disk barcode sample the instrument
10-4
reader reagent
abnormal barcode reader 2, Check whether the barcode reader is broken
Please reset the barcode reader, if it still doesn’t work,
check barcode reader. If it starts to work normally,
indicates that there is no problem on the barcode reader. It
might be the problem of digital wire or circuit board.

Malfunction 1: Current turntable position error


Motor running Solution:
Sampel reagent
steps are
disk turntable 1,Check whether there are friction between sample reagent
10-7 incompatible
motor steps disk shelf and sample reagent refrigeration warehouse
with the given
abnormal
steps number
2,Check whether sample reagent disk fram has obstacles
that affect rotation

102
9.12 Injection pump malfunction analysis

Alarm Detailed
Description Solution
Code description

Malfunction 1: Syringe pump doesn’t move or it couldn’t


rise up to the top
Solution:
1. When the instrument is working, the syringe pump
Syringe pump doesn’t work
Syringe pump
14-1 doesn’t rise up
abnormal (1) Check both ends of the mechanism’s motor are
to the top
connected well

(2) Check thec conductivity of the motor lead is well

(3) Check cicrcuit board’s motor drive lead

Malfunction 1: Pump couldn’t move or it cannot leave


the top

Solution:

1. Observe the moving status of the syring pump while it’s


working
(1) Check both ends of this mechanism motor are
connected well

(2) Check the conductivity of the motor lead is good or


not

(3) Check circuit board’s driving motor


Syringe pump
Syringe pump 2. While the instrument is working, if the motor is
14-2 couldn’t leave
abnormal working ok, and it can leave the photo sensor position
the top
(1) Check whether the photo sensor is in good condiction

(2) Check the conductivity of the lead connects the photo


sensor and the power adapter plate is good or not, check
both ends of the connector are connected well or not.
(3) Check the signal of the photo sensor
Check voltage between P043 pin plugs 1,5, if the voltage
is not 5v, check the plug P043 is in good connection; if the
voltage is 5v, check the potential of P043 4-pin socket.
While the pump is back to zero (vomiting), then the
potential is high, if not, the potential is low. If the potential
is normal, check the adapter plate; if it’s abnormal, check
photo sensor.

103
9.14 Incubation bath malfunction analysis

Alarm Detailed
Description Solution
Code description

(1) Make sure the cooling fan of the instrument is rotating


normally
The
Incubation bath temperature of (2) Check the temperature sensor is working normally
20-1 temperature incubation
(3) Check the connector part of the temperature sensor on
abnormal bath is above
the main control board
45℃
(4) Replace the main control board or the temperature
sensor

The
temperature of
the incubation (1) Make sure the room temperature is in the scope of
bath is out of 15-32
the scope of
Incubation bath (2) Make sure the cooling fan of the instrument is rotating
20-2 temperature 37℃ ±5℃
narmally
abnormal
(Only check
(3) Make sure the water is cycling in the incubation bath
when the
instrument (4) Replace main control board or the temperature sensor
under
operation)

9.15 ISE Failure Analysis


ISE QC is
over
ISE is over measuring (1)Please check whether the Control
0-31 Note measuring lowe lower limit, volume, reagent volume is adequate, and
limit the current whether the position is correct
QC has no
result.

ISE QC is
ISE is over over (1)Please check whether the Control
0-32 Note measuring measuring volume, reagent volume is adequate, and
upper limit upper limit, whether the position is correct
the current
QC has no

104
result.

ISE
Calibration
is over (1)Please check whether the Calibrator
ISE is over measuring volume, reagent volume is adequate, and
0-33 Note measuring lower limit, whether the position is correct
lower limit the current
Calibration
has no
result.

ISE
Calibration
is over
ISE is over measuring (1)Please check whether the Calibrator
0-34 Note measuring upper limit, volume, reagent volume is adequate, and
upper limit the current whether the position is correct
Calibration
has no
result.

ISE sample
is over
ISE is over measuring (1)Please check whether the sample
0-35 Note measuring upper or volume, reagent volume is adequate, and
range lower limit, whether the position is correct
no test
result.

