Cost Estimate
Cost Estimate
Cost Estimate
EQUIPMENT RATES
COMMERCIAL
MATERIALS
HAULING COST
BASIC PRICE ANALYSIS
PROCESSED
MATERIALS
UNIT PRICE ANALYSIS
MATERIAL SOURCES
MAP
GUIDELINES ON UNIT
PRICE ANALYSIS
ANNEXES
PART A
FACILITIES FOR THE
ENGINEER
PART B
OTHER GENERAL
REQUIREMENTS
PART C
EARTHWORK
PART D
SUBBASE AND
BASE COURSE
PART E
SURFACE COURSES
PART F
BRIDGE CONSTRUCTION
PART G
DRAINAGE AND SLOPE
PROTECTION STRUCTURES
PART H
MISCELLANEOUS
STRUCTURES
JICA ASSISTED ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
ASSET PRESERVATION CONTRACT- PREVENTIVE MAINTENANCE (APC- PM)
TABLE OF CONTENTS
1.Location Map
4. Labor Rates
5. Equipment Rates
7. Commercial Materials
8. Hauling Cost
12. Annexes
1) Region V, CMPD, 2nd Quarter
2) Canvassed Sheet for Eng'r. Service Vehicles
3) Canvassed Sheet for Loadometer Eqpt.
4) Back-up Computation for Safety Gadgets
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
TABLE OF CONTENTS
Page Designation
2 Equipment Equip1 -
3 Commercial Materials M1 -
6 Part A A1 -
7 Part B B1 -
8 Part C C1 -
9 Part D D1 -
10 Part E E1 -
11 Part F F1 -
12 Part G G1 -
13 Part H H1 -
IONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
TABLE OF CONTENTS
Page Designation
Equip 4
M12
Haul 3
PM-
A15
B4
C21
D2
E5
G10
H20
Title1 DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
Title2 PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT
Name PM - 13 SAYRE HIGHWAY, REGION X
Rd. Sect MALAYBALAY - CABANGLASAN ROAD SECTION
Station KO 1510 + 110 to KO 1521 + 929 Length = 11.81
AND 3RD YEAR OF THE
ND PRESERVATION PROJECT (RUPP)
L01 Foreman 1.80 541.80 13,545.00 541.80 1,128.75 1,004.50 100.00 137.50 16,457.55
L02 Asst. Foreman/Leadman 1.65 496.65 12,416.25 496.65 1,034.69 930.80 100.00 125.00 15,103.39
L03 Heavy Equipment Operator 1.50 451.50 11,287.50 451.50 940.63 857.20 100.00 112.50 13,749.33
L04 Highly Skilled Labor 1.50 451.50 11,287.50 451.50 940.63 857.20 100.00 112.50 13,749.33
L05 Light Equipment Operator 1.40 421.40 10,535.00 421.40 877.92 783.50 100.00 100.00 12,817.82
L06 Driver 1.30 391.30 9,782.50 391.30 815.21 746.70 100.00 100.00 11,935.71
L07 Skilled Laborer 1.30 391.30 9,782.50 391.30 815.21 746.70 100.00 100.00 11,935.71
L08 Semi-skilled Labor 1.20 361.20 9,030.00 361.20 752.50 673.00 100.00 87.50 11,004.20
L09 Unskilled Laborer 1.00 301.00 7,525.00 301.00 627.08 562.50 100.00 75.00 9,190.58
L10 CADD Operator 1.63 490.63 12,265.75 490.63 1,022.15 930.80 100.00 75.00 14,884.33
NOTE:
Monthly wages based on 300 days per year at 8 hours per day
Leave (vacation and sick) = Basic Daily Wage x 25 days per month x 12/300
L-1
Pag-ibig = Amount Representing Employer's Contribution, Graduated Scale
Sources of Data: National Wages and Productivity Commission, Department of Labor and Employment, Social Security System,
Philippine Contractors Association, Private Contractors, Civil Engineering Consultants and other related sources.
L-2
NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
RATE/
RATE/ DAY HOUR
658.30 82.29
604.14 75.52
549.97 68.75
549.97 68.75
512.71 64.09
477.43 59.68
477.43 59.68
440.17 55.02
367.62 45.95
595.37 74.42
L-3
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
Equip-1
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
Equip-2
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
Equip-3
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
III. STRUCTURES
E306 Pile Vibratory Hammer 2.00 90,519.00 452.60 54.31 3.30
E306a Vibro Hammer (Hydraulic Operated)
E307 Concrete Mixer, 1 - Bagger 22.00 22,308.00 111.54 13.38 36.30
E308 Concrete Mixer, 2 - Bagger 28.00 24,739.00 123.70 14.84 46.20
E309 Concrete Vibrator 5.00 13,125.00 65.63 7.88 8.25
Equip-4
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
Equip-5
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
Equip-6
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
Equip-7
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
LABOR OPERATING
COST/HOUR
(Php) (Php/Hour)
68.75 3,186.09
68.75 4,821.70
68.75 4,377.57
68.75 2,619.18
68.75 3,005.00
68.75 2,145.11
68.75 2,568.75
68.75 1,921.05
68.75 4,144.30
68.75 2,357.58
68.75 2,687.73
68.75 2,045.24
68.75 1,976.37
68.75 2,017.99
68.75 2,185.94
68.75 2,612.80
68.75 476.22
Equip-8
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
LABOR OPERATING
COST/HOUR
(Php) (Php/Hour)
0.00 160.34
59.68 1,352.00
59.68 1,716.00
68.75 1,184.00
59.68 1,102.00
59.68 712.00
1,065.00
1,384.00
68.75 669.10
3,678.59
6,995.39
Equip-9
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
LABOR OPERATING
COST/HOUR
(Php) (Php/Hour)
3,327.79
4,257.90
1,208.03
59.68 2,578.28
59.68 3,506.75
64.09 693.13
64.09 6,241.30
64.09 2,773.46
545.00
64.09 1,585.07
64.09 1,050.76
64.09 3,020.61
1,386.00
1,214.73
130.54
1,833.00
961.20
64.09 1,930.76
64.09 151.20
Equip-10
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
LABOR OPERATING
COST/HOUR
(Php) (Php/Hour)
68.75 3,684.77
68.75 41,820.33
68.75 2,150.60
68.75 3,181.70
68.75 3,950.15
1,729.00
68.75 2,150.60
68.75 3,945.13
68.75 1,117.28
68.75 977.65
68.75 578.95
3,069.00
64.09 225.31
64.09 248.83
64.09 145.84
Equip-11
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
LABOR OPERATING
COST/HOUR
(Php) (Php/Hour)
0.00 4,097.15
292.50
497.75
10,000.00
954.00
59.68 1,004.76
59.68 887.67
615.00
189.00
64.09 752.89
111.83
223.65
315.25
390.85
64.09 329.29
64.09 114.84
64.09 566.98
64.09 1,002.21
Equip-12
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
LABOR OPERATING
COST/HOUR
(Php) (Php/Hour)
64.09 305.04
64.09 391.00
64.09 204.64
64.09 393.93
64.09 228.95
64.09 93.75
64.09 187.50
64.09 45.45
64.09 167.38
65.00
148.00
64.09 490.00
64.09 115.00
64.09
64.09 537.75
Equip-13
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
LABOR OPERATING
COST/HOUR
(Php) (Php/Hour)
650.93
64.09 245.43
64.09 223.03
Equip-14
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
Roadway Materials
RM066 Rock, Class A cu.m. 550.00
RM067 Common Borrow Embankment Material cu.m. 376.00
RM068 Aggregate Sub-base Material cu.m. 700.00
RM069 Aggregate Base Material, Crushed Grading A cu.m. 750.00
RM070 Aggregate Surface Course Material, Crushed Grading A cu.m. 750.00
RM071 Filling Material, Mixed Sand and Gravel cu.m. 500.00
RM072 Aggregate Base Course, Filler Material cu.m. 700.00
RM073 Selected Borrow Material cu.m.
Asphalt
RM081 Cutback Asphalt, MC-70 *(as of April, 2013) tonne 63,409.00
RM082 Emulsified Asphalt, SS-1**as of April, 2013) tonne 57,919.00
RM083 Asphalt Cement Penetration Grade 60-70*(as of April, 2013) tonne 60,923.00
RM084 Asphalt Concrete (Plant Mix) Hot tonne 8,000.00
RM085 Asphalt Cement Penetration Grade 40-50 tonne 63,500.00
RM086 Curing Compound liter 75.00
Sealants
M-2
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
Pre-Fab Guardrails
RM111 Guard Rail Post, Pre cast pc 970.00
RM112 Guard Rail Post, GI pipe, 102mm x 16.40m or (4" x 5') pc 1,562.00
RM113 Guard Rail Bolt, Nut & Washer 5/8mmØ x 9" (16 x 229mm) pc 30.00
Fence
RM116 Barbed Wire, 3 strands GA 12.5 l.m. 20.00
RM117 Chain Link Fence , 2" (H = 6') l.m. 88.00
M-3
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
Catcheye
RM181 Reflective Stud Catcheye Flush Surface, 180mm x 140mm pc 750.00
RM182 Reflective Stud Catcheye Raised Surface, 100mm x 100mm pc 750.00
Paints
RM201 Latex Paint, Semi-Gloss gal 655.00
RM202 Enamel Paint gal 585.00
RM203 Paint, Reflectorized, (white) bag 600.00
RM204 Paint, Reflectorized, (yellow) bag 650.00
RM205 Reflectorized Thermoplastic Paint, (White) sq.m. 477.78
RM206 Reflectorized Thermoplastic Paint, (Yellow) sq.m. 477.78
RM207 Glass Beads bag 800.00
RM208 Primer, white liter 160.00
RM209 Primer, yellow liter 175.00
RM210 Paint Red Lead gal 520.00
RM211 Paint Metal Epoxy gal 655.00
RM212 Paint Primer Solvent gal 670.00
RM213 Paint Thinner gal 230.00
RM214 Concrete Neutralizer liter 95.00
RM215 Calsomine powder kg 100.00
RM216 Flat Wall Enamel/ Choco brown gal. 550.00
RM217 Putty pc 125.00
M-4
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
Structural Materials
PCDG AASHTO
SM001
SM002
Elastomeric Bearing Pads, Duro 60
SM011 Elastomeric Bearing Pad (500 x 500 x 50 Duro 60) each 17,980.50
SM012 Elastomeric Bearing Pad (600 x 300 x 50 Duro 60) each 12,946.50
SM013 Elastomeric Bearing Pad (600 x 600 x 50 Duro 60) each 25,891.50
SM014 Elastomeric Bearing Pad (250 x 700 x 50 Duro 60) each 12,562.55
SM015 Elastomeric Bearing Pad (350 x 350 x 30 Duro 60) each 6,000.00
SM016 Elastomeric Bearing Pad (350 x 350 x 50 Duro 60) each 8,793.78
SM017 Elastomeric Bearing Pad (400 x 500 x 50 Duro 60) each 14,384.82
SM018 Elastomeric Bearing Pad (400 x 700 x 50 Duro 60) each 20,138.75
SM019 Elastomeric Bearing Pad, 1 pc, 1 metal pc 10,100.00
SM020 Elastomeric Bearing Pad, 1 pc, 2 metals pc 16,125.00
Formworks
SM051 Steel Forms l.m. 40.00
SM052 Steel Forms, (decking) sq.m. 850.00
SM053 Formworks ( Good Lumber ) sq.m. 550.00
M-5
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
Miscellaneous Structural
SM201 12.70mm dia. S.R. Wire Strands kg 80.00
SM205 Bolts and Nuts, 5mm diameter pc 15.00
SM206 Rope, (1" diameter) l.m 10.00
SM207 Silica Sand kg 50.00
SM208 Super Mud kg 40.00
SM209 Rust Converter/ Remover gal 385.00
SM210 Bentonite Bag 280.00
Drainage Materials
RCPC Class IV
DM001 RCPC 1370mm dia. (54"), Class IV l.m. 5,800.00
DM002 RCPC 1524mm dia. (60"), Class IV l.m. 6,500.00
DM003 RCPC 910mm dia. (36"), Class IV l.m. 2,800.00
DM004 RCPC 1070mm dia. (42"), Class IV l.m. 3,500.00
DM005 RCPC 1220mm dia. (48"), Class IV l.m. 4,600.00
PVC Pipes
DM021 PVC Pipe 100mm ( 4") diameter x 3.0m l.m. 583.00
DM022 PVC Pipe 150mm (6") diameter x 3.0m l.m. 1,320.00
DM023 PVC Pipe 200mm (8") diameter x 3.0m l.m. 1,980.00
DM024 PVC , 100 mm dia.(Weepholes) l.m. 150.00
G.I. Pipe
DM041 G.I. Pipe 3" (76mm) diameter, Schedule 40 pc 4,200.00
DM042 G.I. Pipe 4" (102mm) diameter, Schedule 40 pc 6,249.00
DM043 G.I. Pipe 5" (127mm) diameter, Schedule 40 pc 8,480.00
DM044 G.I. Pipe 6" (152mm) diameter, Schedule 40 pc 13,850.00
DM045 Premolded Expansion Joint Filler, 12 mm thk sq.m. 650.00
Concrete Pipe
DM061 Concrete Pipe, perforated 6" diameter, (150mm) pc 260.00
M-6
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
Metal Grating
DM071 Metal Grating kg 90.00
Slope Protection
DM081 Coco - net CGN 700 sq.m. 210.00
DM082 Grass Vetiver sq.m. 70.00
DM083 Coco - log / Fascine CGR 300 l.m. 485.00
DM084 Geotextile, (Polyfelt TS50) sq.m. 160.00
DM085 Filter Cloth sq.m. 280.00
DM086 Erosion Control Net w/ calopognium for cover grass sq.m. 200.00
DM087 Gabion Wire; (2.0m x 1.0m x 1.0m), PVC Coated pc 2,225.00
DM088 Mattress; (6.0m x 2.0m x 0.30m), PVC Coated pc 4,600.00
DM089 Riprap, Class A cu.m. 920.00
DM090 Grouted Riprap, Class A cu.m. 920.00
DM091 Stone Masonry cu.m. 920.00
DM092 Hand-Laid Rock Embankment (0.015cu.m./pc) cu.m. 920.00
Ceiling:
FO002 Fiber Board (Hardiflex)/ Marine plywood
Purlins
FO011 LC- 125mm x 50mm x 20mm x 5mm l.m. 1,717.00
Stiffened Light Gage Channel
Miscellaneous Works
FO016 Sag Rods, 10mm diameter l.m. 52.48
M-7
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
V. Structural Steel
Roof Truss
FO021 2L - 125 x 125 x 8mm l.m. 2,197.76
FO022 2L - 50 x 50 x 6mm l.m. 659.33
FO023 L - 50 x 50 x 6mm l.m. 329.66
FO024 L - 30 x 50 x 6mm (hanger) l.m. 263.73
Tiles
FO081 Glazed Tiles sq.m. 700.00
FO082 Vinyl Tiles, 1/12" thick sq.m. 420.00
FO083 Portland Cement bag
IX. Electrical
M-9
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
M-10
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
FR010 Electronic Calculator, Scientific with at least 12-digit display each 1,500.00
FR012 Air Conditioner (Window Type), 0.75 HP, 220V AC unit 15,000.00
M-11
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
FR014 HB Scanner for A3 size including scan software with SCSI unit 15,000.00
Card or USB Connector ( Latest Model)
FR015 LAN Hub Port for 10 Base - T cable with 4 ports min unit 2,000.00
FR018 Portable Projector with 3000 ANSI Lumens or equivalent unit 25,000.00
FR019 Color Printer, A4 - A3 size paper capacity unit 15,000.00
FR020 Laser Jet Printer unit 6,000.00
FR021 Standard Computer Table with swivel chair each 2,500.00
FR022 Magnetic Whiteboard, 1.50 m x 1.O m on roller unit 1,990.00
