Common Mistakes Commirtted in Statistical Process Control
Common Mistakes Commirtted in Statistical Process Control
We should ensure whether the computer protocol automatically adjusts the control limits.
a) The common misconception is, that process is out of control when points go beyond the
limits.
b) Within the limits also there could be non-random patterns such as unexpected trends,
cyclic patterns, runs, hugging of control limits
c) Seven or more consecutive points in one side of the chart (in case of X-bar average)
may be a clear case of run.
• Charts are completed and duly filed (!), without any analysis :
• Charts are plotted and maintained by someone other than the operators concerned :
a) The best way to implement SPC is to provide adequate knowledge to the operators
concerned and making them responsible to plot control charts.
b) I have seen the good practice of Operators plotting the Control charts - in very few
organizations. One such organization is Lucas TVS, Pondicherry plant.
c) As long as someone else is checking the process/product characteristics and charts are
plotted, the ownership is under question mark.
• SPC training doesn’t end with a practical hand holding in respective work area :
a) It is of paramount important to introduce right control chart for the right purpose.
b) One example would be Introduction of X-MR chart for controlling a process parameter.
c) I have seen in one place, wherein X-bar R control chart was deployed to control a Blanking
process.
d) The process being very consistent, the range chart was not sensitive at all.
e) Here the ideal option would be X-bar S chart.
f) A wrong control chart will yield absolutely no results.
a) This is generally happening where the machine is having multiple stations such as
multiple head drilling
b) Though this may appear to one machine, each spindle must be considered as a separate
process
c) The same logic is applicable for multiple cavity mold also.
• Control limits are not reviewed and adjusted based on the data :
a) This may be acceptable in 2 situations viz. Stability check through control chart and in the
initial stage of SPC application, where our interest is to gather data.
b) But for the above situations, control charts without control limits are not acceptable.
Practical exposure to Understand the Concepts & the application of Get your e-Certificate after
statistical techniques to estimate the Capability & performance of successful completion
measuring / inspection systems of the course
Program Date & Time : 16-03-2018 (Friday) & 17-03-2018 (Saturday) [ 2 days ] 09.00 am to 05.00 pm
Target Participants : Engineers & above - from QA, SQA, Manufacturing ,NPD & other engineering functions
Program Fee: Rs. 4500 Rs.3,900/- (incl. GST) per participant Venue:
(Complementary Work book, Stationary, Refreshments & Lunch) THE VIJAY PARK Hotel
Corporate offers : Next to Arumbakkam Metro Station, Near
CMBT Bus Stop, Arumbakkam, Chennai.
No. of participants Program fee ( incl. GST )
3 employees from the same company Rs.3,600/- per head Participants are encouraged to bring
• Scientific calculators
4 to 6 employees from the same company Rs.3,300/- Per head • their cases for clarifications