Electrolyte
system
stops
working
due to the (1)Enter into system maintenance, and
issued execute "Resetting”, and then execute
Electrolyte
19-1 Note function stops
alarm. “Mechanical movement check”
Note: the
stop status
of adding
sample
means to
restart.

Remaining (1)add ISE reference solution


volume of
ISE reference reference (2)Enter into system maintenance
37-1 Note liquid is solution is window, and execute "ISE reference
inadequate inadequate solution reagent pipeline rinsing”
(less then
the user (3)Execute ISE calibration
designed

105
volume)

remaining
volume of
internal (1)add ISE internal standard solution
ISE internal standard
(2)Enter into system maintenance, and
standard solution is
38-1 Note liquid is inadequate
execute "ISE internal standard solution
reagent pipeline rinsing”
inadequate (less then
the user (3)Execute ISE calibration
designed
volume)

remaining
volume of (1)add ISE diluent
diluent is
ISE diluent is (2)Enter into system maintenance, and
inadequate
39-1 Note (less then
execute "ISE diluent reagent pipeline
inadequate rinsing”
the user
designed (3)Execute ISE calibration
volume)

In the
5-measurin
g point

potential of
internal
standard (1) Enter into system maintenance
solution, the window, and execute "ISE check."
average
value
ISE LEVEL (2) please refer to " electrolyte device
60-1 Note
error (EAV)of maintenance " in the "user manual" for
three detail.
potentials is
over the
following
range

(internal
standard
solution)K:
-90.0mv≤E
AV≤-10mv

In the (1) Enter into system maintenance, and


ISE LEVEL
60-2 Note 5-measurin execute "ISE check."
error g point

106
potential of (2) please refer to " electrolyte device
internal maintenance " in the "user manual" for
standard detail.
solution, the
average
value

(EAV)of
three
potentials is
over the
following
range

(internal
standard
solution)K:
-90.0mv≤E
AV≤-10mv

In the
5-measurin
g point

potential of
internal
standard
solution, the
average
value (1) Enter into system maintenance, and
execute "ISE check."
(EAV)of
ISE LEVEL three
60-3 Note potentials is (2) please refer to " electrolyte device
error maintenance " in the "user manual" for
over the
following detail.
range

(internal
standard
solution)
Cl:
80.0mv≤EA
V≤160mv

In the
(1) Enter into system maintenance, and
5-measurin
execute "ISE check."
ISE Noise g point
61-1 Note
error
potential of
(2) please refer to " electrolyte device
internal
maintenance " in the "user manual" for
standard

107
solution, the detail.
difference
(FI) of
the
maximum
and
minimum is
within
following
range

Na:
0.7mv≤|FIV
(2)-FIV
(4)|

In the
5-measurin
g point

potential of
internal
standard
solution, the
difference
(FIV) of (1) Enter into system maintenance, and
the execute "ISE check."
maximum
ISE Noise and
61-2 Note
error minimum is (2) please refer to " electrolyte device
within maintenance " in the "user manual" for
following detail.
range
(internal
standard,
sample)

K:
1.0mv≤|FIV
(2)-FIV
(4)

In the
5-measurin (1) Enter into system maintenance, and
g point execute "ISE check."

ISE Noise potential of


61-3 Note internal (2) please refer to " electrolyte device
error maintenance " in the "user manual" for
standard
solution, the detail.
difference
(FIV) of
the

108
maximum
and
minimum is
within
following
range
(internal
standard,
sample)

Cl:
0.8mv≤|FIV
(2)-FIV
(4)|

The slope
value of
calibration
result is
within
following
range or the
impact of
electrode is
low (1) Enter into system maintenance, and
(cross-conta execute "ISE check."
ISE mination
62-1 Note rate (A) is
Prepare (2) please refer to " electrolyte device
as maintenance " in the "user manual" for
abnormal following detail.
Na:(1)
32.0mv≤SL
OPE≤37mv
or
68.1mv≤SL
OPE

The slope
value of
calibration (1) Enter into system maintenance, and
result is execute "ISE check."
ISE within
following
62-2 Note Prepare (2) please refer to " electrolyte device
range or the
maintenance " in the "user manual" for
abnormal impact of
detail.
electrode is
low
(cross-conta
mination
rate (A) is