stand usable both side
M-12
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
FR034 Long sofa with padded arm and backrest each 24,900.00
synthetic leather upholstery or equivalent
FR035 Sofa lounge chairs, with padded arm and each 40,000.00
backrest synthetic leather upholstery or equivalent
Equipment:
a.) Gradation
SE001 3" - 8" dia. Brass Sieve each 2,090.91
SE002 2" - 8" dia. Brass Sieve each 2,090.91
M-18
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
SE024 Liquid Limit Set Device with Counter 22-T0030/F Controls set 12,363.64
SE025 Grooving Tool, Brass For Liquid Limit Local pc 1,090.91
SE026 Plastic Limit Set SO10 R.M.U. set 1,090.91
SE027 Balance, 0.01 gram sensitivity 311 grms cap each 13,545.45
SE028 Evaporating Dish, 5" dia (aluminum) each 127.27
SE029 Moisture Can, 3 oz. pc 18.18
SE030 Graduated Cylinder (Glass) 100ml pc 327.27
SE031 Spatula, stainless 4" Local pc 90.91
d. Laboratory CBR
Items included per set:
SE044 Mechanical Loading Press, 45KN capacity unit 104,545.45
with metric dial reading to 0.025mm
SE045 CBR Mold, 6" dia x 7" with colar and base plate, each 1,590.91
SE046 Slotted Surcharge Weight, 5# each 1,181.82
SE047 Annular Surcharge Weight, 5# each 1,181.82
SE048 Cutting Edge,6" each 527.27
SE049 Spacer Disk, 5-7/8" each 1,681.82
SE050 Swell Plate, Brass, each 2,727.27
SE051 Dial Indicator Reading to 0-10mm x 0.01mm each 2,909.09
SE052 Swell Dial Indicator each 4,385.91
SE053 Tripod Attachment each 636.36
SE054 Filter Paper, 15 cm. Box of 100 pack 2,090.91
M-20
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
M-22
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
Safety Gadgets
SG001 Hard Hat, Blue Eagle Pin Lock Type pc 265.00
SG002 Hard Hat, Blue Eagle Ratchet Type pc 450.00
SG003 Hard Hat, Class CG&E pc 700.00
SG004 Hard Hat, Ordinary w/ Chin Strap pc 267.00
SG005 Safety Shoes, Panoply, Goult Low Cut pc 1,700.00
SG006 Safety Shoes, Panoply, Jets1p Low Cut pc 1,400.00
SG007 Safety Shoes, Panoply, Gargas Hi Cut pc 1,900.00
SG008 Safety Shoes, Panoply, Jumper Hi Cut pc 1,600.00
SG009 Safety Gloves, nitrile & cut resistant pair 380.00
SG010 Safety Gloves, Ordinary pair 39.00
SG011 Rain Coats Jacket and Pants Yellow, med&Large pair 650.00
SG012 Rain Coats Jacket and Pants Yellow, xLarge pair 680.00
SG013 Rain Coats Jacket and Pants Yellow, xxLarge pair 725.00
SG014 Rain Coats Jacket and Pants Yellow, xxxLarge pair 780.00
SG015 Rain Coats Poncho Yellow & Green pair 485.00
SG016 Dust Mask pc 50.00
SG017 Rubber Boots pair 400.00
SG018 Eye Goggles, Fox pair 150.00
SG019 Ear Plugs pc
SG020 High Visibility Vest pc 180.00
M-23
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
M-24
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 250.00
0.00 260.00
0.00 250.00
0.00 230.00
0.00 60.00
0.00 65.00
0.00 70.00
0.00 55.00
0.00 70.00
0.00 3,386.50
0.00 83.00
0.00 65.00
0.00 98.00
0.00 3,450.00
0.00 120.00
0.00 70.00
0.00 61.00
0.00 66.00
0.00 48.00
0.00 62.00
0.00 57.00
0.00 220.00
0.00 375.00
0.00 710.00
0.00 1,250.00
0.00 330.00
0.00 650.00
0.00 980.00
0.00 85.00
0.00 55.00
0.00 45.00
0.00 15.00
0.00 50.00
0.00 750.00
M-25
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 20.00
1.00 25.00
0.00 3,998.00
0.00 4,288.00
0.00 4,458.00
0.00 4,918.00
0.00 4,688.00
0.00 110.00
0.00 45.00
0.00 550.00
0.00 376.00
0.00 700.00
0.00 750.00
0.00 750.00
0.00 500.00
0.00 700.00
0.00 0.00
0.00 63,409.00
0.00 57,919.00
0.00 60,923.00
0.00 8,000.00
0.00 63,500.00
0.00 75.00
M-26
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 720.00
0.00 710.00
0.00 1,430.00
0.00 2,300.00
0.00 1,200.00
0.00 970.00
0.00 1,562.00
0.00 30.00
0.00 20.00
0.00 88.00
0.00 1,450.00
0.00 530.00
0.00 620.00
0.00 1,060.00
0.00 1,300.00
M-27
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 7,794.60
0.00 7,880.00
0.00 5,230.00
0.00 7,804.84
0.00 7,400.10
0.00 7,880.00
0.00 10,450.00
0.00 13,100.00
0.00 13,100.00
0.00 20,900.00
0.00 32,000.00
0.00 25,548.00
0.00 21,796.90
0.00 7,098.41
0.00 4,500.00
0.00 750.00
0.00 750.00
0.00 655.00
0.00 585.00
0.00 600.00
0.00 650.00
0.00 477.78
0.00 477.78
0.00 800.00
0.00 160.00
0.00 175.00
0.00 520.00
0.00 655.00
0.00 670.00
0.00 230.00
0.00 95.00
0.00 100.00
0.00 550.00
0.00 125.00
M-28
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 600.00
0.00 2.94
0.00 40.00
0.00 50.00
0.00 1,200.00
0.00 178.00
0.00 70.00
0.00 35.00
0.00 40.00
0.00 17,980.50
0.00 12,946.50
0.00 25,891.50
0.00 12,562.55
0.00 6,000.00
0.00 8,793.78
0.00 14,384.82
0.00 20,138.75
0.00 10,100.00
0.00 16,125.00
0.00 40.00
0.00 850.00
0.00 550.00
M-29
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 80.00
0.00 15.00
0.00 10.00
0.00 50.00
0.00 40.00
0.00 385.00
0.00 280.00
0.00 5,800.00
0.00 6,500.00
0.00 2,800.00
0.00 3,500.00
0.00 4,600.00
0.00 583.00
0.00 1,320.00
0.00 1,980.00
0.00 150.00
0.00 4,200.00
0.00 6,249.00
0.00 8,480.00
0.00 13,850.00
0.00 650.00
0.00 260.00
M-30
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 90.00
0.00 210.00
0.00 70.00
0.00 485.00
0.00 160.00
0.00 280.00
0.00 200.00
0.00 2,225.00
0.00 4,600.00
0.00 920.00
0.00 920.00
0.00 920.00
0.00 920.00
0.00 280.00
0.00 1,717.00
0.00 52.48
M-31
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 2,197.76
0.00 659.33
0.00 329.66
0.00 263.73
0.00 988.99
0.00 420.00
0.00 148.50
0.00 190.00
0.00 190.00
0.00 190.00
0.00 0.00
0.00 1,250.00
0.00 700.00
0.00 890.00
0.00 790.00
0.00 2,488.50
M-32
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 3,300.00
0.00 981.00
0.00 1,000.00
0.00 700.00
0.00 420.00
0.00 0.00
0.00 4,500.00
0.00 4,800.00
0.00 1,900.00
0.00 150.00
0.00 755.00
0.00 800.00
0.00 165.00
0.00 59.00
0.00 265.00
0.00 1,300.00
0.00 921.00
0.00 165.00
0.00 850.00
0.00 683.00
0.00 1,500.00
0.00 80.00
0.00 0.00
M-33
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 50.00
0.00 0.00
0.00 1,275.00
0.00 170.00
0.00 367.00
0.00 132.00
0.00 1,350.00
0.00 1,627.00
0.00 2,500.00
0.00 24.00
0.00 38.00
0.00 1,000.00
0.00 73.00
0.00 128.00
0.00 40.00
0.00 32.00
0.00 34.00
0.00 31.00
0.00 200.00
0.00 9,950.00
0.00 7,950.00
0.00 4,990.00
M-34
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 695.00
0.00 26,965.00
0.00 5,988.00
0.00 3,486.00
0.00 13,450.00
0.00 1,500.00
0.00 105,000.00
0.00 15,000.00
M-35
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 17,000.00
0.00 15,000.00
0.00 2,000.00
0.00 35,000.00
0.00 40,000.00
0.00 25,000.00
0.00 15,000.00
0.00 6,000.00
0.00 2,500.00
0.00 1,990.00
0.00 0.00
M-36
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 4,995.00
0.00 11,990.00
0.00 695.00
0.00 24,900.00
0.00 40,000.00
0.00 3,490.00
0.00 15,000.00
0.00 17,000.00
M-37
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 17,980.00
0.00 14,975.00
0.00 2,990.00
0.00 10,000.00
0.00 11,990.00
0.00 1,792.00
0.00 2,490.00
0.00 300.00
0.00 1,500.00
0.00 495.00
0.00 4,490.00
0.00 845.00
0.00 948.00
0.00 595.00
0.00 1,200.00
0.00 15,000.00
0.00 3,000.00
0.00 2,000.00
0.00 75.00
0.00 23.00
M-38
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 250.00
0.00 998.00
M-39
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 37.00
0.00 35.00
0.00 35.00
0.00 85.00
0.00 200.00
0.00 45.00
0.00 30.00
0.00 3.08
0.00 2.50
0.00 20.00
0.00 2.00
0.00 2.00
0.00 6.50
0.00 5.67
0.00 58.00
0.00 250.00
0.00 20.00
0.00 3,498.00
0.00 1,195.00
0.00 240.00
0.00 35.00
0.00 50.00
0.00 30.00
0.00 35.00
0.00 50.00
0.00 75.00
0.00 15.00
0.00 148.00
0.00 35.00
M-40
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 50.00
0.00 130.00
0.00 50.00
0.00 50.00
0.00 90.00
0.00 60.00
0.00 148.00
0.00 10.00
0.00 247.00
0.00 72.00
0.00 198.00
0.00 300.00
0.00 22.00
0.00 148.00
0.00 148.00
0.00 12.00
M-41
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 0.00
0.00 2,090.91
0.00 2,090.91
M-42
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 560.91
0.00 272.73
0.00 50.00
0.00 54.55
0.00 12,363.64
0.00 1,090.91
0.00 1,090.91
0.00 13,545.45
0.00 127.27
0.00 18.18
0.00 327.27
0.00 90.91
0.00 909.09
0.00 909.09
M-43
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 1,181.82
0.00 254.55
0.00 90.91
0.00 90.91
0.00 54.55
0.00 52,727.27
0.00 18.18
0.00 909.09
0.00 1,181.82
0.00 104,545.45
0.00 1,590.91
0.00 1,181.82
0.00 1,181.82
0.00 527.27
0.00 1,681.82
0.00 2,727.27
0.00 2,909.09
0.00 4,385.91
0.00 636.36
0.00 2,090.91
0.00 3,909.09
0.00 818.18
0.00 772,727.27
0.00 9.09
0.00 118.18
0.00 0.45
0.00 54.55
0.00 209.09
0.00 109.09
M-44
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 272.73
0.00 81,818.18
0.00 363.64
0.00 38,909.09
0.00 2,090.91
0.00 2,181.82
0.00 2,181.82
0.00 2,181.82
0.00 2,181.82
0.00 2,181.82
0.00 495,454.55
0.00 22,272.73
0.00 5,000.00
0.00 1,272.73
0.00 1,636.36
0.00 1,454.55
0.00 278.34
0.00 1,181.82
0.00 90.91
0.00 9,863.64
0.00 77,530.30
0.00 7,743.94
0.00 7,727.27
0.00 132,727.27
0.00 1,136.36
0.00 3,500.00
0.00 52,181.82
0.00 2,545.45
M-45
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 50,000.00
0.00 1,727.27
0.00 200.00
0.00 7,272.73
0.00 2,363.64
0.00 318.18
0.00 290.91
0.00 323.03
0.00 254.55
0.00 560.91
0.00 90.91
0.00 272.73
0.00 40.91
0.00 127.27
0.00 685.61
0.00 390.91
0.00 18,181.82
0.00 2,272.73
M-46
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00 265.00
0.00 450.00
0.00 700.00
0.00 267.00
0.00 1,700.00
0.00 1,400.00
0.00 1,900.00
0.00 1,600.00
0.00 380.00
0.00 39.00
0.00 650.00
0.00 680.00
0.00 725.00
0.00 780.00
0.00 485.00
0.00 50.00
0.00 400.00
0.00 150.00
0.00 0.00
0.00 180.00
M-47
NAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
M-48
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RU
A.1 Assumptions:
The contractor will excavate and process the raw materials before hauling..
Terrain : Flat and Rolling
Condition of Road : Fair
Loader Capacity : 1.50 cu.m. = 10 cu.m./hr.
Bucket Efficiency factor : 90%
Dump Truck Capacity : 10.00 cu.m.
Haul-1
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RU
2 20.26 2.962
4 28.96 2.072
8 45.36 1.323
10 51.06 1.175
12 58.76 1.021
15 70.31 0.853
20 89.56 0.670
24 104.96 0.572
28 120.36 0.499
30 128.06 0.469
32 135.76 0.442
35 147.31 0.407
40 166.56 0.360
44 181.96 0.330
50 205.06 0.293
Haul-2
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RU
Equipment:
Wheel Loader, 1.50 cu.m. (1) =P 2,145.11 (1)
Dump Truck, 9 - 10.00 cu.m. (N) =P 1,352.00 (N)
Labor:
Assistant Foreman (1) =P 75.52 (1)
Unskilled Labor (2) =P 45.95 (2)
Haul-4
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RU
Haul-5
D NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
MPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
TOTAL
CYCLE TIME
(Min.)
20.26
28.96
45.36
51.06
58.76
70.31
Haul-6
D NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
MPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
Haul-7
D NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
MPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
say 3 Trucks
say 5 Trucks
say 8 Trucks
say 9 Trucks
say 10 Trucks
say 12 Trucks
say 15 Trucks
say 18 Trucks
say 20 Trucks
say 21 Trucks
say 23 Trucks
say 25 Trucks
say 28 Trucks
say 30 Trucks
say 34 Trucks
HAULED VOLUME
( cu.m. )
88.85
103.59
105.82
105.76
102.11
102.40
Haul-8
D NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
MPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
TOTAL
HAULING
COST
71.68
87.58
124.06
136.92
155.05
181.01
224.82
258.98
294.41
312.07
328.66
354.65
398.24
Haul-9
D NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
MPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
Haul-10
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVAT
PM-11
PM#25 Reinforced Concrete Pipe Culvert, 460mm dia. Class II l.m.
PM#26 Reinforced Concrete Pipe Culvert, 610mm dia. Class II l.m.
PM#27 Reinforced Concrete Pipe Culvert, 760mm dia. Class II l.m.
PM#28a Reinforced Concrete Pipe Culvert, 910mm dia. Class II l.m.
PM#28b Reinforced Concrete Pipe Culvert, 910mm dia. Class IV l.m.
PM#29 Reinforced Concrete Pipe Culvert, 1070mm dia. Class IV l.m.
PM#30 Reinforced Concrete Pipe Culvert, 1220mm dia. Class IV l.m.
PM#31 Reinforced Concrete Pipe Culvert, 1520mm dia. Class IV l.m.
PM#32 Pre-Fab Concrete Footing for Warning / Regulatory signs pc.
PM#33 Pre-Fabricated Concrete Post for Metal Beam Guardrail pc.
PM#34 Pre-Fabricated Concrete Footing for Chevron Signs pc.
