The document summarizes the step-by-step process for a molecule sieve dryer system with three vessels (A, B, C) that undergo alternating cycles of adsorption and regeneration. Key steps include: 1) Vessel A adsorbs while Vessel C regenerates by heating. 2) Vessel A continues adsorbing while Vessel C cools. 3) Vessel A continues adsorbing while Vessel C stands by. 4) When Vessel A is ready, Vessel B adsorbs while Vessel A regenerates with heating. 5) Vessel B adsorbs while Vessel A cools. The process ensures continuous

Uploaded by

wqs_19
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views10 pages

Control Philosophy AC

The document summarizes the step-by-step process for a molecule sieve dryer system with three vessels (A, B, C) that undergo alternating cycles of adsorption and regeneration. Key steps include: 1) Vessel A adsorbs while Vessel C regenerates by heating. 2) Vessel A continues adsorbing while Vessel C cools. 3) Vessel A continues adsorbing while Vessel C stands by. 4) When Vessel A is ready, Vessel B adsorbs while Vessel A regenerates with heating. 5) Vessel B adsorbs while Vessel A cools. The process ensures continuous

Uploaded by

wqs_19
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

When A Adsorption & C Regeneration is selected

The plant has three molecule sieve dryers working simultaneously and self-regulating based on the
process conditions.

The operation sequence is given below.


Initial status of valves is as follows:

Vessel Valve Status


KCV-1A Close
KCV-2A Close
Vessel A
KCV-3A Close
KCV-4A Close
KCV-1B Close
KCV-2B Close
Vessel B
KCV-3B Close
KCV-4B Close
KCV-1C Close
KCV-2C Close
Vessel C
KCV-3C Close
KCV-4C Close
KCV-5 Close
Changing- KCV-6 Close
Over Valves KCV-7 Close
KCV-8 Close
Step – 1 :- Vessel A Adsorption/ Vessel C Regeneration (Heating)

Open KCV-1A and KCV-2A putting Vessel A on Adsorption Mode and Open KCV-3C and KCV-4C for
putting Vessel – C on Regeneration Mode. Open KCV-6 so that the temperature of Regeneration gas can
be increased by Heat Exchanger E-001.

Vessel Valve Status


KCV-1A Open
KCV-2A Open
Vessel A
KCV-3A Close
KCV-4A Close
KCV-1B Close
KCV-2B Close
Vessel B
KCV-3B Close
KCV-4B Close
KCV-1C Close
KCV-2C Close
Vessel C
KCV-3C Open
KCV-4C Open
KCV-5 Close
Changing- KCV-6 Open
Over Valves KCV-7 Close
KCV-8 Close

Note-1: The operation of TCV-3 is controlled by a PID controller having set point of 550 ⁰F interlocked
with KCV-6. If KCV-6 is closed then TCV-3 will be automatically closed in 30 seconds. However, if KCV-6 is
opened then TCV-3 follow its PID controller set point.

Note-2: After TCV-3 is fully closed, KCV-9 must also be closed. When KCV-6 is opened, KCV-9 must also
be opened.
Step – 2 :- Vessel A Adsorption/ Vessel C Regeneration (Cooling)

Vessel A will remain on adsorption. As the temperature of regeneration gas at inlet and outlet of Vessel
C is ideally equal (practically TT1C – TT2C = 30 ⁰F). Open KCV-7 for 10 minutes then close KCV-7 (to avoid
thermal shock). Open KCV-8 and then close KCV-6.

The status of the valves will be as under:

Vessel Valve Status


KCV-1A Open
KCV-2A Open
Vessel A
KCV-3A Close
KCV-4A Close
KCV-1B Close
KCV-2B Close
Vessel B
KCV-3B Close
KCV-4B Close
KCV-1C Close
KCV-2C Close
Vessel C
KCV-3C Open
KCV-4C Open
KCV-5 Close
Changing- KCV-6 Close
Over Valves KCV-7 Close
KCV-8 Open
Step – 3 :- Vessel A Adsorption/ Vessel C Standby

As the temperature of regeneration gas at the outlet of Vessel C is equal to 80 ⁰F. Open KCV-5 and then
close KCV-3C and KCV-4C (Regeneration KCVs).

The status of the valves will be as under:

Vessel Valve Status


KCV-1A Open
KCV-2A Open
Vessel A
KCV-3A Close
KCV-4A Close
KCV-1B Close
KCV-2B Close
Vessel B
KCV-3B Close
KCV-4B Close
KCV-1C Close
KCV-2C Close
Vessel C
KCV-3C Close
KCV-4C Close
KCV-5 Open
Changing- KCV-6 Close
Over Valves KCV-7 Close
KCV-8 Open
Step – 4 :- Vessel B Adsorption/ Vessel A Regeneration (Heating)

When the moisture analyzer installed at Vessel A reach following conditions:

i. AT-2A installed at 70% of the bed length is at 0.15ppm AND AT-3A installed at 90% of the
bed length is 0.1ppm.

Then, the Adsorption cycle will be switched to that Vessel whose regeneration gas inlet KCVs is closed
AND which achieved standby mode earlier.