109
as
following
K:(1)
32.0mv≤SL
OPE≤37mv
or68.1mv≤S
LOPE

The slope
value of
calibration
result is
within
following
range or the
impact of
(1) Enter into system maintenance, and
electrode is
execute "ISE check."
ISE low
(cross-conta
62-3 Note Prepare mination (2) please refer to " electrolyte device
abnormal rate (A) is maintenance " in the "user manual" for
as detail.
following

Cl:(1)
-30mv≤SL
OPE≤-25m
v
or-68.1mv≥
SLOPE

(1)The
slope value
of
calibration
result is
within
following (1) Enter into system maintenance, and
range or the execute "ISE check."
ISE slope impact of
value electrode is
(2) please refer to " electrolyte device
63-1 Note low
(SLOPE) (cross-conta
maintenance " in the "user manual" for
abnormal detail.
mination
rate (A) is
as (3) Please re-execute ISE calibration.
following:

Na:(1)
SLOPE<
32.0mv

(2)current

110
ISE
calibration
result is not
updated

(1)The
slope value
of
calibration
result is
within
following
range or the
impact of (1) Enter into system maintenance, and
electrode is execute "ISE check."
ISE slope low
value (cross-conta
(2) please refer to " electrolyte device
63-2 Note mination
(SLOPE) rate (A) is
maintenance " in the "user manual" for
abnormal detail.
as
following:K
:(1) (3) Please re-execute ISE calibration.
SLOPE<
32mv

(2)current
ISE
calibration
result is not
updated

(1)The
slope value
of
calibration
result is
within
following (1) Enter into system maintenance, and
range or the execute "ISE check."
impact of
electrode is
ISE SLOPE low
63-3 Note (2) please refer to " electrolyte device
abnormal (cross-conta maintenance " in the "user manual" for
mination detail.
rate (A) is
as (3) Please re-execute ISE calibration.
following:C
l:(1)
SLOPE>
-25.0mv

(2)current
ISE

111
calibration
result is not
updated

(1)the
concentratio
n of
internal
solution(C
(IS))is
within (1) Enter into system maintenance, and
following execute "ISE check."
ISE the
range :Na:
concentration (2) please refer to " electrolyte device
64-1 Note of internal C(IS)<
120.0mmol/ maintenance " in the "user manual" for
solution detail.
abnormity l or
190.0mmol/
(3) Please re-execute ISE calibration.
<C(IS)

(2)current
ISE
calibration
result is not
updated

(1)the
concentratio
n of
internal
solution(C
(IS))is (1) Enter into system maintenance, and
within execute "ISE check."
following
ISE the range .K:C (2) please refer to " electrolyte device
concentration (IS)< maintenance " in the "user manual" for
64-2 Note of internal 3.0mmol/l detail.
solution or 8.0mmol/
abnormity <C(IS)
(3) Please re-execute ISE calibration.
(2)current
IS
calibration
result is not
updated

(1)the (1) Enter into system maintenance, and


ISE the concentratio execute "ISE check."
64-3 Note concentration n of
of internal internal
solution solution(C (2) please refer to " electrolyte device

112
abnormity (IS))is maintenance " in the "user manual" for
within detail.
following
range Cl:C
(3) Please re-execute ISE calibration.
(IS)<
80.0mmol/l
or
140.0mmol/
<C(IS)

(2)current
ISE
calibration
result is not
updated

Because of
the
implementa
tion of the
ISE
maintenanc
e (ISE
ISE required
cleaning, Executive ISE calibration
calibration
complete
cleaning), it
is necessary
to
implement
ISE
calibration

113
Alarm Detailed
Description Solution
Code description

Malfunction 1: pump stops or fails to reach the top

solution:

observe running status of pump:

1.when working, injection pump is not running.

(1) Check whether both ends of connector of the motor


are connected well.

(2) Check whether the conductivity of motor lead wire


is good.

(3)check motor drive circuit of circuit board

18-1 2. when working, injection pump is running:

(1) check light sensor


SIP
SIP injection
injection (2) Check whether the conductivity of light sensor to
pump fails to
pump adapter and ISE circuit board is good and both ends of
reach the top
abnormal connector are connected well.