PM-12
D NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
MPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
PM-13
1,282.00 0.00 1,282.00
1,692.04 0.00 1,692.04
2,226.61 0.00 2,226.61
3,631.39 0.00 3,631.39
3,711.32 0.00 3,711.32
4,811.57 0.00 4,811.57
5,769.77 0.00 5,769.77
7,947.67 0.00 7,947.67
2,456.10 0.00 2,456.10
2,398.39 0.00 2,398.39
2,171.99 0.00 2,171.99
PM-14
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A. LABOR
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
B. LABOR
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
PM-3
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
A. LABOR
SUB - TOTAL A
PM-4
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
A. LABOR
PM-5
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
PM-6
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF
UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
PM-7
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
A. LABOR
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
A. LABOR
PM-9
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF
UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
PM-10
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A. LABOR
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
PM-11
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF
UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
PM-12
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
A. LABOR
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
A. LABOR
PM-14
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
Royalties cu.m. 1
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
A. LABOR
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
A. LABOR
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
PM-17
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
A. LABOR
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
PM-18
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF
UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
PM-20
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A. LABOR
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
PM-21
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
A. LABOR
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
PM-22
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
A. LABOR
PM-23
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
A. LABOR
PM-24
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 8 1
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
PM-25
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF
UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
PM-26
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
A. LABOR
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
PM-27
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
A. LABOR
PM-28
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF
UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
PM-29
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A. LABOR
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
PM-30
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF
UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
PM-31
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
A. LABOR
L01 Foreman 1 1
L09 Unskilled Laborer 2 1
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
A. LABOR
L01 Foreman 1 1
L09 Unskilled Laborer 2 1
PM-33
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
PM-34
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 5 1
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
A. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 5 1
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
PM-36
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 5 1
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
PM-37
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
A. LABOR
L01 Foreman 1 1
PM-38
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
A. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
PM-39
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 5 1
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF
UNITS HOUR
A. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
PM-40
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 5 1
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
PM-41
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 10 1
PM-42
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF
UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
PM-43
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 12 1
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
PM-44
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 4 1
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF
UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
PM-45
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 4 1
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
NO. OF NO. OF
REF. NO. DESIGNATION PERSON HOUR
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 4 1
PM-47
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF
UNITS HOUR
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST (A + B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 6 1
L09 Unskilled Laborer 6 1
Total Man-hours = 19 hours
SUB - TOTAL A
NO. OF NO. OF
NAME AND CAPACITY UNITS HOUR
B. EQUIPMENT
E. MATERIALS
SUB - TOTAL E
F. TOTAL BASIC COST (D + E)
PM-50
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
45.95 183.81
183.81
HOURLY RATE AMOUNT
4,821.70 4,821.70
18.38
4,840.08
5,023.89
80.00
62.80
UNIT COST AMOUNT
50.00 50.00
PM-51
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
50.00
112.80
45.95 275.72
275.72
HOURLY RATE AMOUNT
4,821.70 4,821.70
27.57
PM-52
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
4,849.27
5,124.99
60.00
85.42
UNIT COST AMOUNT
50.00 50.00
50.00
135.42
75.52 75.52
45.95 229.76
305.28
PM-53
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
4,821.70 9,643.39
2,145.11 2,145.11
1,352.00 4,056.00
3,327.79 3,327.79
19,172.29
19,477.57
80.00
243.47
UNIT COST AMOUNT
50.00 50.00
50.00
293.47
PM-54
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
305.28
HOURLY RATE AMOUNT
4,821.70 9,643.39
2,145.11 2,145.11
1,352.00 4,056.00
3,327.79 3,327.79
19,172.29
19,477.57
90.00
216.42
UNIT COST AMOUNT
50.00 50.00
PM-55
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
75.52 75.52
59.68 59.68
45.95 183.81
319.01
HOURLY RATE AMOUNT
4,821.70 9,643.39
2,145.11 2,145.11
1,352.00 4,056.00
3,327.79 3,327.79
19,172.29
19,491.30
75.00
259.88
UNIT COST AMOUNT
PM-56
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
50.00 50.00
50.00
309.88
75.52 75.52
59.68 59.68
45.95 183.81
319.01
HOURLY RATE AMOUNT
4,821.70 9,643.39
2,145.11 2,145.11
1,352.00 4,056.00
3,327.79 3,327.79
PM-57
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
19,172.29
19,491.30
70.00
278.45
UNIT COST AMOUNT
50.00 50.00
50.00
328.45
75.52 75.52
59.68 59.68
45.95 183.81
PM-58
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
319.01
HOURLY RATE AMOUNT
4,821.70 9,643.39
2,145.11 2,145.11
1,352.00 4,056.00
3,327.79 3,327.79
19,172.29
19,491.30
60.00
324.86
UNIT COST AMOUNT
50.00 50.00
50.00
374.86
75.52 75.52
59.68 59.68
45.95 183.81
319.01
HOURLY RATE AMOUNT
4,821.70 9,643.39
2,145.11 2,145.11
1,352.00 4,056.00
3,678.59 3,678.59
19,523.10
19,842.10
65.00
305.26
UNIT COST AMOUNT
50.00 50.00
PM-60
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
50.00
355.26
75.52 75.52
45.95 229.76
305.28
HOURLY RATE AMOUNT
4,821.70 9,643.39
2,145.11 2,145.11
1,352.00 4,056.00
3,327.79 3,327.79
19,172.29
19,477.57
PM-61
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
50.00 50.00
50.00
293.47
45.95 459.53
459.53
HOURLY RATE AMOUNT
2,145.11 2,145.11
PM-62
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
11,022.80
11,482.33
25.00
459.29
UNIT COST AMOUNT
50.00 50.00
50.00
509.29
45.95 45.95
PM-63
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
45.95
HOURLY RATE AMOUNT
1,065.00 1,065.00
1,065.00
1,110.95
60.00
18.52
UNIT COST AMOUNT
10.00 10.00
10.00
28.52
82.29 82.29
59.68 119.36
45.95 183.81
385.46
HOURLY RATE AMOUNT
2,145.11 2,145.11
1,065.00 1,065.00
1,208.03 1,208.03
3,506.75 14,026.99
18,445.13
18,830.59
25.00
753.22
UNIT COST AMOUNT
250.00 2,250.00
371.00 166.95
452.38 407.14
PM-65
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
141.40
2,969.49
3,722.71
82.29 82.29
59.68 119.36
45.95 183.81
385.46
HOURLY RATE AMOUNT
2,145.11 2,145.11
1,065.00 1,065.00
1,208.03 1,208.03
3,506.75 14,026.99
PM-66
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
250.00 2,937.50
371.00 155.82
452.38 380.00
28.52 3.99
347.73
3,825.04
4,578.27
82.29 82.29
59.68 119.36
45.95 183.81
385.46
HOURLY RATE AMOUNT
PM-67
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
2,145.11 2,145.11
1,065.00 1,065.00
1,208.03 1,208.03
3,506.75 14,026.99
18,445.13
18,830.59
25.00
753.22
UNIT COST AMOUNT
250.00 2,000.00
371.00 166.95
452.38 407.14
28.52 3.99
128.90
2,706.99
3,460.21
82.29 82.29
59.68 119.36
PM-68
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
385.46
HOURLY RATE AMOUNT
2,145.11 2,145.11
1,065.00 1,065.00
1,208.03 1,208.03
3,506.75 14,026.99
18,445.13
18,830.59
40.00
470.76
UNIT COST AMOUNT
250.00 2,375.00
371.00 166.95
452.38 407.14
28.52 3.99
147.65
3,100.74
3,571.50
PM-69
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 238.71
45.95 367.62
688.63
HOURLY RATE AMOUNT
248.83 248.83
248.83
937.45
5.00
187.49
UNIT COST AMOUNT
PM-70
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
151.36
3,178.65
3,366.14
82.29 82.29
59.68 238.71
45.95 367.62
688.63
HOURLY RATE AMOUNT
248.83 248.83
PM-71
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
248.83
937.45
5.00
187.49
UNIT COST AMOUNT
250.00 2,625.00
371.00 241.15
452.38 407.14
28.52 3.99
163.86
3,441.15
3,628.64
82.29 82.29
59.68 119.36
45.95 183.81
PM-72
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
2,145.11 2,145.11
1,065.00 1,065.00
1,208.03 1,208.03
3,506.75 14,026.99
18,445.13
18,830.59
25.00
753.22
UNIT COST AMOUNT
250.00 2,625.00
371.00 241.15
452.38 407.14
28.52 3.99
163.86
3,441.15
4,194.37
PM-73
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 238.71
45.95 367.62
688.63
HOURLY RATE AMOUNT
248.83 248.83
248.83
937.45
5.00
187.49
UNIT COST AMOUNT
250.00 1,250.00
371.00 166.95
452.38 407.14
28.52 3.99
91.40
PM-74
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,919.49
2,106.98
82.29 82.29
59.68 119.36
45.95 183.81
385.46
HOURLY RATE AMOUNT
2,145.11 2,145.11
1,065.00 1,065.00
1,208.03 1,208.03
3,506.75 14,026.99
38.55
18,483.67
18,869.13
25.00
754.77
UNIT COST AMOUNT
PM-75
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
250.00 2,500.00
371.00 166.95
452.38 407.14
28.52 3.99
153.90
3,231.99
3,986.75
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
1,102.00 551.00
315.25 315.25
390.85 390.85
PM-76
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,344.34
2,216.78
500.00
4.43
UNIT COST AMOUNT
60.00 60.00
55.00 2.20
1.87
64.07
68.50
82.29 82.29
59.68 238.71
45.95 551.44
PM-77
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
872.44
HOURLY RATE AMOUNT
1,102.00 551.00
315.25 315.25
390.85 390.85
87.24
1,344.34
2,216.78
500.00
4.43
UNIT COST AMOUNT
65.00 65.00
55.00 2.20
2.02
69.22
73.65
PM-78
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 238.71
45.95 275.72
596.72
HOURLY RATE AMOUNT
59.67
59.67
656.39
18.00
36.47
UNIT COST AMOUNT
710.00 241.40
55.00 513.15
70.00 17.50
38.60
PM-79
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
810.65
847.12
82.29 82.29
59.68 119.36
45.95 183.81
385.46
HOURLY RATE AMOUNT
38.55
38.55
424.00
PM-80
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
55.00 513.15
70.00 17.50
26.53
557.18
580.74
82.29 82.29
45.95 91.91
174.19
HOURLY RATE AMOUNT
248.83 248.83
PM-81
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
248.83
423.02
1.00
423.02
UNIT COST AMOUNT
250.00 4,500.00
371.00 371.00
4,871.00
5,294.02
82.29 82.29
45.95 91.91
PM-82
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
174.19
HOURLY RATE AMOUNT
248.83 248.83
248.83
423.02
1.00
423.02
UNIT COST AMOUNT
250.00 3,000.00
371.00 371.00
3,371.00
3,794.02
PM-83
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 119.36
45.95 45.95
247.60
HOURLY RATE AMOUNT
74.28
74.28
321.88
1.75
183.93
UNIT COST AMOUNT
3,366.14 403.94
68.50 641.84
PM-84
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
52.29
1,098.07
1,282.00
82.29 82.29
59.68 119.36
45.95 229.76
431.41
HOURLY RATE AMOUNT
129.42
PM-85
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
129.42
560.83
1.50
373.89
UNIT COST AMOUNT
3,366.14 403.94
68.50 851.45
62.77
1,318.16
1,692.04
82.29 82.29
59.68 119.36
45.95 229.76
431.41
HOURLY RATE AMOUNT
PM-86
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
129.42
129.42
560.83
1.25
448.67
UNIT COST AMOUNT
3,366.14 706.89
68.50 986.39
84.66
1,777.95
2,226.61
82.29 82.29
PM-87
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
431.41
HOURLY RATE AMOUNT
129.42
129.42
560.83
1.25
448.67
UNIT COST AMOUNT
3,366.14 976.18
68.50 2,054.99
151.56
3,182.72
PM-88
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 119.36
45.95 229.76
431.41
HOURLY RATE AMOUNT
129.42
129.42
560.83
1.25
448.67
UNIT COST AMOUNT
PM-89
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
3,628.64 1,052.31
68.50 2,054.99
155.36
3,262.66
3,711.32
82.29 82.29
59.68 119.36
45.95 229.76
431.41
HOURLY RATE AMOUNT
129.42
PM-90
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
129.42
560.83
1.25
448.67
UNIT COST AMOUNT
3,628.64 1,415.17
68.50 2,739.98
207.76
4,362.91
4,811.57
82.29 82.29
59.68 119.36
45.95 459.53
PM-91
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
661.17
HOURLY RATE AMOUNT
198.35
198.35
859.53
1.25
687.62
UNIT COST AMOUNT
3,628.64 1,415.17
68.50 3,424.98
242.01
5,082.15
5,769.77
PM-92
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 119.36
45.95 551.44
753.08
HOURLY RATE AMOUNT
225.92
225.92
979.00
1.25
783.20
UNIT COST AMOUNT
3,628.64 2,576.33
68.50 4,246.97
341.17
PM-93
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
7,164.47
7,947.67
82.29 82.29
59.68 119.36
45.95 183.81
385.46
HOURLY RATE AMOUNT
225.31 225.31
145.84 145.84
305.04 305.04
1,065.00 532.50
1,208.70
1,594.15
5.00
318.83
UNIT COST AMOUNT
PM-94
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
60.00 7.99
250.00 128.25
750.00 22.28
616.67 29.97
847.12 897.95
840.00 1,050.84
2,137.27
2,456.10
82.29 82.29
59.68 119.36
45.95 183.81
385.46
HOURLY RATE AMOUNT
225.31 225.31
145.84 145.84
315.25 315.25
PM-95
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,609.75
1,995.20
5.00
399.04
UNIT COST AMOUNT
60.00 798.66
250.00 152.80
750.00 25.13
616.67 25.84
55.00 8.86
847.12 892.86
95.21
1,999.35
2,398.39
82.29 82.29
59.68 119.36
45.95 183.81
PM-96
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
385.46
HOURLY RATE AMOUNT
225.31 225.31
145.84 145.84
305.04 305.04
1,065.00 532.50
1,208.70
1,594.15
5.00
318.83
UNIT COST AMOUNT
60.00 15.98
250.00 106.88
750.00 18.56
616.67 24.98
847.12 804.76
840.00 882.00
1,853.16
2,171.99
82.29 82.29
59.68 358.07
45.95 275.72
716.08
HOURLY RATE AMOUNT
1,833.00 1,833.00
1,214.73 1,214.73
1,184.00 1,184.00
2,185.94 2,185.94
1,352.00 2,704.00
2,145.11 2,145.11
1,065.00 1,065.00
71.61
12,403.39
13,119.46
249.82
52.52
UNIT COST AMOUNT
60,923.00 283.90
452.38 16.34
371.00 6.48
250.00 0.15
PM-98
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
337.55
390.07
PM-99
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A-1
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A-3
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A-4
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
Electric flat iron with temperature control and foldable set 1.00
ironing table with pad
A-6
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
Schedule C
A. Maintenance Staf
A-7
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
SUB-TOTAL A
B. Laboratory Personnel
Laboratory Technician mo. 1.00
Laboratory Aide mo. 2.00
Office Personnel/ Support Staff mo. 1.00
SUB-TOTAL B
C. Miscellaneous
Water Bill mo. 1.00
Electric Bill mo. 1.00
Telephone Bill mo. 1.00
SUB-TOTAL C
Sub-Total (Schedule D)
Schedule D
a.) Office Supplies (to be provided only on the 1st month)
A-8
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
Schedule D
a.) Office Supplies (to be provided only on the 1st month)
A-9
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
Sub - Total 1
Monthly Cost
Schedule E
b.) Office Supply (monthly)
A-10
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A-11
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
Sub - Total 2
Schedule F
c.) Consumable Items for Field Office (Monthly)
Schedule F
c.) Consumable Items for Field Office (Monthly)
A-13
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A-14
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A-15
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
Given:
Fuel Cost = 20 liters per day
Lube Cost = 20% (Fuel Cost)
Operator's Wage = rate/hour
RFM = 413.41/ hour
VAT = 12% of RFO
RFO / hour =
RFO/ day* =
RFO/ month** =
A-16
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A-17
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
Schedule H
a. Survey Personnel
Sub - Total A
A-18
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A-20
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF T
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJE
A-21
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
UNIT TOTAL
RATE COST
(Pesos) (Pesos)
15,000.00 15,000.00
A-22
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
15,000.00
1,200.00
1,944.00
18,144.00
UNIT TOTAL
RATE COST
(Pesos) (Pesos)
7,950.00 31,800.00
3,487.00 13,948.00
26,965.00 26,965.00
3,486.00 6,972.00
13,450.00 13,450.00
A-23
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
105,000.00 105,000.00
17,000.00 17,000.00
35,000.00 35,000.00
40,000.00 40,000.00
25,000.00 25,000.00
15,000.00 15,000.00
UNIT TOTAL
RATE COST
(Pesos) (Pesos)
6,000.00 6,000.00
2,500.00 2,500.00
A-24
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,800.00 3,600.00
2,490.00 4,980.00
300.00 300.00
10,000.00 10,000.00
75.00 75.00
600.00 600.00
1,199.00 1,199.00
A-25
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
UNIT TOTAL
RATE COST
(Pesos) (Pesos)
4,995.00 19,980.00
11,990.00 11,990.00
40,000.00 40,000.00
15,000.00 45,000.00
17,980.00 17,980.00
14,975.00 14,975.00
2,990.00 2,990.00
10,000.00 10,000.00
3,000.00 3,000.00
2,000.00 2,000.00
1,500.00 1,500.00
4,490.00 8,980.00
15,000.00 30,000.00
A-26
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
495.00 495.00
UNIT TOTAL
RATE COST
(Pesos) (Pesos)
247.00 988.00
72.00 576.00
198.00 1,584.00
300.00 2,400.00
A-27
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
575,817.00
46,065.36
74,625.88
696,508.24
UNIT TOTAL
RATE COST
(Pesos) (Pesos)
A-28
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
11,004.20 22,008.40
9,190.58 9,190.58
31,198.98
13,749.33 13,749.33
11,004.20 22,008.40
11,004.20 11,004.20
46,761.93
2,000.00 2,000.00
20,000.00 20,000.00
1,000.00 1,000.00
23,000.00
100,960.91
1,500.00 3,000.00
75.00 150.00
23.00 46.00
485.00 485.00
148.00 296.00
A-29
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
UNIT TOTAL
RATE COST
(Pesos) (Pesos)
448.00 1,792.00
35.00 70.00
495.00 495.00
148.00 296.00
148.00 148.00
85.00 510.00
100.00 600.00
180.00 720.00
35.00 70.00
3,500.00 3,500.00
1,500.00 1,500.00
300.00 1,200.00
150.00 300.00
A-30
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
15,178.00
1,897.25
UNIT TOTAL
RATE COST
(Pesos) (Pesos)
250.00 500.00
998.00 499.00
35.00 35.00
10.00 60.00
35.00 70.00
250.00 500.00
A-31
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
35.00 70.00
35.00 70.00
85.00 425.00
50.00 100.00
45.00 11.25
75.00 150.00
3.08 36.96
2.50 30.00
6.50 78.00
5.67 68.04
30.00 60.00
58.00 58.00
UNIT TOTAL
RATE COST
(Pesos) (Pesos)
A-32
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
35.00 105.00
50.00 100.00
20.00 40.00
1,500.00 1,500.00
1,195.00 2,390.00
3,500.00 1,750.00
8,780.25
15.00 180.00
148.00 74.00
60.00 30.00
145.00 72.50
33.17 66.34
148.00 74.00
85.00 170.00
548.00 137.00
95.00 95.00
148.00 37.00
A-33
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
UNIT TOTAL
RATE COST
(Pesos) (Pesos)
148.00 74.00
12.00 24.00
1,033.84
A-34
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
112,672.25
9,013.78
14,602.32
136,288.35
UNIT TOTAL
RATE COST
(Pesos) (Pesos)
47,000.00 47,000.00
A-35
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
47,000.00
5,640.00
52,640.00
UNIT TOTAL
RATE COST
(Pesos) (Pesos)
A-36
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
40,149.11 40,149.11
120.00
24.00
59.68
24.44
228.12
228.12
1,824.96
40,149.11
A-37
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
40,149.11
4,817.89
44,967.01
UNIT TOTAL
RATE COST
(Pesos) (Pesos)
421,400.00 421,400.00
25,088.33 25,088.33
1,045.50 1,045.50
530.00 530.00
350.00 700.00
600.00 1,200.00
A-38
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
450,317.16
36,025.37
58,361.10
544,703.64
UNIT TOTAL
RATE COST
(Pesos) (Pesos)
25,000.00 25,000.00
13,984.95 13,984.95
10,145.83 30,437.48
15,002.31 15,002.31
84,424.74
A-39
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,000.00 1,000.00
85,424.74
6,833.98
11,071.05
103,329.76
6.00 360.00
2,800.00 2.80
90.00 180.00
48.27 482.67
482.67 4,826.67
A-41
ED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
OMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
4,826.67
386.13
625.54
5,838.34
A-42
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUP
A. LABOR
TOTAL A
B. EQUIPMENT
TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
E. MATERIALS
Usage good for 6 months
SG001 Hard Hat, Blue Eagle Pin Lock Type pc 110.00 265.00
SG006 Safety Shoes, Panoply, Jets1p Low Cut pc 110.00 1,400.00
SG011 Rain Coats Jacket and Pants Yellow, med&Large pair 80.00 650.00
SG012 Rain Coats Jacket and Pants Yellow, xLarge pair 10.00 680.00
SG013 Rain Coats Jacket and Pants Yellow, xxLarge pair 10.00 725.00
SG014 Rain Coats Jacket and Pants Yellow, xxxLarge pair 10.00 780.00
SG016 Dust Mask pc 10,560.00 50.00
SG018 Eye Goggles, Fox pair 110.00 150.00
B-1
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUP
TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
UNIT
ITEM
NO. DESCRIPTION UNIT QTY. RATE
(Pesos)
A. LABOR
TOTAL A
B. EQUIPMENT
TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
B-2
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUP
E. MATERIALS
TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
TOTAL A
B. EQUIPMENT
B-3
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUP
TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
E. MATERIALS
Recapitrulation :
UNIT
ITEM
NO. DESCRIPTION UNIT QTY. RATE
(Pesos)
A. LABOR
B-4
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUP
TOTAL A
B. EQUIPMENT
TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
E. MATERIALS
TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
B-5
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,465,000.00
1.00
TOTAL
COST
(Pesos)
280,000.00
200,000.00
200,000.00
680,000.00
0.00
680,000.00
1.00
680,000.00
29,150.00
154,000.00
52,000.00
6,800.00
7,250.00
7,800.00
528,000.00
16,500.00
B-6
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
19,800.00
785,000.00
1,465,000.00
117,200.00
189,864.00
1,772,064.00
2,489.87
2.00
TOTAL
COST
(Pesos)
75.52
59.68
183.81
135.20
712.00
13.52
725.52
860.72
2.00
430.36
B-7
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
526.73
635.55
710.00
187.23
2,059.51
2,489.87
199.19
322.69
3,011.74
690,510.67
1.00
TOTAL
COST
(Pesos)
381,942.67
381,942.67
45,568.00
B-8
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
45,568.00
427,510.67
1.00
427,510.67
263,000.00
62,000.00
75,500.00
50,000.00
70,000.00
1,500.00
4,000.00
263,000.00
263,000.00
690,510.67
55,240.85
89,490.18
835,241.70
908,000.00
1.00
TOTAL
COST
(Pesos)
240,000.00
240,000.00
B-9
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
480,000.00
0.00
480,000.00
1.00
480,000.00
128,000.00
180,000.00
120,000.00
428,000.00
908,000.00
72,640.00
117,676.80
1,098,316.80
B-10
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
Part E cont…
310g Bituminous Plant Mix Surface Course, 40mm thk at Shoulder sq.m.
