PART – I : STRUCTURAL
(FROM PAGE 3 TO 20)
PART–I: STRUCTURAL
TABLE OF CONTENTS
2.0 GENERAL.………………………………………….……….…………….……6
S.No. CODES
Note The above list is suggestive and not exhaustive. Apart from these basic codes any
other related codes shall also be followed wherever required.
2.0 GENERAL
2.1 This specification defines the design criteria and loads that shall be taken in to
account for the design of all industrial plant and non-plant structures and buildings for
a pipeline project. The design considerations given hereunder establish the minimum
basic requirements of reinforced concrete structures, structural steel works and
masonry structures. However, all structures shall be designed for the satisfactory
performance of the functions for which the same are to be constructed.
3.1 All shed type structures such as Compressor house, Ware house etc. shall be in
structural steel.
3.2 Pipe supports, cross over, access way, service platform shall completely be of steel
construction. All other buildings shall be as per Architectural Design Basis.
3.3 All buildings shall be of RCC Frame type construction with brick masonry walls.
3.5 Bricks for masonry works shall be of the class conforming to IS: 1077 which is locally
available.
4.1 These loadings shall be applicable to all structures irrespective of the material
employed for construction.
a. DEAD LOADS
The weight of all permanent construction including walls, fire proofing, floors, roofs,
partitions, stairways and fixed service and other equipments excluding their content.
b. EQUIPMENT LOADS
The empty weight of process equipment including all fixtures, platforms, ladders and
attached piping but excluding contents shall be considered. If piping weight is not
indicated separately or included in the weight of the equipment, the same shall be
taken as 10% of the weight of the equipment.
For horizontal equipments the weight on two supports shall be calculated based on
the total weight and C.G. of the equipment.
c. LIVE LOADS
Live loads shall, in general, be as per IS: 875. However, the following minimum live
loads shall be considered in the design of structures to account for maintenance and
erection as well.
v. Office building
vi. Laboratory
vii. Staircase
vi. Walkway
Live load on various types of roofs shall be as per the requirements given in IS: 875.
d. OPERATING LOADS
Operating loads shall include the maximum designed equipment inventory in the
operating cycle of the plant.
e. WIND LOADS
Wind loads shall generally be as per IS: 875. The basic wind speed for all the
stations/terminals shall be taken as 44 m/sec.
k2 (Terrain, height & structure size factor) = this shall be taken for relevant
class of structure with category 2
terrain w.r.t. actual height of the
structure
The design life span of all structures shall be taken as 50 years. Temporary
structures shall be designed for a design life span of 25 years. Design life span for
boundary wall/barricading structure shall be as per IS: 875.
To account for surface area of piping , platforms and other attachments fixed to
the equipment the surface area of the equipment ( vessel/column ) exposed to
wind shall be increased by 20% or as specified in the mechanical data sheet of
the equipment.
f. SEISMIC LOADS
Seismic forces shall be as per site specific seismic spectra 6987-00-16-54-DB-01 for
Seismic Zone Ill.
h. BLAST FORCES
Blast resistant control room or any other specified structure subjected to blast forces
generated due to accidental blasts from hydrocarbon ignitions shall be designed to
withstand all such forces. Design blast loads and blast resistant construction shall
conform to OISD-STD-163.
i. BUNDLE PULL
Bundle pull for different types of Exchangers shall be taken for design of their
supports unless it is made clear that bundle extractor is to be used.
j. OTHER LOADS
Apart from the specified live loads, any other equipment load or possible overloading
during construction/hydro-test/ maintenance/erection shall also be considered in the
design. Under hydro test condition the wind force shall be taken as 25% of normal
loading.
Design of all structures shall also consider any other relevant and consequential
load/stress imparted to the structure.
All liquid retaining/storage structures shall be designed assuming liquid up to the full
height of wall irrespective of provision of any over flow arrangement. Pressure relief
valves or similar pressure relieving devices shall not be made in underground water
retaining/storage RCC structures.
All buildings/structures shall be designed to resist the worst combination of the above
loads. However wind loads shall not be considered in combination with loads due to
maintenance cranes in workshop, comp. House etc.
6.1.1 Minimum depth of foundation for all structures shall be as per Geo-Technical Data.
Factors of safety against overturning and sliding shall be as per values given in
Table-1. Component of soil backfill weight over foundation slab shall be appropriately
covered as foundation dead load. For stability checks the weight of soil as
overburden shall be as per Table-1.