(3) check light sensor signal

check voltage between P901A plug pin 1,3 (measured


when plug it into plug seat), if the voltage is 5v, check
potential (measured when plug it into plug seat)of
P901A plug pin 2,3; The potential is high when
reaching to the zero position(discharging liquid),
otherwise the potential is low. If the potential is
normal, Check whether the conductivity of light sensor
to adapter and ISE circuit board is good; if not normal,
replace the light sensor

If the voltage is not 5v, check voltage between P190


plug pin 1,3; if voltage is 5v, replace light sensor
adapter. If the voltage is not 5v, check input circuit of
ISE circuit board.

114
Alarm Detailed
Description Solution
Code description

Malfunction 1: injection pump stops or fails to


leave the top

solution:

observe running status of pump

1.when working, injection pump is not running.

(1) Check whether both ends of connector of the


motor are connected well.

(2) Check whether the conductivity of motor lead


wire is good.

(3)check motor drive circuit of circuit board

2. when working, injection pump is running:

(1) check light sensor


SIP
18-2 SIP injection (2) Check whether the conductivity of light sensor to
injection
pump fails to adapter and ISE circuit board is good and both ends of
pump
leave the top connector are connected well.
abnormity
(3) check light sensor signal

check voltage between P901A plug pin 2,3 (measured


when plug it into plug seat), if the voltage is 5v, check
potential (measured when plug it into plug seat)of
P901A plug pin 2,3; The potential is high when
reaching to the zero position(discharging liquid),
otherwise the potential is low. If the potential is
normal, Check whether the conductivity of light sensor
to adapter and ISE circuit board is good; if not normal,
replace the light sensor

If the voltage is not 5v, check voltage between P190


plug pin 1,3; if voltage is 5v, replace light sensor
adapter. If the voltage is not 5v, check input circuit of
ISE circuit board.

115
Alar
Detailed
m Description Solution
description
Code

Malfunction 1: Motor stops or fails to leave the top

(1) Check whether both ends of connector of the


motor are connected well.

(2) Check whether the conductivity of the motor lead


wire is good.

(3)check motor drive circuit of sample reagent disk


circuit board

(4) Inspect whether the rise and fall zero light sensor
is working well.

Malfunction 2:The motor swing to the required


position, but the signal is not detected by the light
sensor.
16-1
Solution:Manually enable the unit repeatedly rise to
top, transfer the multimeter to DC, negative points, 3rd
The nozzle of SIP nozzle core of plug P142, positive point ,2nd core of P142
electrolyte SIP fails to reach plug.
abnormal the bottom
1.If the value of multimeter changing between 5 V
–OV, the light sensor and the wire is working
normally.

(1)Check the wire

Check whether the conductivity of probe light sensor


(P142)to wire J2 of ISE circuit board is good and
both ends of connector are connected well.

(2)Check the light sensor input circuit of sample


reagent disk circuit board.

2. The value of multimeter is not changing.

(1)Check the wire

Check whether the 1.2.3 core of P142 plug is


connected well, and whether the two ends connected
well.

(2)Check light sensor signal

116
Check voltage between P142A plug pin 1,3, if the
voltage is not 5v, check the connection of plug. If the
voltage is 5v, check potential of P142 plug pin 2. The
potential is high when reaching to the top position,
otherwise the potential is low. If not normal, check
the light sensor

Alar
Detailed
m Description Solution
description
Code

Malfunction 1:The motor stops or fails to leave the


bottom.

(1) Check whether both ends of connector of the


motor are connected well.

(2) Check whether the conductivity of the motor lead


wire is good.

(3)check motor drive circuit of sample reagent disk


circuit board

16-2 (4) Inspect whether the rise and fall zero light sensor
The nozzle of SIP nozzle is working well.
electrolyte SIP fails to reach
Malfunction 2:The motor swing to the required
abnormal the top
position, but the signal is not detected by the light
sensor.

Solution:Manually enable the unit repeatedly rise to


top, transfer the multimeter to DC, negative points, 3rd
core of plug P142, positive point ,2nd core of P142
plug.

