01 CSA PUNCHLIST For Green Field Rev.03
01 CSA PUNCHLIST For Green Field Rev.03
01 CSA PUNCHLIST For Green Field Rev.03
Target Date C
Method of
Item Description Proposed Remedy To be filled within 24
Verification hours
Date
Revisit
1
Photo
Revisit
2
Photo
Revisit
3
Photo
Revisit
4
Photo
Revisit
5
Photo
Revisit
6
Photo
Revisit
7
Photo
Revisit
8
Photo
Revision number : 03 1
Date of issue : June 25, 2014 of
24
Revisit
9
Photo
Revisit
10
Photo
Revision number : 03 2
Date of issue : June 25, 2014 of
24
2) MINOR ITEMS - list all items ticked on checklist as minor deficiency
Target Date C
Method of
Item Description Proposed Remedy To be filled within 24
Verification hours
Date
Revisit
1
Photo
Revisit
2
Photo
Revisit
3
Photo
Revisit
4
Photo
Revisit
5
Photo
Revisit
6
Photo
Revisit
7
Photo
Revisit
8
Photo
Revisit
9
Photo
Revisit
10
Photo
Revisit
11
Photo
Revisit
12
Photo
Revisit
13
Photo
Revisit
14
Photo
Revisit
15
Photo
Revision number : 03 3
Date of issue : June 25, 2014 of
24
Revisit
16
Photo
Revisit
17
Photo
Revisit
18
Photo
Revisit
19
Photo
Revisit
20
Photo
Revision number : 03 4
Date of issue : June 25, 2014 of
24
Clearance Confirmed
Date …………………
Managed Service
Representative
………………………
Clearance
Managed Service
Date
Representative
Revision number : 03 5
Date of issue : June 25, 2014 of
24
Revision number : 03 6
Date of issue : June 25, 2014 of
24
Clearance
Date Managed Service
Revision number : 03 7
Date of issue : June 25, 2014 of
24
Revision number : 03 8
Date of issue : June 25, 2014 of
24
SITE INSPECTION PUNCH LI
SITE ID :
SITE NAME :
TYPE OF SITE :
TOWER HEIGHT :
ACCEPTANCE DATE :
RESULTS
NO. INSPECTION ITEMS
ACC MAJOR
A VISUAL CHECK OF TOWER
I FOUNDATION
1 Dimensions
2 Concrete
3 Anchor
4 Finishing Works
5 Grouting
II STEEL STRUCTURE
1 Base Plate
2 Bordes Plate
3 Ladder & Bracket
4 Welding
5 Holes
6 Galvanizing Thickness
7 Nuts & Bolts
8 Spring & Flat Washer
9 Tower members
10 Painting (if any)
II ACCESSORIES
1 Lightning Protection
Revision number : 03 9
Date of issue : June 25, 2014 of
24
SITE INSPECTION PUNCH LI
SITE ID :
SITE NAME :
TYPE OF SITE :
TOWER HEIGHT :
ACCEPTANCE DATE :
RESULTS
NO. INSPECTION ITEMS
ACC MAJOR
2 M20 (200 Nm)
C VERTICALITY CHECK
1 Verticality
Revision number : 03 10
Date of issue : June 25, 2014 of
24
SITE INSPECTION PUNCH LI
SITE ID :
SITE NAME :
TYPE OF SITE :
TOWER HEIGHT :
ACCEPTANCE DATE :
RESULTS
NO. INSPECTION ITEMS
ACC MAJOR
II FUNCTIONAL CHECK
1 Voltages Measurements (RST) on MCB input
2 MCB Function
3 All Alarm connected is working properly (Checked by Ohm meter)
H GROUNDING CHECK
1 Control Pit
2 Control Box
3 Grounding System Integration
4 Grounding System Arrangement
Grounding Resistance
5
R= Ohm
Revision number : 03 11
Date of issue : June 25, 2014 of
24
SITE INSPECTION PUNCH LI
SITE ID :
SITE NAME :
TYPE OF SITE :
TOWER HEIGHT :
ACCEPTANCE DATE :
RESULTS
NO. INSPECTION ITEMS
ACC MAJOR
K KEYS FUNCTION
1 ACPDB
2 KWh Meter
3 Control Box
4 Fence/Gate
Revision number : 03 12
Date of issue : June 25, 2014 of
24
SITE INSPECTION PUNCH LI
SITE ID :
SITE NAME :
TYPE OF SITE :
TOWER HEIGHT :
ACCEPTANCE DATE :
RESULTS
NO. INSPECTION ITEMS
ACC MAJOR
L POWER GENERATOR
I VISUAL CHECK
1 Genset Data
2 Capacity
3 Area Around The Generator Ventilated
4 Genset Installation
5 Exhaust Pipe (knalpot) System
6 Oil Level
7 Genset Body is Grounded
8 External Tank Leakage Check
9 Genset Leakage Check
10 Fuel Indicator
11 Doors of Generator Set