310h Bituminous Plant Mix Surface Course, 35mm thk at Shoulder sq.m.
311(1)a Portland Cement Concrete Pavement, 100 mm thk. Plant Mixed 3,500psi - sq.m.
Overlay
311(1)b Portland Cement Concrete Pavement, 150 mm thk. Plant Mixed 3,500psi - Overla sq.m.
311(1)c Portland Cement Concrete Pavement, 200 mm thk. Plant Mixed 3,500psi - Overla sq.m.
Portland Cement Concrete Pavement, 230 mm thk. Plant Mixed 3,500psi -
311(1)d sq.m.
Overlay
Portland Cement Concrete Pavement, 250 mm thk. Plant Mixed 3,500psi -
311(1)e sq.m.
Overlay
Portland Cement Concrete Pavement, 280 mm thk. Plant Mixed 3,500psi
311(1)f sq.m.
Overlay
Portland Cement Concrete Pavement, 300 mm thk. Plant Mixed 3,500psi
311(1)g sq.m.
overlay
Portland Cement Concrete Pavement, 310 mm thk. Plant Mixed 3,500psi
311(1)h sq.m.
Overlay
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
Part F
401 Railing (Reinforced Concrete) l.m.
404(1) Reinforcing Steel Bars, GR. 40 kg.
405(1)a Structural Concrete, Class "A" for Bridge Structure cu.m.
405(1)b Structural Concrete, Class "A" for Foundation cu.m.
SPL 405(6)a Plastering Cement Mortar 3/8", 10mm sq.m.
SPL 405(6)b Plastering Cement Mortar, 4mm thk sq.m.
SPL 405(7)a Epoxy Injection cu.m.
SPL 405(7)b Epoxy Concrete cu.m.
SPL 405(7)c Epoxy Concrete, (Mortar) cu.m.
409 Welded Structural Steel kg.
411(a) Application of Anti-Corrosive Paints ( to Steel Members ) sq.m.
411(b) Application of Paints to Concrete sq.m.
412 Elastomeric Bearing Pad, Thickness = 30mm, Duro 60 each
413 Preformed Sponge Rubber or Cork with Sealant, Thickness=12mm. sq.m.
SPL 415 Water Proofing sq.m.
517 Metal Drain Pipe, G.I. Pipe, 150mm diameter, Sched 40 each
Part G
404(1)a Reinforcing Steel Bars, GR. 40 for Drainage Structures kg.
405(1)c Structural Concrete, Class "A" for Drainage Structures cu.m.
405(2) Structural Concrete, Class "B" cu.m.
407(1)b Lean Concrete (Drainage Structures) cu.m.
500(1) Reinforced Concrete Pipe Culvert 910mm Ø Class IV l.m.
Part G …cont
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF TH
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJEC
Part C
102,454.06 130,813.34
2,882.55 3,680.44
2,882.55 3,680.44
77,841.48 99,388.00
2,528.70 3,228.65
136.90 174.80
185.65 237.04
156.66 200.02
89.51 114.28
179.01 228.56
119.34 152.37
179.25 228.87
70.62 90.17
17.08 21.81
13.64 17.41
227.39 290.33
76.14 97.22
3,659.78 4,672.81
986.32 1,259.33
929.56 1,186.86
42.58 54.36
60.83 77.66
256.63 327.67
148.02 188.99
243.36 310.72
590.14 753.49
170.87 218.17
797.60 1,018.38
243.36 310.72
340.83 435.17
157.51 201.10
525.79 671.33
8.73 11.15
17.15 21.90
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
14.42 18.41
63.64 81.25
Part D
499.61 637.90
529.55 676.13
550.90 703.39
623.16 795.65
Part E
72.87 93.04
33.56 42.85
903.06 1,153.02
773.03 987.00
665.84 850.15
594.96 759.64
517.14 660.28
794.82 1,014.83
685.21 874.88
Part E cont…
612.39 781.90
532.08 679.36
1,199.37 1,531.36
1,199.37 1,531.36
1,533.69 1,958.22
1,840.50 2,349.95
1,842.51 2,352.51
2,106.82 2,689.99
2,415.03 3,083.51
2,522.02 3,220.11
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,780.73 2,273.64
2,042.19 2,607.47
2,380.82 3,039.84
2,487.00 3,175.41
1,361.15 1,737.92
141.35 180.47
78.01 99.60
Part F
2,367.41 3,022.70
71.99 91.92
7,099.17 9,064.22
5,139.32 6,561.89
114.94 146.76
117.83 150.44
574,934.67 734,076.59
3,105.87 3,965.57
5,700.15 7,277.95
346.06 441.84
386.50 493.48
278.58 355.69
6,360.27 8,120.79
2,041.92 2,607.12
102.39 130.73
4,446.81 5,677.69
Part G
70.20 89.63
5,659.11 7,225.56
5,179.94 6,613.75
2,182.83 2,787.04
4,609.85 5,885.86
Part G …cont
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
5,924.80 7,564.78
7,396.41 9,443.74
6,129.61 7,826.29
1,737.65 2,218.64
496.33 633.72
744.50 950.58
3,659.36 4,672.27
6,589.12 8,412.98
6,993.50 8,929.30
181.63 231.91
2,046.57 2,613.06
1,019.70 1,301.95
2,954.03 3,771.71
2,807.36 3,584.43
798.33 1,019.30
719.66 918.86
1,551.60 1,981.08
2,227.08 2,843.53
Part H
506.70 646.96
710.82 907.57
665.22 849.35
1,398.52 1,785.63
3,055.84 3,901.70
2,980.21 3,805.14
3,089.60 3,574.05
203.52 259.85
426.49 544.54
1,498.41 1,913.17
126.01 160.89
2,559.92 3,268.51
15,848.55 20,235.43
15,858.79 20,248.50
15,454.05 19,731.73
38,116.53 48,667.18
41,867.63 53,456.59
16,994.70 21,698.83
16,994.70 21,698.83
691.65 883.09
866.48 1,106.32
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
565.00 721.40
565.00 721.40
565.00 721.40
541.62 691.53
14,001.49 17,877.10
241.58 308.45
2,356.79 3,009.15
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
C-1
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C-2
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
C-3
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
C-4
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
C-5
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
C-6
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
C-7
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
C-8
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
C-9
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
C-10
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
C-11
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
C-12
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
C-13
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
C-14
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
C-15
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
C-16
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
C-17
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
C-18
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
C-19
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
C-20
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
C-21
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
C-22
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
C-23
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
C-24
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
C-25
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
C-26
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
C-27
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
C-28
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
C-29
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
C-30
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
C-31
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
C-32
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
C-33
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
C-34
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
C-35
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
C-36
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
C-37
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
C-38
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
C-39
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
C-40
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
C-41
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
C-42
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
C-43
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
C-44
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
C-45
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
C-46
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
C-47
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
C-48
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
310a Bituminous Plant Mix Surface Course - General sq.m. 1.00 773.03
(50mm thk)
101(3)b.1 Removal of Existing AC Pavement sq.m. 1.00 89.51
C-49
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
C-50
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
C-51
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
102,454.06
0.12
AMOUNT
82.29
183.81
266.10
AMOUNT
4,821.70
2,145.11
2,357.58
2,704.00
12,028.39
12,294.49
0.12
102,454.06
AMOUNT
C-52
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
102,454.06
6,147.24
8,196.32
14,015.72
130,813.34
2,882.55
1.00
AMOUNT
82.29
59.68
91.91
233.87
AMOUNT
712.00
329.29
1,384.00
23.39
2,448.68
2,682.55
C-53
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
200.00
200.00
2,882.55
172.95
230.60
394.33
3,680.44
2,882.55
1.00
AMOUNT
82.29
59.68
91.91
233.87
AMOUNT
C-54
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
23.39
2,448.68
2,682.55
1.00
2,682.55
AMOUNT
200.00
200.00
2,882.55
172.95
230.60
394.33
3,680.44
77,841.48
1.00
AMOUNT
658.30
C-55
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,870.98
AMOUNT
33,154.37
21,632.00
15,368.43
363.60
4,920.00
187.10
75,625.50
77,496.48
1.00
77,496.48
AMOUNT
345.00
345.00
77,841.48
4,670.49
6,227.32
10,648.71
C-56
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
2,528.70
2.00
AMOUNT
82.29
91.91
174.19
AMOUNT
169.00
307.50
245.00
4,144.30
17.42
4,883.22
5,057.41
2.00
2,528.70
AMOUNT
C-57
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00
2,528.70
151.72
202.30
345.93
3,228.65
136.90
4.00
AMOUNT
82.29
91.91
174.19
AMOUNT
356.00
17.42
C-58
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
373.42
547.61
4.00
136.90
AMOUNT
136.90
8.21
10.95
18.73
174.80
185.65
4.00
AMOUNT
82.29
91.91
174.19
C-59
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
551.00
17.42
568.42
742.61
4.00
185.65
AMOUNT
185.65
11.14
14.85
25.40
237.04
156.66
50.00
AMOUNT
C-60
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29
91.91
174.19
AMOUNT
4,144.30
2,145.11
1,352.00
17.42
7,658.82
7,833.02
50.00
156.66
AMOUNT
0.00
156.66
9.40
C-61
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
89.51
60.00
AMOUNT
82.29
91.91
174.19
AMOUNT
2,145.11
2,357.58
676.00
17.42
5,196.11
5,370.30
60.00
89.51
AMOUNT
C-62
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00
89.51
5.37
7.16
12.24
114.28
179.25
300.00
AMOUNT
82.29
229.76
312.05
AMOUNT
41,820.33
1,352.00
1,065.00
615.00
C-63
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
49,371.89
49,683.94
300.00
165.61
AMOUNT
13.64
13.64
179.25
10.76
14.34
24.52
228.87
187.34
32.00
AMOUNT
82.29
229.76
C-64
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
312.05
AMOUNT
3,684.77
1,352.00
615.00
31.21
5,682.97
5,995.02
32.00
187.34
AMOUNT
187.34
11.24
14.99
25.63
239.20
179.01
30.00
AMOUNT
C-65
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29
91.91
174.19
AMOUNT
2,145.11
2,357.58
676.00
17.42
5,196.11
5,370.30
30.00
179.01
AMOUNT
0.00
C-66
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
119.34
45.00
AMOUNT
82.29
91.91
174.19
AMOUNT
2,145.11
2,357.58
676.00
17.42
5,196.11
5,370.30
45.00
119.34
C-67
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00
119.34
7.16
9.55
16.33
152.37
70.62
80.00
AMOUNT
82.29
45.95
128.24
AMOUNT
2,145.11
2,687.73
676.00
C-68
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
12.82
5,521.66
5,649.90
80.00
70.62
AMOUNT
0.00
70.62
4.24
5.65
9.66
90.17
17.08
180.00
AMOUNT
82.29
45.95
C-69
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
128.24
AMOUNT
1,930.76
1,002.21
12.82
2,945.79
3,074.03
180.00
17.08
AMOUNT
0.00
17.08
1.02
1.37
2.34
21.81
13.64
140.00
C-70
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
AMOUNT
82.29
45.95
128.24
AMOUNT
151.20
615.00
1,002.21
12.82
1,781.23
1,909.48
140.00
13.64
AMOUNT
C-71
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00
13.64
0.82
1.09
1.87
17.41
90.60
65.00
AMOUNT
82.29
91.91
174.19
AMOUNT
1,921.05
2,704.00
1,072.55
17.42
5,715.03
5,889.22
65.00
C-72
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
90.60
5.44
7.25
12.39
115.68
227.39
25.00
AMOUNT
82.29
59.68
91.91
233.87
AMOUNT
2,410.85
C-73
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
23.39
5,450.82
5,684.69
25.00
227.39
AMOUNT
227.39
13.64
18.19
31.11
290.33
76.14
50.00
AMOUNT
82.29
59.68
91.91
C-74
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
233.87
AMOUNT
960.53
1,352.00
164.64
1,072.55
23.39
3,573.11
3,806.98
50.00
76.14
AMOUNT
76.14
4.57
6.09
10.42
97.22
C-75
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
AMOUNT
82.29
119.36
183.81
303.17
AMOUNT
1,502.50
2,072.15
615.00
676.00
45.45
30.32
4,941.42
5,244.59
25.00
209.78
AMOUNT
3,450.00
C-76
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
3,450.00
3,659.78
219.59
292.78
500.66
4,672.81
986.32
4.00
AMOUNT
82.29
91.91
174.19
AMOUNT
1,921.05
1,352.00
480.60
17.42
3,771.07
C-77
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
986.32
59.18
78.91
134.93
1,259.33
929.56
3.00
AMOUNT
82.29
91.91
174.19
AMOUNT
C-78
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,921.05
676.00
17.42
2,614.47
2,788.67
3.00
929.56
AMOUNT
929.56
55.77
74.36
127.16
1,186.86
42.58
40.00
AMOUNT
82.29
91.91
C-79
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
174.19
AMOUNT
960.53
551.00
17.42
1,528.95
1,703.14
40.00
42.58
AMOUNT
42.58
2.55
3.41
5.82
54.36
C-80
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
60.83
28.00
AMOUNT
82.29
91.91
174.19
AMOUNT
960.53
551.00
17.42
1,528.95
1,703.14
28.00
60.83
AMOUNT
C-81
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
60.83
3.65
4.87
8.32
77.66
256.63
5.00
AMOUNT
82.29
137.86
220.15
AMOUNT
551.00
490.00
22.01
C-82
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,063.01
1,283.16
5.00
256.63
AMOUNT
256.63
15.40
20.53
35.11
327.67
148.02
50.00
AMOUNT
82.29
119.36
201.64
AMOUNT
C-83
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,921.05
2,145.11
429.02
2,704.00
7,199.18
7,400.83
50.00
148.02
AMOUNT
148.02
8.88
11.84
20.25
188.99
243.36
20.00
AMOUNT
C-84
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
220.15
AMOUNT
1,921.05
2,704.00
22.01
4,647.07
4,867.22
20.00
243.36
AMOUNT
243.36
14.60
19.47
C-85
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
590.14
0.50
AMOUNT
82.29
183.81
266.10
AMOUNT
26.61
26.61
292.71
0.50
590.14
AMOUNT
C-86
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
590.14
35.41
47.21
80.73
753.49
170.87
60.00
AMOUNT
82.29
59.68
183.81
325.78
AMOUNT
4,821.70
2,704.00
1,921.05
447.30
C-87
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
32.58
9,926.63
10,252.41
60.00
170.87
AMOUNT
170.87
10.25
13.67
23.38
218.17
797.60
1.25
AMOUNT
82.29
183.81
C-88
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
160.34
10.65
26.61
197.59
463.69
1.25
370.96
AMOUNT
426.65
426.65
797.60
47.86
63.81
109.11
1,018.38
243.36
20.00
AMOUNT
C-89
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29
137.86
220.15
AMOUNT
1,921.05
2,704.00
22.01
4,647.07
4,867.22
20.00
243.36
AMOUNT
243.36
C-90
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
340.83
50.00
AMOUNT
82.29
91.91
174.19
AMOUNT
2,687.73
2,017.99
266.25
4,971.97
5,146.16
50.00
102.92
AMOUNT
C-91
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
237.91
237.91
340.83
20.45
27.27
46.63
435.17
157.51
4.67
AMOUNT
75.52
183.81
259.33
AMOUNT
476.22
C-92
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
476.22
735.55
4.67
157.51
AMOUNT
0.00
157.51
9.45
12.60
21.55
201.10
525.79
6.67
AMOUNT
75.52
183.81
C-93
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
259.33
AMOUNT
476.22
476.22
735.55
6.67
110.28
AMOUNT
415.52
415.52
525.79
31.55
42.06
71.93
671.33
8.73
300.00
C-94
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29
91.91
174.19
AMOUNT
160.34
2,017.99
266.25
2,444.58
2,618.77
300.00
8.73
AMOUNT
C-95
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
8.73
0.52
0.70
1.19
11.15
17.15
300.00
AMOUNT
82.29
91.91
174.19
AMOUNT
2,687.73
2,017.99
266.25
4,971.97
5,146.16
300.00
17.15
AMOUNT
C-96
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
17.15
1.03
1.37
2.35
21.90
14.42
250.00
AMOUNT
82.29
91.91
174.19
AMOUNT
2,687.73
476.22
266.25
C-97
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
3,430.20
3,604.39
250.00
14.42
AMOUNT
14.42
0.87
1.15
1.97
18.41
17.15
300.00
AMOUNT
82.29
91.91
C-98
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
174.19
AMOUNT
2,687.73
2,017.99
266.25
4,971.97
5,146.16
300.00
17.15
AMOUNT
17.15
1.03
1.37
2.35
21.90
974.63
C-99
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
AMOUNT
82.29
91.91
174.19
AMOUNT
2,687.73
2,017.99
266.25
1,184.00
130.54
6,286.51
6,460.70
250.00
25.84
AMOUNT
773.03
89.51
86.25
C-100
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
948.79
974.63
58.48
77.97
133.33
1,244.41
63.64
100.00
AMOUNT
82.29
91.91
174.19
AMOUNT
4,144.30
2,045.24
6,189.54
6,363.73
100.00
C-101
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
63.64
3.82
5.09
8.71
81.25
C-102
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
D-1
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
D-2
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