6.1.2 The design ground water level shall be as per the Geo-Technical Data and the
hydrostatic pressure shall be adequately accounted for in design.
6.1.3 Allowable net bearing capacity of soil shall be based on the following settlement
criteria for dead plus imposed load conditions:
For transient loadings, e.g. wind/seismic, settlement shall not be the design criteria
and the SBC (safe bearing capacity) based on shear criteria shall be considered.
6.1.5 Under blast (due to hydrocarbon explosion load combinations the design bearing
pressure of soil shall not exceed 2 (two) times the allowable static bearing pressure of
soil. Pile capacity shall be similarly increased in blast condition to 1.5 times the
permissible capacity under compression, tension and shear modes.
6.1.6 Grade of concrete to be used shall in general be as per the philosophy adopted for
the entire project However, minimum cement content, type of cement & any remedial
actions required for foundation due to aggressiveness of sub soil water shall be as
per the Geo-Technical Data.
No anti termite treatment shall be provided inside the unit areas. All buildings shall be
provided with anti termite treatment as per IS: 8944 and IS: 6313.
i) Clear distance from the edge of the base plate/base frame to the outer edge
of the pedestal shall be minimum 50mm.
ii) Clear distance from the face of pocket to the outer edge of the pedestal shall
be 100mm.
iii) Clear distance from the edge of the sleeve or anchor plate to the edge of
pedestal shall be 100mm.
The minimum thickness of grout shall be 25 mm and not more than 50mm.
All anchor bolt sleeves/pockets and spaces under column bases, shoe plates etc.
shall be grouted with free flow, non shrink (premix type) grout with 28-day minimum
cube crushing strength of 40N/mm2. Ordinary cement sand (1:2) grout shall only be
used under the base plates of cross-overs, short pipe supports (not exceeding 1.5 m
height) and small operating platforms (not exceeding 2 m height) not supporting any
equipment.
Grouting requirement for machines and equipments are not covered here. The same
shall be governed by equipment vendor’s requirement.
The specifications given hereunder shall be adopted for the non-suspended ground
floor slabs for buildings & sheds as categorised in Table-2 only.
b) Only limit state method as per IS: 456 shall be followed in the design unless
otherwise specified elsewhere in this document for special structures.
coming in contact with the liquid shall be designed according to IS:456 except ribs
of beams of suspended floor slabs & counter forts of walls (located on the side
remote from the liquid) and roof which shall be designed as uncracked section.
No increase in permissible stresses in concrete and reinforcement shall be made
under wind or seismic conditions for such structures.
e) The walls and base slabs of liquid retaining/storage structures shall be provided
with reinforcement on both faces for thickness greater than or equal to 150mm. In
all liquid retaining structures, PVC water bars (minimum size 230mm wide, 5mm
thick) shall be provided at each construction joint.
f) Hot/cold water basin and other primary framing members of Cooling towers or
similar liquid retaining structures which remain constantly in contact with water
(stored/sprayed) shall be designed as uncracked sections.
High Strength Deformed TMT steel bars of grade Fe 500 (with corrosion inhibitors in
concrete) conforming to IS: 1786 shall be used for all structures.
8.3 CONCRETE
Minimum grade of reinforced cement concrete to be used for different structures and
foundations shall be M30. From Durability considerations the minimum cement
content and maximum water-cement ratio shall be as under. However, the maximum
cement content shall not exceed 450 kg/m3.
OPC/Fly ash
based 250 0.50 320 0.45 Severe
PPC/SRC(*)
*SRC: Sulphate Resistant Cement (if required as per soil recommendation for
respective site)
75mm thick lean concrete of grade 1:5:10 shall be provided under all RCC
foundations except under base slab of liquid retaining structures where 100 thick
concrete of mix 1:3:6 shall be used. The lean concrete shall extend 50mm beyond
the foundation for normal foundations and 75mm under liquid retaining structures.
Plain Cement Concrete (PCC) of grade M15 of minimum 150mm thickness shall be
provided under all masonry wall foundations.
Plain cement concrete of grade M20 of minimum 40mm thickness shall be provided
as damp proof course at plinth level of all masonry walls and to be coated with 3mm
thick bitumen emulsion.
The following minimum clear cover shall be provided for RCC works.