12 Main Fuel Tank Leakage Check
13 Grounding
14 Tag Labelling
15 Site Keys
16 Cleanness and Tidiness
17 Genset RUN sensor/ indicator and cabling to DDF
18 Genset FAIL sensor / indicator and cabling to DDF
19 LOW FUEL level indicator and cabling to DDF on external fuel tank
II FUNCTION TEST
1 MCB PLN
2 MCB Genset
3 Genset Functional Test - Manual Starting
4 Genset Measurement
5 AMF (Automatic Main Failure) - Automatic Genset Starting
6 Genset Shutdown System
7 Turn off the genset by using starter key
8 Genset Grounding Resistance
9 Simulation test of Genset RUN sensor
10 Simulation test of Genset FAIL sensor
11 Simulation test of LOW FUEL sensor
Revision number : 03 13
Date of issue : June 25, 2014 of
24
SITE INSPECTION PUNCH LI
SITE ID :
SITE NAME :
TYPE OF SITE :
TOWER HEIGHT :
ACCEPTANCE DATE :
RESULTS
NO. INSPECTION ITEMS
ACC MAJOR
M SHELTER CHECKLIST (Shelter/Indoor Site)
1 Shelter Dimensions
2 Shelter Floor
N AIR CONDITIONER
I VISUAL CHECK
1 Placement
2 Appearance of Indoor Cabinet/Fins & Outdoor Unit
3a Technical Data Indoor Unit
Revision number : 03 14
Date of issue : June 25, 2014 of
24
SITE INSPECTION PUNCH LI
SITE ID :
SITE NAME :
TYPE OF SITE :
TOWER HEIGHT :
ACCEPTANCE DATE :
RESULTS
NO. INSPECTION ITEMS
ACC MAJOR
7 Refrigerant Pipes Insulation
8 Condensation-Water Drainage System
Revision number : 03 15
Date of issue : June 25, 2014 of
24
SITE INSPECTION PUNCH LI
SITE ID :
SITE NAME :
TYPE OF SITE :
TOWER HEIGHT :
ACCEPTANCE DATE :
RESULTS
NO. INSPECTION ITEMS
ACC MAJOR
II TRIAL OPERATIONS TESTS
1 Air Flow Adjusting Button
2 Room Temperature Adjusting button
3 Input Voltage
4 Temperature
III FUNCTION TEST
1 On/Off Button
2 Auto Restart
3 Timer in ACPDB
RESULT OF INSPECTION
Site approved for Conditional Acceptance.
Major Deficiency = …………… items.
Minor Deficiency = …………… items.
Agreed Punch List is Attached.
________________________ ________________________
NAME NAME
________________________ ________________________
DATE DATE
________________________ ________________________
SIGN SIGN
Revision number : 03 16
Date of issue : June 25, 2014 of
24
PUNCH LIST - GREENFIELD
Normally Major
Normally Minor
Normally Major
Normally Major
Normally Major
Minor
if dimension and completeness are not If length is not sufficient and
in accordance with design rectification possible afterward
If rectification possible afterwards
If missing of any tower member (Tower Minor if it does not threaten safety or
Bracing, bolts, nuts etc) integrity
Minor
Revision number : 03 17
Date of issue : June 25, 2014 of
24
PUNCH LIST - GREENFIELD
Revision number : 03 18
Date of issue : June 25, 2014 of
24
PUNCH LIST - GREENFIELD
Normally Major
Normally Major
If not functional
if not provided
if not provided
Normally Major
Normally Major
Normally Major
Normally Major
Revision number : 03 20
Date of issue : June 25, 2014 of
24
PUNCH LIST - GREENFIELD
Revision number : 03 21
Date of issue : June 25, 2014 of
24
PUNCH LIST - GREENFIELD
Revision number : 03 22
Date of issue : June 25, 2014 of
24
PUNCH LIST - GREENFIELD
Revision number : 03 23
Date of issue : June 25, 2014 of
24
PUNCH LIST - GREENFIELD
NOTE
Accepted on condition:
1) No major deficiency items
2) No more than 20 minor deficiency items
3) Punch List Completed
MANAGED SERVICE
REPRESENTATIVE
________________________
NAME
________________________
DATE
________________________
SIGN
Revision number : 03 24
Date of issue : June 25, 2014 of
24