D-3
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
D-4
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
D-5
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
D-6
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
499.61
50.00
AMOUNT
82.29
91.91
174.19
AMOUNT
2,687.73
2,017.99
40.08
266.25
17.42
5,029.47
5,203.67
50.00
104.07
AMOUNT
395.54
D-7
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
395.54
499.61
29.98
39.97
68.35
637.90
529.55
90.00
AMOUNT
82.29
229.76
312.05
AMOUNT
2,357.58
2,612.80
1,184.00
1,065.00
31.21
D-8
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
7,250.59
7,562.64
90.00
84.03
AMOUNT
445.52
445.52
529.55
31.77
42.36
72.44
676.13
550.90
90.00
AMOUNT
82.29
229.76
312.05
AMOUNT
D-9
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
2,357.58
2,612.80
1,184.00
1,065.00
31.21
7,250.59
7,562.64
90.00
84.03
AMOUNT
466.87
466.87
550.90
33.05
44.07
75.36
703.39
623.16
50.00
AMOUNT
D-10
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29
91.91
174.19
AMOUNT
2,687.73
2,017.99
266.25
4,971.97
5,146.16
50.00
102.92
AMOUNT
520.24
520.24
623.16
37.39
D-11
ATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
ONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
49.85
85.25
795.65
D-12
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L09 Unskilled Laborer 3 1
Total Man-hours = 4 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-1
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
DIRECT COST Per Square Meter
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L09 Unskilled Laborer 3 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
E-2
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
DIRECT COST Per Square Meter
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 6 1
L09 Unskilled Laborer 12 1
Total Man-hours = 19 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
E-3
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
E-4
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 6 1
L09 Unskilled Laborer 12 1
Total Man-hours = 19 hours
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-5
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 6 1
L09 Unskilled Laborer 12 1
Total Man-hours = 19 hours
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-6
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 6 1
L09 Unskilled Laborer 12 1
Total Man-hours = 19 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-7
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
E-8
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
E-9
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 6 1
L09 Unskilled Laborer 12 1
Total Man-hours = 19 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-10
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
Miscellaneous(10% of Above)
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 6 1
L09 Unskilled Laborer 12 1
Total Man-hours = 19 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-11
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 6 1
L09 Unskilled Laborer 12 1
Total Man-hours = 19 hours
SUB - TOTAL A
E-12
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
E-13
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 6 1
L09 Unskilled Laborer 12 1
Total Man-hours = 19 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-14
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 8 1
Total Man-hours = 13 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-15
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 8 1
Total Man-hours = 13 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-16
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
E-17
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 8 1
Total Man-hours = 13 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
E-18
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 8 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-19
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 8 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-20
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 8 1
Total Man-hours = 13 hours
E-21
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
E-22
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-23
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-24
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
E-25
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
E-26
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-27
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
E-28
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-29
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
E-30
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
E-31
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-32
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-33
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
E-34
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
E-35
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
* Based on DO No.40
PAY ITEM NO. : 311(1)e.1
DESCRIPTION: Portland Cement Concrete Pavement, 280 mm thk. NewPavement
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-36
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
* Based on DO No.40
PAY ITEM NO. : 311(1)e.2
DESCRIPTION: Portland Cement Concrete Pavement, 280 mm thk., High
Early Strength
NO. OF
REF. NO. DESIGNATION PERSON NO. OF HOUR
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-37
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
* Based on DO No.40
PAY ITEM NO. : 311(1)e.3
DESCRIPTION: Portland Cement Concrete Pavement, 280 mm thk., High
Early Strength (On Existing ACP)
NO. OF
REF. NO. DESIGNATION PERSON NO. OF HOUR
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
E-38
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
E-39
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-40
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
* Based on DO No.40
PAY ITEM NO. : 311(1)a
DESCRIPTION: Portland Cement Concrete Pavement, 150 mm thk. Plant
Mixed 3,500psi - Overlay
NO. OF
REF. NO. DESIGNATION PERSON NO. OF HOUR
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E-41
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
* Based on DO No.40
PAY ITEM NO. : 311(1)b
DESCRIPTION: Portland Cement Concrete Pavement, 230 mm thk. Plant
Mixed 3,500psi - Overlay
REF. NO. DESIGNATION NO. OF NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-42
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
* Based on DO No.40
PAY ITEM NO. : 311(1)c
DESCRIPTION: Portland Cement Concrete Pavement, 280 mm thk. Plant
Mixed 3,500psi Overlay
NO. OF
REF. NO. DESIGNATION PERSON NO. OF HOUR
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
E-43
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
E-44
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
* Based on DO No.40
PAY ITEM NO. : 311(1)d
DESCRIPTION: Portland Cement Concrete Pavement, 300 mm thk. Plant
Mixed 3,500psi overlay
NO. OF
REF. NO. DESIGNATION PERSON NO. OF HOUR
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-45
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
* Based on DO No.40
PAY ITEM NO. : 311(1)e
DESCRIPTION: Portland Cement Concrete Pavement, 310 mm thk. Plant
Mixed 3,500psi Overlay
NO. OF
REF. NO. DESIGNATION PERSON NO. OF HOUR
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-46
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
E-47
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-49
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
E-50
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-51
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
E-52
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
E-53
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-54
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
* Based on DO No.40
PAY ITEM NO. : 311(1)g
DESCRIPTION: Portland Cement Concrete Pavement, 300 mm thk. Plant
Mixed 3,500psi overlay
NO. OF
REF. NO. DESIGNATION PERSON NO. OF HOUR
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-55
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
* Based on DO No.40
PAY ITEM NO. : 311(1)h
DESCRIPTION: Portland Cement Concrete Pavement, 310 mm thk. Plant
Mixed 3,500psi Overlay
NO. OF
REF. NO. DESIGNATION PERSON NO. OF HOUR
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
E-56
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
* Based on DO No.40
E-57
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-58
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
* Based on DO No.40
PAY ITEM NO. : 311(1)j
DESCRIPTION: Portland Cement Concrete Pavement, 250 mm thk. Exist
Plant Mixed 3,500psi Re-Blocking
NO. OF
REF. NO. DESIGNATION PERSON NO. OF HOUR
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
E-59
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
* Based on DO No.40
PAY ITEM NO. : 311(1)k
DESCRIPTION: Portland Cement Concrete Pavement, 280 mm thk. Exist.
Plant Mixed 3,500psi Re-Blocking
NO. OF
REF. NO. DESIGNATION PERSON NO. OF HOUR
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-60
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
* Based on DO No.40
PAY ITEM NO. : 311(1)l
DESCRIPTION: Portland Cement Concrete Pavement, 300 mm thk. Exist.
Plant Mixed 3,500psi Re-Blocking
NO. OF
REF. NO. DESIGNATION PERSON NO. OF HOUR
E-61
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 12 1
Total Man-hours = 17 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
E-62
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 4 1
Total Man-hours = 7 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-63
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
Assumed :
Specific Gravity of AP 30-50 = 1.03
Depth = 50 mm
Width = 6 mm
Factor = 0.05 x 0.006 x 1.03 x 1.05
= 0.00033
SUB - TOTAL E
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 4 1
Total Man-hours = 7 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-64
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 4 1
E-65
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
E-66
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L09 Unskilled Laborer 3 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
E-67
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L09 Unskilled Laborer 3 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
E-68
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
E-69
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
45.95 137.86
220.15
HOURLY RATE AMOUNT
1,585.07 1,585.07
130.54 130.54
1,715.61
1,935.75
0.30
6,452.52
UNIT COST AMOUNT
63,409.00 66,579.45
E-70
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
66,579.45
73,031.97
4,381.92
5,842.56
9,990.77
Php/ mt. 93,247.21
72.87
4.37
5.83
9.97
Php/Sq.m 93.04
82.29 82.29
45.95 137.86
220.15
HOURLY RATE AMOUNT
1,585.07 1,585.07
130.54 130.54
1,715.61
1,935.75
0.30
E-71
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
6,452.52
UNIT COST AMOUNT
57,919.00 60,814.95
60,814.95
67,267.47
4,036.05
5,381.40
9,202.19
Php/ mt. 85,887.10
33.56
2.01
2.68
4.59
Php/Sq.m 42.85
82.29 82.29
59.68 358.07
45.95 551.44
991.79
HOURLY RATE AMOUNT
E-72
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,214.73 1,214.73
1,352.00 2,704.00
2,145.11 2,145.11
1,065.00 1,065.00
99.18
7,228.02
8,219.81
171.30
47.98
UNIT COST AMOUNT
60,923.00 746.92
452.38 4.52
371.00 15.21
250.00 32.50
48.00 55.92
855.07
903.06
54.18
72.24
123.54
1,153.02
E-73
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 358.07
45.95 551.44
991.79
HOURLY RATE AMOUNT
1,833.00 1,833.00
1,214.73 1,214.73
2,145.11 2,145.11
476.22 476.22
669.10 669.10
1,352.00 2,704.00
1,065.00 1,065.00
99.18
10,206.34
11,198.13
171.30
65.37
UNIT COST AMOUNT
60,923.00 597.65
452.38 32.68
371.00 12.97
250.00 0.03
64.33
E-74
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
707.66
773.03
46.38
61.84
105.75
987.00
82.29 82.29
59.68 358.07
45.95 551.44
991.79
HOURLY RATE AMOUNT
1,833.00 1,833.00
1,214.73 1,214.73
2,145.11 2,145.11
476.22 476.22
669.10 669.10
1,352.00 2,704.00
1,065.00 1,065.00
99.18
10,206.34
11,198.13
192.72
58.11
UNIT COST AMOUNT
E-75
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
60,923.00 511.14
452.38 29.41
371.00 11.67
250.00 0.26
55.25
607.74
665.84
39.95
53.27
91.09
850.15
82.29 82.29
59.68 358.07
45.95 551.44
991.79
HOURLY RATE AMOUNT
1,833.00 1,833.00
1,352.00 2,704.00
1,214.73 1,214.73
2,145.11 2,145.11
E-76
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
476.22 476.22
669.10 669.10
1,065.00 1,065.00
99.18
10,206.34
11,198.13
214.13
52.30
UNIT COST AMOUNT
60,923.00 454.49
452.38 26.14
371.00 10.37
250.00 2.33
49.33
542.66
594.96
35.70
47.60
81.39
759.64
82.29 82.29
E-77
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
59.68 358.07
45.95 551.44
991.79
HOURLY RATE AMOUNT
1,833.00 1,833.00
1,214.73 1,214.73
476.22 476.22
669.10 669.10
1,352.00 2,704.00
2,145.11 2,145.11
1,065.00 1,065.00
99.18
10,206.34
11,198.13
249.82
44.82
UNIT COST AMOUNT
60,923.00 397.22
452.38 22.87
371.00 9.08
250.00 0.21
42.94
472.31
517.14
31.03
41.37
E-78
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
70.74
660.28
82.29 82.29
59.68 358.07
45.95 551.44
991.79
HOURLY RATE AMOUNT
1,833.00 1,833.00
1,214.73 1,214.73
476.22 476.22
669.10 669.10
1,352.00 2,704.00
2,145.11 2,145.11
1,065.00 1,065.00
99.18
10,206.34
11,198.13
187.37
59.77
UNIT COST AMOUNT
60,923.00 397.22
452.38 22.87
371.00 9.08
250.00 0.21
E-79
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
42.94
472.31
532.08
31.92
42.57
72.79
679.36
82.29 82.29
59.68 358.07
45.95 551.44
991.79
HOURLY RATE AMOUNT
1,833.00 1,833.00
1,352.00 2,704.00
1,214.73 1,214.73
2,145.11 2,145.11
476.22 476.22
669.10 669.10
1,065.00 1,065.00
99.18
E-80
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
10,206.34
11,198.13
160.60
69.73
UNIT COST AMOUNT
60,923.00 454.49
452.38 26.14
371.00 10.37
250.00 2.33
49.33
542.66
612.39
36.74
48.99
83.77
781.90
82.29 82.29
59.68 358.07
45.95 551.44
991.79
E-81
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,833.00 1,833.00
1,214.73 1,214.73
2,145.11 2,145.11
476.22 476.22
669.10 669.10
1,352.00 2,704.00
1,065.00 1,065.00
99.18
10,206.34
11,198.13
144.54
77.48
UNIT COST AMOUNT
60,923.00 511.14
452.38 29.41
371.00 11.67
250.00 0.26
55.25
607.74
685.21
41.11
54.82
93.74
874.88
E-82
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
OUTPUT/HR. 128.48
82.29 82.29
59.68 358.07
45.95 551.44
991.79
HOURLY RATE AMOUNT
1,833.00 1,833.00
1,214.73 1,214.73
2,145.11 2,145.11
476.22 476.22
669.10 669.10
1,352.00 2,704.00
1,065.00 1,065.00
99.18
10,206.34
11,198.13
128.48
87.16
UNIT COST AMOUNT
60,923.00 597.65
452.38 32.68
371.00 12.97
250.00 0.03
64.33
E-83
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
707.66
794.82
47.69
63.59
108.73
1,014.83
82.29 82.29
59.68 238.71
45.95 367.62
688.63
HOURLY RATE AMOUNT
1,833.00 1,833.00
1,184.00 1,184.00
2,185.94 2,185.94
1,065.00 1,065.00
68.86
E-84
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
6,336.80
7,025.43
271.43
25.88
UNIT COST AMOUNT
8,000.00 652.40
652.40
678.28
40.70
54.26
92.79
866.03
82.29 82.29
59.68 238.71
45.95 367.62
688.63
HOURLY RATE AMOUNT
E-85
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,833.00 1,833.00
1,184.00 1,184.00
2,185.94 2,185.94
1,065.00 1,065.00
68.86
6,336.80
7,025.43
237.50
29.58
UNIT COST AMOUNT
8,000.00 745.60
745.60
775.18
46.51
62.01
106.04
989.75
E-86
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 238.71
45.95 367.62
688.63
HOURLY RATE AMOUNT
1,833.00 1,833.00
1,184.00 1,184.00
2,185.94 2,185.94
1,065.00 1,065.00
68.86
6,336.80
7,025.43
190.00
36.98
UNIT COST AMOUNT
8,000.00 932.00
932.00
968.98
E-87
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
58.14
77.52
132.56
1,237.19
82.29 82.29
59.68 238.71
45.95 367.62
688.63
HOURLY RATE AMOUNT
1,833.00 1,833.00
1,184.00 1,184.00
2,185.94 2,185.94
1,065.00 1,065.00
68.86
6,336.80
7,025.43
271.43
25.88
UNIT COST AMOUNT
E-88
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
8,000.00 652.40
652.40
678.28
40.70
54.26
92.79
866.03
82.29 82.29
59.68 238.71
45.95 367.62
688.63
HOURLY RATE AMOUNT
1,833.00 1,833.00
1,184.00 1,184.00
2,185.94 2,185.94
1,065.00 1,065.00
68.86
E-89
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
6,336.80
7,025.43
237.50
29.58
UNIT COST AMOUNT
8,000.00 745.60
745.60
775.18
46.51
62.01
106.04
989.75
82.29 82.29
59.68 238.71
45.95 367.62
E-90
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