- Basement
a) Walls 150mm
- Slab thickness in Raft foundations with beam & slab construction 150mm
- Parapet 75mm
a) Walls 150mm
- Underground Pit
a) Walls 150mm
a) Design, fabrication and erection of the above work shall be carried out in accordance
with the following IS Codes as applicable to the specific structures, viz. IS: 800, 801,
802, 806, 814, 816, 875, 1893, 9178, 9595, 6533, etc. Basic consideration of
structural frame work shall primarily be stability, ease of fabrication/erection and
overall economy satisfying relevant Indian Standard Codes of Practice. Simple and
fully rigid design as per IS: 800 shall be used. Where fully rigid joints are adopted
they shall generally be confined to the major axis of the column member
c) Crane gantry girders shall generally be of welded construction and of single span
length. Chequered plate shall be used for gantry girder walkway flooring.
d) Steel staircases for main approaches to operating platforms shall have channels
provided as stringers with minimum clear width of 750mm and slope of app. 41
degree. The vertical height between successive landings shall not be less than 2.6m
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
DOCUMENT No.
ENGINEERING DESIGN BASIS
STRUCTURAL & ARCHITECTURAL 6987-00-16-48-DB01
Rev. 1
Page 15 of 40
nor exceed 4.0 meters. Treads shall be minimum 230mm wide made of grating (with
suitable nosing) spaced equally so as to restrict the rise to maximum 200mm.
e) Hand rails, 1000mm high, shall be provided to all walkways, platforms, staircases.
Toe plate (100mmx5mm) shall be provided for all hand railing (except for staircases).
Spacing of uprights shall be 1500mm (maximum). Two types of hand railing shall be
provided.
ii) For platforms around circular vessels: Top rail shall be 32mm dia (NB)
galvanised MS tubes but mid rail and upright shall be of structural steel.
g) Welded connections shall be adopted as far as practicable except for the removable
members where bolted connections are required viz. (Galvanised) electrical
switchyard structures and transmission towers. Structural connections shall have
minimum two bolts of 16mm dia. unless otherwise limited by the size of members.
h) Minimum two nuts shall be used for all anchor bolts except for ladder, stair and
handrail.
Structural steel shall be of yield stress of 250 MPa conforming to grade A of IS: 2062.
RHS/SHS/CHS shall conform to Yst 310/240.
a) The limiting permissible vertical deflection for structural steel members shall
be as specified below:
b) The limiting permissible horizontal deflection for multi storied steel structure/
building including flare stack shall be Height/325.
The minimum thickness of various structural components (Hot rolled sections) shall
be as given:
a) General Construction:
Trusses, purlins, side girts & bracings 6mm
Columns, beams 7mm
Gussets in trusses & girders
The minimum thickness for rolled beams and channels shall be mean flange
thickness regardless of the web thickness.
9.7 PAINTING
10.1 General
Masonry works shall be of the class which is locally available in accordance with
IS: 1077, IS: 1905, IS: 1597, IS: 12894 and other relevant IS Codes as applicable. All
external brick masonry walls shall be of minimum 230mm thickness except for fire
walls.
All masonry work shall be constructed in cement sand mortar 1:6 except half brick
partition walls which shall be constructed in 1:4 cement sand mortar with two
numbers of 6mm diameter MS bars provided at every fourth course properly
anchored with cross walls or pillars.
Design of pipe rack & pipe supports shall be as per document no. 8-76-0020
Machine foundations shall satisfy the requirements of IS: 2974 and any other
parameter as per machine vendor.
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
DOCUMENT No.
ENGINEERING DESIGN BASIS
STRUCTURAL & ARCHITECTURAL 6987-00-16-48-DB01
Rev. 1
Page 18 of 40
Sand Filling for Ring Wall foundation shall be either by river sand or crushed Stone
Sand.
TABLE-1
Minimum Factor of safety against UPLIFT shall be 1.2 for all structures. (Note: In case
of sumps, lining weight shall not be included)
TABLE – 2
Flooring Type
S No Description
I II III
1(a) Sub Earth fill base compacted to 95%
Grade dry density.
1(b) Compacted layer of sand/boulder 200 THK. 200 THK. 150 THK.
packing over thoroughly compacted
Earth fill (in mm)
2(a) Strl Lean concrete 1:5:10 over sand 50 THK. 50 THK. 50 THK.
