JSA NUMBER: PTM-PS-JSA-009 JOB SAFETY ANALYSIS

PROJECT: Pengembangan Terminal BBM Pulau Sambu CHECK PPE AND CONTROLS REQUIRED
LOCATION: Pertamina Pulau Sambu Hard Hats  Respirator  Fire Extinguisher  Other - List
JOB NAME: Pipe Cutting Cleaning and Flushing Safety Shoes  Work Vest Lockout/Tag out  Chemical gloves/gauntlets
General Safety Glasses  Safety Harness Permit-to-Work  Chemical Apron
INITIAL DATE: 27/08/2012 Hearing Protection  Face Shield Stokes Basket Chemical boots
LAST REVISION DATE: 0 Cotton Gloves  Goggles  Life Rings
0 
REVISION NUMBER: Leather Gloves  Ventilation Barricades

JOB STEPS/TASKS HAZARD DESCRIPTION RISK TO WHAT? INITIAL RISK REQUIRED CONTROLS RESIDUAL RISK
Separate the job into the main tasks and record Describe all hazards identified for each task based on Classify risk Describe fully all equipment, facility, and/or procedure controls applicable for
them in sequence observations and experience rating from each hazard (i.e. if PPE is used as a control, it must be specifically described.) Classify risk rating from matrix for each

Environment
matrix for each

Reputation
Note: Additional hazards may be caused by If a control can only be verified by documentation then it must be available. hazard with controls in place.

Personnel
interaction with other work hazard with no
All controls must be valid in that they reduce severity, probability or both.

Assets
controls in place.

1. Manual Lifting.  Hand and Finger Injury.    M 1. Rigger Foreman shall instruct and mentor all personnel on L
 Physical Strain. hand and finger placement when working.
 Equi pment Damage. 2. Rigger Foreman shall instruct and mentor all personnel on
proper lifting techniques, Utilize legs with back in a straight
position, sufficient number personnel for item to be lifted, etc.,
3. No person shall lift any item over 25 Kg.
4. All personnel shall utilize other crew members for assistance
when lifting items and inspect packaging prior to making the
lift.
2. Manual Lifting with tools. (Chain  Hand and Finger Injury.    M 1. Rigger Foreman shall instruct and mentor all personnel on L
blocks and hoists)  Physical Strain. hand and finger placement when working.
 Rigging Failure. 2. Rigger Foreman shall instruct and mentor all personnel on
proper lifting techniques, Utilize legs with back in a straight
position, sufficient number personnel for item to be lifted, etc.
3. All personnel shall utilize other crew members for assistance
when lifting items and inspect packaging prior to making the
lift.
4. Rigger Foreman shall determine the weight of the load and the
path of movement the load will be transferred through.
5. Rigger Foreman shall ensure all lifting tools are fit for purpose
and inspect prior to use.

Page 1 of 2
JOB STEPS/TASKS HAZARD DESCRIPTION RISK TO WHAT? INITIAL RISK REQUIRED CONTROLS RESIDUAL RISK
3. Cutting pipe  Pinch Points.    H 1. Ensure a stable pipeline position L
 Uncontrolled load. 2. Check cutting equipment works well and is safe to use
 Hand and finger Injury. 3. give protection to the cutting area, and keep flamable objects
 Equipment Damage. from areas
 Fire 4. The person using the tool shall ensure the line of fire path is
clear prior to applying force to the tool.
5. Use Face shield with Properly welding tools & Mask
6. Prepare a fire extinguisher

4. Cleaning and flushing pipe  Hazardous waste    M 1. Use appropriate PPE properly L
 Uncontrolled load. 2. Work area clean of dirt and working tools
 Fall and slip 3. Standing in the right position
4. Ensure that wastes generated are placed in shelters
5. Completely remove weld slag, flux, debris, grease, oil and any
foreign matter on the surfaces of field

Approved by, Checked by, Prepared by,


PT. PERTAMINA (PERSERO) PT. PP-TIMAS KSO
PT. PERTAMINA (PERSERO)

Page 2 of 2