1.If the value of multimeter changing between 5 V


–OV, the light sensor and the wire is working
normally.

(1)Check the wire

Check whether the conductivity of probe light sensor


(P142)to wire J2 of ISE circuit board is good and
both ends of connector are connected well.

117
(2)Check the light sensor input circuit of sample
reagent disk circuit board.

2. The value of multimeter is not changing.

(1)Check the wire

Check whether the 1.2.3 core of P142 plug is


connected well, and whether the two ends connected
well.

(2)Check light sensor signal

Check voltage between P142A plug pin 1,3, if the


voltage is not 5v, check the connection of plug. If the
voltage is 5v, check potential of P142 plug pin 2. The
potential is high when reaching to the top position,
otherwise the potential is low. If not normal, check
the light sensor.

9.16 Resetting and other failure analysis

Alar
m Detailed
Code Description Solution
description

Time Sending time


synchronizatio
143 synchronizati Check the communications of control board and
n
-1 on order sub-boards respectively.
failure failure

Water tank Check whether the water supply machine, magnetic


liquid system valve, pipeline and filter are working normally, and
143 Water adding malfunction, check whether the water supply pipe has air, and check
-2 overtime error water adding whether the floater is normal, and check whether
overtime relevant electrical units of floater and control board are
error normal.

AD board Use control panel monitoring software to monitor the


143 AD board detects fault information to see if there is AD communication
-3 reset failure malfunction error. Repair AD board if there is AD communication
when error to debug.
resetting, AD

118
board reset
failure.

Reaction disk
detects
malfunction
143 Reaction disk Lower machine monitoring software monitors error
when
-4 reset failure information, and analyze the reaction disk
resetting,
Reaction disk board-related failure to eliminate the error
reset failure

Sample
reagent disk
detects Use lower machine monitoring software to monitor
Sample malfunction error information, and refer to the related information
143
reagent disk when of sample reagent disk board to debug.
-5
reset failure resetting,
sample
reagent disk
fails to reset

Check whether the indication of reaction bath liquid


Water Water level detector is right; check whether there is
143 discharging discharging remaining water in reaction bath, and check reaction
-8 failure of failure of bath water outlet pipeline if there is remaining water in
reaction bath reaction bath it; check whether relevant electrical units of liquid
level detection and control board are normal.

Sample
Connect the main control board debugging program to
reagent
electrify the machine; observe machine electrifying
probe fails
flow; observe whether the 6 times the normal
Adding to add
143 cleansing movement of detergents reagent is finished
detergent detergent
-9 in the phase of adding detergents. Corresponding
overtime error completely
control board of reagent sample probe should be
in the
repaired if the reagent sample probe did not achieve
specified
normal movement.
time

fails to detect
liquid level
143 liquid level
detection Refer to liquid detection error analysis to debug
-10 when adding
failure
detergent

143 Liquid level Liquid level Check the liquid level of reaction bath, and check
-12 detection detection whether the liquid level detector of reaction bath
failure of failure of works normally; check whether relevant electrical

119
reaction bath reaction bath units of liquid level detection and control board are
normal.

Check whether the liquid level detector of reaction


bath is clean, whether there is water in reaction bath,
Reaction bath Reaction bath whether water level reaches the position where the
143
liquid level liquid level detector can detect, and check liquid level detector in
-13
malfunction malfunction reaction bath is working normally; check whether
relevant electrical units of liquid level detection and
control board are normal.

Bar code
Bar code Use lower machine monitoring software to monitor
143 scanning
scanning error information, and refer to the related error
-14 overtime
overtime error information of reagent and sample disks to debug.
error

Execute the main board debugging program to


monitor, and re-execute pipeline air exhausting and
Pipeline observe whether air exhausting is carried out by
Pipeline
143 exhaust reagent and sample injection pumps and the
exhaust
-15 overtime implementation is complete. Use lower machine
overtime error
error monitoring software to monitor error information, and
refer to the related error information of reagent and
sample disks to debug.

Use lower machine monitoring software to monitor


143 Reaction disk Reaction disk
error information, and refer to the related error
-16 start failure start failure
information of reaction disk to debug.