Grade layer (in mm)
Slab
Strl. non suspended slab in M20 150 THK. 150 THK. 100 THK.
Grade concrete (Reinforced with
8mm dia bars @200 c/c both ways)
over lean concrete.
2(b) R/F placement R/F R/F placed No R/F
placed in two layers required.
centrally at top &
bottom
3 Finish Floor finish As per As per As per
Arch Arch Detail Arch Detail
Detail
Notes:
1) Reinforcement steel shall be as per clause 8.2.
2) For Ware Houses & Work shops non suspended ground floor slabs with
above specifications shall be provided using vacuum dewatering concrete
system.
CONTENTS
2.4 AESTHETICS………………………………………………27
EIL Engineering design incorporates Codes and Standards as referred in the design
philosophy of respective engineering disciplines as well as applicable EIL standards
specifications.
Architectural design of the buildings shall be in accordance with this design basis and
references as stated above to meet the functional requirements.
The above list of Non Plant Building is subjected to finalization during detail
engineering
Spatial requirement for non-plant buildings. shall be finalized looking into the
functional requirements and its occupancy which shall be governed by Owner’s
specific requirement. Design shall be in accordance with Factory Act, NBC etc.
The above lists of Plant Buildings are subjected to finalization during detail
engineering.
Spatial requirements of these Plant Buildings shall mainly be decided based on the
equipment/panel layout, activities to be performed in the building and consequent
occupancy pattern. Sizes of various type of spaces shall be decided based on
occupancy/ equipment/Panel layout, clearances, maintenance & safety requirements.
The objective of spatial arrangement shall be to satisfy functional requirements,
physical comfort, and safety regulations as well as aesthetics.
(a) Control Room Buildings & Satellite Rack Rooms for Process Units shall be
designed as per OISD-STD 163, TAC building bye-laws and Factory Act.
Control Room Buildings shall be centrally air-conditioned, single storied
construction, designed to fully meet the Instrumentation, Electrical, HVAC,
safety and other requirements.
Control Room Buildings shall broadly consist of Console Room, Rack Room,
EC/ PLC Room, Computer Room, UPS Room, Battery Room, Operators’
Rooms, Shift-in-Charge Rooms, Supervisor’s Office accommodation,
Instruments Calibration Room, Operators’ Check and Change Room, Toilets
(Ladies & Gents), A.C. Plant/ AHU Rooms, Clean Agent Storage Room etc.
Satellite Rack Rooms shall broadly consist of Rack Room, Room, UPS Room,
Battery Room, A.C. Plant/ AHU Rooms, Clean Agent Storage Room etc.
Operators’ Rooms, Toilets (Ladies & Gents) may be provided if required.
(b) Sub-Station buildings shall be designed as per OSID –STD 149; 173;
IEA;IER; TAC building bye-laws, Factory Acts etc. Sub Stations shall be
double storied having Cable Cellar at ground floor or single storied (having
trenches for the cables) as per the Electrical requirements and Electrical
Design Basis. Sub Station Buildings shall broadly consist of Switchgear
Room, Operator’s Room, Battery Room, Other Electrical Panels’ Room,
Pressurization Room etc. as per functional requirements and Electrical design
basis. Toilets shall be provided as per requirement.
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
DOCUMENT No.
ENGINEERING DESIGN BASIS
STRUCTURAL & ARCHITECTURAL 6987-00-16-48-DB01
Rev. 1
Page 24 of 40
2.2.1.3 Units
Buildings/ Sheds of Process Units shall be designed as per Factory Act & NBC
incorporating special requirements of Licensors if any.
1. Buildings/ sheds for power receiving and distribution system utility package (as
required for utility package)
2. Buildings/ sheds for raw water system utility package (as required for utility
package)
3. Buildings/ sheds for DM water system utility package (as required for utility
package)
4. Buildings/ sheds for cooling water system utility package (as required for utility
package)
5. Buildings/ sheds for compressed air (instrument & plant) system utility package
(as required for utility package)
6. Buildings/ sheds for fuel gas system utility package (as required for utility
package)
7. Buildings/ sheds for Inert gas system utility package (as required for utility
package)
8. Buildings/ sheds for Steam generation system utility package (as required for
utility package)
9. Buildings/ sheds for condensate & condensate polishing system utility package
(as required for utility package)
10. Buildings/ sheds for emergency power system utility package (as required for
utility package)
11. Buildings/ sheds for utility & product distribution piping utility package (as required
for utility package)
Buildings/ Sheds of Process Units shall be designed as per Factory Act & NBC
incorporating special requirements of Licensors if any.
