0% found this document useful (0 votes)
100 views2 pages

Yzcvf

This document outlines Xylem India's quality assurance plan for metal volute pumps being supplied to Xylem for the Sundilla Project. It details the inspection steps and acceptance criteria for raw materials, welding, dimensional checks, and non-destructive testing to be carried out by the supplier on key components like the stay ring, stay vane, and casing. The supplier is responsible for inspection and maintaining quality control documentation for each batch to be reviewed and approved by Xylem.

Uploaded by

Cheerag
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views2 pages

Yzcvf

This document outlines Xylem India's quality assurance plan for metal volute pumps being supplied to Xylem for the Sundilla Project. It details the inspection steps and acceptance criteria for raw materials, welding, dimensional checks, and non-destructive testing to be carried out by the supplier on key components like the stay ring, stay vane, and casing. The supplier is responsible for inspection and maintaining quality control documentation for each batch to be reviewed and approved by Xylem.

Uploaded by

Cheerag
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

XYLEM INDIA QUALITY ASSURANCE PLAN

Customer : Xylem Water Solutions Pvt. Ltd. Item : Metalic Volute Pump (Spiral Casing) QAP No: KLIS/Spiral Casing/01
Project : Sundilla Project KLIS Stage 3 Capacity: As per approved Datasheet Qty. : 09 Nos.
Ref OA/PO No : 910095 Head : As per approved Datasheet

Model: - KLIS 163 X 160 SSB PS3 RPM :As per approved Datasheet Date : 28.07.2017 By : AS
Format of
Inspection Agency
Components/ Characteristics/Acti Reference Documents / Records/Documents
Sr No Type of Check Quantum Remark
Description vity Acceptance Criteria
D* S Xylem C

Raw Material Xylem Manufacturing


Visual 100% MIR √ P W V
Identification Standard
Chemical
Raw Material Properties - One
Identification (Stay Material Chemical & IS 2062 E250 BR per Heat
MTC
Mechanical
MTC √ P V V Mill TC Review
1 Ring Upper & Physical Test
Lower, Stay Vane, Properties - One
per HT batch
Shell)
Supplier to submit
Raw Material - UT applicable NDT
ASME A 435 NDT -UT 100% UT test Report √ P W V
(≥ 20 mm) procedure for Xylem
Approval
Welding Procedure For weld Repair -
Visual & Mechanical Test
Welder & Process Qualification & Supplier shall qualify
2 / QW 200.1 & QW.200.2 Visual & Mechanical Test 100% QW 483, 484 √ P W V
Qualification Welders Procedure and
ASME Sec IX
Qualification welder
UT - ASME Section V / Supplier to submit
ASME Section VIII DIV 1 applicable NDT
Segmental Flange - APP 12 LPT & UT test procedure for Xylem
LPT & Ultrasonic Test 100% √ P W V
Butt Weld Joint - UT LPT - ASME Section V / Report Approval.
Stay Ring Upper & ASME Section VIII DIV 1 LPT shall be carried
3
Lower APP 8 out after machining

Dimension
Dimension
Xylem Approved Drawing Measurement 100% Inspection √ P W V After Machining
Inspection
Report
Dimension Thickness Mapping
Dimension
Inspection (After Measurement to be done with
Xylem Approved Drawing 100% Inspection √ P W V
Machining) & Ultrasonic Thickness
Report
Thickness Mapping Meter
4 Stay Vane
Template shall be
Template Fitment made as per Xylem
Profile Verification Xylem Approved Drawing Template Fitment 100% √ P W V
Report drawing and will be
verified by Xylem SQ.
UT - ASME Section V /
ASME Section VIII DIV 1
Supplier to submit
APP 12 Florescent Wet Magnetic
MPI & UT Test applicable NDT
Weld Joint - NDT MPI - ASME Section V / Particle test & Ultrasonic 100% √ P W V
Report procedure for Xylem
Stay Vane - Stay ASME Section VIII DIV 1 Test
5 Approval
Ring Assembly APP 6

Dimension
Dimension
Xylem Approved Drawing Measurement 100% Inspection √ P W V After Machining
Inspection
Report
Supplier to submit
Stay Ring - MPI - ASME Section V /
Florescent Wet Magnetic applicable NDT
6 Transition Plate Weld Joint - NDT ASME Section VIII DIV 1 100% MPI Test Report √ P W V
Particle test procedure for Xylem
Welding APP 6
Approval

Dimension
Dimension
7 Mock Up Assembly Xylem Approved Drawing Measurement 100% Inspection √ P W W
Inspection
Report

8 Painting Primer Painting Xylem Painting procedure DFT Measurement 100% Paint Report √ P W V

Pre dispatch
9 Packing & Dispatch Xylem Standard Visual 100% Packing list :-- :-- W :-- None
Inspection

LEGEND: * RECORDS IDENTIFIED WITH "TICK" ( √ ) SHALL BE ESSENTIALLY INCLUDED BY SUPPLIER/MFR IN QA DOCUMENTATION.
S : SUPPLIER C: CUSTOMER/CONSULTANT
P : PERFORM W: WITNESS V: VERIFICATION

Prepared By Verify By / Date