Use lower machine monitoring software to monitor


143 Reaction disk Reaction disk
error information, and refer to the related error
-17 stop failure stop failure
information of reaction disk to debug.

Maintenance operation of the sample reagent probe.


Sample Sample Check whether the pressure sensor and magnetic valve
143
reagent probe reagent probe of sample reagent probe pipeline are normal; check
-18
blocked blocked whether relevant electrical units of pressure detection
and control board are normal.

Previous
Previous Use lower machine monitoring software to monitor
143 sample
sample adding error information, and refer to the related error
-19 adding
failure information of sample disk to debug.
failure

120
Previous
Previous Use lower machine monitoring software to monitor
143 reagent 1
reagent 1 error information, and refer to the related error
-20 adding
adding failure information of reagent 1 to debug.
failure

Previous
Previous Use lower machine monitoring software to monitor
143 reagent 2
reagent 2 error information, and refer to the related error
-21 adding
adding failure information of reagent 2 to debug.
failure

Previous Previous Use lower machine monitoring software to monitor


143
stirring 1 stirring 1 error information, and refer to the related error
-24
failure failure information of reaction disk to debug.

Use lower machine monitoring software to monitor


143 Previous Previous
error information, and refer to the related error
-25 stirring 2 stirring 2
information of reaction disk to debug.
failure failure

Check whether waste liquid bottle is full; check


143 Waste liquid Waste liquid whether the sensor in waste liquid bottle is normal;
-28 bottle full bottle full check whether relevant electrical units of the floater in
waste liquid bottle and control board are normal.
Switch
malfunction,
Check whether the floaters of high and low liquid level
high-level
143 and the signal cable connecting floater to main control
Floater switch floater
-29 board are normal; check whether relevant electrical
error detects the
units of floater detection and control board are normal.
signal, but
low-level
floater fails.
Reagent level
Reagent level Use lower machine monitoring software to monitor
143 scanning
scanning error information, and refer to the related error
-30 overtime
overtime error information of reagent board to debug.
error

Check whether the vacuum pump and vacuum pump


Vacuum
switch are normal; check whether relevant electrical
143 Vacuum Pump Pump
units of vacuum pump switch and control board are
-31 Failure negative
normal.
pressure low

Sample Sample Use lower machine monitoring software to monitor


143 barcode barcode error information, and refer to the related error
-32 scanning scanning information of sample board to debug.
overtime in overtime in

121
testing testing

ISE detects
Observe whether there is ISE alarm information; Use
malfunction
143 ISE reset lower machine monitoring software to monitor error
in resetting;
-33 failure information, and refer to the related error information
resetting
of ISE board to debug.
failed.

ISE check ISE check


Observe whether there is ISE alarm information; Use
143 maintenance maintenance
lower machine monitoring software to monitor error
-34 movement movement
information, and refer to the related error information
overtime overtime
of ISE board to debug.

ISE pipeline
ISE pipeline rinsing is Observe whether there is ISE alarm information; Use
143 over lower machine monitoring software to monitor error
rinsing
-35 specified information, and refer to the related error information
overtime
time of ISE board to debug.

ISE
ISE malfunction Observe whether there is ISE alarm information; Use
143 when testing, lower machine monitoring software to monitor error
malfunction in
-36 follow-up information, and refer to the related error information
testing
ISE stops of ISE board to debug.

Check gear pump and pressure sensor of sample


pipeline are normal. Check whether the read value of
pressure sensor which is running is more than 2500 by
143 Gear pump Gear pump
using main control board debugging software; check
-37 failure pressure low
whether relevant electrical units of pressure sensor and
control board are normal.

Sending
reagent
Sending
mapping
reagent
143 information
mapping Refer to instrument module error analysis
-42 failure,
information
adding
failure
reagent may
fail.

122
When the
water tank
temperature
is over 36.5
degrees, add
cold water
Execute the main board debugging program to observe
into the tank
whether the display of temperature is normal and room
into to cool
temperature is high; check the water supply pipeline of
143 cooling water down.
water tank is normal; check whether relevant electrical
-43 overtime Temperature
units of temperature sensor and control board are
could not
normal.
drop to 35.5
degrees in
one minute,
which means
cold water
temperature
is too high.