688.63
HOURLY RATE AMOUNT
1,833.00 1,833.00
2,185.94 2,185.94
1,184.00 1,184.00
1,065.00 1,065.00
68.86
6,336.80
7,025.43
190.00
36.98
UNIT COST AMOUNT
8,000.00 932.00
932.00
968.98
58.14
77.52
132.56
1,237.19
E-91
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
145.84 291.68
545.00 545.00
1,065.00 1,065.00
167.38 16.74
87.24
2,005.66
2,878.10
107.33
26.82
UNIT COST AMOUNT
4,578.27 686.74
75.00 21.45
68.50 169.34
40.00 14.44
E-92
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
43.88
935.84
962.66
57.76
77.01
131.69
1,229.12
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
145.84 291.68
545.00 545.00
1,065.00 1,065.00
167.38 16.74
87.24
E-93
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
2,005.66
2,878.10
107.33
26.82
UNIT COST AMOUNT
4,918.00 737.70
68.50 169.34
40.00 14.44
45.35
966.83
993.65
59.62
79.49
135.93
1,268.69
82.29 82.29
59.68 238.71
45.95 551.44
872.44
E-94
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
145.84 291.68
545.00 545.00
1,065.00 1,065.00
167.38 16.74
87.24
2,005.66
2,878.10
107.33
26.82
UNIT COST AMOUNT
4,918.00 820.08
68.50 169.34
40.00 14.44
49.47
1,053.32
1,080.14
64.81
86.41
147.76
1,379.12
E-95
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
OUTPUT/HR. 70.00
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
4,455.37
5,327.81
sq.m. / hr. 70.00
76.11
UNIT COST AMOUNT
4,578.27 1,053.00
75.00 21.75
60.00 158.46
40.00 15.77
E-96
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
62.45
1,311.43
1,387.54
83.25
111.00
189.82
1,771.62
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
4,455.37
5,327.81
E-97
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
75.00 21.75
4,288.00 986.24
60.00 158.46
40.00 15.77
58.32
1,240.54
1,316.66
79.00
105.33
180.12
1,681.11
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
E-98
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
4,455.37
5,327.81
sq.m. / hr. 70.00
76.11
UNIT COST AMOUNT
4,918.00 1,131.14
60.00 158.46
40.00 15.77
65.27
1,370.64
1,446.75
86.81
115.74
197.92
1,847.21
E-99
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
4,455.37
5,327.81
69.00
77.21
UNIT COST AMOUNT
4,578.27 1,121.68
75.00 21.45
60.00 158.86
40.00 15.83
65.89
1,383.70
1,460.91
E-100
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
87.65
116.87
199.85
1,865.30
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
4,455.37
5,327.81
67.90
78.47
UNIT COST AMOUNT
E-101
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
4,578.27 1,190.35
75.00 21.45
60.00 159.51
40.00 15.88
69.36
1,456.55
1,535.01
92.10
122.80
209.99
1,959.91
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
E-102
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
390.85 39.08
87.24
4,455.37
5,327.81
67.90
78.47
UNIT COST AMOUNT
4,918.00 1,278.68
60.00 159.51
40.00 15.88
72.70
1,526.77
1,605.24
96.31
128.42
219.60
2,049.57
82.29 82.29
59.68 238.71
45.95 551.44
E-103
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
872.44
HOURLY RATE AMOUNT
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
4,455.37
5,327.81
66.45
80.18
UNIT COST AMOUNT
4,578.27 1,281.91
75.00 21.45
60.00 159.72
40.00 15.88
73.95
1,552.91
1,633.09
97.99
130.65
223.41
2,085.13
E-104
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
4,455.37
5,327.81
66.45
80.18
UNIT COST AMOUNT
4,578.27 1,281.91
75.00 21.45
60.00 353.04
40.00 21.96
E-105
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
83.92
1,762.28
1,842.46
110.55
147.40
252.05
2,352.45
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
E-106
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
4,455.37
5,327.81
66.45
80.18
UNIT COST AMOUNT
4,918.00 1,377.04
60.00 353.04
40.00 17.92
87.40
1,835.40
1,915.58
114.93
153.25
262.05
2,445.81
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
E-107
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
4,455.37
5,327.81
66.45
80.18
UNIT COST AMOUNT
4,918.00 1,460.65
60.00 353.04
40.00 17.92
91.58
1,923.19
2,003.36
120.20
160.27
274.06
2,557.90
E-108
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
4,455.37
5,327.81
65.00
81.97
UNIT COST AMOUNT
4,578.27 1,373.48
75.00 21.68
60.00 160.60
0.80 0.13
77.79
E-109
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,633.68
1,715.64
102.94
137.25
234.70
2,190.53
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
6,241.30 6,241.30
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
10,696.67
11,569.11
107.33
107.79
UNIT COST AMOUNT
E-110
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
4,578.27 686.74
75.00 21.75
60.00 143.10
61.00 383.57
28.00 17.05
123.52
1,375.73
1,483.52
89.01
118.68
202.94
1,894.15
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
6,241.30 6,241.30
145.84 291.68
2,773.46 2,773.46
E-111
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
10,696.67
11,569.11
70.00
165.27
UNIT COST AMOUNT
4,578.27 1,053.00
75.00 21.75
60.00 143.10
61.00 383.57
43.00 26.19
160.14
1,787.75
1,953.02
117.18
156.24
267.17
2,493.62
82.29 82.29
59.68 238.71
E-112
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
45.95 551.44
872.44
HOURLY RATE AMOUNT
6,241.30 6,241.30
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
10,696.67
11,569.11
66.45
174.10
UNIT COST AMOUNT
4,578.27 1,281.91
75.00 21.45
60.00 143.10
61.00 383.57
52.00 31.67
183.00
2,044.70
2,218.81
133.13
177.50
303.53
E-113
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
2,832.97
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
6,241.30 6,241.30
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
10,696.67
11,569.11
65.00
177.99
UNIT COST AMOUNT
4,578.27 1,373.48
75.00 21.68
E-114
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
60.00 156.72
61.00 416.94
56.00 34.15
196.88
2,199.84
2,377.83
142.67
190.23
325.29
3,036.01
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
6,241.30 6,241.30
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
E-115
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
87.24
10,696.67
11,569.11
62.50
185.11
UNIT COST AMOUNT
4,578.27 1,419.26
75.00 21.68
60.00 168.36
61.00 450.30
56.00 34.15
205.96
2,299.71
2,484.81
149.09
198.79
339.92
3,172.61
82.29 82.29
59.68 238.71
45.95 551.44
872.44
E-116
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
6,241.30 6,241.30
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
10,696.67
11,569.11
107.33
107.79
UNIT COST AMOUNT
4,578.27 686.74
75.00 21.75
60.00 31.06
61.00 205.14
28.00 16.93
17.08 17.08
13.64 13.64
99.23
1,091.58
1,199.37
71.96
95.95
164.07
1,531.36
E-117
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
6,241.30 6,241.30
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
10,696.67
11,569.11
107.33
107.79
UNIT COST AMOUNT
4,578.27 686.74
75.00 21.75
60.00 31.06
61.00 205.14
28.00 16.93
17.08 17.08
13.64 13.64
E-118
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
99.23
1,091.58
1,199.37
71.96
95.95
164.07
1,531.36
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
6,241.30 6,241.30
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
10,696.67
11,569.11
84.00
E-119
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
137.73
UNIT COST AMOUNT
4,578.27 915.65
75.00 21.75
60.00 48.51
61.00 229.97
37.00 22.46
17.08 17.08
13.64 13.64
126.91
1,395.97
1,533.69
92.02
122.70
209.81
1,958.22
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
6,241.30 6,241.30
E-120
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
10,696.67
11,569.11
70.00
165.27
UNIT COST AMOUNT
4,578.27 1,053.00
75.00 21.75
60.00 95.08
61.00 296.25
43.00 26.14
17.08 17.08
13.64 13.64
152.29
1,675.23
1,840.50
110.43
147.24
251.78
2,349.95
E-121
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
6,241.30 6,241.30
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
10,696.67
11,569.11
70.00
165.27
UNIT COST AMOUNT
4,578.27 1,053.00
75.00 21.75
60.00 95.08
61.00 296.25
46.00 27.97
17.08 17.08
13.64 13.64
152.48
1,677.23
1,842.51
110.55
E-122
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
147.40
252.06
2,352.51
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
6,241.30 6,241.30
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
10,696.67
11,569.11
66.45
174.10
UNIT COST AMOUNT
E-123
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
4,578.27 1,281.91
75.00 21.45
60.00 95.08
61.00 296.25
52.00 31.62
17.08 17.08
13.64 13.64
175.70
1,932.72
2,106.82
126.41
168.55
288.21
2,689.99
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
6,241.30 6,241.30
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
E-124
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
390.85 39.08
87.24
10,696.67
11,569.11
65.00
177.99
UNIT COST AMOUNT
4,578.27 1,373.48
75.00 21.68
60.00 156.72
61.00 416.94
56.00 34.15
17.08 17.08
13.64 13.64
203.37
2,237.04
2,415.03
144.90
193.20
330.38
3,083.51
82.29 82.29
59.68 238.71
45.95 551.44
E-125
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
872.44
HOURLY RATE AMOUNT
6,241.30 6,241.30
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
87.24
10,696.67
11,569.11
62.50
185.11
UNIT COST AMOUNT
4,578.27 1,419.26
75.00 21.68
60.00 168.36
61.00 450.30
56.00 34.15
17.08 17.08
13.64 13.64
212.45
2,336.91
2,522.02
151.32
201.76
345.01
3,220.11
E-126
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
393.93 1,575.71
87.24
6,031.08
6,903.52
70.00
98.62
UNIT COST AMOUNT
4,578.27 1,053.00
75.00 21.45
60.00 173.10
61.00 281.64
E-127
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
2.94 0.0012
152.92
1,682.11
1,780.73
106.84
142.46
243.60
2,273.64
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
393.93 1,575.71
87.24
E-128
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
6,031.08
6,903.52
65.00
106.21
UNIT COST AMOUNT
4,578.27 1,144.57
75.00 21.45
60.00 226.14
61.00 367.83
2.94 0.0013
176.00
1,935.99
2,042.19
122.53
163.38
279.37
2,607.47
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
E-129
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
393.93 1,575.71
87.24
6,031.08
6,903.52
57.50
120.06
UNIT COST AMOUNT
4,578.27 1,281.91
75.00 21.45
60.00 286.26
61.00 465.61
2.94 0.0015
205.52
2,260.76
2,380.82
142.85
190.47
325.70
3,039.84
E-130
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 238.71
45.95 551.44
872.44
HOURLY RATE AMOUNT
145.84 291.68
2,773.46 2,773.46
1,065.00 1,065.00
167.38 167.38
315.25 31.52
390.85 39.08
393.93 1,575.71
87.24
6,031.08
6,903.52
55.00
125.52
UNIT COST AMOUNT
4,578.27 1,373.48
75.00 21.45
60.00 286.26
61.00 465.61
2.94 0.0015
214.68
2,361.48
E-131
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
2,487.00
149.22
198.96
340.22
3,175.41
82.29 82.29
59.68 119.36
45.95 183.81
385.46
HOURLY RATE AMOUNT
130.54 130.54
223.03 446.06
615.00 615.00
238.32
1,429.92
1,815.38
25.00
P/l.m. 72.62
P/kg 726.15
UNIT COST AMOUNT
63,500.00 63.50
E-132
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
P/l.m. 63.50
P/kg 635.00
P/kg 1,361.15
81.67
108.89
186.21
P/kg 1,737.92
82.29 82.29
59.68 119.36
45.95 183.81
385.46
HOURLY RATE AMOUNT
223.03 446.06
E-133
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
615.00 615.00
212.21
1,273.27
1,658.73
25.00
66.35
UNIT COST AMOUNT
2,500.00 62.50
12.50
75.00
141.35
8.48
11.31
19.34
180.47
82.29 82.29
59.68 119.36
45.95 183.81
E-134
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
385.46
HOURLY RATE AMOUNT
148.00 296.00
615.00 615.00
393.93 196.96
38.55
1,146.51
1,531.97
20.00
76.60
UNIT COST AMOUNT
11.77 1.18
0.24
1.41
78.01
4.68
6.24
10.67
99.60
E-135
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
45.95 137.86
220.15
HOURLY RATE AMOUNT
1,585.07 1,585.07
130.54 130.54
1,715.61
1,935.75
0.30
6,452.52
UNIT COST AMOUNT
63,409.00 66,579.45
E-136
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
66,579.45
73,031.97
4,381.92
5,842.56
9,990.77
93,247.21
82.29 82.29
45.95 137.86
220.15
HOURLY RATE AMOUNT
1,585.07 1,585.07
130.54 130.54
E-137
CTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,715.61
1,935.75
0.30
6,452.52
UNIT COST AMOUNT
57,919.00 0.00
0.00
6,452.52
387.15
516.20
882.70
8,238.57
E-138
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1 82.29
L07 Skilled Laborer 4 1 59.68
L09 Unskilled Laborer 8 1 45.95
Installation/Removal of Formworks
L01 Foreman 1 20 82.29
L07 Skilled Laborer 4 20 59.68
L09 Unskilled Laborer 8 20 45.95
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
B. EQUIPMENT
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
A. LABOR
L01 Foreman 1 1 82.29
L07 Skilled Laborer 2 1 59.68
L09 Unskilled Laborer 6 1 45.95
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
Note :
0.27 gals covers 0.00l cu m
Assumptions :
length = 1.0m
width = 5mm
depth = 200mm
Therefore :
Cost per linear meter = cost per cu.m. multiply by 0.001
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
E. MATERIALS
Mixture = 1:3
Epoxy, 81 gal = 0.25 cu.m
Sand, well graded; = 0.75 cu m
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
B. EQUIPMENT
Note :
Assumed wt. = 100 kg per l.m.
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
Note :
Coal Tar Epoxy, 1 gal covers 5 sq m at 2 coats
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
DM044 G.I. Pipe 6" (152mm) diameter, Schedule l.m. 1.50 2,770.00
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
2,367.41
0.83
AMOUNT
82.29
119.36
183.81
385.46
AMOUNT
36.46
26.17
32.44
1.50
38.55
135.11
520.57
0.83
624.93
AMOUNT
398.33
888.00
94.67
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
322.67
12.32
16.28
10.21
1,742.48
2,367.41
142.04
189.39
323.86
3,022.70
71.99
180.00
AMOUNT
82.29
119.36
367.62
569.27
AMOUNT
322.59
165.30
157.62
195.42
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
840.94
1,410.21
180.00
7.83
AMOUNT
63.00
1.16
64.16
71.99
4.32
5.76
9.85
91.92
7,099.17
10.00
AMOUNT
82.29
238.71
367.62
1,645.76
4,774.28
7,352.47
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
14,461.13
AMOUNT
5,156.57
291.68
604.02
1,072.55
266.25
1,344.13
8,735.19
23,196.32
10.00
2,319.63
AMOUNT
2,375.00
266.25
1,375.00
70.00
75.00
185.50
432.79
4,779.54
7,099.17
425.95
567.93
971.17
9,064.22
5,139.32
7.00
AMOUNT
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29
119.36
275.72
477.36
AMOUNT
1,386.00
291.68
266.25
97.20
2,041.12
2,518.49
7.00
359.78
AMOUNT
2,375.00
266.25
1,375.00
70.00
75.00
185.50
432.79
4,779.54
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
5,139.32
308.36
411.15
703.06
6,561.89
114.94
5.00
AMOUNT
82.29
119.36
183.81
385.46
AMOUNT
225.31
77.09
77.09
462.55
5.00
92.51
AMOUNT
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
8.25
3.71
9.41
1.07
22.43
114.94
6.90
9.20
15.72
146.76
117.83
4.50
AMOUNT
82.29
119.36
183.81
385.46
AMOUNT
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
77.09
77.09
462.55
4.50
102.79
AMOUNT
6.00
1.48
6.84
0.72
15.04
117.83
7.07
9.43
16.12
150.44
574,934.67
0.002
AMOUNT
82.29
119.36
183.81
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
385.46
AMOUNT
615.00
148.00
1.40
764.40
1,149.86
0.002
574,927.68
AMOUNT
6.36
0.64
6.99
574,934.67
34,496.08
45,994.77
78,651.06
734,076.59
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
3,105.87
0.40
AMOUNT
82.29
119.36
183.81
385.46
AMOUNT
615.00
148.00
38.55
801.55
1,187.00
0.40
2,967.51
AMOUNT
11.77
120.00
6.59
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
138.36
3,105.87
186.35
248.47
424.88
3,965.57
5,700.15
0.25
AMOUNT
82.29
119.36
183.81
385.46
AMOUNT
615.00
38.55
653.55
1,039.00
0.25
4,156.01
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
AMOUNT
953.77
450.00
140.38
1,544.14
5,700.15
342.01
456.01
779.78
7,277.95
346.06
50.00
AMOUNT
82.29
179.04
183.81
445.14
AMOUNT
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
114.84
45.45
391.00
44.51
595.80
1,040.94
50.00
20.82
AMOUNT
70.00
81.25
122.50
36.00
15.49
325.24
346.06
20.76
27.68
47.34
441.84
386.50
40.00
AMOUNT
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29
119.36
183.81
385.46
AMOUNT
38.55
38.55
424.00
40.00
10.60
AMOUNT
77.00
104.00
131.00
46.00
17.90
375.90
386.50
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
23.19
30.92
52.87
493.48
278.58
40.00
AMOUNT
82.29
238.71
91.91
412.91
AMOUNT
41.29
41.29
454.20
40.00
11.35
AMOUNT
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
131.00
58.50
46.00
19.00
12.73
267.23
278.58
16.71
22.29
38.11
355.69
6,360.27
4.00
AMOUNT
82.29
45.95
128.24
AMOUNT
100.00
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
12.82
112.82
241.06
4.00
60.27
AMOUNT
6,000.00
300.00
6,300.00
6,360.27
381.62
508.82
870.08
8,120.79
2,041.92
10.00
AMOUNT
82.29
59.68
45.95