1. Buildings/ sheds for tankage/ storage facility (as required for offsite package)
2. Buildings/ sheds for resin silos and bagging facility (as required for offsite
package)
3. Buildings/ sheds for effluent system (as required for offsite package)
4. Buildings/ sheds for chemical storage (as required for offsite package)
5. Buildings/ sheds for catalyst storage (as required for offsite package)
6. Buildings/ sheds for fire fighting system (as required for offsite package)
7. Buildings/ sheds for security & surveillance system (as required for offsite
package)
8. Buildings/ sheds for loading and unloading system (as required for offsite
package)
Buildings/ Sheds of Process Units shall be designed as per Factory Act & NBC
incorporating special requirements of Licensors if any.
Established level of illumination shall be maintained for all parts of the buildings by
means of windows, ventilators etc. Provision of referenced publications like NBC part-
VIII; Section-1; IS-2440-1975; IS-3646 (part II-1996); IS-7662 (part I-1974), Factory
rule or other relevant rules etc. shall be adhered to in this regard. Openings shall be
provided with shading devices to avoid glare. For the purpose of illumination, day
lighting shall also be supplemented by artificial illumination particularly at fire-exit.
2.2.3 Ventilation
Established level of ventilation in terms of air changes per hour shall be maintained
for all spaces as per the provision of referenced publications like State Factory rules,
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
DOCUMENT No.
ENGINEERING DESIGN BASIS
STRUCTURAL & ARCHITECTURAL 6987-00-16-48-DB01
Rev. 1
Page 26 of 40
Safety from fire and like emergencies shall be taken into account in building design
as per NBC-Part IV; State Factory Rules and other relevant code/ rules. The buildings
shall be provided with exits sufficient to permit safe escape of occupants in case of
emergency. The exits shall be in terms of doorway, corridors, etc. to internal/ external
staircase or to areas having access to the outside.
Site planning of building shall take into account aspects like inter-relationship of the
buildings with the whole system, movement pattern, traffic and road net-work, safety
regulations, service network, fire safety, climatic and environmental aspects, site
conditions like site dimension, contour, drainage, noise level, view, future expansion,
visual aspects etc.
Suitable Landscaping treatment shall also be done around the important buildings.
Such treatment shall generally consist of lawns, road side plantation and
beautification of building entrance areas. Standard landscape elements such as earth
contours, pavings, flower beds, hedges, shrubs, ground cover and ornamental trees
shall be incorporated in landscape treatment. Necessary water supply/sprinklers shall
also be provided.
This service is essential for all human occupied buildings. The building shall have
toilet and drinking water facility and accordingly water supply, distribution and
drainage, sanitary services as per NBC- Part-IX: Section 1&2, Factory rules and or
referenced publication. Drinking water provisions shall be provided within an
enclosure separated from the toilets. Space for janitor shall be provided in the toilets.
All service pipes showing on the external wall shall be suitably concealed or shall be
provided within a shaft.
This service shall be provided as essential service for all the buildings. Electrical
services for building shall consist of electrical supply, and distributions, electrical
lighting installations, telephone network, fans, exhaust fans, lighting protection system
etc., all accessories, cabling etc. including Emergency power supply, all as defined
under Engg. Design Basis of Electrical.
2.4 AESTHETICS
Apart from the fulfillment of functional & safety requirement, aesthetic requirement of
the building shall be taken care of in the design. Preliminary drawings indicating
Architectural scheme shall be submitted for Owner’s approval.
Building Elements like canopies, overhangs & shading devices, gutters, roof
projections, parapets, door; window/ ventilator composition, External wall/ facade
shall be considered as contributory elements to aesthetics.
The building shall be provided with minimum 900 mm wide (100mm high from top of
Approach Road Level) plinth protection around the building.
In general, FFL of the Building shall be determined with respect to top of approach
road or pavement. Following schedule shall be adhered to for FFL of the building:
C Plant Buildings (Unit area) floors (HPP) shall be maintained as per Design
Basis of General Civil.
D. Other Buildings:
Top of approach Road level +300 mm to 450 mm and or as per functional
requirement.
Notes:
1. In case of approaches with different top levels, the highest top level of
approach road/ pavement shall be considered.