Execute the main board debugging program to monitor


Analyzer Malfunction whether the communications of main board and
143 among sub-boards are normal; check whether relevant
module
-44 modules electrical units of sub-boards communications and
malfunction
control board are normal.

Check whether light source, water quality of


Continuous incubation bath, reaction cup and counting light sensor
Continuous
143 emergence of of reaction disk are normal; test data collecting board
emergence of
-45 5 dirty cups lines by using the testing program of data collecting
dirty cups
board.

AD data AD data Execute the main board debugging program to monitor


143 malfunction mixed whether the communications of main control board
-46 and AD board is normal, and analyze error; check
whether counting light sensor is normal.

IES ISE Use lower machine monitoring software to monitor


malfunction in measuring error information, and refer to the related error
143 testing internal information of ISE board to debug.
-47 standard
liquid failure

143 Version Version Execute the main board debugging program to monitor
-48 number number whether the communications is normal, and analyze
reading reading error; check whether relevant electrical units of

123
overtime overtime sub-boards communications and control board are
normal.

9.17 Cooling system

Alar
m Detailed
Code Description Solution
description

(1)check whether reagent disk cover is covered,


whether the ambient temperature is in line with
environmental requirements of instrument.
Cooling
Cooling time
144-1 system (2) observe the temperature displayed on digital pipe
abnormal
abnormal of cooling system and Peltier current value are normal.

If abnormal: Please check Peltier and cooling


circuit board

(1)observe whether current value displayed on


digital pipe of cooling system is normal.
Cooling Cooling
144-2 system current
(2)Make sure which current is abnormal, and cope
abnormal abnormal
with it after check the corresponding abnormal Peltier
and circuit board.

Cooling (1)observe which chip is abnormal


Cooling chip
144-3 system
abnormal
abnormal (2)cope with the corresponding abnormal chip

(1)check the communications wiring of cooling


board and main board

(2)check the communications interface circuit of


Cooling Cooling
cooling board
144-5 communicatio status
n abnormal abnormal
(3)check the communications interface circuit of
main board

124
The 1st line The 1st line Check the 1st line cooling Peltier and cooling chip
145-1 cooling chip cooling
malfunction current <5A

The 2nd line The 2nd Check the 2nd line cooling Peltier and cooling chip
145-2 cooling chip line cooling
malfunction current <5A

9.18 AD Collector
Alarm Detailed
Description Solution
Code description

The 1st line The Check the AD collection board and preamp board
AD collector measuring
malfunction value of the
146-1 1st line AD
collector is
over normal
range

The 2nd line The Check the AD collection board and preamp board
AD collector measuring
malfunction value of the
146-2 2nd line AD
collector is
over normal
range

The 3rd line The Check the AD collection board and preamp board
AD collector measuring
malfunction value of the
146-3 3rd line AD
collector is
over normal
range

The 4th line The Check the AD collection board and preamp board
AD collector measuring
146-4 malfunction value of the
4th line AD
collector is
over normal

125
range

The fifth line The Check the AD collection board and preamp board
AD collector measuring
malfunction value of the
146-5 fifth line AD
collector is
over normal
range

The sixth line The Check the AD collection board and preamp board
AD collector measuring
malfunction value of the
146-6 sixth line AD
collector is
over normal
range

The seventh The Check the AD collection board and preamp board
line AD measuring
collector value of the
146-7 malfunction seventh line
AD collector
is over
normal range

The eighth The Check the AD collection board and preamp board
line AD measuring
collector value of the
146-8 malfunction eighth line
AD collector
is over
normal range

The ninth The Check the AD collection board and preamp board
line AD measuring
collector value of the
146-9 malfunction ninth line AD
collector is
over normal
range

The tenth The Check the AD collection board and preamp board
146-10 line AD measuring
collector value of the

126
malfunction tenth line
AD collector
is over
normal range

The 11th line The Check the AD collection board and preamp board
AD collector measuring
malfunction value of the
146-11 11th line AD
collector is
over normal
range

The 12th line The Check the AD collection board and preamp board
AD collector measuring
malfunction value of the
146-12 12th line AD
collector is
over normal
range

127