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
187.92
AMOUNT
100.00
18.79
18.79
206.71
10.00
20.67
AMOUNT
1,800.00
125.00
96.25
2,021.25
2,041.92
122.52
163.35
279.33
2,607.12
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
102.39
5.00
AMOUNT
82.29
119.36
91.91
293.55
AMOUNT
8.40
8.40
301.95
5.00
60.39
AMOUNT
40.00
2.00
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
42.00
102.39
6.14
8.19
14.01
130.73
4,446.81
5.00
AMOUNT
82.29
59.68
45.95
187.92
AMOUNT
213.60
18.79
232.39
ONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
420.31
5.00
84.06
AMOUNT
4,155.00
207.75
4,362.75
4,446.81
266.81
355.74
608.32
5,677.69
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
L01 Foreman 1 1 82.29
L07 Skilled Laborer 4 1 59.68
L09 Unskilled Laborer 8 1 45.95
Total Man-hours = 13 hours
Installation/Removal of Formworks
L07 Skilled Laborer 2 2 59.68
L09 Unskilled Laborer 4 2 45.95
Total Man-hours = 12 hours
Total Man-hours = 25 hours
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
L01 Foreman 1 1 82.29
L07 Skilled Laborer 4 1 59.68
L09 Unskilled Laborer 8 1 45.95
Total Man-hours = 13 hours
Installation/Removal of Formworks
L07 Skilled Laborer 2 2 59.68
L09 Unskilled Laborer 4 2 45.95
Total Man-hours = 12 hours
Total Man-hours = 25 hours
SUB - TOTAL A
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
A. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
A. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
A. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
( Waste Factor , 5 % )
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR HOURLY RATE
UNITS
A. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
E. MATERIALS
DM087 Gabion Wire; (2.0m x 1.0m x 1.0m), PVC C bag 0.28 2,225.00
PM#09 Boulders cu.m. 1.05 586.82
Incidental/Waste Factor , ( 5 % of
Materials Cost )
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR HOURLY RATE
PERSON
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR HOURLY RATE
UNITS
A. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY UNIT COST
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP
E. MATERIALS
DM088 Mattress; (6.0m x 2.0m x 0.30m), PVC Coat bag 0.28 4,600.00
PM#09 Boulders cu.m. 1.05 586.82
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
70.20
180.00
AMOUNT
82.29
119.36
367.62
569.27
AMOUNT
165.30
157.62
195.42
518.35
1,087.62
180.00
6.04
AMOUNT
63.00
1.16
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
64.16
70.20
4.21
5.62
9.60
89.63
5,659.11
1.40
AMOUNT
82.29
238.71
367.62
238.71
367.62
1,294.96
AMOUNT
225.31
291.68
106.50
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
623.49
1,918.45
1.40
1,370.32
AMOUNT
2,375.00
284.00
962.50
49.00
185.50
432.79
4,288.79
5,659.11
339.55
452.73
774.17
7,225.56
5,179.94
1.40
AMOUNT
82.29
238.71
367.62
238.71
367.62
1,294.96
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
AMOUNT
225.31
145.84
106.50
477.65
1,772.62
1.40
1,266.15
AMOUNT
2,000.00
284.00
962.50
49.00
185.50
432.79
3,913.79
5,179.94
310.80
414.40
708.62
6,613.75
2,182.83
4.00
AMOUNT
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29
238.71
459.53
780.53
AMOUNT
225.31
145.84
106.50
477.65
1,258.18
4.00
314.55
AMOUNT
1,250.00
185.50
432.79
1,868.29
2,182.83
130.97
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
174.63
298.61
2,787.04
4,609.85
3.00
AMOUNT
82.29
119.36
183.81
385.46
AMOUNT
960.53
80.17
38.55
1,079.24
1,464.70
3.00
488.23
AMOUNT
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
175.00
14.84
47.49
3,711.32
172.97
4,121.62
4,609.85
276.59
368.79
630.63
5,885.86
5,924.80
2.00
AMOUNT
82.29
119.36
183.81
385.46
AMOUNT
960.53
80.17
38.55
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,079.24
1,464.70
2.00
732.35
AMOUNT
300.00
22.26
58.62
4,811.57
5,192.45
5,924.80
355.49
473.98
810.51
7,564.78
7,396.41
1.25
AMOUNT
82.29
119.36
183.81
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
385.46
AMOUNT
960.53
80.17
38.55
1,079.24
1,464.70
1.25
1,171.76
AMOUNT
351.00
29.68
74.20
5,769.77
6,224.65
7,396.41
443.78
591.71
1,011.83
9,443.74
6,129.61
4.00
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
AMOUNT
82.29
238.71
459.53
780.53
AMOUNT
145.84
160.34
78.05
384.23
1,164.76
4.00
291.19
AMOUNT
37.10
1,675.22
3,000.97
847.12
278.02
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
5,838.42
6,129.61
367.78
490.37
838.53
7,826.29
1,737.65
3.00
AMOUNT
82.29
59.68
183.81
325.78
AMOUNT
2,150.60
2,704.00
32.58
4,887.18
5,212.96
3.00
1,737.65
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
AMOUNT
0.00
1,737.65
104.26
139.01
237.71
2,218.64
496.33
3.00
AMOUNT
82.29
119.36
183.81
385.46
AMOUNT
1,065.00
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
38.55
1,103.55
1,489.00
3.00
496.33
AMOUNT
0.00
496.33
29.78
39.71
67.90
633.72
744.50
2.00
AMOUNT
82.29
119.36
183.81
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
385.46
AMOUNT
1,065.00
38.55
1,103.55
1,489.00
2.00
744.50
AMOUNT
0.00
744.50
44.67
59.56
101.85
950.58
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
3,659.36
0.38
AMOUNT
82.29
59.68
91.91
233.87
AMOUNT
338.00
480.26
1,065.00
50.00
23.39
1,138.39
1,372.26
0.38
3,659.36
AMOUNT
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00
3,659.36
219.56
292.75
500.60
4,672.27
6,589.12
0.38
AMOUNT
82.29
119.36
183.81
385.46
AMOUNT
405.60
576.32
1,065.00
38.55
2,085.46
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
2,470.92
0.38
6,589.12
AMOUNT
0.00
6,589.12
395.35
527.13
901.39
8,412.98
6,993.50
0.38
AMOUNT
82.29
119.36
321.67
523.32
AMOUNT
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
405.60
576.32
1,065.00
52.33
2,099.25
2,622.56
0.38
6,993.50
AMOUNT
0.00
6,993.50
419.61
559.48
956.71
8,929.30
181.63
10.00
AMOUNT
82.29
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
119.36
183.81
385.46
AMOUNT
135.20
192.11
1,065.00
38.55
1,430.85
1,816.31
10.00
181.63
AMOUNT
0.00
181.63
10.90
14.53
24.85
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
231.91
2,046.57
3.80
AMOUNT
82.29
59.68
183.81
325.78
AMOUNT
16.29
16.29
342.07
3.80
90.02
AMOUNT
948.50
586.82
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
243.36
177.87
1,956.55
2,046.57
122.79
163.73
279.97
2,613.06
2,249.24
1.50
AMOUNT
82.29
119.36
367.62
569.27
AMOUNT
225.31
53.25
28.46
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
307.03
876.30
1.50
584.20
AMOUNT
750.00
4.20
45.00
92.75
5.56
616.16
151.37
1,665.04
2,249.24
134.95
179.94
307.70
2,871.83
1,019.70
2.00
AMOUNT
82.29
179.04
275.72
537.04
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
AMOUNT
56.33
53.25
53.70
163.28
700.32
2.00
350.16
AMOUNT
8.75
0.74
308.08
270.13
49.95
31.88
669.54
1,019.70
61.18
81.58
139.49
1,301.95
2,954.03
1.56
AMOUNT
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29
119.36
367.62
569.27
AMOUNT
225.31
53.25
0.00
56.93
335.49
904.76
1.5625
579.05
AMOUNT
1,375.00
4.20
45.00
111.30
7.42
616.16
215.91
2,374.99
2,954.03
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
177.24
236.32
404.11
3,771.71
2,807.36
1.40
AMOUNT
82.29
119.36
367.62
569.27
AMOUNT
225.31
53.25
0.00
56.93
335.49
904.76
1.40
646.26
AMOUNT
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,050.00
4.20
45.00
97.39
227.21
7.42
369.70
360.18
2,161.10
2,807.36
168.44
224.59
384.05
3,584.43
798.33
3.13
AMOUNT
82.29
119.36
367.62
569.27
AMOUNT
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
0.00
569.27
3.125
182.17
AMOUNT
616.16
616.16
798.33
47.90
63.87
109.21
1,019.30
719.66
3.13
AMOUNT
82.29
91.91
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
174.19
AMOUNT
356.00
356.00
530.19
3.125
169.66
AMOUNT
550.00
550.00
719.66
43.18
57.57
98.45
918.86
1,551.60
2.50
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
AMOUNT
82.29
119.36
367.62
569.27
AMOUNT
56.93
56.93
626.19
2.50
250.48
AMOUNT
623.00
616.16
61.96
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,301.12
1,551.60
93.10
124.13
212.26
1,981.08
2,227.08
2.50
AMOUNT
82.29
119.36
367.62
569.27
AMOUNT
0.00
569.27
2.50
227.71
AMOUNT
TIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
NENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,288.00
616.16
95.21
1,999.37
2,227.08
133.62
178.17
304.66
2,843.53
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 8 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
L09 Unskilled Laborer 8 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 4 1
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 4 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E) per linear meter
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 4 1
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E) per linear meter
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E) per Linear meter
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E) per Linear meter
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E) per piece
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E) per Linear meter
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 4 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E) per linear meter
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 1 1
L09 Unskilled Laborer 2 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 1 1
L09 Unskilled Laborer 2 1
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 1 1
L09 Unskilled Laborer 2 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 1 1
L09 Unskilled Laborer 2 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 1 1
L09 Unskilled Laborer 2 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 1 1
L09 Unskilled Laborer 2 1
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 1 1
L09 Unskilled Laborer 2 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 1 1
L09 Unskilled Laborer 2 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 1 1
L09 Unskilled Laborer 2 1
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 1 1
L09 Unskilled Laborer 2 1
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L09 Unskilled Laborer 3 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 6 1
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 6 1
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 2 1
L09 Unskilled Laborer 6 1
SUB - TOTAL A
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 3 1
L09 Unskilled Laborer 6 1
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
L01 Foreman 1 1
L07 Skilled Laborer 1 1
L09 Unskilled Laborer 2 1
SUB - TOTAL A
NAME AND CAPACITY NO. OF NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
DETAILED DESIGN OF SELECTED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR O
PREVENTIVE MAINTENANCE (PM) COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PRO
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
NO. OF
REF. NO. DESIGNATION NO. OF HOUR
PERSON
A. LABOR
SUB - TOTAL A
NO. OF
NAME AND CAPACITY NO. OF HOUR
UNITS
B. EQUIPMENT
SUB - TOTAL B
TOTAL A + B
C. OUTPUT
D. UNIT COST : (A+B)/C
NAME AND SPECIFICATION UNIT QUANTITY
E. MATERIALS
SUB - TOTAL E
F. DIRECT UNIT COST, (D+E)
G. OVERHEAD, MISCELLANEOUS & CONTINGENCY ( 6% OF F)
H. PROFIT ( 8% OF F)
I. VALUE ADDED TAX ( 12% OF F+G+H)
J. TOTAL UNIT COST (F+G+H+I)
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 238.71
45.95 367.62
688.63
HOURLY RATE AMOUNT
225.31 225.31
1,065.00 53.25
145.84 145.84
68.86
214.70
903.33
17.50
51.62
UNIT COST AMOUNT
250.00 180.00
710.00 49.70
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
45.00 136.80
70.00 7.70
75.00 22.50
371.00 14.84
432.79 34.62
8.92
455.09
506.70
30.40
40.54
69.32
646.96
82.29 82.29
59.68 238.71
45.95 367.62
688.63
HOURLY RATE AMOUNT
225.31 225.31
1,065.00 53.25
145.84 145.84
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
68.86
214.70
903.33
10.30
87.70
UNIT COST AMOUNT
250.00 322.50
710.00 42.60
45.00 129.04
70.00 7.70
75.00 22.50
371.00 25.97
432.79 60.59
12.22
623.12
710.82
42.65
56.87
97.24
907.57
82.29 82.29
59.68 238.71
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
45.95 551.44
872.44
HOURLY RATE AMOUNT
545.00 545.00
2,578.28 10,313.13
1,208.03 1,208.03
2,145.11 2,145.11
1,065.00 1,065.00
145.84 291.68
167.38 167.38
43.62
15,778.95
16,651.39
161.00
103.42
UNIT COST AMOUNT
250.00 237.50
75.00 21.75
125.00 15.00
580.74 267.14
371.00 20.40
561.79
665.22
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
39.91
53.22
91.00
849.35
75.52 75.52
59.68 59.68
45.95 91.91
227.10
HOURLY RATE AMOUNT
1,102.00 55.10
22.71
77.81
304.91
4.00
76.23
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
600.00 30.00
650.00 32.50
530.00 530.00
310.72 447.44
201.10 282.35
1,322.29
1,398.52
83.91
111.88
191.32
1,785.63
75.52 75.52
59.68 59.68
45.95 91.91
227.10
HOURLY RATE AMOUNT
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,102.00 551.00
145.84 7.29
22.71
581.00
808.10
2.00
404.05
UNIT COST AMOUNT
600.00 60.00
650.00 65.00
1,450.00 1,450.00
3,722.71 353.66
310.72 453.66
201.10 269.48
2,651.79
3,055.84
183.35
244.47
418.04
3,901.70
82.29 82.29
59.68 119.36
45.95 183.81
385.46
HOURLY RATE AMOUNT
1,102.00 275.50
145.84 72.92
315.25 31.52
390.85 39.08
38.55
457.57
843.03
4.20
200.72
UNIT COST AMOUNT
60.00 311.52
55.00 4.40
710.00 33.00
45.00 90.00
70.00 5.60
2,300.00 2,300.00
15.00 45.00
3,722.71 99.36
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
2,888.88
3,089.60
185.38
247.17
51.91
3,574.05
82.29 82.29
59.68 119.36
45.95 183.81
385.46
HOURLY RATE AMOUNT
712.00 178.00
38.55
216.55
602.00
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
4.20
143.33
UNIT COST AMOUNT
2,300.00 2,300.00
15.00 9.00
2,398.39 479.68
590.14 39.54
157.51 8.66
2,836.88
2,980.21
178.81
238.42
407.69
3,805.14
75.52 75.52
59.68 477.43
45.95 91.91
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
644.85
HOURLY RATE AMOUNT
64.49
64.49
709.34
20.00
35.47
UNIT COST AMOUNT
2,400.00 72.00
2,600.00 78.00
670.00 10.05
8.00
168.05
203.52
12.21
16.28
27.84
259.85
OUTPUT : 20.00
75.52 75.52
59.68 179.04
45.95 275.72
530.27
HOURLY RATE AMOUNT
712.00 712.00
45.45 45.45
391.00 391.00
53.03
1,201.48
1,731.75
20.00
86.59
UNIT COST AMOUNT
1,625.00 162.50
2,450.00 122.50
120.00 24.00
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
30.90
339.90
426.49
25.59
34.12
58.34
544.54
75.52 75.52
59.68 59.68
45.95 91.91
227.10
HOURLY RATE AMOUNT
1,102.00 1,102.00
11.36
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,113.36
1,340.46
6.00
223.41
UNIT COST AMOUNT
1,200.00 1,200.00
15.00 75.00
1,275.00
1,498.41
89.90
119.87
204.98
1,913.17
75.52 75.52
59.68 477.43
45.95 91.91
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
644.85
HOURLY RATE AMOUNT
64.49
64.49
709.34
20.75
34.18
UNIT COST AMOUNT
600.00 77.40
670.00 10.05
4.37
91.82
126.01
7.56
10.08
17.24
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
160.89
82.29 82.29
59.68 119.36
45.95 183.81
385.46
HOURLY RATE AMOUNT
225.31 225.31
145.84 145.84
315.25 315.25
390.85 390.85
1,065.00 532.50
38.55
1,648.29
2,033.75
6.00
338.96
UNIT COST AMOUNT
60.00 798.66
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
55.00 8.86
250.00 152.80
750.00 25.13
616.67 25.84
847.12 1,209.69
2,220.96
2,559.92
153.60
204.79
350.20
3,268.51
82.29 82.29
59.68 59.68
45.95 91.91
233.87
HOURLY RATE AMOUNT
712.00 178.00
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
23.39
201.39
435.26
4.00
108.81
UNIT COST AMOUNT
7,794.60 7,794.60
4,200.00 5,334.00
2,456.10 2,456.10
590.14 129.83
157.51 25.20
15,739.74
15,848.55
950.91
1,267.88
2,168.08
20,235.43
82.29 82.29
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
59.68 59.68
45.95 91.91
233.87
HOURLY RATE AMOUNT
712.00 178.00
23.39
201.39
435.26
4.00
108.81
UNIT COST AMOUNT
7,804.84 7,804.84
4,200.00 5,334.00
2,456.10 2,456.10
590.14 129.83
157.51 25.20
15,749.98
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
15,858.79
951.53
1,268.70
2,169.48
20,248.50
82.29 82.29
59.68 59.68
45.95 91.91
233.87
HOURLY RATE AMOUNT
712.00 178.00
23.39
201.39
435.26
2.00
217.63
UNIT COST AMOUNT
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
250.00 120.00
70.00 140.00
55.00 110.00
70.00 5.60
7,880.00 7,880.00
840.00 2,604.00
15.00 180.00
371.00 9.27
432.79 21.64
11,070.51
11,288.14
677.29
903.05
1,544.22
14,412.70
82.29 82.29
59.68 59.68
45.95 91.91
233.87
HOURLY RATE AMOUNT
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
712.00 178.00
23.39
201.39
435.26
4.00
108.81
UNIT COST AMOUNT
7,400.10 7,400.10
4,200.00 5,334.00
2,456.10 2,456.10
590.14 129.83
157.51 25.20
15,345.24
15,454.05
927.24
1,236.32
2,114.11
19,731.73
82.29 82.29
59.68 59.68
45.95 91.91
233.87
HOURLY RATE AMOUNT