Steps/ ramps shall be provided for access to the Building for pedestrian/ vehicular,
equipment entry as per relevant code. Minimum 1000 mm wide platform shall be
provided in between entrance door and steps/ramps. Following dimensions of the
steps/ ramps shall be adhered to.
2.6.4 Walls
Notes:
1. 115 mm thk. brick partition walls (with nominal steel requirement as per
structure design) shall be provided with 230 mm thk. brick pillars for stability.
2. Wherever conduits or pipes are required to be concealed within partition wall,
the wall thickness shall be increased suitably.
3. Wherever, bricks are not commonly available, suitable alternative material
shall be used after obtaining owner’s approval.
2.6.5 Doors
Doors shall be provided for access, security and safety at all entry & exits of rooms,
functional areas & the buildings. Air tight door shall be provided in pressurized area
and in gaseous protection area. Fire check doors shall be with minimum two hours
rating as per statuary requirement. Sizes of the doors shall be determined on the
basis of the following schedule:
Notes:
1. Rolling shutters shall be provided for equipment entry for Switchgear Room/
Electrical Room, A.C. Plant Room etc.
2. Motor operated Rolling Shutters shall be provided in the main equipment entry
door.
Windows/ ventilators shall be provided in all areas for natural lighting, ventilation and
visibility at working level.
For the purposes of natural ventilation, total openable area of the windows/ventilators
shall be as per Factory Act subjected to a minimum of 15% of the floor area to be
ventilated.
For the purpose of natural lighting total glass area shall be minimum 15% of the floor
area. However, in case of offices, work places etc. windows shall be provided for the
full length of walls as per approved Architectural scheme. Areas accommodating
panels/eqpts. shall be normally provided with ventilators at high level for unobstructed
distributed lighting.
Wherever due to limitation of external wall area or any other reasons, stipulated area
of window/ ventilation for ventilation cannot be provided, suitable mechanical devices
shall be provided. For Workshop/Warehouse sheds etc. with roof sheeting etc.
suitable monitor to be provided for ventilation.
Transparent roof light sheeting shall be provided in roofing of shed type structures for
day lighting.
Canopy/overhangs shall be provided at all entries & exits for rain & sun protection.
Size of the canopy/ porch shall be decided w.r.to utility of the building and other
aesthetic. Blast proof Control Rooms shall not have any projections with outer face of
its walls except with false treatment for aesthetics of the building.
Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
DOCUMENT No.
ENGINEERING DESIGN BASIS
STRUCTURAL & ARCHITECTURAL 6987-00-16-48-DB01
Rev. 1
Page 30 of 40
Shading devices shall be provided over all windows, openable ventilators for rain &
sun protection. These devices shall be in form of horizontal projections, vertical
projected fins or combination of both as per building facade treatment. Minimum
projection shall be 600 mm.
2.6.9 Parapet
Parapets shall be of RCC for all buildings with minimum 500 mm high for non-
approachable roof and 900 mm high for approachable roof.
Gutter with rain water pipes or R.C.C. shafts shall be provided for all the building for
roof water drainage. Sizing of the gutter shall be based on area to be drained and
number of outlets. Gutters shall be of RCC. For Workshop/ Warehouse shed with
precoated roof sheeting, precoated sheets gutters may be provided and for big size of
workshops/warehouse RCC shaft may be provided at the end of gutter.
Rain water pipes shall be provided for roof water drainage. Number of rain water
pipes shall be decided on the basis of roof area, slope and rainfall intensity as per
NBC-IX Section 2. Rain water pipes shall be embedded in concrete. RCC or GI
spouts may be used for drainage of chajja/small canopies of ground floor.
This shall be provided for all entries with centrally air-conditioned spaces.
Emergency exits shall be provided for the building as per State Factory Rules, NBC-
Part IV and for individual functional spaces such as Console area, Electrical room etc.
Emergency exits shall be located in such a manner that escape route is direct,
unobstructed & without passing through any other functional areas to safe area.
2.6.14 Staircases
Staircases shall be provided for vertical circulation & emergency exits. Number of
staircases shall be based on building sizes more than 500 Sq.M ground covered area
shall have two stairs (NBC-Part IV). Emergency exit requirements shall be as per
safety distance requirement. At least one no. staircase/ladder shall be provided for
access to the flat roof top for maintenance.