Open KCV-1B and KCV-2B and then close KCV-1A and KCV-2A. Open KCV-3A, KCV-4A and close KCV-5
and open KCV-6 and close KCV-8.

The status of the valves will be as under:

Vessel Valve Status


KCV-1A Close
KCV-2A Close
Vessel A
KCV-3A Open
KCV-4A Open
KCV-1B Open
KCV-2B Open
Vessel B
KCV-3B Close
KCV-4B Close
KCV-1C Close
KCV-2C Close
Vessel C
KCV-3C Close
KCV-4C Close
KCV-5 Close
Changing- KCV-6 Open
Over Valves KCV-7 Close
KCV-8 Close
Step – 5:- Vessel B Adsorption/ Vessel A Regeneration (Cooling)

As the temperature of regeneration gas at inlet and outlet of Vessel A is ideally equal (practically TT1A –
TT2A = 30 ⁰F). Open KCV-7 for 10 minutes then close KCV-7 (to avoid thermal shock). Open KCV-8 and
then close KCV-6.

The status of the valves will be as under:

Vessel Valve Status


KCV-1A Close
KCV-2A Close
Vessel A
KCV-3A Open
KCV-4A Open
KCV-1B Open
KCV-2B Open
Vessel B
KCV-3B Close
KCV-4B Close
KCV-1C Close
KCV-2C Close
Vessel C
KCV-3C Close
KCV-4C Close
KCV-5 Close
Changing- KCV-6 Close
Over Valves KCV-7 Close
KCV-8 Open
Step – 6:- Vessel B Adsorption/ Vessel A Standby

As the temperature of regeneration gas at the outlet of Vessel A is equal to 80 ⁰F. Open KCV-5 and then
close KCV-3A and KCV-4A (Regeneration KCVs).

The status of the valves will be as under:

Vessel Valve Status


KCV-1A Close
KCV-2A Close
Vessel A
KCV-3A Close
KCV-4A Close
KCV-1B Open
KCV-2B Open
Vessel B
KCV-3B Close
KCV-4B Close
KCV-1C Close
KCV-2C Close
Vessel C
KCV-3C Close
KCV-4C Close
KCV-5 Open
Changing- KCV-6 Close
Over Valves KCV-7 Close
KCV-8 Open
Step – 7 :- Vessel C Adsorption/ Vessel B Regeneration (Heating)

When the moisture analyzer installed at Vessel C reach following conditions:

i. AT-2B installed at 70% of the bed length is at 0.15ppm AND AT-3B installed at 90% of the
bed length is 0.1ppm.

Then, the Adsorption cycle will be switched to that Vessel whose regeneration gas inlet KCVs is closed
AND which achieved standby mode earlier.

Open KCV-1C and KCV-2C and then close KCV-1B and KCV-2B. Open KCV-3B, KCV-4B and close KCV-5 and
open KCV-6 and close KCV-8.

The status of the valves will be as under:

Vessel Valve Status


KCV-1A Close
KCV-2A Close
Vessel A
KCV-3A Close
KCV-4A Close
KCV-1B Close
KCV-2B Close
Vessel B
KCV-3B Open
KCV-4B Open
KCV-1C Open
KCV-2C Open
Vessel C
KCV-3C Close
KCV-4C Close
KCV-5 Close
Changing- KCV-6 Open
Over Valves KCV-7 Close
KCV-8 Close
Step – 8:- Vessel C Adsorption/ Vessel B Regeneration (Cooling)

As the temperature of regeneration gas at inlet and outlet of Vessel B is ideally equal (practically TT1B –
TT2B = 30 ⁰F). Open KCV-7 for 10 minutes then close KCV-7 (to avoid thermal shock). Open KCV-8 and
then close KCV-6.

The status of the valves will be as under:

Vessel Valve Status


KCV-1A Close
KCV-2A Close
Vessel A
KCV-3A Close
KCV-4A Close
KCV-1B Close
KCV-2B Close
Vessel B
KCV-3B Open
KCV-4B Open
KCV-1C Open
KCV-2C Open
Vessel C
KCV-3C Close
KCV-4C Close
KCV-5 Close
Changing- KCV-6 Close
Over Valves KCV-7 Close
KCV-8 Open
Step – 9:- Vessel C Adsorption/ Vessel B Standby

As the temperature of regeneration gas at the outlet of Vessel B is equal to 80 ⁰F. Open KCV-5 and then
close KCV-3B and KCV-4B (Regeneration KCVs).

The status of the valves will be as under:

Vessel Valve Status


KCV-1A Close
KCV-2A Close
Vessel A
KCV-3A Close
KCV-4A Close
KCV-1B Close
KCV-2B Close
Vessel B
KCV-3B Close
KCV-4B Close
KCV-1C Open
KCV-2C Open
Vessel C
KCV-3C Close
KCV-4C Close
KCV-5 Open
Changing- KCV-6 Close
Over Valves KCV-7 Close
KCV-8 Open

Note: After completion of Adsorption cycle of Vessel C, the logic will jump to Step 1.