712.00 178.00
23.39
201.39
435.26
2.00
217.63
UNIT COST AMOUNT
250.00 120.00
70.00 140.00
55.00 110.00
70.00 5.60
7,400.10 7,400.10
840.00 2,604.00
15.00 180.00
371.00 9.27
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
432.79 21.64
10,590.61
10,808.24
648.49
864.66
1,478.57
13,799.97
82.29 82.29
59.68 59.68
45.95 91.91
233.87
HOURLY RATE AMOUNT
712.00 178.00
23.39
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
201.39
435.26
1.00
435.26
UNIT COST AMOUNT
21,796.90 21,796.90
4,200.00 10,668.00
2,456.10 4,912.21
590.14 253.76
157.51 50.40
37,681.27
38,116.53
2,286.99
3,049.32
5,214.34
48,667.18
82.29 82.29
59.68 59.68
45.95 91.91
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
233.87
HOURLY RATE AMOUNT
712.00 178.00
23.39
201.39
435.26
1.00
435.26
UNIT COST AMOUNT
25,548.00 25,548.00
4,200.00 10,668.00
2,456.10 4,912.21
590.14 253.76
157.51 50.40
41,432.37
41,867.63
2,512.06
3,349.41
5,727.49
53,456.59
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
82.29 82.29
59.68 59.68
45.95 91.91
233.87
HOURLY RATE AMOUNT
712.00 178.00
23.39
201.39
435.26
1.00
435.26
UNIT COST AMOUNT
250.00 330.00
70.00 140.00
55.00 110.00
70.00 5.60
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
13,100.00 13,100.00
840.00 2,604.00
15.00 180.00
371.00 27.08
432.79 62.75
16,559.44
16,994.70
1,019.68
1,359.58
2,324.87
21,698.83
82.29 82.29
59.68 59.68
45.95 91.91
233.87
HOURLY RATE AMOUNT
712.00 178.00
23.39
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
201.39
435.26
1.00
435.26
UNIT COST AMOUNT
250.00 330.00
70.00 140.00
55.00 110.00
70.00 5.60
13,100.00 13,100.00
840.00 2,604.00
15.00 180.00
371.00 27.08
432.79 62.75
16,559.44
16,994.70
1,019.68
1,359.58
2,324.87
21,698.83
82.29 82.29
59.68 59.68
45.95 91.91
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
233.87
HOURLY RATE AMOUNT
712.00 178.00
23.39
201.39
435.26
1.00
435.26
UNIT COST AMOUNT
250.00 330.00
70.00 140.00
55.00 110.00
70.00 5.60
20,900.00 20,900.00
840.00 2,604.00
15.00 180.00
371.00 27.08
432.79 62.75
24,359.44
24,794.70
1,487.68
1,983.58
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
3,391.91
31,657.87
82.29 82.29
59.68 59.68
45.95 91.91
233.87
HOURLY RATE AMOUNT
712.00 35.60
11.69
47.29
281.17
25.00
11.25
UNIT COST AMOUNT
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
600.00 300.00
650.00 325.00
230.00 23.00
32.40
680.40
691.65
41.50
55.33
94.62
883.09
82.29 82.29
45.95 137.86
220.15
HOURLY RATE AMOUNT
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
393.93 196.96
148.00 74.00
566.98 283.49
712.00 178.00
189.00 189.00
22.01
943.47
1,163.62
10.00
116.36
UNIT COST AMOUNT
750.00 750.00
2.94 0.12
750.12
866.48
51.99
69.32
118.53
1,106.32
82.29 82.29
59.68 119.36
45.95 275.72
477.36
HOURLY RATE AMOUNT
712.00 712.00
93.75 93.75
187.50 187.50
65.00 65.00
47.74
1,105.99
1,583.35
25.00
63.33
UNIT COST AMOUNT
477.78 477.78
23.89
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
501.67
565.00
33.90
45.20
77.29
721.40
82.29 82.29
59.68 119.36
45.95 275.72
477.36
HOURLY RATE AMOUNT
712.00 712.00
93.75 93.75
187.50 187.50
65.00 65.00
47.74
1,105.99
1,583.35
25.00
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
63.33
UNIT COST AMOUNT
477.78 477.78
23.89
501.67
565.00
33.90
45.20
77.29
721.40
82.29 82.29
59.68 119.36
45.95 275.72
477.36
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
712.00 712.00
93.75 93.75
187.50 187.50
65.00 65.00
47.74
1,105.99
1,583.35
25.00
63.33
UNIT COST AMOUNT
477.78 477.78
23.89
501.67
565.00
33.90
45.20
77.29
721.40
59.68 59.68
45.95 183.81
243.49
HOURLY RATE AMOUNT
223.03 223.03
130.54 130.54
615.00 615.00
24.35
992.92
1,236.41
10.00
123.64
UNIT COST AMOUNT
63,500.00 3,358.58
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
167.93
3,526.51
3,650.15
219.01
292.01
499.34
4,660.51
82.29 82.29
59.68 179.04
45.95 275.72
537.04
HOURLY RATE AMOUNT
712.00 712.00
93.75 93.75
187.50 187.50
65.00 65.00
53.70
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
1,111.95
1,648.99
15.00
109.93
UNIT COST AMOUNT
3,386.50 20.32
913.00 2.74
477.78 286.67
800.00 48.00
160.00 38.40
100.00 15.00
20.56
431.68
541.62
32.50
43.33
74.09
691.53
82.29 82.29
59.68 59.68
45.95 91.91
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
233.87
HOURLY RATE AMOUNT
712.00 178.00
23.39
201.39
435.26
4.00
108.81
UNIT COST AMOUNT
7,098.41 7,098.41
4,200.00 4,494.00
2,171.99 2,171.99
590.14 106.23
157.51 22.05
13,892.68
14,001.49
840.09
1,120.12
1,915.40
17,877.10
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
75.52 75.52
59.68 59.68
45.95 183.81
319.01
HOURLY RATE AMOUNT
712.00 178.00
31.90
209.90
528.91
50.00
10.58
UNIT COST AMOUNT
210.00 210.00
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
21.00
231.00
241.58
14.49
19.33
33.05
308.45
75.52 75.52
59.68 119.36
45.95 183.81
378.69
HOURLY RATE AMOUNT
712.00 178.00
TED NATIONAL ROADS FOR THE AWP 2ND YEAR AND 3RD YEAR OF THE
COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
37.87
215.87
594.55
2.00
297.28
UNIT COST AMOUNT
710.00 710.00
15.00 635.55
182.89 526.73
187.23
2,059.51
2,356.79
141.41
188.54
322.41
3,009.15
JICA ASSISTED ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
ASSET PRESERVATION CONTRACT- PREVENTIVE MAINTENANCE (APC- PM)
COST ESTIMATE
PAY
DIRECT COST
ITEM MARK UP
DESCRIPTION UNIT QUANTITY
NO. OCM PROFIT TO
UNIT COST TOTAL
% % %
(1) (2) (3) (4) (5) (6) (7) (8) (9)
Provision of Furnitures, Fixtures, Equipment and Appliances for the Combined Field
A.1.1(d) l.s. 1.00 0.00 0.00 8.00 8.00
Office, Laboratory Building and Living Quarters for the Engineer, (Schedules A & B)
COST ESTIMATE
PAY
DIRECT COST
ITEM MARK UP
DESCRIPTION UNIT QUANTITY
NO. OCM PROFIT TO
UNIT COST TOTAL
% % %
(1) (2) (3) (4) (5) (6) (7) (8) (9)
Furnish Two (2) units, 4 x 4 Pick-up Type, Double Crew Cab, 3000cc Displacement,
A.1.2(a) Diesel with factory installed air conditioner and car accessories or equivalent veh 2.00 Err:508 Err:508 -
(Brand New)
Operate and Maintain Two (2) units 4 x 4 Pick-up Type, Double Crew Cab Service
A.1.2(b) veh-mo. 120.00 Err:508 Err:508 -
Vehicles for the Engineer
Furnish Three (3) units, 2 x 4 Pick-up Type, Double Crew Cab, 2500cc
A.1.2(c) Displacement, Diesel with factory installed air conditioner and car accessories or veh 3.00 Err:508 Err:508 -
equivalent (Brand New)
Operate and Maintain Three (3) units, 4 x 2 Pick-up Type,Double Crew Cab,
A.1.2(d) veh-mo. 180.00 Err:508 Err:508 -
Service Vehicle for the Engineer
Furnish One (1) unit, Commuter 2.5M/T Van, 2.5L, Diesel with factory installed air
A.1.2(e) veh 1.00 Err:509 Err:509
conditioner and van accessories or equivalent (Brand New)
Operate and Maintain One (1) unit Type, Commuter Van, 2.5 M/T (5-speed manual
A.1.2(f) veh-mo. 60.00 Err:508 Err:508
transmission) Service Vehicle for the Engineer
Furnish, Operate and Maintain Survey Equipment and Apparatus for the Assistance
A.1.3(a) l.s. 1.00 Err:508 Err:508 8.00 8.00
to the Engineer ; (Schedule G) (Brand New)
A.1.3(b) Provision of Survey Personnel for the Assistance to the Engineer; (Schedule H) mo. 60.00 Err:508 Err:508 8.00 8.00
A.1.4 Provide Progress Photographs; (Proof prints, Negatives and E-File) set-mo. 60.00 Err:508 Err:508 8.00 8.00
JICA ASSISTED ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
ASSET PRESERVATION CONTRACT- PREVENTIVE MAINTENANCE (APC- PM)
COST ESTIMATE
PAY
DIRECT COST
ITEM MARK UP
DESCRIPTION UNIT QUANTITY
NO. OCM PROFIT TO
UNIT COST TOTAL
% % %
(1) (2) (3) (4) (5) (6) (7) (8) (9)
OST ESTIMATE
OST ESTIMATE
OST ESTIMATE
SUMMARY OF COSTS
TOTAL COST
BILL ITEM DESCRIPTION
PERCENT AMOUNT
PART A FACILITIES FOR THE ENGINEER Err:508 Err:508
CIVIL WORKS REHABILITATION, MINOR IMPROVEMENTS & MAINTENANCE BACKLOG Err:509 Err:509
1). PAVEMENT WORKS Err:509 Err:509
2). SHOULDER REFORMATION Err:509 Err:509
3). CROSSFALL REISNTATEMENT Err:509 Err:509
4). ALL PROTECTION WORKS Err:508 19,971,889.69
5). SIGNAGE & THERMOPLASTIC MARKINGS Err:508 48,138,913.64
6). RUMBLE STRIPS Err:508 819,475.39
7). CROSS DRAIN STRUCTURES; (RCBC's & RCPC's) Err:508 13,355,884.91
8). SIDE DRAINAGE STRUCTURES Err:508 19,492,597.19
9). BRIDGE CONSTRUCTION Err:509 Err:509
10). POST AND MARKER Err:508 1,158,799.14
11). MAIN JUNCTION Err:508 3,131,050.75
12). VISIBILITY OBSTRUCTION Err:508 99,371.88
13). SERVICE LEVEL BILLBOARD Err:508 72,219.59
ACP OVERLAY OVERLAY DURING INITIAL 18 MONTHS OF 5 YEAR CONTRACT PERIOD Err:508 1,859,615,402.22
310 (2) Bituminous Concrete Wearing Surface Course, 50mm thick sq.m. 13.00 430.00 131,811.00 3,984.98 3,985 3,985 3,985 3,985 1,195 1,195 3,985
310(2)a Bituminous Concrete Wearing Surface Course, 35mm thick sq.m. 13.00 550.00 0.00 -
311 (1)b Portland Cement Concrete Pavement ; (thickness 230mm) sq.m. 17.00 70.00 191,470.00 46,499.86 46,500 46,500 46,500 13,950 13,950 46,500
311 (1)c Portland Cement Concrete Pavement ; (thickness 300mm) sq.m. 17.00 65.00 0.00 - - - - - - -
Item
No. DESCRIPTION UNIT
Part C : EARTHWORKS
100 (1) Clearing and Grubbing hectare
101 (1) Removal of Structures and Obstruction lump sum
101 (2)a Removal of Existing Headwall / Wingwall and Apron, (Inlet/Outlet Structure) each
101 (2)b Removal of Existing Road Signs each
101 (2)c Removal of Existing Kilometer Post each
101 (3)a Removal of Existing PCC Pavement sq.m.
101 (3)b Removal of Existing AC Pavement, (Overlay) sq.m.
101 (3)c Removal of Existing Bridge Slope Protection sq.m.
101 (3)d Removal of Rocks, Concrete Blocks and Other Obstruction, (Heavy Materials) sq.m.
101 (3)e Removal of Debris, Trees and Other Obstruction, (Light Materials) sq.m.
101 (4)a Removal of Existing RCPC, 910mm diameter and Below l.m.
101 (4)c Removal of Existing Metal Beam Guardrails l.m.
102 (4) Surplus Unclassified Excavation, (Existing Sub-base Course, etc.) cu.m.
103 (1) Structure Excavation cu.m.
103 (3) Foundation Fill cu.m.
103 (6) Pipe Culverts and Drain Excavation cu.m.
104 (1) Embankment from Borrow Materials cu.m.
105 (1) Subgrade Preparation, Common Materials, (Compaction and Reformation) sq.m.
105 (2) Subgrade Preparation on Existing Pavement sq.m.
Part D : SUB-BASE and BASE COURSE
200 Aggregate Sub-base Course ; (thickness 200mm) cu.m.
Part E : SURFACING
300 Aggregate Surface Course; (thickness 200mm) cu.m.
302(2) Bituminous Tack Coat, (SS-1) sq.m.
613(1) Bituminous Seal Coat ; (for Joints and Crack Sealing) kg.
SPL 303 (a) Bituminous Seal Coat ; (for ACP Cracks/Joints) l.m.
SPL 303 (b) Bituminous Seal Coat ; (Epoxy Injection for PCCP Crack Sealing) l.m.
310 (1) Bituminous Concrete Binder Surface Course, 50mm thick sq.m.
310 (1)a Bituminous Concrete Binder Surface Course, 35mm thick sq.m.
310 (1)b Bituminous Concrete Binder Surface Course, 40mm thick sq.m.
310 (2) Bituminous Concrete Wearing Surface Course, 50mm thick sq.m.
310 (2)a Bituminous Concrete Wearing Surface Course, 35m thick sq.m.
311 (1)b Portland Cement Concrete Pavement ; (thickness 230mm) sq.m.
311 (1)c Portland Cement Concrete Pavement ; (thickness 300mm) sq.m.
Part F : BRIDGE WORKS
401 Railings l.m.
404 (1)a Reinforcing Steel bar, Grade 40 kg.
405 (1) Structural Concrete, Class "A" ; (fc' = 21 Mpa) cu.m.
SPL 405 (6) Plastering Cement Mortar cu.m.
SPL 405 (7)a Epoy Injection , ( Repair Cracks ) l.m.
SPL 405 (7)b Epoxy Mortar, (Repair Cracks) sq.m.
409 Welded Structural Steel kg.
411 (a) Paint, (Steel) sq.m.
411 (b) Paint, (Concrete) sq.m.
412 Elastomeric Bearing Pad, 30mm thick each
413 Preforated Joint Filler, 12mm thick sq.m.
517 Drain G.I. Pipe, 150mm diameter, schedule 40 each
Highway
Shoulder Carriageway Bridge RCBC RCPC Side Drainage
3.93 0.29
3.00
174.00
221.00
96.00
89,743.00
127,387.00 6,748.00
4,947.00
11,535.00
9,086.00
1,478.00
557.00
90,516.00 41,891.00
697.00 565.00
16.00 385.00
3,118.00
5,712.00
124,260.00 7,551.00
4,653.00
575.00
2,136.00
124,260.00 7,551.00
191,365.00 105.00
171.00
400.00
60.75
355.00
23.00
29.75
2,553.00
7,135.00
5,629.00 32.00
896.00
526.00
216.00
22,653.00 1,743.00
204.00 516.00
21.00
4.00
18.00
1,553.00
5,219.00
1,160.00 270.00
312.00
60.00
17.00
5.00
30,841.00
4,345.00
220.00
94.00
692.00
2,160.00
430.00
120.00
120.00
100.00
6.00 284.00
96.00
797.00
10,652.00
456.00
216.00
731.00
77.00
6.00 2.00
12.00
4.00
25,040.00
4,952.00
638.00
604.00
22.00
1.00
2.00
1.00
1.00
2.00
1.00
1.00
50,000,000.00
4.22
3.00
174.00
221.00
96.00
89,743.00
134,135.00
4,947.00
11,535.00
9,086.00
1,478.00
557.00
132,407.00
1,262.00
401.00
3,118.00
0.00
260,873.00
105,530.00
61,973.00
5,712.00
131,811.00
4,653.00
575.00
2,136.00
0.00
0.00
0.00
131,811.00
0.00
191,470.00
0.00
171.00
400.00
60.75
355.00
23.00
29.75
2,553.00
7,135.00
5,661.00
896.00
526.00
216.00
24,396.00
720.00
0.00
21.00
4.00
18.00
1,553.00
5,219.00
1,430.00
312.00
60.00
17.00
5.00
30,841.00
4,345.00
0.00
220.00
94.00
692.00
2,160.00
430.00
120.00
120.00
100.00
290.00
96.00
797.00
10,652.00
456.00
216.00
731.00
0.00
77.00
8.00
12.00
4.00
0.00
12,275.00
0.00
25,040.00
4,952.00
638.00
604.00
22.00
1.00
2.00
1.00
1.00
1.00
1.00
50,000,000.00
51,433,491.72
JICA ASSISTED ROAD UPGRADING AND PRESERVATION PROJECT (RUPP)
ASSET PRESERVATION CONTRACT- PREVENTIVE MAINTENANCE (APC- PM)
HYBRID, PBM - 1 MANILA NORTH ROAD
SECTION 1: ARINGAY - SANTA/VIGAN CITY ROAD SECTION
(K0243 + 000 to K0389 + 000); Length = 146.00 Km
PBM - 3: MAHARLIKA HIGHWAY, SIPOCOT - BAAO ROAD SECTION (K0370 + 700 to K0480 + 146); Le
SUMMARY OF ACTIVITY WISE ANNUAL COST FOR ENTIRE PROJECT LENGTH
EMERGENCY RESTORATION WORKS
No. Main Activity YEAR 1 YEAR 2 YEAR 3
0 3,394,626 6,594,386
0 1,432,616 2,415,900
0 1,582,352 1,582,352
0 136,568 265,296
0 16,966 32,958
0 4,091 7,947
2,995,863 0 5,113,779
79,702,180 0 79,702,180
7,681,322 0 7,681,322
5,292,540 0 5,292,540
SUMMARY OF COSTS
Station: KO370 + 700 to KO480 + 146
Length: 109.446 Km
Duration: Five (5) Years
ITEM ESTIMATED MARK-UPS IN PERCENT TOTAL MARK-UP
DESCRIPTION QUANTITY UNIT
NO. DIRECT COST OCM PROFIT %
(1) (2) (3) (4) (5) (6) (7) (8)
TOTAL Err:509
ROAD SECTION
ROAD
Err:509
50,000,000.00
Err:509
ROGELIO L. SINGSON
Secretary
DPWH
ASSET PRESERVATION CONTRACT-PREVENTIVE MAINTENANCE(APC-PM) CO
PILOT PBM - 3, (SIPOCOT ~ BAAO ROAD SECTION)
KO370 + 700 to KO480 + 146; Length = 109.446 Km
BILL OF QUANTITIES
BILL OF QUANTITIES
____________________________________
and_________________________________
centavos per month)
BILL OF QUANTITIES
BILL OF QUANTITIES
and_________________________________
centavos per vehicle-month)
BILL OF QUANTITIES
BILL OF QUANTITIES
ITIES
ITIES
ITIES
ITIES
ITIES
ITIES
BILL OF QUANTITIES
BILL OF QUANTITIES
TIES
TIES
PART C: EARTHWORKS
PART C: EARTHWORKS
_______________________________________
and ________________________________ .
centavos)
(Carried to Summary)
(Php __________________________________
_______________________________________
_______________________________________
and ________________________________ .
centavos)
and_________________________________
centavos per linear meter)
and_________________________________
centavos per cubic meter)
(Php __________________________________
and_________________________________
centavos per cubic meter)
(Carried to Summary)
(Php __________________________________
and_________________________________
centavos per kg.)
(Php __________________________________
and_________________________________
centavos per cubic meter)
(Php __________________________________
and_________________________________
centavos per cubic meter)
(Php __________________________________
and_________________________________
centavos per cubic meter)
and_________________________________
centavos per cubic meter)
_______________________________________
_______________________________________
and ________________________________ .
centavos)
#N/A
(PHP________________________________
and_________________________________
centavos per each)
_______________________________________
_______________________________________
and ________________________________ .
centavos)
BILL OF QUANTITIES
PART K: DAYWORK
BILL OF QUANTITIES
_______________________________________
and ________________________________ .
centavos)
TIES
#N/A #N/A
AINTENANCE(APC-PM) COMPONENT
O ROAD SECTION)
ngth = 109.446 Km
TIES
BILL OF QUANTITIES
BILL OF QUANTITIES
(Carried to Summary)
(Php __________________________________
_______________________________________
_______________________________________
and ________________________________ .
centavos)
TIES
#N/A #N/A
#N/A #N/A
#N/A #N/A
AINTENANCE(APC-PM) COMPONENT
O ROAD SECTION)
ngth = 109.446 Km
TIES