2.6.15 Railings
False ceilings shall be provided in the all air-conditioned areas for the purpose of
reducing room volume and to hide air conditioned ducting etc. and also to maintain
acoustic level inside any space.
Steel gate of suitable size in front of transformer bays in substations building may be
provided as per electrical requirement.
2.7.1 GENERAL
For the purposes of schedule of Architectural finishes, buildings are categorised into
following types. colour Scheme for all Architectural items shall be as approved by the
Owner.
Type Buildings
Type A Important buildings like Administration Building / Training / Medical
centre, Main Gate/ Guard House
Type B Control Rooms, Satellite Rack Room, Sub Stations
Type C Non plant buildings like Guest house, Canteen Building, Health
Centre, Central Laboratory Building, Gate House (other than main
gate/ guard house) etc.
Type D Non plant buildings like Service Buildings, Security Barracks,
Product Ware House, Central Ware House, Construction Office
Building, Central Workshop, Central Warehouse, NCU/GCU Service
Building, Weigh Bridge, Chemical Storage Building etc. & other non
plant buildings not categorized under any other group
Type E Utility/ storage/ Process Buildings/ Sheds like DG Shed, Pump
Houses, Compressor House, Process Building/Sheds, Cement
Godown, Storage Shed, Analyzer Room etc.
Note:
In case of conflict between licensor/ process/ safety/ statutory requirement and this
schedule of Architectural finishes, the former shall override.
o Granite stone o Granite stone o Vitrified tiles o Kota stone o Kota stone
B. Office and associated areas like records/ storage, meeting/ conference room etc.:
o Vitrified tiles o Vitrified tiles o Vitrified tiles o Ceramic Tiles o Kota stone
o Granite stone o Granite stone o Vitrified Tiles o Kota stone o Kota stone
o Vitrified Tiles o Vitrified Tiles o Vitrified Tiles o Ceramic Tiles o Kota stone
o Granite Stone o Granite Stone o Vitrified Tiles o Ceramic Tiles o Ceramic Tiles
Note: In Sub Station building flooring of Toilet/ drinking water shall be of Ceramic
Tiles
F. Staircase.
o Granite Stone o Granite Stone o Marble Stone o Kota Stone o Kota Stone
o Granite stone o Granite stone o Marble stone o POP punning o Oil bound
cladding cladding cladding & Plastic distemper
emulsion paint
B. Office and associated areas like records/ storage, meeting/ conference room etc.:
o POP punning & o POP punning & o POP punning o POP punning o Oil bound
Plastic emulsion Plastic & Plastic & Plastic distemper
paint emulsion paint emulsion paint emulsion paint
o Granite stone o Granite stone o POP punning o POP punning o Oil bound
cladding up to cladding up to & Plastic & Plastic distemper
1500mm height, 1500mm emulsion paint emulsion paint
POP punning & height, POP
Plastic emulsion punning &
paint above Plastic
emulsion paint
above
Note : In Sub Station building wall finish of Circulation area shall be Oil bound
distemper
Note: In Sub Station building cladding in Toilet etc. shall be of Ceramic Tile dado
F. Staircase.
Note: In Sub Station building Staircase wall finish shall be Oil bound distemper.
o Acid resistant tiles/ epoxy coating over cement plaster up to 2500 height & oil
bound distemper above 2500 height.
J. Console Room :
B. Office and associated areas like records/ storage, meeting/ conference room etc.:
o POP punning & o POP punning & o POP punning & o POP punning & o Oil bound
Plastic emulsion Plastic emulsion Plastic emulsion Plastic distemper
paint paint paint emulsion paint
2.7.4 DOORS
D. All Electrical Room, A.C. Plant Room, Battery Room doors of all type of
Buildings
E. Toilet doors
B. Other Rooms :
o Solid type steel fire check door (with 300x300 vision panel)
B. Other Rooms :
B. Other Rooms :
o Solid type steel fire check door (with 300x300 vision panel)
o Wall hung type, o Wall hung type, o Wall hung type, o Pedestal type, o Pedestal type,
coloured coloured coloured coloured coloured
(premium (premium (premium
luxury model) luxury model) luxury model)
B. Wash Basins :
C. Urinals :
o With electronic o With electronic o With electronic o Standard Wall o Standard Wall
sensor sensor sensor hung type hung type
(premium (premium (premium
luxury model) luxury model) luxury model)